CN208055855U - A kind of connection structure of prefabricated light-weight abutment and drilled pile - Google Patents

A kind of connection structure of prefabricated light-weight abutment and drilled pile Download PDF

Info

Publication number
CN208055855U
CN208055855U CN201820485882.9U CN201820485882U CN208055855U CN 208055855 U CN208055855 U CN 208055855U CN 201820485882 U CN201820485882 U CN 201820485882U CN 208055855 U CN208055855 U CN 208055855U
Authority
CN
China
Prior art keywords
drilled pile
circular hole
abutment
prefabricated light
pour
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820485882.9U
Other languages
Chinese (zh)
Inventor
吴志勇
陈怀智
王法武
张欣欣
李鑫
贾奋宗
吴珍瑞
王晓平
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Shanghai Design Institute Group Co Ltd
Original Assignee
China Railway Shanghai Design Institute Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Shanghai Design Institute Group Co Ltd filed Critical China Railway Shanghai Design Institute Group Co Ltd
Priority to CN201820485882.9U priority Critical patent/CN208055855U/en
Application granted granted Critical
Publication of CN208055855U publication Critical patent/CN208055855U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to the technique of design and construction field of science of bridge building, especially a kind of connection structure of prefabricated light-weight abutment and drilled pile, it is characterised in that:Circular hole is poured after being reserved on the prefabricated light-weight abutment, poured after described circular hole position correspond to the drilled pile position and it is described after pour circular hole aperture be less than the drilled pile stake diameter, it is reserved with reinforcing bar in the stake top of the drilled pile, the reinforcing bar be located at it is described after pour in circular hole, poured after described in circular hole and poured concrete the prefabricated light-weight abutment and the drilled pile is made to be connected and fixed.The utility model has the advantages that:1)This province of precasting process be exactly a kind of site operation speed it is fast, it is environmentally protective, save the high a kind of technique of field workforce, mechanization degree;2)The size of abutment abutment body considers in combination with pier cap beam, saves the cast-in-situ template at scene;3)It is a kind of inevitable requirement of the full prefabrication and assembly construction design and construction of bridge that abutment is prefabricated.

Description

A kind of connection structure of prefabricated light-weight abutment and drilled pile
Technical field
The utility model is related to the technique of design and construction field of science of bridge building, especially a kind of prefabricated light-weight abutment and brill The connection structure of hole stake.
Background technology
Abutment in Urban Bridge generally uses light-weight abutment, the abutment body of light-weight abutment to be generally connected directly with drilled pile, At present mainly based on field cast-in-place, the country is considerably less using precasting process.To promote the full prefabrication and assembly construction of Urban Bridge Level using prefabrication and assembly construction technique is clearly inevitable requirement for light-weight abutment, researches and develops its crucial connecting structure and construction method With regard to important.
Invention content
The purpose of this utility model is to provide a kind of prefabricated light-weight abutment and drilling according to above-mentioned the deficiencies in the prior art The connection structure of stake pours circular hole mode after and realizes connection between prefabricated light-weight abutment and drilled pile, saves scene Labour, it is environmentally protective, it is fast from site operation speed.
The utility model aim realization is completed by following technical scheme:
A kind of connection structure of prefabricated light-weight abutment and drilled pile, including prefabricated light-weight abutment and drilled pile, it is described prefabricated Light-weight abutment is supported on the drilled pile, it is characterised in that:Circular hole is poured after being reserved on the prefabricated light-weight abutment, institute Poured after stating circular hole position correspond to the drilled pile position and it is described after pour circular hole aperture be less than the drilled pile stake Diameter, is reserved with reinforcing bar in the stake top of the drilled pile, the reinforcing bar be located at it is described after pour in circular hole, pour in circular hole and pour after described Having built concrete makes the prefabricated light-weight abutment and the drilled pile be connected and fixed.
Be embedded with member in shear memory in the stake top centre position of the drilled pile, the position of the member in shear memory be located at it is described after It pours among circular hole.
The bottom hole that circular hole is poured after described has poured high strength and no shrinting mortar.
The inner wall that circular hole is poured after described is the inner wall handled through dabbing.
The utility model has the advantages that:1)This province of precasting process be exactly a kind of site operation speed it is fast, it is environmentally protective, save The high a kind of technique of field workforce, mechanization degree;2)The size of abutment abutment body considers in combination with pier cap beam, saves existing The cast-in-situ template of field;3)It is a kind of inevitable requirement of the full prefabrication and assembly construction design and construction of bridge that abutment is prefabricated;4)Back pouring hole diameter It is smaller than pile body diameter, temporary support can be provided for prefabricated abutment;5)There is very big push away in terms of bridge prefabrication assembling Wide application prospect is apparent using competitive advantage.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the vertical view of Fig. 1.
Specific implementation mode
The utility model feature and other correlated characteristics are described in further detail by embodiment below in conjunction with attached drawing, In order to the understanding of technical staff of the same trade:
As shown in Figs. 1-2, figure label 1-6 is expressed as:Prefabricated light-weight abutment 1, drilled pile 2, after pour circular hole 3, section The wet seam 4 of section, member in shear memory 5, embedded bar 6.
Embodiment:As shown in Figure 1, the connection structure of prefabricated light-weight abutment and drilled pile is for prefabricated light-duty in the present embodiment Being connected and fixed between abutment 1 and drilled pile 2.As shown in Figure 1, prefabricated light-weight abutment 1 is sectional type, in two prefabricated light bridges It is provided with the wet seam 4 in segment between platform 1, makes two prefabricated light-weight abutments 1 that can be connected and fixed composition one by the wet seam in segment 4 Body.Prefabricated light-weight abutment 1 is erected at the top of several drilled piles 2 and is supported jointly by several drilled piles 2.
As depicted in figs. 1 and 2, circular hole 3 is poured after being reserved on prefabricated light-weight abutment 1, after pour circular hole 3 in prefabricated light bridge It is reserved in the prefabrication process of platform 1.The quantity and position difference of the quantity of circular hole 3 and the drilled pile 2 of position and lower section are poured afterwards It constitutes and corresponds.The aperture that circular hole 3 is poured after each is respectively less than the stake diameter of corresponding drilled pile 2.As shown in Fig. 2, every The stake top of root drilled pile 2 is respectively arranged with embedded bar 6, and the position of embedded bar 6 corresponds to the position that circular hole 3 is poured behind side thereon It sets, that is, ensures to pour after embedded bar 6 is among the circular hole range of circular hole 3.Meanwhile among the stake top of every drilled pile 2 Position is embedded with member in shear memory 5, and member in shear memory 5 pours the position of circular hole 3 after also corresponding to.Member in shear memory 4 can be used bar reinforcement, Shaped steel etc..After prefabricated light-weight abutment 1 is set up in place, is poured after and pour non-shrinkage concrete and vibration compacting in circular hole 3, support Shield, to complete being connected and fixed between prefabricated light-weight abutment 1 and several drilled piles 2.
The present embodiment is in the specific implementation:It pours backward between pouring non-shrinkage concrete in circular hole 3, circular hole 3 can be poured after Bottom hole pour high strength and no shrinting mortar, to improve the pouring quality of concrete, pour circular hole 3 after especially ensureing and connect with drilled pile 2 The pouring quality for touching position, avoids dead angle, to further increase the bonding strength between prefabricated light-weight abutment 1 and drilled pile 2.
Dabbing processing can be carried out by pouring the inner wall of circular hole 3 afterwards, to ensure subsequently to pour the ungauged regions poured in circular hole 3 backward The inner wall that the concreting body that concrete is constituted can pour circular hole 3 with after is combined closely, and then is further increased prefabricated light-duty Bonding strength between abutment 1 and drilled pile 2 ensures to stablize.
Although above example elaborates the design of the utility model aim and embodiment with reference to attached drawing, But those skilled in the art will realize that in the case where no disengaging claim limits the precondition of range, still may be used To make various modifications and variations to the utility model, therefore do not repeat one by one herein.

Claims (4)

1. a kind of connection structure of prefabricated light-weight abutment and drilled pile, including prefabricated light-weight abutment and drilled pile, described prefabricated light Type abutment is supported on the drilled pile, it is characterised in that:Circular hole is poured after being reserved on the prefabricated light-weight abutment, it is described Pour afterwards circular hole position correspond to the drilled pile position and it is described after pour circular hole aperture be less than the drilled pile stake diameter, Be reserved with reinforcing bar in the stake top of the drilled pile, the reinforcing bar be located at it is described after pour in circular hole, pour in circular hole and pour after described There is concrete that the prefabricated light-weight abutment and the drilled pile is made to be connected and fixed.
2. the connection structure of a kind of prefabricated light-weight abutment and drilled pile according to claim 1, it is characterised in that:Described The stake top centre position of drilled pile is embedded with member in shear memory, the position of the member in shear memory be located at it is described after pour among circular hole.
3. the connection structure of a kind of prefabricated light-weight abutment and drilled pile according to claim 1, it is characterised in that:After described The bottom hole for pouring circular hole has poured high strength and no shrinting mortar.
4. the connection structure of a kind of prefabricated light-weight abutment and drilled pile according to claim 1, it is characterised in that:After described The inner wall for pouring circular hole is the inner wall handled through dabbing.
CN201820485882.9U 2018-04-08 2018-04-08 A kind of connection structure of prefabricated light-weight abutment and drilled pile Active CN208055855U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820485882.9U CN208055855U (en) 2018-04-08 2018-04-08 A kind of connection structure of prefabricated light-weight abutment and drilled pile

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820485882.9U CN208055855U (en) 2018-04-08 2018-04-08 A kind of connection structure of prefabricated light-weight abutment and drilled pile

Publications (1)

Publication Number Publication Date
CN208055855U true CN208055855U (en) 2018-11-06

Family

ID=63984643

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820485882.9U Active CN208055855U (en) 2018-04-08 2018-04-08 A kind of connection structure of prefabricated light-weight abutment and drilled pile

Country Status (1)

Country Link
CN (1) CN208055855U (en)

Similar Documents

Publication Publication Date Title
CN104404869A (en) Pile column type concrete hollow pile pier structure
CN108086693A (en) A kind of assembled steel reinforced concrete frame structure system method of construction of low multilayer
CN101831875A (en) Precast assembly process of prestressed concrete cylindrical hollow pier
CN204282199U (en) Pile-column concrete hollow pile bridge pier structure
CN201155080Y (en) Large-span V-shaped continuous rigid frame bridge
CN109056506A (en) Plug-in type post-tensioning prestressing without bondn section assembling concrete pier of steel tube
CN109440634B (en) Prefabricated high-strength concrete hollow bent cap structure with removable internal mold
CN110387826B (en) Segment prefabricated and assembled pier steel member and construction method and application thereof
CN211368352U (en) Connecting structure for assembly type pier and bearing platform anchoring steel bar sleeving and inserting post-pouring RPC
CN103741812A (en) Connection joint of steel reinforced concrete superposed beams and middle column
CN202000251U (en) Cylindrical hollow prefabricated prestressed concrete pier structure
CN203603267U (en) Connecting joint of steel reinforced concrete superposed beams and middle column
CN103981803A (en) Prefabricated assembled combination type door-shaped pillar and construction method thereof
CN208151833U (en) A kind of construction of novel RC-masonry combination arch bridge
CN106958259B (en) A kind of concrete towers column foundation and its construction method
CN200974956Y (en) Prestressed concrete box girder
CN108086134A (en) A kind of assembled hollow steel pipe constrains armored concrete pillar height pier
CN103147438A (en) Cast-in-place post-tensioning method-based I-shaped support pile and manufacturing method of support pile
CN112796198A (en) Hollow arch bridge system connected by UHPC wet joints and construction method
CN208055855U (en) A kind of connection structure of prefabricated light-weight abutment and drilled pile
CN208235310U (en) A kind of hollow concrete bridge pier of prefabricated centrifugal forming
CN208363421U (en) Assembly concrete-filled steel tube column-isolated footing-concrete collar tie beam cross connecting node
CN206359881U (en) A kind of assembled hollow steel pipe constrains armored concrete pillar height pier
CN109518593A (en) Assembly concrete-filled steel tube lattice pier
CN108999077A (en) The circumferential weld connection structure and its circumferential weld connection method of prefabricated stand column and adjacent members

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant