CN208066915U - Waste deposit station - Google Patents

Waste deposit station Download PDF

Info

Publication number
CN208066915U
CN208066915U CN201820108858.3U CN201820108858U CN208066915U CN 208066915 U CN208066915 U CN 208066915U CN 201820108858 U CN201820108858 U CN 201820108858U CN 208066915 U CN208066915 U CN 208066915U
Authority
CN
China
Prior art keywords
fixing bracket
deposit station
waste deposit
guide rail
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820108858.3U
Other languages
Chinese (zh)
Inventor
徐立岩
庞建新
陈鑫
蒋高辉
安阳
冯宇飞
肖祜
龙智强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
BUCG EIGHTH CONSTRUCTION DEVELOPMENT Co Ltd
Original Assignee
BUCG EIGHTH CONSTRUCTION DEVELOPMENT Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BUCG EIGHTH CONSTRUCTION DEVELOPMENT Co Ltd filed Critical BUCG EIGHTH CONSTRUCTION DEVELOPMENT Co Ltd
Priority to CN201820108858.3U priority Critical patent/CN208066915U/en
Application granted granted Critical
Publication of CN208066915U publication Critical patent/CN208066915U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of waste deposit stations, its key points of the technical solution are that including being placed in parallel two guide rails on the ground and sliding two be connected on the guide rail warehouses in split setting, two warehouses are relatively close or far from moving along guide rail, a bottom opening, the storage compartment of inner hollow are formed when two warehouses are stitched together.The utility model solves at the stacking of building waste, it is in air storage generally to have a large amount of building waste, not timed out in transport vehicle, due to there is a large amount of dust in building waste, the problems such as being flown upward it is easy to appear dust, sand-lime, the problem of causing serious environmental pollution.

Description

Waste deposit station
Technical field
The utility model is related to Architectural Equipment field, more particularly to a kind of waste deposit station.
Background technology
Building waste refers to that construction, all kinds of buildings of unit in charge of construction or personal team, structures, pipe network etc. are built, spread If or remove, in reparative processes produced by dregs, spoir, rejected material, remaining mud and other wastes.
Currently, the quantity of China's building waste has accounted for the 30%-40% of municipal refuse total amount.With 500-600 tons/ten thousand squares The standard of rice calculates, arrives the year two thousand twenty, also by about 30,000,000,000 square metres of newly-increased construction area, newly generated building waste will be in China One shocking number.
The volume of existing building waste has bigger, and the reinforcing bar etc. in concrete compares entanglement, therefore general Building waste is launched in the specified place stacked using loop wheel machine.Then use transport vehicle by building waste transport to countryside into Row processing.But at the stacking of building waste, it is in air storage generally to have a large amount of building waste, not timed out in transport vehicle, Due to there is a large amount of dust in building waste, it is easy to dust occur, the problems such as sand-lime is flown upward, it is dirty to cause serious environment Dye.
Utility model content
The purpose of this utility model is to provide a kind of waste deposit stations, it is carried out by the building waste for transporting crane Covering so that the dust in building waste is less prone to the pollution that environment is reduced in the external world.
The above-mentioned purpose of the utility model technical scheme is that:
A kind of waste deposit station, including it is placed in parallel two guide rails and sliding on the ground are connected on guide rail two A warehouse in split setting, two warehouses are relatively close or far from moving along guide rail, and two warehouses are formed when being stitched together One bottom opening, the storage compartment of inner hollow.
By using above-mentioned technical proposal, at waste deposit station in use, staff by two warehouses along guide rail two Side pushes so that two warehouses separate and occur a vacant lot, the building rubbish that then loop wheel machine will be sling among two warehouses Rubbish is launched towards vacant lot, after building waste is launched, will be hindered the building waste closed with warehouse and is cleared up, will Two warehouses are pushed to centre so that two warehouses cover and close off building waste, not timed out in transport vehicle, reduce building rubbish Dust from flying in rubbish reduces the pollution of environment in the external world.The building rubbish for being transported crane by the way that waste deposit station is arranged Rubbish is covered so that the dust in building waste is less prone to the pollution that environment is reduced in the external world.And waste deposit station It is carrying out only needing to set on guide rail when building, then be combined together warehouse and guide rail, so that it may with conveniently Waste deposit station is constructed.On the other hand, the vacant lot occurred in centre after warehouse is moved to both sides, is compared two storehouses Body is fixed together, and for the mode of the upside of warehouse setting opening, two warehouses separate the range for the opening to be formed more Greatly, and do not need staff go waste deposit station top will by opening close, both facilitated loop wheel machine and sling building waste Dispensing, be also convenient for staff and opened and closed waste deposit station.
The utility model is further arranged to:The warehouse includes fixing bracket and covering and is fixedly connected on fixing bracket On fixed bin plate.
The intensity of warehouse is increased using fixing bracket as the skeleton of warehouse by using above-mentioned technical proposal, compares one The warehouse of body formula is provided with the stability higher of support bracket fastened warehouse.
The utility model is further arranged to:The fixed bin plate is fixedly connected on by screw on fixing bracket.
By using above-mentioned technical proposal, fixed bin plate is installed on sub- fixing bracket by screw when mounted, is made The connection between fixed bin plate and fixing bracket is obtained not only to facilitate but also fasten.
The utility model is further arranged to:The fixing bracket includes the supporting rod as pillar and the connection as beam Bar, the supporting rod and connecting rod are fixed together to form a rectangular parallelepiped structure, and the fixing bracket further includes fixing The bracing piece being connected between supporting rod and connecting rod, the connecting rod are equally spaced in support bracket fastened upside, described solid Determine storehouse plate to include the cover board being arranged at the top of fixing bracket, vertical be fixedly connected on a side plate of cover board and vertical symmetry is set It sets in cover board both sides and two be fixedly connected lid door vertical with side plate.
By using above-mentioned technical proposal, supporting rod and connecting rod are by being fixedly connected to form a rectangular parallelepiped structure, root According to needs, fixing bracket can also be set as other shapes, such as hemispherical so that the building waste launched for crane has more Good covering and closed effect.
The utility model is further arranged to:Supporting rod, connecting rod on the fixing bracket and the company between bracing piece It is welding to connect mode.
By using above-mentioned technical proposal, the connection type between supporting rod, connecting rod and bracing piece is set as welding, So that support bracket fastened connection is more convenient, and there is very high stability.
The utility model is further arranged to:The support bracket fastened downside is fixedly connected with multiple pulleys, the pulley Cooperation is provided with baffle on guide rail beside the pulley.
By using above-mentioned technical proposal, support bracket fastened downside is provided with multiple pulleys so that warehouse and guide rail it Between sliding connection it is more preferable realize, and staff is more laborsaving when pushing warehouse because when waste deposit station is closed, Not dry concrete in internal building waste is bonded between pulley and guide rail sometimes, after the concrete has set for cunning The sliding taken turns on guide rail impacts, so being fixedly connected with baffle at the position of pulley on fixing bracket, will slide Wheel is detached with building waste so that the concrete in building waste will not be with pulley contact.
The utility model is further arranged to:The guide rail is provided at both ends with two side block blocks, and two side block blocks are whole The centre position of T-shaped piece of type, the guide rail is provided with intermediate block, shape and structure and two side block blocks of the intermediate block It is identical.
By using above-mentioned technical proposal, it is provided at both ends with two side block blocks in guide rail so that staff will fix When storehouse plate is pushed to both sides, two side block blocks block pulley so that fixed bin plate will not be slipped from the both ends of guide rail, and be passed through Intermediate block is set on guide rail so that the block degree warehouse being arranged among guide rail when two warehouses dock stopped, So that warehouse will not be because of pushing and two warehouses slide in the same direction of guide rail upper edge together after docking again, and it will Intermediate block is arranged in the centre position of guide rail so that when installing intermediate block on guide rail, the position of the block on two guide rails It sets and is easier to be aligned compared in other positions.
The utility model is further arranged to:The waste deposit station further includes being fixedly connected on the upside of fixing bracket to prevent Retaining frame, the protective frame include that protection montant and fender rod, the protection montant and fender rod are fixed together to form one A rectangular parallelepiped structure, the fender rod are equally spaced on the upside of protective frame, the connection on the fender rod and fixing bracket Bar is staggered arrangement.
By using above-mentioned technical proposal, in the dispensing of actual building waste, crane is sling sometimes building waste meeting There is some volumes are larger to be fallen from the air, the broken of fixed bin plate can be caused when on the fixed bin plate on waste deposit station by pounding Damage, so protective frame is provided on the upside of waste deposit station, by the way that protective frame is arranged so that in the building waste that crane is sling From when falling in the air, larger building waste receives the blocking of protective frame, and too much influence will not be caused to fixed bin plate, and And protection montant and fender rod are fixed together to form a rectangular parallelepiped structure, fender rod is equidistant in the upside of protective frame Arrangement, the connecting rod on fender rod and fixing bracket are staggered arrangement so that protective frame is more preferable for the protecting effect of fixed bin plate.
The utility model is further arranged to:Locking assembly, the locking are provided in lid door on the fixed bin plate Component includes closing piece, the jam plate coordinated with closing piece, through the lockhole being opened on closing piece and jam plate and the lock coordinated with lockhole Bar, closing piece and jam plate are separately positioned in the lid door of two warehouses, and when closing piece and jam plate coordinate, the lockhole in the two corresponds to Together.
By using above-mentioned technical proposal, when waste deposit station is closed, the closing piece in two lid doors coordinates with jam plate Together, then by locking bar it is inserted into lockhole so that closing piece is locked together with jam plate, so that two lid doors lock together, is being opened When waste deposit station, first locking bar is extracted from lockhole so that closing piece is unlocked with jam plate, then again opens waste deposit station. By the way that locking assembly is arranged so that when closing waste deposit station, be closed between two warehouses more secured.
The utility model is further arranged to:The fixing bracket is made of the square tube of inner hollow, the fixed bin plate It is made of color steel.
By using above-mentioned technical proposal, the square tube using lighter weight and color steel by fixing bracket and fixed bin plate At so that it is more laborsaving when transport opens and closes waste deposit station with staff.
In conclusion the utility model has the advantages that:
1, the building waste that crane transports is covered by the way that waste deposit station is arranged so that the powder in building waste Dirt is less prone to the pollution that environment is reduced in the external world, and waste deposit station is carrying out only needing to set on guide rail when building It sets, is then combined together warehouse and guide rail, so that it may with conveniently that waste deposit station is constructed;
2, by the way that protective frame is arranged so that when the building waste that crane is sling is from aerial fall, larger building waste The blocking of protective frame is received, too much influence will not be caused to fixed bin plate, and montant is protected to be fixedly connected with fender rod A rectangular parallelepiped structure is formed together, and fender rod is equally spaced on the upside of protective frame, on fender rod and fixing bracket Connecting rod is staggered arrangement so that protective frame is more preferable for the protecting effect of fixed bin plate;
3, by the way that locking assembly is arranged so that when closing waste deposit station, be closed between two warehouses more firm Gu.
Description of the drawings
Fig. 1 is schematic diagram when waste deposit station is opened in embodiment 1;
Fig. 2 is the schematic diagram of 1 middle warehouse of embodiment;
Fig. 3 is the schematic diagram of 1 middle guide of embodiment;
Fig. 4 is the enlarged drawing in the portions A in Fig. 3;
Fig. 5 is the enlarged drawing in the portions B in Fig. 3;
Fig. 6 is that cross bar and connecting rod is protected to be staggered the schematic diagram of arrangement in embodiment 1;
Fig. 7 is schematic diagram when waste deposit station is closed in embodiment 1;
Fig. 8 is the explosive view of locking assembly in embodiment 1.
In figure, 1, guide rail;2, warehouse;21, fixing bracket;211, supporting rod;212, connecting rod;213, bracing piece;22, solid Determine storehouse plate;221, cover board;222, side plate;223, lid door;23, pulley;24, two side block blocks;25, intermediate block;26, baffle;27, Protective frame;271, montant is protected;272, cross bar is protected;28, locking assembly;281, closing piece;282, jam plate;283, lockhole;284, Locking bar.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
Embodiment 1:As shown in Figure 1 and Figure 2, including two guide rails 1 on the ground are arranged in parallel in a kind of waste deposit station And sliding be connected to two on guide rail 1 be in split setting warehouse 2, two warehouses 2 carried out on guide rail 1 it is relatively close or Person forms the storage compartment of a bottom opening, inner hollow far from movement when two warehouses 2 are docking together.
Warehouse 2 includes fixing bracket 21 and the fixed bin plate for covering and being bolted to connection on fixing bracket 21 22, fixing bracket 21 includes the supporting rod 211 as pillar and the connecting rod 212 as beam, supporting rod 211 here and connection Bar 212 forms a rectangular parallelepiped structure by welding, and as needed, fixing bracket 21 can also be welded into other shapes, example If hemispherical is welded with bracing piece 213 to reinforce the intensity of fixing bracket 21 between supporting rod 211 and connecting rod 212, Wherein, the connecting rod 212 for being fixedly connected on 21 upside of fixing bracket is to be equally spaced, and supporting rod 211 and connecting rod 212 are selected as The square tube of the inner hollow made of aluminium alloy.
Here fixed bin plate 22 is made of color steel, because the lighter weight of color steel is readily transported, and is propped up with fixation Frame 21 it is easy for installation so that convenient for the Fast Installation at waste deposit station when using on building sites, and be made of square tube Fixing bracket 21 quality it is also very light, fixing bracket 21 and fixed bin plate 22 are pushed convenient for staff, fixed bin plate 22 Including the cover board 221 at the top of fixing bracket 21, a vertical side plate 222 for being fixedly connected on cover board 221 and vertical is arranged It is symmetricly set on 221 both sides of cover board and two be fixedly connected lid door vertical with side plate 222 223.
The downside of fixing bracket 21 is fixedly connected with multiple pulleys 23 coordinated with guide rail 1 so that warehouse 2 and guide rail 1 it Between sliding connection realize it is more convenient.
It is provided with handle in lid door 223 so that staff is more convenient when opening and closing lid door 223.
When in use, staff by two fixed bin plates 22 along guide rail 1 under the action of pulley 23 direction guiding rail 1 two Side pushes, because the quality of fixing bracket 21 and fixed bin plate 22 is all very light so that staff can be easily solid by two Determine storehouse plate 22 and fixing bracket 21 is pushed open so that occurs a vacant lot between two fixed bin plates 22, then loop wheel machine will be sling Building waste is launched towards the vacant lot between two fixed bin plates 22, after building waste is launched, will be hindered and fixed bin The building waste that plate 22 is closed is cleared up, two fixed bin plates 22 is pushed to centre so that two fixed bin plates 22 will be built Building refuse covers and closes off, not timed out in transport vehicle, reduces the dust from flying in building waste in the external world, reduces the dirt of environment Dye.The building waste that crane transports is covered by the way that waste deposit station is arranged so that the dust in building waste is not easy The external world is appeared in, the pollution of environment is reduced.And waste deposit station is carrying out only needing to set on guide rail 1 when building, Then fixing bracket 21 and fixed bin plate 22 are combined together with guide rail 1, so that it may conveniently to build waste deposit station It makes.
On the other hand, the vacant lot occurred in centre after fixed bin plate 22 is moved to both sides, is compared two fixed bins Plate 22 is fixed together, and the cover board 221 on fixed bin plate 22 is for openable mode, between two fixed bin plates 22 Be open the range bigger opened, and does not need staff and the top at waste deposit station is gone to close lid door 223, both facilitated Loop wheel machine slings the dispensing of building waste, has been also convenient for staff and has opened and closed waste deposit station.
As shown in Figure 3, Figure 4, two side block blocks 24 are fixedly connected at the both ends of guide rail 1, two side block blocks 24 are T-shaped piece whole Type, perpendicular end and the guide rail 1 of two side block blocks 24 weld together so that staff when fixed bin plate 22 is pushed to both sides, Two side block blocks 24 block pulley 23 so that fixed bin plate 22 will not be slipped from the both ends of guide rail 1.
The centre position of guide rail 1 is provided with intermediate block 25, the shape and structure phase of intermediate block 25 and two side block blocks 24 Together.By the way that intermediate block 25 is arranged on guide rail 1 so that the block degree storehouse among guide rail 1 is arranged when two warehouses 2 dock Body 2 is stopped so that warehouse 2 will not be because of pushing and two warehouses 2 are same in 1 upper edge of guide rail together after docking again Direction is slided, and intermediate block 25 is arranged in the centre position of guide rail 1 so that when installing intermediate block 25 on guide rail 1, The position of block on two guide rails 1 is compared to be easier to be aligned in other positions.
As shown in figs. 3 and 5, it is fixedly connected with baffle 26 at the position of pulley 23 on fixing bracket 21, because When waste deposit station is closed, the not dry concrete in internal building waste is bonded in sometimes between pulley 23 and guide rail 1, Sliding of the pulley 23 on guide rail 1 is impacted after the concrete has set, thus be provided with baffle 26 by pulley 23 with build Building refuse is detached so that the concrete in building waste will not be contacted with pulley 23.
In the dispensing of actual building waste, it is larger from aerial that crane is sling sometimes building waste has some volumes It falls, pounds on waste deposit station, because rubbish dumping station has used color steel as fixed bin plate 22, institute to build quickly The breakage of fixed bin plate 22 can be caused when on fixed bin plate 22 by being pounded with the larger building waste of volume, so at waste deposit station Upside be provided with protective frame 27, with reference to Fig. 2, Fig. 3, protective frame 27 is welded on fixing bracket 21.
As shown in Fig. 3, Fig. 6, protective frame 27 here is also by multiple square tubes solderings into cuboid-type, including as pillar Protection montant 271 and the protection cross bar 272 as beam, wherein protection montant 271 is welded on fixing bracket 21, and protection is horizontal Bar 272 is equally spaced in the upside of protective frame 27, and is protected between the connecting rod 212 on cross bar 272 and fixing bracket 21 Be staggered arrangement so that large-scale building waste is when falling by the blocking and connecting rod 212 of protection cross bar 272 to fixed bin The support of plate 22, impact when heavy construction rubbish is fallen are alleviated, and reduce building waste and fixed bin plate 22 is made At breakage.By the way that protective frame 27 is arranged so that when the building waste that crane is sling is from aerial fall, larger building waste The blocking of protective frame 27 and connecting rod 212 is received, too much influence will not be caused to fixed bin plate 22.
As shown in Figure 7, Figure 8, it is additionally provided with locking assembly 28 on waste deposit station so that close by waste deposit station When, it is closed between two fixed bin plates 22 more secured.There are two locking assemblies 28 for setting on waste deposit station, are located at In the both sides lid door 223 at waste deposit station.Locking assembly 28 includes closing piece 281, with the jam plate 282 of the cooperation of closing piece 281, through opening The lockhole 283 being located on closing piece 281 and jam plate 282 and the locking bar 284 coordinated with lockhole 283.Wherein, closing piece 281 and jam plate 282 are separately positioned in two lid doors 223, and when closing piece 281 and jam plate 282 coordinate, the lockhole 283 in the two is corresponded to one It rises.
When waste deposit station is closed, the closing piece 281 in two lid doors 223 is combined together with jam plate 282, then by locking bar 284 are inserted into lockhole 283 so that closing piece 281 is locked together with jam plate 282, so that two lid doors 223 lock together, is being beaten When opening waste deposit station, first locking bar 284 is extracted from lockhole 283 so that closing piece 281 is unlocked with jam plate 282, then again by rubbish Rubbish stacking station is opened.By the way that locking assembly 28 is arranged so that when closing waste deposit station, closed between two fixed bin plates 22 That closes is more secured.
The application method at this waste deposit station is as shown in Figure 2 and Figure 3, first on the ground by the setting of guide rail 1, then will to consolidate Fixed rack 21 and fixed bin plate 22 cooperation on guide rail 1, then staff by two fixed bin plates 22 along guide rail 1 in pulley The both sides of direction guiding rail 1 push under the action of 23, and the quality of fixing bracket 21 and fixed bin plate 22 is all very light so that work people Member can easily push two fixed bin plates 22 and fixing bracket 21 open so that occur a sky between two fixed bin plates 22 Ground, then loop wheel machine by the building waste sling towards between two fixed bin plates 22 vacant lot launch, launched in building waste Bi Hou will hinder the building waste closed with fixed bin plate 22 and clear up, two fixed bin plates 22 are pushed to centre so that Two fixed bin plates 22 cover and close off building waste, not timed out in transport vehicle, and the dust from flying reduced in building waste exists The external world reduces the pollution of environment.The building waste that crane transports is covered by the way that waste deposit station is arranged so that build Dust in building refuse is less prone to the pollution that environment is reduced in the external world.
And waste deposit station is carrying out only needing to set on guide rail 1 when building, then by fixing bracket 21 and admittedly Determine storehouse plate 22 to be combined together with guide rail 1, so that it may with conveniently that waste deposit station is constructed.On the other hand, solid Determine the vacant lot occurred in centre after storehouse plate 22 is moved to both sides, compared to will, compared to two fixed bin plates 22 are fixed together, Gu It is for openable mode to determine the cover board 221 on storehouse plate 22, and the range that the opening between two fixed bin plates 22 is opened is more Greatly, it and does not need staff the top at waste deposit station is gone to close lid door 223, both facilitated loop wheel machine and sling building waste Dispensing, be also convenient for staff and opened and closed waste deposit station.
This specific embodiment is only the explanation to the utility model, is not limitations of the present invention, ability Field technique personnel can as needed make the present embodiment the modification of not creative contribution after reading this specification, but As long as all being protected by Patent Law in the right of the utility model.

Claims (10)

1. a kind of waste deposit station, it is characterised in that:Including being placed in parallel two guide rails (1) and sliding connection on the ground Two on guide rail (1) be in split setting warehouse (2), two warehouses (2) are relatively close or far from movement along guide rail (1), A bottom opening, the storage compartment of inner hollow are formed when two warehouses (2) are stitched together.
2. waste deposit station according to claim 1, it is characterised in that:The warehouse (2) include fixing bracket (21) and It covers and is fixedly connected on the fixed bin plate (22) on fixing bracket (21).
3. waste deposit station according to claim 2, it is characterised in that:The fixed bin plate (22) is fixed by screw to be connected It is connected on fixing bracket (21).
4. waste deposit station according to claim 3, it is characterised in that:The fixing bracket (21) includes as pillar Supporting rod (211) and connecting rod (212) as beam, the supporting rod (211) and connecting rod (212) are fixed together shape At a rectangular parallelepiped structure, the fixing bracket (21) further includes being fixedly connected between supporting rod (211) and connecting rod (212) Bracing piece (213), the connecting rod (212) is equally spaced on the upside of fixing bracket (21), the fixed bin plate (22) Including the side plate (222) that cover board (221) at the top of fixing bracket (21) is arranged, is vertically fixedly connected on cover board (221) And vertical symmetry is arranged in cover board (221) both sides and two be fixedly connected lid door (223) vertical with side plate (222).
5. waste deposit station according to claim 4, it is characterised in that:Supporting rod on the fixing bracket (21) (211), the connection type between connecting rod (212) and bracing piece (213) is welding.
6. waste deposit station according to claim 5, it is characterised in that:It is fixedly connected on the downside of the fixing bracket (21) There are multiple pulleys (23), pulley (23) cooperation to be provided with baffle (26) beside the pulley (23) on guide rail (1).
7. waste deposit station according to claim 6, it is characterised in that:The guide rail (1) is provided at both ends with two side blocks Block (24), the whole T-shaped piece of type of two side block blocks (24), the centre position of the guide rail (1) are provided with intermediate block (25), The shape and structure of the intermediate block (25) are identical as two side block blocks (24).
8. waste deposit station according to claim 7, it is characterised in that:The waste deposit station further includes being fixedly connected on Protective frame (27) on the upside of fixing bracket (21), the protective frame (27) include protection montant (271) and protection cross bar(272), The protection montant (271) and fender rod are fixed together to form a rectangular parallelepiped structure, the protection cross bar(272)? Protective frame is equally spaced on the upside of (27), the protection cross bar(272)It is staggered with the connecting rod (212) on fixing bracket (21) Arrangement.
9. waste deposit station according to claim 8, it is characterised in that:Lid door (223) on the fixed bin plate (22) On be provided with locking assembly (28), the locking assembly (28) includes closing piece (281), the jam plate with closing piece (281) cooperation (282), through the lockhole (283) being opened on closing piece (281) and jam plate (282) and the locking bar coordinated with lockhole (283) (284), closing piece (281) and jam plate (282) are separately positioned in the lid door (223) of two warehouses (2), in closing piece (281) and lock When plate (282) coordinates, the lockhole (283) in the two is corresponding together.
10. waste deposit station according to claim 9, it is characterised in that:The fixing bracket (21) is by inner hollow Square tube is made, and the fixed bin plate (22) is made of color steel.
CN201820108858.3U 2018-01-22 2018-01-22 Waste deposit station Expired - Fee Related CN208066915U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820108858.3U CN208066915U (en) 2018-01-22 2018-01-22 Waste deposit station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820108858.3U CN208066915U (en) 2018-01-22 2018-01-22 Waste deposit station

Publications (1)

Publication Number Publication Date
CN208066915U true CN208066915U (en) 2018-11-09

Family

ID=64035784

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820108858.3U Expired - Fee Related CN208066915U (en) 2018-01-22 2018-01-22 Waste deposit station

Country Status (1)

Country Link
CN (1) CN208066915U (en)

Similar Documents

Publication Publication Date Title
CN208830666U (en) A kind of skyscraper vertical garbage transportation system
US11078696B2 (en) Sludge containment vessel and method for use in concert with a vacuum truck in spill containment
WO2015054772A1 (en) Granular material storage with input and output
CN208066915U (en) Waste deposit station
CN103818671B (en) Put down into formula refuse transfer station and its operational method of clearing
CN213742391U (en) Electric sliding platform
CN105236055A (en) Vertical box device of vertical trash compression transfer station
CN210659184U (en) Lifting integrated scaffold for building construction
CN205976365U (en) High -rise construction garbage shaft of socket joint formula
US20090242553A1 (en) Construction waste removal container
CN213738121U (en) Full-intelligent self-climbing conveying operation table
CN217756531U (en) Movable hanging hopper with folding type closing door
CN109353722A (en) A kind of Construction of High-rise multipurpose body feed tank and its application method
DE4338158A1 (en) Large-capacity transporting container
CN205955234U (en) Movable type platform of unloading
CN212101842U (en) Logistics material storage and transportation device
CN113060437B (en) Intelligent garbage classification and recovery system for urban community
CN209618058U (en) A kind of Construction of High-rise multipurpose body feed tank
WO2012094711A1 (en) Waste processing apparatus
CN210459878U (en) Vertical transportation device for construction waste
CN211286474U (en) Floor rubbish transport corridor
CN218288953U (en) A concrete conveyer for in confined space
CN205525517U (en) Movable cage of storing in a warehouse
CN208119928U (en) A kind of granular material transport container
CN206766819U (en) A kind of building waste storing unit

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181109

Termination date: 20200122

CF01 Termination of patent right due to non-payment of annual fee