CN208088563U - A kind of assembled compound shear wall and its with girder steel, the connecting structure of floor - Google Patents

A kind of assembled compound shear wall and its with girder steel, the connecting structure of floor Download PDF

Info

Publication number
CN208088563U
CN208088563U CN201820168261.8U CN201820168261U CN208088563U CN 208088563 U CN208088563 U CN 208088563U CN 201820168261 U CN201820168261 U CN 201820168261U CN 208088563 U CN208088563 U CN 208088563U
Authority
CN
China
Prior art keywords
steel
wall
node
shear wall
steel pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201820168261.8U
Other languages
Chinese (zh)
Inventor
刘翔
潘乃和
曹大燕
徐其功
苍久山
李俞谕
陈林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Provincial Academy of Building Research Group Co Ltd
Original Assignee
Guangdong Provincial Academy of Building Research Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Provincial Academy of Building Research Group Co Ltd filed Critical Guangdong Provincial Academy of Building Research Group Co Ltd
Priority to CN201820168261.8U priority Critical patent/CN208088563U/en
Application granted granted Critical
Publication of CN208088563U publication Critical patent/CN208088563U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model discloses a kind of assembled compound shear wall and its and girder steel, the connecting structure of floor, by pouring the connection between the realization edge member of the cast-in-place concrete in the steel pipe tube chamber of edge member and wall, the connecting structure is simple, reliably, it can ensure the site operation quality of shear wall, and, concrete and the respective advantage of steel construction can be given full play to, i.e. the compressive property of concrete and steel construction is easy for construction, ensure that assembled compound shear wall has good anti-side rigidity, relative to existing double-layer plate compound shear wall, the utility model can save 50% or more steel using amount, and concreting amount at the construction field (site) can be reduced, reduce the template amount of building at the construction field (site), to accelerate the speed of application of shear wall and reduce worker's usage amount.The connecting structure of shear wall and girder steel realizes the connection of girder steel and assembled compound shear wall using connecting node component, can save the occupied space of connecting structure.

Description

A kind of assembled compound shear wall and its with girder steel, the connecting structure of floor
Technical field
The utility model is related to a kind of assembled compound shear wall and its with girder steel, the connecting structure of floor, belong to building Standard formula structural system field can be widely applied to high residential building, apartment, office building, the civil buildings such as hotel.
Background technology
Steel building enterprise is architectural industrialization, industrialized inevitable outcome.Country continuously issues a series of in the recent period About architectural industrialization file (such as《The General Office of the State Council is about forwarding State Development and Reform Commission house town and country construction portion green building The notice of action scheme》(Office of the State Council sends out (2013) No. 1),《" 13 " assembled architecture action scheme》(build section [2017] 77 Number),《The General Office of the State Council is about the instruction for greatly developing assembled architecture》(Office of the State Council sends out [2016] No. 71)《State affairs Institute Office The public Room is about the opinion for promoting construction industry sustainable and healthy development》(Office of the State Council sends out [2017] No. 19) etc.), clearly propose development steel construction Building guides national architectural industrialization.
The assembled high residential building structural system that building trade generally uses at present has cast-in-situ steel reinforced concrete shear wall, in advance System assembly reinforced concrete shear wall, double-layer plate compound shear wall etc..The former two is both needed to live formwork, casting concrete;It needs Equal concrete reach ability form removal after design strength, and the duration is longer;Live dust is more, big with water electricity consumption, and country-driven The general orientation of green building is not very consistent.And precast concrete shear wall weight is big, transport, installation are more difficult;Clad steel board group Combination shearing wall rolled steel dosage is big, and site welding amount is big, and cost is higher.
Utility model content
Technical problem to be solved in the utility model is:There is provided a kind of assembled compound shear wall and its with girder steel, building The connecting structure of plate.
Above-mentioned technical problem is solved, technical solution is as follows used by the utility model:
A kind of assembled compound shear wall is equipped at least two edge members and several face wall bodies, per the one side wall It is both connected between adjacent two edge members, it is characterised in that:The connection type of the edge member and wall is:Institute It states edge member to be made of vertically extending steel pipe and the cast-in-place concrete being cast in the steel pipe tube chamber, and the steel pipe is used It is provided with multiple through-holes in the joint face being connected with the wall, each through-hole vertically arranged for interval;The wall Body is prefabricated reinforced concrete wall, and multigroup horizontal reinforcement of the reinforced concrete wall is reserved with steel bar end, described in each The joint face that steel bar end is used to be connected with the edge member from the wall extend out to the concrete parts of the wall Except;The joint face of the edge member is mutually close to the joint face of the wall, and two sides of the edge member with The both sides metope of the wall is close to concordant, also, each through-hole of the edge member at least corresponds to the wall A steel bar end, each steel bar end of the wall stretched into before the cast-in-place concrete pours by corresponding through-hole Into the steel pipe tube chamber of the edge member so that each steel bar end is embedded in the cast-in-place concrete of the edge member.
As preferred embodiments of the present invention:The joint face of the wall reserves multiple edge cavitys, Ge Gesuo It is corresponding with the quantity of each through-hole of the edge member and position to state edge cavity, and the two neighboring edge cavity it Between be connected by groove so that can be by the edge member when cast-in-place concrete is poured into the steel pipe tube chamber Each through-hole be flowed into corresponding edge cavity.
As preferred embodiments of the present invention:The steel pipe cross section "-" type of the edge member, L-type, T-type and One kind in cross.
As preferred embodiments of the present invention:The steel pipe intracavitary of the edge member is equipped with several blocks of separation steel The tube chamber of the steel pipe is divided into multiple vertically extending tube chambers by plate.
As preferred embodiments of the present invention:The assembled compound shear wall corresponds to each edge Component is equipped with one group of vertical anchor bar, which stretches into corresponding edge component before the cast-in-place concrete pours Steel pipe tube chamber in so that the vertical anchor bar is embedded in the cast-in-place concrete of corresponding edge component.
A kind of connecting structure of assembled compound shear wall and girder steel, it is characterised in that:The connecting structure by girder steel, Connecting node component connects composition with above-mentioned assembled compound shear wall;
The connecting node component be welded to connect by node body, upper node steel plate, lower node steel plate and perpendicular rib steel plate and At;Two pieces of junction steel plates that the node body extends by joint steel pipe and by the joint steel pipe are constituted, and the company It connects and has poured node cast-in-place concrete in the tube chamber of steel pipe, wherein combined with the assembled cross section of the joint steel pipe The steel pipe cross section of the edge member of shear wall is identical, extending direction of the two pieces of junction steel plates each parallel to the girder steel; The upper node steel plate and lower node steel plate are vertically welded between two pieces of junction steel plates, the perpendicular rib steel plate vertical welding It is connected between the upper node steel plate and lower node steel plate, and the upper node steel plate, lower node steel plate and perpendicular rib steel plate hang down It is directly welded on the side of the joint steel pipe;Also, the joint steel pipe with the assembled compound shear wall for being connected The joint face connect is provided with multiple node through-holes, each node through-hole vertically arranged for interval;
The wall of the assembled compound shear wall and edge member for being connected with the connecting node component it Between there are the differences in height for being adapted to the connecting node component, and the wall also has multigroup horizontal reinforcement to be reserved with joint reinforcing bar Head, each described joint reinforcing bar head is except the concrete parts that the joint face of the wall extend out to the wall;Institute The joint face for stating joint steel pipe is mutually close to the joint face of the wall, and two sides of the joint steel pipe and the wall Both sides metope close to concordant, the bottom surface of the joint steel pipe and the steel pipe top surface of the edge member are welded to connect, described The node cast-in-place concrete of connecting node component and the cast-in-place concrete formed by integrally casting of the edge member, also, the connection Each node through-hole of node component at least corresponds to a joint reinforcing bar head of the wall, the joint reinforcing bar of the wall Head extend into the connection of the connecting node component before the node cast-in-place concrete pours by corresponding node through-hole In steel pipe tube chamber so that each joint reinforcing bar head is embedded in the node cast-in-place concrete of the connecting node component;
The girder steel is H profile steel beam or steel beam with box shape, when the girder steel is H profile steel beam, the end face of the H profile steel beam and institute The upper node steel plate end face, lower node steel plate end face and perpendicular rib steel plate end face for stating connecting node component are welded to connect, when the steel When beam is steel beam with box shape, the upper node steel plate end face of the end face of the steel beam with box shape and the connecting node component, lower node steel plate End face and two pieces of junction steel plate end faces are welded to connect.
As preferred embodiments of the present invention:The joint face of the wall reserves multiple node cavitys, Ge Gesuo It is corresponding with the quantity of each node through-hole of the connecting node component and position to state node cavity, and the two neighboring section It is connected by groove between point cavity so that the node cast-in-place concrete is poured into the connection steel of the connecting node component It can be flowed into corresponding node cavity by each node through-hole of the connecting node component when in pipe tube chamber.
A kind of connecting structure of assembled compound shear wall and floor, it is characterised in that:The connecting structure is by floor Composition is connected with above-mentioned assembled compound shear wall;The wall pre-embedded of the assembled compound shear wall, which has, is vertically pierced by its metope Reserved plate muscle, and the metope of the wall is reserved with metope cavity;The floor is by floor bar and floor cast-in-place concrete Composition, the floor bar of the floor and the reserved plate muscle of the assembled compound shear wall are welded to connect, the building of the floor Plate cast-in-place concrete is flowed into when being poured in the metope cavity of the assembled compound shear wall.
Compared with prior art, the utility model has the advantages that:
First, the utility model realizes edge member by pouring the cast-in-place concrete in the steel pipe tube chamber of edge member Connection between wall, the connecting structure is simple, reliable, can ensure the site operation quality of shear wall, also, can be abundant Concrete (i.e. reinforced concrete wall, cast-in-place concrete) and steel construction (i.e. the steel pipe of edge member) the respective advantage of performance, i.e., The compressive property of concrete and steel construction it is easy for construction, it is ensured that assembled compound shear wall has good anti-side rigidity, Relative to existing double-layer plate compound shear wall, the utility model can save 50% or more steel using amount, and can reduce Concreting amount, the template amount of building of reduction at the construction field (site) of construction site, to accelerate the speed of application of shear wall and subtract Few worker's usage amount.
In addition, the high residential building system of opposite pure steel structure, the utility model can significantly reduce horizontal displacement, ensure outer The density of wall plate piecing, safety;Also, the reinforced concrete wall used due to the utility model is as wall, at wall Fireproof coating can not be had to, and due to being perfused with cast-in-place concrete in edge member, it is possibility to have effect reduces fireproof coating dosage.
Second, the utility model reserves edge cavity by the joint face in wall so that cast-in-place concrete is poured into steel It can be flowed into corresponding edge cavity by each through-hole of edge member when in pipe tube chamber, edge can be further enhanced Bonding strength between component and wall.
Third, the utility model can extensions different from wall composition using the seldom edge member of steel pipe cross-sectional form The assembled compound shear wall in direction, and the thickness used needed for the steel pipe of edge member is also seldom, therefore, the steel of edge member Tubing type is seldom, advantageous prefabricated and use and factory's mass production so that assembled compound shear wall being capable of convenient root It needs to choose suitable edge member and wall from limited type according to design, meets the industrialization of assembled compound shear wall Requirement, can match with the requirement of building industrialization in industrial chain tissue, technical qualification, business accounting etc..
4th, the assembled compound shear wall of the utility model and the connecting structure of girder steel utilize connecting node component real The connection of girder steel and assembled compound shear wall is showed, the connection reliability is high, is produced convenient for industrialized construction, also, connects Node component can be concordant with the holding of the metope of assembled compound shear wall without protrusion, and the occupancy that can save connecting structure is empty Between.
5th, the assembled compound shear wall of the utility model and the connecting structure of floor keep the floor of floor cast-in-place mixed Solidifying soil is flowed into when being poured in the metope cavity of the assembled compound shear wall, can be improved floor and be combined with assembled Bonding strength between shear wall.
Description of the drawings
The utility model is described in further detail in the following with reference to the drawings and specific embodiments:
Fig. 1 is the structural schematic diagram of the assembled compound shear wall of the utility model example one and the connecting structure of girder steel;
Fig. 2 is the sectional view of the assembled compound shear wall in Fig. 1;
Fig. 3 is the dimensional structure diagram of girder steel 4, connecting node component 5 and edge member 1 in Fig. 1;
Fig. 4 is the dimensional structure diagram of wall 2 in Fig. 1;
Fig. 5 is the sectional view of the assembled compound shear wall of the utility model example two;
Fig. 6 is the sectional view of the assembled compound shear wall of the utility model example three;
Fig. 7 is the sectional view of the assembled compound shear wall of the utility model example four;
Fig. 8 is the sectional view of the assembled compound shear wall of the utility model example five;
Fig. 9 is the sectional view of the assembled compound shear wall of the utility model example six;
Figure 10 is the sectional view of the assembled compound shear wall of the utility model example seven;
Figure 11 is the sectional view of the assembled compound shear wall of the utility model example eight;
Figure 12 is the sectional view of the assembled compound shear wall of the utility model example nine;
Figure 13 is the dimensional structure diagram that connecting node component 5 carries transparent effect in Fig. 1;
Figure 14 is the structural schematic diagram of the assembled compound shear wall of the utility model and the connecting structure of floor.
Specific implementation mode
As shown in Figures 1 to 4, disclosed by the utility model is a kind of assembled compound shear wall, is equipped at least two sides Edge component 1 and several face wall bodies 2, the arrangement orientation of each edge member 1 determine according to the extending direction of shear wall in building, often One face wall 2 is both connected between adjacent two edge members 1.The assembled compound shear wall should be able to be suitable for industrial metaplasia The assembled high-level structure system of production, such as combined shear wall construction, steel frame-compound shear wall core wall structure, steel tube concrete Soil-steel girder frame-compound shear wall Core Walls Structure etc..
The inventive concept of the utility model is:Edge member 1 and the connection type of wall 2 are:Edge member 1 is by vertically prolonging The steel pipe 11 stretched and the cast-in-place concrete 12 being cast in 11 tube chamber of steel pipe constitutes, and steel pipe 11 is used to be connected with wall 2 Joint face 111 is provided with multiple through-hole 111a, each through-hole 111a vertically arranged for interval;Wall 2 is mixed for prefabricated reinforcing bar Solidifying cob wall, and multigroup horizontal reinforcement of the reinforced concrete wall is reserved with steel bar end 21, each steel bar end 21 is used from wall 2 It is extend out to except the concrete parts of wall 2 in the joint face 22 being connected with edge member 1;The joint face 111 of edge member 1 It is close to 22 phase of joint face of wall 2, and the both sides metope 23 of two sides 112 of edge member 1 and wall 2 is close to flat Together, also, each through-hole 111a of edge member 1 at least corresponds to a steel bar end 21 of wall 2, wall 2 each Steel bar end 21 extend into 11 tube chamber of steel pipe of edge member 1 before cast-in-place concrete 12 pours by corresponding through-hole 111a In so that each steel bar end 21 is embedded in the cast-in-place concrete 12 of edge member 1.
To which the utility model realizes side by pouring the cast-in-place concrete 12 in 11 tube chamber of steel pipe of edge member 1 Connection between edge component 1 and wall 2, the connecting structure is simple, reliable, can ensure the site operation quality of shear wall, and And concrete (i.e. reinforced concrete wall, cast-in-place concrete 12) and steel construction (i.e. the steel pipe 11 of edge member 1) can be given full play to Respective advantage, the i.e. compressive property of concrete and steel construction it is easy for construction, it is ensured that assembled compound shear wall have very Good anti-side rigidity, relative to existing double-layer plate compound shear wall, the utility model can save 50% or more steel using amount, And concreting amount at the construction field (site) can be reduced, reduce the template amount of building at the construction field (site), to accelerate shear wall Speed of application simultaneously reduces worker's usage amount.
In addition, the high residential building system of opposite pure steel structure, the utility model can significantly reduce horizontal displacement, ensure outer The density of wall plate piecing, safety;Also, since the reinforced concrete wall of the utility model use is as wall 2, wall 2 Place can not have to fireproof coating, and due to being perfused with cast-in-place concrete in edge member 1, it is possibility to have effect reduces fireproof coating and uses Amount.
On the basis of foregoing invention is conceived, following preferred structure may be used in the utility model:
As preferred embodiments of the present invention:Referring to Fig. 3 and Fig. 4, the joint face 22 of wall 2 reserves multiple edges Cavity 22a, each edge cavity 22a and the quantity of each through-hole 111a of edge member 1 and position are corresponding and two neighboring It is connected by groove between edge cavity 22a so that cast-in-place concrete 12 can pass through side when being poured into 11 tube chamber of steel pipe Each through-hole 111a of edge component 1 is flowed into corresponding edge cavity 22a.To, after the solidification of cast-in-place concrete 12, Neng Goujin One step enhances the bonding strength between edge member 1 and wall 2.
As preferred embodiments of the present invention:11 cross section of steel pipe of edge member 1 can be but be not limited only to "-" type, L-type, T-type and it is cross in one kind.Utilize the edge member 1 of these varying cross-sections, you can form with wall 2 The assembled compound shear wall of different extending directions, such as:Referring to Fig. 2, to utilize 1, T of edge member of a "-" type The edge member 1 of type and a face wall 2 form the assembled compound shear wall of a face T-type, referring to Fig. 5, to utilize two words The assembled compound shear wall of the edge member 1 of type and a face wall 2 composition one side "-" type, referring to Fig. 6, to utilize one one The assembled compound shear wall of the edge member 1 of 1, L-type of edge member of font and a face wall 2 composition one side L-type, ginseng Fig. 7 is seen, to form one side L-type using the edge member 1 of 1, L-type of edge member of two "-" types and two sides wall 2 Assembled compound shear wall, referring to Fig. 8, to form the assembly of one side c-type using the edge member 1 of two L-types and a face wall 2 Formula compound shear wall, referring to Fig. 9, to utilize the edge member 1 and three face wall bodies of 1, two L-type of edge member of two "-" types The assembled compound shear wall of 2 composition one side c-types, referring to Figure 10, to utilize 1, two L-type of edge member of two "-" types Edge member 1 and three face wall bodies 2 form the assembled compound shear wall of a face Z-shaped, referring to Figure 11, to utilize three "-" types 1, T-type of edge member edge member 1 and three face wall bodies 2 composition one side T fonts assembled compound shear wall, referring to Figure 12, to form a face cross using 1, cross edge member 1 of edge member of four "-" types and four sides wall 2 The assembled compound shear wall of type.
Moreover, because the thickness used needed for the steel pipe 11 of edge member 1 is also seldom, and therefore, the steel pipe 11 of edge member 1 Type is seldom, advantageous prefabricated and use and factory's mass production so that assembled compound shear wall being capable of convenient basis Design needs to choose suitable edge member 1 and wall 2 from limited type, meets the industrialization of assembled compound shear wall Requirement, can match with the requirement of building industrialization in industrial chain tissue, technical qualification, business accounting etc..
As preferred embodiments of the present invention:Several blocks of separation steel are equipped in 11 tube chamber of steel pipe of edge member 1 The tube chamber of steel pipe 11 is divided into multiple vertically extending tube chambers by plate, to improve the intensity and bearing capacity of edge member 1; And for the shorter "-" type edge member 1 of length, the single-lumen form for being not provided with separating steel plate can also be used.
As preferred embodiments of the present invention:Referring to Fig. 1, assembled compound shear wall corresponds to each edge structure Part 1 is equipped with one group of vertical anchor bar 3, which stretches into corresponding edge component 1 before cast-in-place concrete 12 pours 11 tube chamber of steel pipe in so that the vertical anchor bar 3 is embedded in the cast-in-place concrete 12 of corresponding edge component 1.To utilize The connection function of vertical anchor bar 3 and cast-in-place concrete 12, can further enhance the company between edge member 1 and wall 2 Intensity is connect, and further enhances the bearing capacity of edge member 1;And cast-in-place coagulation is passed through for some in assembled compound shear wall Soil 12 can reach the position of required bonding strength, can also be not provided with vertical anchor bar 3.
As shown in Fig. 1, Fig. 3, Fig. 4 and Figure 13, the invention also discloses a kind of assembled compound shear wall and girder steels Connecting structure, it is characterised in that:Connecting structure is assembled by girder steel 4, connecting node component 5 and claim 1 to 5 any one Formula compound shear wall connection composition;
Connecting node component 5 is welded by node body 51, upper node steel plate 52, lower node steel plate 53 and perpendicular rib steel plate 54 to be connected It connects;Two pieces of junction steel plates 512 that node body 51 extends by joint steel pipe 511 and by joint steel pipe 511 are constituted, and Node cast-in-place concrete is poured in the tube chamber of joint steel pipe 511, wherein combined with assembled the cross section of joint steel pipe 511 11 cross section of steel pipe of the edge member 1 of shear wall is identical, extending direction of two pieces of junction steel plates 512 each parallel to girder steel 4;On Node steel plate 52 and lower node steel plate 53 are vertically welded between two pieces of junction steel plates 512, and perpendicular rib steel plate 54 is vertically welded in Between upper node steel plate 52 and lower node steel plate 53, and upper node steel plate 52, lower node steel plate 53 and perpendicular rib steel plate 54 are vertical It is welded on the side of joint steel pipe 511;Also, the connection that joint steel pipe 511 is used to be connected with assembled compound shear wall Face 5111 is provided with multiple node through-hole 5111a, each node through-hole 5111a vertically arranged for interval;
Between the wall 2 of assembled compound shear wall and the edge member 1 for being connected with connecting node component 5 there are It is adapted to the difference in height of connecting node component 5, and wall 2 also has multigroup horizontal reinforcement to be reserved with joint reinforcing bar head 24, each Joint reinforcing bar head 24 is extend out to from the joint face 22 of wall 2 except the concrete parts of wall 2;The connection of joint steel pipe 511 Face 5111 is close to 22 phase of joint face of wall 2, and the both sides metope 23 of two sides 5112 and wall 2 of joint steel pipe 511 Close to concordant, the bottom surface of joint steel pipe 511 is welded to connect with 11 top surface of steel pipe of edge member 1, the section of connecting node component 5 12 formed by integrally casting of cast-in-place concrete of point cast-in-place concrete and edge member 1, also, each node of connecting node component 5 Through-hole 5111a at least corresponds to a joint reinforcing bar head 24 of wall 2, and the joint reinforcing bar head 24 of wall 2 is cast-in-place mixed in node Solidifying soil is extend by corresponding node through-hole 5111a in 511 tube chamber of joint steel pipe of connecting node component 5 before pouring so that Each joint reinforcing bar head 24 is embedded in the node cast-in-place concrete of connecting node component 5;
Girder steel 4 is H profile steel beam or steel beam with box shape, when girder steel 4 is H profile steel beam, the end face of the H profile steel beam and connecting node Upper 52 end face of node steel plate, 53 end face of lower node steel plate and perpendicular 54 end face of rib steel plate of component 5 are welded to connect, when girder steel 4 is case When section steel beam, the end face of the steel beam with box shape and upper 52 end face of node steel plate of connecting node component 5,53 end face of lower node steel plate and Two pieces of 512 end faces of junction steel plate are welded to connect, and the other end of girder steel 4 can be with connection combination shear wall, steel column, concrete filled steel tube Column etc..
To which the assembled compound shear wall of the utility model and the connecting structure of girder steel are real using connecting node component 5 The connection of girder steel 4 and assembled compound shear wall is showed, the connection reliability is high, is produced convenient for industrialized construction, also, connects Node component 5 can be concordant with the holding of the metope of assembled compound shear wall without protrusion, can save the occupancy of connecting structure Space.
As preferred embodiments of the present invention:Referring to Fig. 3 and Fig. 4, the joint face 22 of above-mentioned wall 2 is reserved multiple Node cavity 22b, each node cavity 22b are opposite with the quantity of each node through-hole 5111a of connecting node component 5 and position It answers, and is connected by groove between two neighboring node cavity 22b so that node cast-in-place concrete is poured into connecting node structure It can be flowed by each node through-hole 5111a of connecting node component 5 when in 511 tube chamber of joint steel pipe of part 5 corresponding Node cavity 22b.To, after node cast-in-place concrete solidification, can further enhance connecting node component 5 and wall 2 it Between bonding strength.
The sequence of construction of the assembled compound shear wall of the utility model and the connecting structure of girder steel is as follows:
Step 1: in factory, prefabricated edge member 1, wall 2 and connecting node component 5;
Step 2: in factory, connection edge member 1 and connecting node component 5;
Step 3: by the component conveying being prefabricated in the factory to construction site;
Step 4: at the construction field (site), wall 2 being installed and is fixed;
Step 5: at the construction field (site), installation and welding edge component 1;
Step 6: at the construction field (site), placing vertical anchor bar 3;
Step 7: pouring the cast-in-place concrete 12 of the node cast-in-place concrete and edge member 1 of connecting node component 5;
Step 8: installation girder steel 4.
As shown in figure 14, the invention also discloses a kind of connecting structure of assembled compound shear wall and floor, It is characterized in that:Connecting structure is connected with claim 1 to 5 any one assembled compound shear wall by floor 6 and is formed;Assembled The wall 2 of compound shear wall is embedded with the reserved plate muscle 25 for being vertically pierced by its metope 23, and the metope 23 of wall 2 is reserved with metope Cavity 23a;Floor 6 is made of floor bar 61 and floor cast-in-place concrete 62, and the floor bar 61 of floor 6 is combined with assembled The reserved plate muscle 25 of shear wall is welded to connect, and the floor cast-in-place concrete 62 of floor 6 flows into assembled combination when being poured In the metope cavity 23a of shear wall.To improve the bonding strength between floor 6 and assembled compound shear wall.
The utility model is not limited to above-mentioned specific implementation mode, according to the above, according to the ordinary skill of this field Knowledge and customary means, under the premise of not departing from the utility model above-mentioned basic fundamental thought, the utility model can also be made Equivalent modifications, replacement or the change of other diversified forms are all fallen among the scope of protection of the utility model.

Claims (8)

1. a kind of assembled compound shear wall, equipped at least two edge members (1) and several face wall bodies (2), described in every one side Wall (2) is both connected between adjacent two edge members (1), it is characterised in that:The edge member (1) and wall (2) connection type is:The edge member (1) is by vertically extending steel pipe (11) and is cast in the steel pipe (11) tube chamber Cast-in-place concrete (12) constitute, and the steel pipe (11) be used for the joint face (111) that is connected with the wall (2) be provided with it is more A through-hole (111a), each through-hole (111a) vertically arranged for interval;The wall (2) is prefabricated reinforced concrete Cob wall, and multigroup horizontal reinforcement of the reinforced concrete wall is reserved with steel bar end (21), each described steel bar end (21) from The joint face (22) that the wall (2) is used to be connected with the edge member (1) extend out to the concrete section of the wall (2) / outer;The joint face (111) of the edge member (1) is mutually close to the joint face (22) of the wall (2), and the edge Two sides (112) of component (1) and the both sides metope (23) of the wall (2) are close to concordant, also, the edge member (1) each through-hole (111a) at least corresponds to a steel bar end (21) of the wall (2), the wall (2) it is each A steel bar end (21) extend into the edge structure before the cast-in-place concrete (12) pours by corresponding through-hole (111a) In steel pipe (11) tube chamber of part (1) so that each steel bar end (21) is embedded in the cast-in-place concrete of the edge member (1) (12) in.
2. assembled compound shear wall according to claim 1, it is characterised in that:The joint face (22) of the wall (2) Reserve multiple edge cavitys (22a), each through-hole (111a) of each the edge cavity (22a) and the edge member (1) Quantity and position it is corresponding, and be connected by groove between the two neighboring edge cavity (22a) so that described cast-in-place Concrete (12) can be flowed when being poured into the steel pipe (11) tube chamber by each through-hole (111a) of the edge member (1) Enter to corresponding edge cavity (22a).
3. assembled compound shear wall according to claim 1 or 2, it is characterised in that:The steel pipe of the edge member (1) (11) cross section "-" type, L-type, T-type and it is cross in one kind.
4. assembled compound shear wall according to claim 3, it is characterised in that:The steel pipe of the edge member (1) (11) it is equipped with several blocks of separation steel plates in tube chamber, the tube chamber of the steel pipe (11) is divided into multiple vertically extending tube chambers.
5. assembled compound shear wall according to claim 1 or 2, it is characterised in that:The assembled combined shear Wall corresponds to each edge member (1) and is equipped with one group of vertical anchor bar (3), and the vertical anchor bar (3) is described existing Pouring concrete (12) is stretched into before pouring in steel pipe (11) tube chamber of corresponding edge component (1) so that the vertical anchor bar (3) is buried In the cast-in-place concrete (12) of corresponding edge component (1).
6. a kind of connecting structure of assembled compound shear wall and girder steel, it is characterised in that:The connecting structure is by girder steel (4), connecting node component (5) connects composition with assembled compound shear wall described in claim 1 to 5 any one;
The connecting node component (5) is by node body (51), upper node steel plate (52), lower node steel plate (53) and perpendicular rib steel plate (54) it is made of welded connection;The node body (51) is extended by joint steel pipe (511) and by the joint steel pipe (511) Two pieces of junction steel plates (512) constitute, and poured node cast-in-place concrete in the tube chamber of the joint steel pipe (511), wherein Steel pipe (11) cross section of the cross section of the joint steel pipe (511) and the edge member (1) of the assembled compound shear wall It is identical, extending direction of the two pieces of junction steel plates (512) each parallel to the girder steel (4);The upper node steel plate (52) and Lower node steel plate (53) is vertically welded between two pieces of junction steel plates (512), perpendicular rib steel plate (54) vertical welding Between the upper node steel plate (52) and lower node steel plate (53), and the upper node steel plate (52), lower node steel plate (53) It is vertically welded on the side of the joint steel pipe (511) with perpendicular rib steel plate (54);Also, the joint steel pipe (511) is used Multiple node through-holes (5111a) are provided in the joint face (5111) being connected with the assembled compound shear wall, it is each described Node through-hole (5111a) vertically arranged for interval;
The wall (2) of the assembled compound shear wall and the edge member for being used to be connected with the connecting node component (5) (1) there are the differences in height for being adapted to the connecting node component (5) between, and the wall (2) also has multigroup horizontal reinforcement pre- There are joint reinforcing bar head (24), each described joint reinforcing bar head (24) extend out to from the joint face of the wall (2) (22) Except the concrete parts of the wall (2);The company of the joint face (5111) and the wall (2) of the joint steel pipe (511) Junction (22) is mutually close to, and the both sides metope (23) of two sides (5112) and the wall (2) of the joint steel pipe (511) Close to concordant, the bottom surface of the joint steel pipe (511) is welded to connect with steel pipe (11) top surface of the edge member (1), institute The node cast-in-place concrete of connecting node component (5) and cast-in-place concrete (12) formed by integrally casting of the edge member (1) are stated, and And each node through-hole (5111a) of the connecting node component (5) at least corresponds to a node of the wall (2) Steel bar end (24), the joint reinforcing bar head (24) of the wall (2) is before the node cast-in-place concrete pours by corresponding Node through-hole (5111a) is extend into joint steel pipe (511) tube chamber of the connecting node component (5) so that each section Point steel bar end (24) is embedded in the node cast-in-place concrete of the connecting node component (5);
The girder steel (4) be H profile steel beam or steel beam with box shape, when the girder steel (4) be H profile steel beam when, the end face of the H profile steel beam with Upper node steel plate (52) end face, lower node steel plate (53) end face and perpendicular rib steel plate (54) end face of the connecting node component (5) It is welded to connect, when the girder steel (4) is steel beam with box shape, the end face of the steel beam with box shape is upper with the connecting node component (5) Node steel plate (52) end face, lower node steel plate (53) end face and two pieces of junction steel plate (512) end faces are welded to connect.
7. the connecting structure of assembled compound shear wall and girder steel according to claim 6, it is characterised in that:The wall (2) joint face (22) reserves multiple node cavitys (22b), each node cavity (22b) and the connecting node component (5) quantity of each node through-hole (5111a) and position are corresponding, and lead between the two neighboring node cavity (22b) It crosses groove to be connected so that the node cast-in-place concrete is poured into joint steel pipe (511) pipe of the connecting node component (5) Corresponding node cavity can be flowed by each node through-hole (5111a) of the connecting node component (5) when in chamber (22b)。
8. a kind of connecting structure of assembled compound shear wall and floor, it is characterised in that:The connecting structure is by floor (6) Composition is connected with assembled compound shear wall described in claim 1 to 5 any one;The wall of the assembled compound shear wall (2) it is embedded with the reserved plate muscle (25) for being vertically pierced by its metope (23), and to be reserved with metope recessed for the metope (23) of the wall (2) Chamber (23a);The floor (6) is made of floor bar (61) and floor cast-in-place concrete (62), the floor steel of the floor (6) Muscle (61) and the reserved plate muscle (25) of the assembled compound shear wall are welded to connect, the cast-in-place coagulation of floor of the floor (6) Native (62) are flowed into when being poured in the metope cavity (23a) of the assembled compound shear wall.
CN201820168261.8U 2018-01-31 2018-01-31 A kind of assembled compound shear wall and its with girder steel, the connecting structure of floor Withdrawn - After Issue CN208088563U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820168261.8U CN208088563U (en) 2018-01-31 2018-01-31 A kind of assembled compound shear wall and its with girder steel, the connecting structure of floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820168261.8U CN208088563U (en) 2018-01-31 2018-01-31 A kind of assembled compound shear wall and its with girder steel, the connecting structure of floor

Publications (1)

Publication Number Publication Date
CN208088563U true CN208088563U (en) 2018-11-13

Family

ID=64062936

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820168261.8U Withdrawn - After Issue CN208088563U (en) 2018-01-31 2018-01-31 A kind of assembled compound shear wall and its with girder steel, the connecting structure of floor

Country Status (1)

Country Link
CN (1) CN208088563U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193800A (en) * 2018-01-31 2018-06-22 广东省建筑科学研究院集团股份有限公司 A kind of assembled compound shear wall and its with girder steel, the connecting structure of floor
CN113494144A (en) * 2020-04-02 2021-10-12 广东博智林机器人有限公司 Assembled shear wall and connecting method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108193800A (en) * 2018-01-31 2018-06-22 广东省建筑科学研究院集团股份有限公司 A kind of assembled compound shear wall and its with girder steel, the connecting structure of floor
CN108193800B (en) * 2018-01-31 2023-11-10 广东省建筑科学研究院集团股份有限公司 Assembled composite shear wall and connection structure thereof with steel beam and floor slab
CN113494144A (en) * 2020-04-02 2021-10-12 广东博智林机器人有限公司 Assembled shear wall and connecting method thereof

Similar Documents

Publication Publication Date Title
CN109372186B (en) Assembly frame system with steel pipe concrete divides special-shaped post of limb combination and damping wall
CN207553289U (en) A kind of assembled steel and concrete frame space modular structure and system
CN112681568B (en) Full-prefabricated steel tube concrete shear wall and building structure system
CN105625566A (en) Fabricated concrete orthogonal-diagonal lattice space grid box type tube-in-tube structure and making method thereof
CN212534652U (en) Steel-concrete composite structure frame-cast-in-place concrete shear wall structure system
CN208088563U (en) A kind of assembled compound shear wall and its with girder steel, the connecting structure of floor
CN110439291A (en) A kind of assembled production and construction method suitable for low-rise building
CN108193800B (en) Assembled composite shear wall and connection structure thereof with steel beam and floor slab
CN114575532B (en) Prefabricated unit of assembled hybrid column with bracket and connecting node
CN110761464A (en) Through-type full precast floor assembled steel-concrete composite floor system
CN214531068U (en) Assembled steel structure house
CN206737200U (en) A kind of assembled arthitecutral structure system
CN208293823U (en) A kind of connecting node component for be linked and packed formula compound shear wall and girder steel
CN211850263U (en) Through-type full precast floor assembled steel-concrete composite floor system
CN208088570U (en) A kind of prefabricated components for assembled compound shear wall
CN111851791A (en) Assembled steel frame-steel sheet shear force wall structure
CN111691580A (en) Superposed embedded column with large-diameter edge member vertical stress reinforcing steel bars arranged in cavity and prefabricated wall
CN218758246U (en) Novel prefabricated externally-hung wallboard without rib and connecting piece thereof
CN217517862U (en) Assembled L shape post and ecological interior wall self-tapping nail cluster connection structure
CN109440992B (en) Full-dry type prefabricated assembly concrete slab-column structure system
CN100392197C (en) Ribbed grid-like reinforced concrete shear wall and making method thereof
CN109296074A (en) A kind of assembly concrete column beam connecting node
CN213143495U (en) Assembled integral tenon-and-mortise connection modular multi-cavity steel plate combined shear wall
CN208293825U (en) A kind of edge member for assembled compound shear wall
CN109138220A (en) The compound assembled skeleton of fiber cement board, wall component and assembled steel reinforced concrete shear wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned
AV01 Patent right actively abandoned