CN2749932Y - Sea wall structure - Google Patents

Sea wall structure Download PDF

Info

Publication number
CN2749932Y
CN2749932Y CNU2004200781370U CN200420078137U CN2749932Y CN 2749932 Y CN2749932 Y CN 2749932Y CN U2004200781370 U CNU2004200781370 U CN U2004200781370U CN 200420078137 U CN200420078137 U CN 200420078137U CN 2749932 Y CN2749932 Y CN 2749932Y
Authority
CN
China
Prior art keywords
reinforcement
conjuncted
sea
campshed
sea wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CNU2004200781370U
Other languages
Chinese (zh)
Inventor
刘汉龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SOIL AND ROCK ENGINEERING SCIENCE INST HEHAI UNIV
Original Assignee
SOIL AND ROCK ENGINEERING SCIENCE INST HEHAI UNIV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SOIL AND ROCK ENGINEERING SCIENCE INST HEHAI UNIV filed Critical SOIL AND ROCK ENGINEERING SCIENCE INST HEHAI UNIV
Priority to CNU2004200781370U priority Critical patent/CN2749932Y/en
Application granted granted Critical
Publication of CN2749932Y publication Critical patent/CN2749932Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a sea wall structure, which is composed of combined row piles, a reinforcement wall body, plastic drainage boards, light filling materials and an anchor rod structure, wherein the lower parts in the longitudinal vertical combined row piles of both sides are provided with vertical wall foundations which are reinforced by the vertical plastic drainage boards, a sand filled drainage layer is arranged on the wall foundations, and the reinforcement wall body is arranged on the sand filled drainage layer; the reinforcement wall body and the combined row piles are connected by the anchor rod structure and cross beams, and the light filling materials are filled between the combined row piles and the reinforcement wall body. The utility model solves the problems of long settlement time, long construction period and great sea wall settlement and settlement after construction which exist in rockfill sea walls, tube bag sand-blasting sea walls, etc. and influence sea wall quality, overcomes the defects that construction of exploding mountains and stones or tube bag sand-blasting construction are easy to cause environment pollution, shock resistance of sea walls is weak, stability is poor, cross sections of the structure are large, occupied area of sea areas is large, etc., and has low cost.

Description

A kind of novel sea wall structure
Technical field
The utility model relates to a kind of sea wall structure, particularly the sea wall structure of a kind of conjuncted campshed.
Background technology
At present, on deep soft soil foundation, build sea wall and mainly contain enrockment sea wall, pipe bag blast sea wall etc.But it is long that they exist the settlement stability time, causes the construction period long, and sea wall sedimentation and settlement after construction are big, influences the sea wall quality; Fried stone construction or the pipe bag blast construction of cutting into a mountain very easily causes environment pollution; A little less than the sea wall impact resistance, poor stability; In addition, these sea wall structure sections are big, and it is big to take oceanic area.
Summary of the invention
The purpose of this utility model just is to overcome that above-mentioned settlement after construction is big, anti-impact force is weak and defective such as construction pollution, design, a kind of novel sea wall structure of research.
The technical solution of the utility model is: a kind of novel sea wall structure, comprise the solid base of jackstone, levee body, levee crown and wave wall, its major technique is characterised in that by conjuncted campshed, the reinforcement levee body, plastic draining board, light-duty casting resin, anchor structure constitutes, both sides vertically are respectively vertical conjuncted campsheds, the bottom is the levee foundation that vertical plastic draining board is reinforced within it, what lay on it is the horizontal drainage sand cushion, it on sand mat of subgrade horizontal several rows of reinforcement levee body from bottom to up, pass through anchor structure, crossbeam is with the reinforcement levee body, conjuncted campshed connects, conjuncted campshed, add light-duty casting resin between the reinforcement levee body.
Advantage of the present utility model is with effect because vertical conjuncted campshed section is little, save soil and marine site, not controlled by the soft foundation gain in strength, can not produce the landslide unstable phenomenon, can finish settlement after construction rapidly and controlled, can not pollute in the construction surrounding enviroment, light-duty casting resin can be alleviated the effect of levee body soil pressure, plastic draining board and the acting in conjunction of horizontal drainage sand cushion and quicken ground consolidation, conjuncted campshed is the cast-in-place concrete thin-walled pile tube of large-diameter hollow, cost is low, has solved settlement after construction in the prior art greatly to the destruction of sea wall, and the defective of impact resistance difference.
Description of drawings
Fig. 1---the utility model structure section principle schematic.
The generalized section of Fig. 2---Fig. 1.
Fig. 3---another section structure principle schematic of the present utility model.
The specific embodiment
Embodiment 1:
As shown in Figure 1, 2, novel sea wall structure is vertically carried out the cast-in-place concrete thin-walled tube pile construction of conjuncted large-diameter hollow by two rows, i.e. vertically piling forms the conjuncted campshed 1 of two rows (or many rows), is the solid base 8 of jackstone in the outside of two Volleyball Association body campsheds; Vertically setting plastic draining board 3 to ground between two Volleyball Association body campsheds 1, also is several rows of vertical arrangement; Lay horizontal drainage sand cushion 4 thereon, constitute levee foundation; Laterally (conjuncted relatively campshed 1) arranges 2 several layers of reinforcement levee bodys on horizontal drainage sand cushion 4, and reinforcement levee body 2 is formed by stacking with banketing by the multilayer geo-grid, and geo-grid has been wrapped up in both sides; Anchor structure 6 is arranged between reinforcement levee body 2 and the conjuncted campshed 1, by crossbeam 7 reinforcement levee body 2 and conjuncted campshed 1 is coupled together; Add light-duty inserts 5 between reinforcement levee body 2 and conjuncted campshed 1, light-duty casting resin 5 can be flyash or light mixed soil; On the top of several layers of reinforcement levee body 2 are levee crowns 9, in levee crown 9 both sides wave wall 10 are set, and claim the wave resistance breastwork again.
Embodiment 2:
As Fig. 3 is another form of the utility model, promptly implements two conjuncted campshed 1 formed sea wall structures.

Claims (5)

1. novel sea wall structure, comprise the solid base of jackstone, levee body, levee crown and wave wall, it is characterized in that constituting by conjuncted campshed, reinforcement levee body, plastic draining board, light-duty casting resin, anchor structure, both sides vertically are respectively vertical conjuncted campsheds, the bottom is the levee foundation that vertical plastic draining board is reinforced within it, what lay on it is the horizontal drainage sand cushion, it on sand mat of subgrade horizontal several rows of reinforcement levee body from bottom to up, by anchor structure, crossbeam reinforcement levee body, conjuncted campshed are connected, add light-duty casting resin between conjuncted campshed, the reinforcement levee body.
2. a kind of novel sea wall structure according to claim 1 is characterized in that conjuncted campshed is that the cast-in-place concrete thin-walled pile tube of two row or multi-row major diameter is formed.
3. a kind of novel sea wall structure according to claim 1, it is characterized in that horizontal reinforcement levee body be by the multilayer geo-grid, banketing is formed by stacking, geo-grid has been wrapped up in both sides.
4. a kind of novel sea wall structure according to claim 1 is characterized in that light-duty casting resin is flyash or light mixed soil.
5. a kind of novel sea wall structure according to claim 1 is characterized in that anchor structure is arranged between conjuncted campshed, the reinforcement levee body.
CNU2004200781370U 2004-07-28 2004-07-28 Sea wall structure Expired - Fee Related CN2749932Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2004200781370U CN2749932Y (en) 2004-07-28 2004-07-28 Sea wall structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2004200781370U CN2749932Y (en) 2004-07-28 2004-07-28 Sea wall structure

Publications (1)

Publication Number Publication Date
CN2749932Y true CN2749932Y (en) 2006-01-04

Family

ID=35823319

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2004200781370U Expired - Fee Related CN2749932Y (en) 2004-07-28 2004-07-28 Sea wall structure

Country Status (1)

Country Link
CN (1) CN2749932Y (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007045173A1 (en) * 2005-10-19 2007-04-26 Zhenxin Chen An assembly type open caisson and a marine engineering structure
CN101892650A (en) * 2010-06-11 2010-11-24 浙江海桐高新工程技术有限公司 Combined type seawall and construction method thereof
CN102268863A (en) * 2011-06-16 2011-12-07 上海友为工程设计有限公司 Deposit-promoting dam with prism-shaped steel frame and nylon tuck net and method
CN102505662A (en) * 2011-11-10 2012-06-20 沈玉山 Flood control structure by aid of concrete poles
CN104141285A (en) * 2014-08-06 2014-11-12 浙江省水利水电勘测设计院 Seepage-proofing seawall
CN106049350A (en) * 2016-07-26 2016-10-26 浙江省水利水电勘测设计院 Anti-seepage seawall with pile foundation framework rib plate structures
CN107761663A (en) * 2017-11-08 2018-03-06 江苏科技大学 A kind of sheep pile wharf structure and its construction method
CN109113020A (en) * 2018-08-28 2019-01-01 中交上海航道局有限公司 A kind of harbour mole structure and its construction method
CN113062263A (en) * 2021-04-06 2021-07-02 山东省鲁南地质工程勘察院(山东省地勘局第二地质大队) Immersed tube filling type coal mining subsidence land treatment method

Cited By (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2007045173A1 (en) * 2005-10-19 2007-04-26 Zhenxin Chen An assembly type open caisson and a marine engineering structure
CN101892650A (en) * 2010-06-11 2010-11-24 浙江海桐高新工程技术有限公司 Combined type seawall and construction method thereof
CN101892650B (en) * 2010-06-11 2012-07-04 浙江海桐高新工程技术有限公司 Combined type seawall and construction method thereof
CN102268863B (en) * 2011-06-16 2013-03-20 上海友为工程设计有限公司 Deposit-promoting dam with prism-shaped steel frame and nylon tuck net and method
CN102268863A (en) * 2011-06-16 2011-12-07 上海友为工程设计有限公司 Deposit-promoting dam with prism-shaped steel frame and nylon tuck net and method
CN102505662B (en) * 2011-11-10 2013-12-25 沈玉山 Flood control structure by aid of concrete poles
CN102505662A (en) * 2011-11-10 2012-06-20 沈玉山 Flood control structure by aid of concrete poles
CN104141285A (en) * 2014-08-06 2014-11-12 浙江省水利水电勘测设计院 Seepage-proofing seawall
CN106049350A (en) * 2016-07-26 2016-10-26 浙江省水利水电勘测设计院 Anti-seepage seawall with pile foundation framework rib plate structures
CN107761663A (en) * 2017-11-08 2018-03-06 江苏科技大学 A kind of sheep pile wharf structure and its construction method
CN109113020A (en) * 2018-08-28 2019-01-01 中交上海航道局有限公司 A kind of harbour mole structure and its construction method
CN113062263A (en) * 2021-04-06 2021-07-02 山东省鲁南地质工程勘察院(山东省地勘局第二地质大队) Immersed tube filling type coal mining subsidence land treatment method
CN113062263B (en) * 2021-04-06 2022-06-03 山东省鲁南地质工程勘察院(山东省地勘局第二地质大队) Immersed tube filling type coal mining subsidence land treatment method

Similar Documents

Publication Publication Date Title
CN1837511B (en) Double-rowed cofferdam and method for manufacturing the same
CN103015396A (en) Construction method of soft foundation
CN2749932Y (en) Sea wall structure
CN105002916A (en) Immerseable embankment high slope interlocked ecological brick flexible protection structure and construction method
CN104404956A (en) Construction method for pedestal piles
CN201506969U (en) Large-diameter dyke tubular pile and dyke or wharf structure thereof
CN109252542B (en) Tree root pile light retaining wall for road widening and construction method thereof
CN103243678A (en) Breakwater
CN104480956A (en) Small-diameter mold-bagged concrete pile composite foundation
CN202187340U (en) Socketed pile with concrete-filled steel tube core column
CN103966996A (en) Gravel pile and manufacturing method thereof
CN101994304A (en) Construction process of applying ribbed cylindrical piles to novel diking, and diking or wharf structure thereof
CN101187207A (en) Concrete pedestal pile construction equipment and its construction method
CN201254728Y (en) Pile and earthwork cellular chamber composite foundation
CN2646215Y (en) Fixed bottom tubular pile possessing high pressure rotary churning pile foundation
CN202969405U (en) Cup-shaped concrete foundation of wind power generation tower
CN214657188U (en) Gravity foundation for reinforcing soft soil foundation by offshore wind power cemented gravel pile
CN215441846U (en) Foundation anti-settling structure
CN206233257U (en) Combined composite foundation for reinforcing inclined soft foundation
CN101899827A (en) Broken soil vibration and compaction treatment method by utilizing impact hammer in immersed tube in riprap filled foundation
CN208251014U (en) A kind of upright embankment structure of composite foundation base empty van
CN204959774U (en) Ecological brick flexible protection structure of immerseable embankment high slope interlocking formula
CN202969406U (en) Wind power generation tower foundation combining reverse frustum with free-standing column
CN103195077A (en) Dam foundation reinforcement frame structure and dam foundation reinforcement method
CN102936901A (en) Wind power tower foundation with inverted frustum and independent column combined

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee