Prior art keywords
steel
pier
construction
short
anchoring
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201910671403.1A
Other languages
Chinese (zh)
Other versions
CN110387826A (en
Inventor
邓开来
赵灿晖
杜金龙
梁桓伟
吴斌
廖曼
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southwest Jiaotong University
Original Assignee
Southwest Jiaotong University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southwest Jiaotong University filed Critical Southwest Jiaotong University
Priority to CN201910671403.1A priority Critical patent/CN110387826B/en
Publication of CN110387826A publication Critical patent/CN110387826A/en
Application granted granted Critical
Publication of CN110387826B publication Critical patent/CN110387826B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/02Piers; Abutments ; Protecting same against drifting ice
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses a segment prefabricated and assembled pier steel member, which comprises a short steel member, a long steel member and anchoring and positioning steel bars, wherein the short steel member is provided with a plurality of stiffening ribs I, two ends of the short steel member are provided with vertical bolt holes I, and a lower end steel plate is provided with a plurality of horizontal bolt holes I; a plurality of stiffening ribs II are arranged on the elongated steel member, vertical bolt holes II are formed in two ends of the elongated steel member, and a plurality of horizontal bolt holes II are formed in the lower end steel plate; the anchoring positioning steel bars are uniformly distributed and arranged in the steel bar cage, the outer ends of the anchoring positioning steel bars are provided with screw threads, and the inner sides of the anchoring positioning steel bars are provided with a plurality of matched reinforcing steel bars. The invention also provides a construction method and application of the steel member. The section steel member is used as a template and a supporting upper structure, is temporarily anchored, increases construction safety, can be detached for repeated use after construction is finished, and finally realizes the construction operation of factory prefabrication and on-site rapid assembly of the pier.

Description

Segment prefabricated and assembled pier steel member and construction method and application thereof
Technical Field
The invention belongs to the technical field of civil engineering, and particularly relates to a segment prefabricated assembly pier steel member, a construction method and application.
Background
The conventional bridge construction is that the site is blocked in the construction range to carry out on-site formwork erecting and concrete pouring, which seriously influences the original traffic, meanwhile, the mechanical construction noise is large, the interference to the surrounding environment is large, and the problem of insufficient durability of the splicing part of the partially-assembled pier still exists in the use process. The research and development and application of novel concrete materials such as ultra-high performance concrete promote bridge construction process to change greatly, the superstructure of bridge has already realized the construction of segmentation splicing, and the part of the pier of assembling still has the not enough problem of splice department durability in the use. For a bridge across the sea and river, the number and the size of the piers are large, and the turnover reuse rate of the steel template is lower due to the severe corrosion of the marine environment; for urban bridges, the construction is not beneficial to modern mechanized construction due to the influence of factors such as large flow of people and vehicles, small construction site and the like. Therefore, a construction method for segment prefabricating and assembling bridge piers is needed, which is used for prefabricating segments of bridge piers which are large in size and inconvenient to construct on site in a factory, and connecting the prefabricated segments by using ultra-high performance concrete after the bridge piers are conveyed to the site and accurately positioned.
Disclosure of Invention
Aiming at the defects, the invention provides a segment prefabricated and assembled pier steel member, a construction method and application, and the construction method is used for realizing the assembly between the piers in stages by taking ultra-high performance concrete as a connecting material and a section steel member. The structural steel member serves as a template and a supporting upper structure, the construction safety of the assembled pier is increased by temporary anchoring, the pier can be detached and reused after construction is completed, the utilization rate of steel is increased, and finally the construction operation of factory prefabrication and field rapid assembly of the pier is realized. The construction method adopts industrial production, can ensure the construction quality of the bridge pier, reduce the field construction amount, and can further accelerate the industrial construction speed of the bridge.
In order to achieve the purpose, the technical scheme adopted by the invention for solving the technical problems is as follows: the utility model provides a pier steel member is assembled in prefabricated of segment, includes short steel member, elongated steel member and anchor positioning steel bar. The short steel member and the long steel member are semicircular, a plurality of stiffening ribs I are arranged on the short steel member, a plurality of vertical bolt holes I are arranged at the joints of two ends of the short steel member, and a plurality of horizontal bolt holes I are arranged on the lower end steel plate; the elongated steel member is provided with a plurality of stiffening ribs II, the joints of the two ends of the elongated steel member are provided with a plurality of vertical bolt holes II, and the lower end steel plate is provided with a plurality of horizontal bolt holes II; the anchor positioning steel bar is the homodisperse form and sets up in the steel reinforcement cage, and anchor positioning steel bar outer end all is provided with the thread, and the inboard is provided with a plurality of assorted reinforcement reinforcing bars.
Furthermore, an anchoring positioning reinforcing steel bar hole I and an anchoring positioning reinforcing steel bar hole II which are used for inserting anchoring positioning reinforcing steel bars are respectively arranged on the short steel member and the long steel member.
Further, the first horizontal bolt hole and the second horizontal bolt hole are the same in size.
The construction method for the pier by adopting the section prefabricated and assembled pier steel member comprises the following steps:
(1) binding the anchoring and positioning steel bars with the steel bar cage, reserving connecting steel bars for connecting pier sections at two ends, and then pouring concrete and maintaining;
(2) splicing two short steel members at the lower end of the segmental pier after the maintenance in the step (1), connecting two long steel members at the upper end of the segmental pier to form a cup mouth, and simultaneously connecting the short steel members and the long steel members with anchoring and positioning steel bars through fixing bolts respectively;
(3) and (3) filling ultrahigh-performance concrete into the cup mouth in the step (2) and vibrating, then assembling pier sections, uniformly distributing connecting steel bars at the splicing position, connecting short steel members and long steel members through high-strength bolts, and after the ultrahigh-performance concrete is hardened, dismantling the short steel members and the long steel members to complete the construction of section prefabrication and assembly of piers.
Furthermore, two short steel members are connected through high-strength bolts in the first vertical bolt hole, and two long steel members are connected through high-strength bolts in the second vertical bolt hole.
Furthermore, long steel members are embedded into the bearing platform, so that the connection between the bearing platform and the segment pier is realized.
Furthermore, the short steel members are embedded into the bent cap to realize the connection between the bent cap and the segment pier.
Further, the short steel members and the long steel members may be constructed using steel hoops.
The section prefabricated assembled pier steel member is applied to construction of circular piers, rectangular piers, polygonal piers and circular-end rectangular hollow piers.
In summary, the invention has the following advantages:
1. the anchoring and positioning steel bars reserved during the prefabrication of the segment pier can ensure the connection between the section steel members and the pier segments, and the section steel members at the end parts of the members can be temporarily anchored and bear the gravity of the upper parts of the members and can also play a role of a template. And (3) each section of pier component prefabricated in a factory is reserved with steel bars overlapped on site, and the pier components are accurately positioned and spliced and then connected by concrete. Because the number of longitudinal bars at the connecting part is doubled and the ultrahigh-performance concrete can effectively anchor the reinforcing bars, the assembled pier can achieve the mechanical property of integral cast-in-place of the pier with the same size.
2. The consumption of steel is reduced by reusing the profile steel member, and the comprehensive cost of bridge construction can be reduced; the structural steel member can support the upper structure and can also play a role in temporary anchoring, and the safety of the assembling construction of the segmental pier is ensured.
3. The segment pier columns can be prefabricated in a factory, so that the construction quality of the project can be ensured, and the assembly efficiency among all components is high; the end parts of the prefabricated components are reserved with lap-jointed reinforcing steel bars, so that the assembly construction can be directly carried out on site, and the construction efficiency is high.
4. The occupied field space is small, only the bearing platform is cast in place, and the pier body and the bent cap are prefabricated in a factory, so that a template for casting the pier body and the bent cap is not needed to be erected, and the area of a construction field is reduced.
5. And (5) small-sized mechanized construction. For the bridge pier with larger size, the weight of each segment can be reduced by increasing the number of prefabricated segments, and the construction operation of large machinery is reduced.
6. The method is little interfered by construction environment, has wide application range and shortens construction period. The prefabrication work of each component is finished in a factory and is not influenced by the construction environment; and after the concrete pouring of the wet joint sections is finished, the next construction operation can be carried out, a template does not need to be erected any more, and the construction speed of the bridge is increased.
Drawings
FIG. 1 is a schematic view of a short steel member;
FIG. 2 is a schematic view of an elongated steel member;
FIG. 3 is a schematic view of the arrangement of anchoring and positioning bars;
FIG. 4 is a top view of an anchoring spacer bar;
FIG. 5 is a schematic view of the construction of a segmental pier stud;
FIG. 6 is a schematic view of connection between a segmental pier and a steel member;
FIG. 7 is a schematic view of the connection of a short steel member and a long steel member;
FIG. 8 is a schematic view of steel member construction;
100, short steel members; 101. a first vertical bolt hole; 102. a first horizontal bolt hole; 103. anchoring and positioning the first reinforcing steel bar hole; 104. a first stiffening rib; 200. a long steel member; 201. a second vertical bolt hole; 202. a second horizontal bolt hole; 203. anchoring and positioning a reinforcing steel bar hole II; 204. a second stiffening rib; 300. anchoring the positioning steel bars; 301. screw teeth; 302. reinforcing steel bars; 400. segment piers; 401. a reinforcement cage; 402. connecting reinforcing steel bars; 403. a high-strength bolt; 404. fixing the bolt; 405. a cup mouth; 406. a connecting bolt; 407. concrete; 500. a bearing platform; 600. and a capping beam.
Detailed Description
The following detailed description of embodiments of the invention refers to the accompanying drawings.
In an embodiment of the invention, as shown in fig. 1 to 8, a segmental prefabricated pier steel member is provided, which comprises a short steel member 100, a long steel member 200 and anchoring positioning steel bars 300, wherein the short steel member 100 and the long steel member 200 are both semicircular, a plurality of stiffening ribs I104 are arranged on the short steel member 100, a plurality of vertical bolt holes I101 are arranged at the joints of two ends of the short steel member 100, and a plurality of horizontal bolt holes I102 are arranged on a lower end steel plate; a plurality of second stiffening ribs 204 are arranged on the long steel member 200, a plurality of second vertical bolt holes 201 are arranged at the joint of two ends of the long steel member 200, a plurality of second horizontal bolt holes 202 are arranged on the lower steel plate, and the first horizontal bolt holes 102 and the second horizontal bolt holes 202 are the same in size; the anchoring and positioning steel bars 300 are uniformly dispersed in the steel bar cage 401, the outer ends of the anchoring and positioning steel bars 300 are provided with screw threads 301, and the inner sides of the anchoring and positioning steel bars 300 are provided with a plurality of matched reinforcing steel bars 302; the short steel member 100 and the long steel member 200 are provided with first anchoring-positioning reinforcement holes 103 and second anchoring-positioning reinforcement holes 203, respectively, through which the anchoring-positioning reinforcements 300 are inserted.
The construction method for the pier by adopting the section prefabricated assembled pier steel member is characterized by comprising the following steps:
(1) binding the anchoring positioning steel bars 300 and the steel reinforcement cage 401, reserving connecting steel bars 402 for connecting the segment piers 400 at two ends, and then pouring concrete 407 and maintaining;
(2) splicing two short steel members 100 at the lower end of the segmental pier 400 after the maintenance in the step (1) is completed, connecting two long steel members 200 at the upper end of the segmental pier 400 to form a cup opening 405, connecting the two short steel members 100 on a first vertical bolt hole 101 through a high-strength bolt 403, and connecting the two long steel members 200 on a second vertical bolt hole 201 through a high-strength bolt; meanwhile, the short steel member 100 and the long steel member 200 are respectively connected with the anchoring and positioning steel bar 300 through the fixing bolt 404;
(3) and (3) filling concrete 407 into the cup mouth 405 in the step (2) and vibrating, then assembling the segmental pier 400, uniformly distributing connecting steel bars 402 at the splicing position, connecting the short steel member 100 and the long steel member 200 through a high-strength bolt 403, and after the concrete 407 is hardened, disassembling the short steel member 100 and the long steel member 200 to complete segmental prefabricated pier construction.
Wherein, the long steel members 200 are embedded into the bearing platform 500 to realize the connection between the bearing platform 500 and the segmental pier 400; the short steel members 100 are embedded into the capping beams 600 to realize the connection between the capping beams 600 and the segment piers 400. The short steel member 100 and the long steel member 200 are connected by a connecting bolt 406; the short and long steel members 100 and 200 for supporting the weight of the upper section of the pier stud and the formwork of the post-cast section are constructed using steel hoops.
The section prefabricated assembled pier steel member is applied to construction of circular piers, rectangular piers, polygonal piers and circular-end rectangular hollow piers.
The anchoring and positioning steel bar 300 reserved when the segmental pier 400 is prefabricated can ensure the connection between the section steel member and the segmental pier 400, and the section steel members at the end parts of the members can be temporarily anchored and bear the gravity of the upper parts of the members and can also play a role of a template. Each segment of pier 400 member prefabricated in a factory is reserved with steel bars due to on-site lap joint, and is connected by concrete 407 after accurate positioning and assembly. Because the number of longitudinal bars at the connecting part is doubled and the ultrahigh-performance concrete 407 can effectively anchor the reinforcing bars, the assembled pier can achieve the mechanical property of integral cast-in-place of piers with the same size. The consumption of steel is reduced by reusing the profile steel member, and the comprehensive cost of bridge construction can be reduced; the structural steel member can support the upper structure and can also play a role in temporary anchoring, and the safety of the assembling construction of the segmental pier 400 is ensured. The segment pier columns can be prefabricated in a factory, so that the construction quality of the project can be ensured, and the assembly efficiency among all components is high; the end parts of the prefabricated components are reserved with lap-jointed reinforcing steel bars, so that the assembly construction can be directly carried out on site, and the construction efficiency is high.
While the present invention has been described in detail with reference to the illustrated embodiments, it should not be construed as limited to the scope of the present patent. Various modifications and changes may be made by those skilled in the art without inventive step within the scope of the appended claims.

Claims (8)

1. The section prefabricated assembling pier steel member is characterized by comprising a short steel member (100), a long steel member (200) and anchoring and positioning steel bars (300), wherein the short steel member (100) and the long steel member (200) are semicircular, a plurality of stiffening ribs I (104) are arranged on the short steel member (100), a plurality of vertical bolt holes I (101) are formed in joints of two ends of the short steel member (100), and a plurality of horizontal bolt holes I (102) are formed in a steel plate at the lower end of the short steel member; a plurality of second stiffening ribs (204) are arranged on the long steel member (200), a plurality of second vertical bolt holes (201) are formed in the joints of the two ends of the long steel member (200), and a plurality of second horizontal bolt holes (202) are formed in the lower steel plate; the anchoring and positioning steel bars (300) are uniformly dispersed in the steel bar cage (401), the outer ends of the anchoring and positioning steel bars (300) are provided with screw threads (301), and the inner sides of the anchoring and positioning steel bars are provided with a plurality of matched reinforcing steel bars (302); and the short steel member (100) and the long steel member (200) are respectively provided with a first anchoring and positioning reinforcing steel bar hole (103) and a second anchoring and positioning reinforcing steel bar hole (203) which are used for penetrating the anchoring and positioning reinforcing steel bar (300).
2. The segment precast erection pier steel member of claim 1, wherein the first horizontal bolt holes (102) and the second horizontal bolt holes (202) are the same size.
3. A construction method of a pier using the segment precast erection pier steel member of any one of claims 1 to 2, comprising the steps of:
(1) binding the anchoring positioning steel bars (300) and the steel bar cage (401), reserving connecting steel bars (402) for connecting the segment piers (400) at two ends, and then pouring concrete (407) and maintaining;
(2) splicing two short steel members (100) at the lower end of the segmental pier (400) after the maintenance in the step (1) is finished, connecting two long steel members (200) at the upper end of the segmental pier (400) to form a cup mouth (405), and simultaneously connecting the short steel members (100) and the long steel members (200) with anchoring and positioning steel bars (300) through fixing bolts (404);
(3) concrete (407) is filled in the cup mouth (405) in the step (2) and vibrated, then the segmental pier (400) is assembled, connecting steel bars (402) are uniformly distributed at the splicing position, the short steel member (100) and the long steel member (200) are connected through high-strength bolts (403), after the concrete (407) is hardened, the short steel member (100) and the long steel member (200) are disassembled, and the segmental precast pier assembling construction is completed.
4. The construction method of the segment precast pier steel member according to claim 3, wherein in the step (2), two short steel members (100) are connected to the first vertical bolt hole (101) by a high strength bolt (403), and two long steel members (200) are connected to the second vertical bolt hole (201) by a high strength bolt (403).
5. The construction method of the segment precast pier steel member according to claim 3, wherein the long steel member (200) is embedded in the cap (500) to achieve the connection of the cap (200) and the segment pier (400).
6. The construction method of the segment precast pier steel member according to claim 3, wherein the short steel member (100) is embedded in the capping beam (600) to achieve the coupling of the capping beam (600) and the segment pier (400).
7. The construction method of segment precast pier steel members according to claim 3, wherein the short steel members (100) and the long steel members (200) are constructed using steel hoops.
8. Use of the segment prefabricated pier steel member of any one of claims 1 to 2 in construction of circular piers, rectangular piers, polygonal piers and round-ended rectangular hollow piers.
CN201910671403.1A 2019-07-24 2019-07-24 Segment prefabricated and assembled pier steel member and construction method and application thereof Active CN110387826B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201910671403.1A CN110387826B (en) 2019-07-24 2019-07-24 Segment prefabricated and assembled pier steel member and construction method and application thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201910671403.1A CN110387826B (en) 2019-07-24 2019-07-24 Segment prefabricated and assembled pier steel member and construction method and application thereof

Publications (2)

Publication Number Publication Date
CN110387826A CN110387826A (en) 2019-10-29
CN110387826B true CN110387826B (en) 2021-02-09

Family

ID=68287276

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201910671403.1A Active CN110387826B (en) 2019-07-24 2019-07-24 Segment prefabricated and assembled pier steel member and construction method and application thereof

Country Status (1)

Country Link
CN (1) CN110387826B (en)

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820546A (en) * 2019-11-21 2020-02-21 深圳大学 Concrete column high anti-seismic performance assembled connection structure
CN111576196A (en) * 2020-04-29 2020-08-25 中铁四局集团第二工程有限公司 On-site splicing pouring construction process for prefabricated pier column segment shell and bent cap
CN111519520B (en) * 2020-04-30 2021-04-20 招商局重庆交通科研设计院有限公司 Prefabricated type double-column pier capable of being assembled quickly

Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884502A (en) * 2017-03-29 2017-06-23 深圳市福田建安建设集团有限公司 A kind of reinforced concrete combination rod structure and same period pouring construction method

Family Cites Families (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100804125B1 (en) * 2007-02-28 2008-02-19 진성토건 주식회사 Connecting apparatus for precast concrete members, and fabricated bridge pier using the apparatus, and constructing method thereof
KR100905317B1 (en) * 2009-03-17 2009-07-02 (주)유림이엔디 Precast segment for structure and construction method therewith
KR100971003B1 (en) * 2009-04-09 2010-07-20 (주)대우건설 Match-casting concrete form and construction method for constructing assembling-type precast pier using thereof
CN206553957U (en) * 2017-03-14 2017-10-13 中交二公局第四工程有限公司 A kind of bridge construction cylinder pier position apparatus for form
CN208777149U (en) * 2018-08-01 2019-04-23 宁波交通工程建设集团有限公司 Packaged type bridges pier stud super high strength concrete connection structure
CN109914233A (en) * 2019-03-22 2019-06-21 西安建筑科技大学 A kind of bolted Precast Concrete Segmental Bridges concrete pier
CN109989339B (en) * 2019-05-05 2020-01-07 西南交通大学 Prefabricated segment pier and application thereof in bridge construction

Patent Citations (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106884502A (en) * 2017-03-29 2017-06-23 深圳市福田建安建设集团有限公司 A kind of reinforced concrete combination rod structure and same period pouring construction method

Also Published As

Publication number Publication date
CN110387826A (en) 2019-10-29

Similar Documents

Publication Publication Date Title
CN110387826B (en) Segment prefabricated and assembled pier steel member and construction method and application thereof
CN109736479B (en) Assembly type shear wall joint structure and splicing method thereof
CN202000251U (en) Cylindrical hollow prefabricated prestressed concrete pier structure
CN110820545B (en) Assembled concrete pier
CN109989339B (en) Prefabricated segment pier and application thereof in bridge construction
CN109610707B (en) Assembly structure with parallel and level prefabricated steel beams and floor slab and rapid construction method
CN105002816A (en) Prefabricated-assembling fish-bellied I-shaped prestress steel-concrete combination continuous beam bridge and construction method
CN205369005U (en) Joint construction of annular cross -section prefabricating bridge pier and cushion cap
CN210975503U (en) Large-span prefabricated assembled bent cap and pier stand connection structure
CN210916962U (en) Segmental precast beam of cantilever assembly bridge and splicing structure thereof
CN103938533A (en) Simple-supported continuous structure and construction method thereof
CN109457597B (en) Flat plate type modular prefabricated hollow pier splicing structure and manufacturing method thereof
CN211171555U (en) Large-span assembled bridge structure
CN111962386A (en) Energy-dissipation and shock-absorption type self-resetting prefabricated segment assembled pier structure and construction method thereof
CN210066817U (en) Assembly integral vault is striden no post underground structure greatly
CN210117650U (en) Prefabricated reinforced concrete bridge deck of non-modular post-cast strip
CN111188258A (en) Novel assembled bridge substructure
JP2000045229A (en) Constructing method of bridge
KR101576865B1 (en) Construction method of slab for bridge without support bar using converse T-type beams
CN109591183A (en) A kind of construction technology and precast beam unit of cantilevered shape of a hoof bent cap
CN212561132U (en) Prefabricated hollow pier of assembling of built-in floor in area
CN214116272U (en) Dumbbell type longitudinal connecting device suitable for bridge is assembled to festival segmentation cantilever
CN210856909U (en) Continuous beam assembled by prefabricated cantilever of side span non-wet joint segment
CN208441258U (en) Pin-connected panel beam-to-column joint structure
CN211036670U (en) Beam end processing structure for railway section prefabricated assembly beam

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant