CN208056655U - A kind of building construction hoist stop layers platform - Google Patents

A kind of building construction hoist stop layers platform Download PDF

Info

Publication number
CN208056655U
CN208056655U CN201820443021.4U CN201820443021U CN208056655U CN 208056655 U CN208056655 U CN 208056655U CN 201820443021 U CN201820443021 U CN 201820443021U CN 208056655 U CN208056655 U CN 208056655U
Authority
CN
China
Prior art keywords
cage
directive wheel
protective door
stop layers
wheel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820443021.4U
Other languages
Chinese (zh)
Inventor
王文涛
王航
王秀红
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820443021.4U priority Critical patent/CN208056655U/en
Application granted granted Critical
Publication of CN208056655U publication Critical patent/CN208056655U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model discloses a kind of building construction hoist stop layers platforms, including cage, cage side is movably set with the first and second cage protective doors, cage side is parallel with the first cage protective door corresponding position to be equipped with two groups of guide rails, first cage protective door quadrangle is provided with idler wheel, and the first cage protective door is slided by its idler wheel along guide rail;Second cage protective door a side is rotatablely connected with cage ontology side bottom edge by rotary shaft, it is fixedly installed two-way hoist engine at the top of cage, and cage both sides are from top to bottom symmetrically arranged with directive wheel successively, haulage cable is wound on directive wheel, drive the open and close of cage protective door, the function as plate tunnel is also equipped with when the second cage protective door is opened, and both sides are equipped with guard rail, play the role of safety guarantee.By the improvement to construction platform, keep platform easy to operate, reduces and set up and remove that construction lifts the quantities of stop layers platform and the safety of operation increases.

Description

A kind of building construction hoist stop layers platform
Technical field
The utility model belongs to building lifting device technical field, and in particular to a kind of building construction hoist stop layers are flat Platform.
Background technology
Common building construction hoist stop layers plate tunnel and its protection are set up as the double fastener type steel pipe of console mode Scaffold building.It is using components such as fastener and steel pipes, by inside and outside two rows of vertical that console mode double-pole fastening steel pipe scaffold, which is set up, The scaffold and supporting rack that bar and horizon bar are constituted, protect for building hoist stop layers plate tunnel and periphery, set up Stop layers plate tunnel and protection can play the role of transport channel and security protection to a certain extent.But such mode is behaved Work site installation, security risk is big during peace is torn open, low construction efficiency, and the security and stability of frame body is by the skill of installer Art level influences greatly, while needing a large amount of steel pipe, fastener, and material lease expenses is high, assembling and disassembling is costly.It is unable to reach item Mesh standardization, regularization, automation, the civilized construction requirement of tool-type.
Utility model content
The utility model in view of the above shortcomings of the prior art, provides a kind of pacify and tears convenient, stable structure construction open Elevator stop layers platform.
Technical solution used by the utility model is:A kind of building construction hoist stop layers platform, including cage, cage Side top movable is provided with the first cage protective door, and one side lower removable is provided with the second cage protective door, the cage Ontology side is parallel with the first cage protective door corresponding position to be equipped with two groups of guide rails, and the first cage protective door quadrangle is provided with rolling Wheel, the first cage protective door are slided by its idler wheel along guide rail, described second cage protective door a side and cage ontology Side bottom edge is rotatablely connected by rotary shaft, and cage bodies top both sides are symmetrically fixedly installed two-way hoist engine, and institute It states cage ontology both sides and is from top to bottom symmetrically arranged with the first directive wheel, the second directive wheel, third directive wheel and the 4th successively Directive wheel is wound with the first haulage cable, first haulage cable one on first directive wheel and the second directive wheel It holds and is fixedly connected with the first hanging ring for being set to one side bottom of the first cage protective door, the second cage protective door both sides are symmetrical It is provided with the 5th directive wheel, coiling successively on the 5th directive wheel, the 4th directive wheel, two-way hoist engine and third directive wheel There is the second haulage cable.
Preferably, the second cage protective door two sides are equipped with guard rail.
It is further preferred that first directive wheel, the second directive wheel, third directive wheel and the 4th directive wheel pass through Wheel shaft is fixedly connected with the girder steel being arranged in cage ontology.
Still more preferably, first haulage cable away from hanging ring one end and is wound on third directive wheel and the 5th The second haulage cable between directive wheel is connected by stationary nodes.
Compared to the prior art, the utility model has the advantage that:First directive wheel, the second directive wheel, are set Three directive wheels, the 4th directive wheel and two-way hoist engine realize the first cage protective door and are opened with the automatic of the second cage protective door It opens and closes, the second cage protective door of setting both has the function of protective door, also has the function of plate tunnel.The platform structure Simply, easy to operate, it not only reduces and sets up and remove the quantities of construction lifting stop layers platform, and improve worker The safety of operation.
Description of the drawings
Fig. 1 is the side structure schematic view of the utility model;
Fig. 2 is the utility model overlooking structure diagram.
Specific implementation mode
A kind of building construction hoist stop layers platform, refering to fig. 1 and Fig. 2, including cage 1,1 side top movable of cage It is provided with the first cage protective door 5, height 1200mm, width 1500m (1300mm), by square steel frame, magnesium-trellis net, drawing Hand forms, and square steel frame is welded using 30mm (length) × 30mm (width) × 2.4mm (wall thickness) square steel, and magnesium-trellis net uses net The zinc-plated magnesium-trellis nets of hole 20mm × 20mm, knob are made of 3mm steel plates.It is anti-that one side lower removable is provided with the second cage Door 13 is protected, plate tunnel when unlatching as transport cargo when being closed and has the function of protective door, and total height is 1500mm, wherein add lower part 1200mm to form by top 300mm, level difference 30mm, width 1500mm (1300mm), by Square steel frame, checkered steel plate are welded, and square steel frame is using 40mm (length) × 40mm (width) × 3.5mm (wall thickness) square steel weldering Machine.Checkered steel plate uses the zinc-plated checkered steel plates of thickness 5mm.1 side of the cage is parallel with 5 corresponding position of the first cage protective door to be set There are two groups of guide rails 9,5 four jiaos of the first cage protective door to be provided with idler wheel 6, idler wheel 6 is oriented to using 2 groups of diameter 80mm cast steels Pulley, the first cage protective door by its idler wheel 6 along guide rail 9 slide, described second cage protective door, 13 a side with hang 1 ontology side bottom edge of cage is rotatablely connected by rotary shaft 14, and rotary shaft is made of diameter 16mm thickness round steel, the cage 1 Both sides are symmetrically fixedly installed two-way hoist engine 2 at the top of body, and two-way hoist engine 2 and the steel bracket for being welded on 1 top of cage use Bolt is fixed, and the power of two-way hoist engine 2 is 3KW, and 1 both sides of the cage are from top to bottom symmetrically arranged with the first guiding successively Take turns the 4, second directive wheel 8, third directive wheel 10 and the 4th directive wheel 16, on first directive wheel and the second directive wheel around It is formed with the first haulage cable 3, described first haulage cable, 3 one end and is set to 5 one side bottom of the first cage protective door First hanging ring 7 is fixedly connected, and 13 both sides of the second cage protective door are symmetrically arranged with the 5th directive wheel 11, and both sides the 5th are oriented to Wheel 11 is fixed by welding to by taking turns axis connection, wheel shaft on the steel bracket of the second cage protective door 13, the 5th directive wheel 11, the second haulage cable 15 is wound on the 4th directive wheel 16, two-way hoist engine 2 and third directive wheel 10 successively, it is described Haulage cable 15 uses diameter 8mm flexible wire ropes.Second cage protective door, 13 two sides are equipped with guard rail 12.It is anti- Guard rail rod 12 is welded on 13 rigid frame of the second cage protective door.Guard rail 12 is made of railing, skirting board, is highly 1200mm, length 1500mm, railing useCoating steel pipe welds, and outer patch is red white Alternate No striding Luminous warning color, skirting board use the zinc-plated checkered steel plates of thickness 5mm, inside and outside patch No striding red and white Luminous warning color.First directive wheel 4, the second directive wheel 8, third directive wheel 10 and the 4th directive wheel 16 pass through wheel shaft It is welded to connect with cage top girder steel.Directive wheel uses diameter 100mm cast steel leading blocks.First haulage cable 3 is carried on the back Pass through stationary nodes from hanging ring one end and the second haulage cable 15 being wound between third directive wheel 10 and the 5th directive wheel 11 17 connections.16 upper end steel wire rope of the 4th directive wheel of second haulage cable is fixing end, third directive wheel and two-way elevator Generator terminal is movable end.
It should be noted that
The platform further includes control system and limiting device (not marking in fig. 1 and fig. 2), wherein control system by Two-way hoist-engine controller and elevator operation interlocking controller composition.
Limiting device is made of emergency stop switch, cage door, protective fence door interlock, floor passage door stop.
This building construction hoist stop layers platform in operation principle is:Control system control inside cage 1 is two-way Hoist engine 2 is rotated clockwise and is rotated counterclockwise, when two-way hoist engine 2 rotates clockwise, discharges the second haulage cable 15, Second haulage cable 15 bypasses third directive wheel 10 successively, the 5th directive wheel 11 and the 4th is oriented to 16 wheels, keeps the second cage anti- It protects door 13 to open, while the second haulage cable 15 in rotation passes through anchoring point A and drives the first haulage cable 3 fortune downwards Dynamic, the first haulage cable 3 bypasses the second directive wheel 8 and the first directive wheel 4 successively, and 3 other end of the first haulage cable is used Hanging ring 7 is fixed on 5 lower end of the first cage protective door, the first haulage cable 3 driven when moving downward the first cage protective door 5 to Upper unlatching, when two-way hoist engine 2 rotates counterclockwise, the second haulage cable 15 is upwards collected through, and drives the second cage protective door 13 close, while the first cage protective door 5 is closed under the action of self-weight.
When second cage protective door 13 is opened, the second cage protective door 13 can be used as freight corridor, and both sides have anti- Guard rail rod 12;When the second cage protective door 13 is packed up, two lateral rails 12 lean against on 1 two walls of inside of cage.
Above-described embodiment, the only preferred embodiment of the utility model not are used for limiting the implementation model of the utility model It encloses, therefore all equivalent variations done with content described in the utility model claims, the utility model right should all be included in and wanted Within the scope of asking.

Claims (4)

1. a kind of building construction hoist stop layers platform, including cage (1), which is characterized in that (1) one upper lateral part of the cage is lived Dynamic to be provided with the first cage protective door (5), one side lower removable is provided with the second cage protective door (13), the cage (1) Side is parallel with the first cage protective door (5) corresponding position to be equipped with two groups of guide rails (9), and the first cage protective door (5) quadrangle is set It is equipped with idler wheel (6), the first cage protective door (5) is slided by its idler wheel (6) along guide rail (9), the second cage protection Door (13) a side is rotatablely connected with cage (1) side bottom edge by rotary shaft (14), and both sides are symmetrically solid at the top of the cage (1) Surely be provided with two-way hoist engine (2), and the cage (1) two sides be from top to bottom symmetrically arranged with successively the first directive wheel (4), Second directive wheel (8), third directive wheel (10) and the 4th directive wheel (16), first directive wheel (4) and the second directive wheel (8) it is wound with the first haulage cable (3) on, described first haulage cable (3) one end and is set to the first cage protective door The first hanging ring (7) of (5) one side bottoms is fixedly connected, and the second cage protective door (13) both sides are symmetrically arranged with the 5th guiding Take turns (11), on the 5th directive wheel (11), the 4th directive wheel (16), two-way hoist engine (2) and third directive wheel (10) according to It is secondary to be wound with the second haulage cable (15).
2. a kind of building construction hoist stop layers platform according to claim 1, which is characterized in that second cage is anti- It protects door (13) two sides and is equipped with guard rail (12).
3. a kind of building construction hoist stop layers platform according to claim 2, which is characterized in that first directive wheel (4), the second directive wheel (8), third directive wheel (10) and the 4th directive wheel (16) pass through setting in wheel shaft and cage (1) Girder steel is fixedly connected.
4. a kind of building construction hoist stop layers platform according to claim 3, which is characterized in that the first traction steel Cord (3) is away from hanging ring one end and the second haulage cable being wound between third directive wheel (10) and the 5th directive wheel (11) (15) it is connected by stationary nodes (17).
CN201820443021.4U 2018-03-29 2018-03-29 A kind of building construction hoist stop layers platform Expired - Fee Related CN208056655U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820443021.4U CN208056655U (en) 2018-03-29 2018-03-29 A kind of building construction hoist stop layers platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820443021.4U CN208056655U (en) 2018-03-29 2018-03-29 A kind of building construction hoist stop layers platform

Publications (1)

Publication Number Publication Date
CN208056655U true CN208056655U (en) 2018-11-06

Family

ID=63987366

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820443021.4U Expired - Fee Related CN208056655U (en) 2018-03-29 2018-03-29 A kind of building construction hoist stop layers platform

Country Status (1)

Country Link
CN (1) CN208056655U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111606174A (en) * 2020-06-30 2020-09-01 中国建筑第七工程局有限公司 Overlength automatic opening and closing construction elevator flap gate
CN114013866A (en) * 2021-11-26 2022-02-08 靖江市高新窑炉材料有限公司 A collection device for endangering change waste material
CN117550501A (en) * 2024-01-11 2024-02-13 中铁城建集团第一工程有限公司 Climbing frame attached adjustable tower crane walkway and integral lifting method

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111606174A (en) * 2020-06-30 2020-09-01 中国建筑第七工程局有限公司 Overlength automatic opening and closing construction elevator flap gate
CN114013866A (en) * 2021-11-26 2022-02-08 靖江市高新窑炉材料有限公司 A collection device for endangering change waste material
CN114013866B (en) * 2021-11-26 2024-05-24 靖江市高新窑炉材料有限公司 Collecting device for hazardous waste
CN117550501A (en) * 2024-01-11 2024-02-13 中铁城建集团第一工程有限公司 Climbing frame attached adjustable tower crane walkway and integral lifting method
CN117550501B (en) * 2024-01-11 2024-03-22 中铁城建集团第一工程有限公司 Climbing frame attached adjustable tower crane walkway and integral lifting method

Similar Documents

Publication Publication Date Title
CN208056655U (en) A kind of building construction hoist stop layers platform
CN110240048A (en) A kind of external attached type skyscraper goods jack system
CN202324571U (en) Overhanging type double-row scaffold
CN106586774A (en) Supersized elevator for use in building large ship or offshore plant
CN203173644U (en) Multifunctional lifting shaft working platform system
CN208814562U (en) A kind of visualization formula glass curtain wall plate vertical transit system
CN204081436U (en) A kind of climbing frame and template integrated system
CN101876209B (en) Supertall building core tube construction safety fire protection system and device
CN202379620U (en) Lifting and operating platform comprehensive equipment
CN107060474A (en) A kind of sleeve-type chimney people goods shunting vertical transferring apparatus and construction method
CN105129577B (en) Self-crawling type material vertical transit system
CN201172921Y (en) Slideway on oblique roof and pulley system
CN210480526U (en) Lifting device using steel structure elevator shaft as vertical transportation channel
CN210854900U (en) Vertical material lifting machine
CN102777048A (en) Vertical transportation device
CN207749818U (en) A kind of suspension type hanging basket for anti-lift-slb construction
CN214269987U (en) Hoisting device applied to high-rise building roof elevator shaft
JP4187445B2 (en) crane
KR20000009699A (en) Safety fence for construction
CN220412563U (en) Elevator with fall protection device
CN204112694U (en) Open excavation section side wall waterproof construction support
CN218642202U (en) Construction elevator
CN112141854B (en) Full-intelligent self-climbing conveying operation table and application method thereof
CN206375521U (en) Stop layers maintenance unit on building hoist
CN102434064A (en) Safety protection door of discharging platform for building lifting frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181106

Termination date: 20190329