CN208039789U - Parapet construction operation platform - Google Patents
Parapet construction operation platform Download PDFInfo
- Publication number
- CN208039789U CN208039789U CN201820420856.8U CN201820420856U CN208039789U CN 208039789 U CN208039789 U CN 208039789U CN 201820420856 U CN201820420856 U CN 201820420856U CN 208039789 U CN208039789 U CN 208039789U
- Authority
- CN
- China
- Prior art keywords
- parapet
- platform
- girder
- protection
- construction operation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides parapet construction operation platform, including protection canopy, be arranged parapet medial surface counterweight platform and external platform hanging in parapet lateral surface is set, protection canopy includes girder, secondary beam, reverse V-shaped roof bracket and the protective layer being laid on roof bracket, girder at least three and parallel interval are arranged, and secondary beam has four rows and the setting that is mutually parallel is between girder;Counterweight platform includes square floor, the frame in bottom plate edge position is arranged, column, clump weight and the universal wheel being arranged below bottom plate four corners;External platform hanging includes steel pedal, protection post, protection network and the frame in steel pedal edge position is arranged;There are the construction spaces being adapted with parapet to be built by laying bricks or stones between counterweight platform and external platform hanging.The utility model provides normalizing operation platform, solves the problems, such as that parapet construction needs are built and removed platform and delay the exterior wall duration and can have enough to meet the need reduction construction cost.
Description
Technical field
The utility model is related to construction ancillary equipment fields, and in particular to parapet construction operation platform.
Background technology
Parapet is typically the parapet of building roof all around, is arranged on the roof of some unit buildings, becomes building and applies
Essential and with closure part in work process plays the safety of protection staff, decoration is played to elevation of building, is fixed
The effects that malthoid or fixed waterproof roll.
Nowadays alien invasion moulding change is more when many project constructions, changes greatly, and the variation of parapet is especially pronounced, mesh
Preceding form of construction work the problem is that:1, parapet construction needs individually to build operating platform;2, the operating platform of parapet
It needs to remove after alien invasion construction, affects construction personnel in the time of outside of the building face installation form, prolong
The construction period is grown;3, level of operation is different, parapet operating platform disunity, cannot provide the construction environment of stable safety;
4, the turnover of parapet operating platform is inconvenient, and material lease expenses is high, increases construction cost.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide parapet construction operation platform, lead to
Cross the normalizing operation platform, solve the problems, such as parapet construction need build and remove platform delay the external wall construction duration,
The problem of security risk that the quality level disunity of operating platform leaves and platform cannot be used in turn increase construction cost
The problem of.
The utility model adopts the following technical solution:Parapet construction operation platform, including protection canopy 1, setting are in daughter
The counterweight platform 3 of side and external platform hanging 4 in parapet lateral surface is set within the walls,
Protection canopy 1 includes girder 11, secondary beam 12, reverse V-shaped roof bracket 13 and the protective layer being laid on roof bracket 13,
The girder 11 at least three and parallel interval are arranged, and the secondary beam 12 has four rows and the setting that is mutually parallel is in girder
Between 11;The roof bracket 13 is mounted on girder 11, is bolted between protective layer, roof bracket 13 and girder 11
1 ceiling of protection canopy is formed after fixation;
Counterweight platform 3 includes square floor 31, the frame, column 2, clump weight 32 in 31 edge position of bottom plate is arranged
With the universal wheel 33 being arranged below 31 four corners of bottom plate;It is connected by column 2 between counterweight platform 3 and girder 11;
External platform hanging 4 includes steel pedal 41, protection post 42, protection network 43 and is arranged in 41 edge position of steel pedal
Frame;It protection post 42 at least four and is vertically installed on 41 4 angles of steel pedal, leads between steel pedal 41 and girder 11
Cross the connection of protection post 42;Protection network 43 be vertically mounted on three edges of the steel pedal 41 far from parapet and with protection post 42
Lower part is fixedly connected;
There are the construction spaces being adapted with parapet to be built by laying bricks or stones between counterweight platform 3 and external platform hanging 4.
Further, 42 bottom of the protection post is fixedly connected with steel pedal 41,42 top of protection post and parapet lateral surface
Girder 11 be fixedly connected with the connecting node of secondary beam 12.
Further, the hanging ring for coordinating lifting appliance operation is additionally provided on girder 11.
Further, it at least six roots of sensation of column 2 and is symmetricly set on one group of opposite side of bottom plate 31,2 bottom of column and bottom plate
31 are fixedly connected, and the girder 11 of 2 top of column and parapet medial surface is fixedly connected with the connecting node of secondary beam 12.
Further, 11 length of girder is more than 12 length of secondary beam.
Further, the material of girder 11 and secondary beam 12 is I16 I-steel.
Further, it is additionally provided with retainer on universal wheel 33.
Further, external platform hanging 4 further includes that the supporting rod in 41 bottom of steel pedal is arranged at least three parallel interval fittings.
Further, the material of frame and protection post 42 is L4 angle steel.
Further, 4 load-bearing of external platform hanging is 40-100kg.
The utility model has the characteristics that and advantageous effect compared with prior art:
(1)Parapet construction operation platform provided by the utility model, it is ingenious in design reasonable, it is simple in structure, it is easy to use,
1 cost input is only needed, can repeatedly be used in turn, effectively reduce construction cost, meets requirement of the country to green construction.
(2)It can be used in use, being hoisted to operation platform by tower crane, it is no longer necessary to build flat in the scene of wasting time
Platform, need not also remove platform after use, handling can carry out subsequent construction step after walking, greatly shorten the construction period.
Construction cost and cost of labor can be substantially reduced while accelerating construction progress.
(3)Parapet construction operation platform provided by the utility model, it is ensured that construction personnel is normal in outside of the building
Installation form.Using operating platform provided by the utility model, outrigger can premature removal, it is not necessary to after facade is stablized
It removes again, circulation material lease expenses has been saved for project, protection safety guarantee and preferable construction are provided for construction personnel
Environment.
The utility model can be widely applied in parapet construction.
Other features and advantages of the utility model will illustrate in the following description, and partly from specification
It becomes apparent, or is understood by implementing the utility model.The main purpose and further advantage of the utility model can lead to
Specifically noted scheme in specification, claims is crossed to realize and obtain.
Description of the drawings
Fig. 1 is the utility model side view;
Fig. 2 is girder and secondary beam attachment structure schematic diagram;
Fig. 3 is counterweight platform bottom surface structure schematic diagram;
Fig. 4 is external platform hanging bottom surface structure schematic diagram;
Fig. 5 the utility model stereograms.
Reference numeral:1- protection canopies, 11- girders, 12- secondary beams, 13- roof brackets,
2- columns, 3- counterweight platforms, 31- bottom plates, 32- clump weights, 33- universal wheels,
4- external platform hangings, 41- steel pedal, 42- protection posts, 43- protection networks.
Specific implementation mode
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation
Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only explaining this
Utility model is not used to limit the utility model.
The utility model provides parapet construction operation platform, it is ensured that construction personnel is in outside of the building normal mounting mould
Plate.Circulation material lease expenses has been saved for project, protection safety guarantee and preferable construction environment are provided for construction personnel.
As shown in Figure 1, the utility model specifically includes protection canopy 1, is arranged in the counterweight platform 3 of parapet medial surface and setting in female
The external platform hanging 4 of youngster's wall lateral surface, protection canopy 1 include girder 11, secondary beam 12, reverse V-shaped roof bracket 13 and the roof branch that is laid in
Protective layer on frame 13, the roof bracket 13 are welded by model L4 angle steel.Protective layer can be color steel tile protective plate.
Wherein, 11 length of girder is more than 12 length of secondary beam;The material of girder 11 and secondary beam 12 can be I16 I-steel.On girder 11
It is also provided with the hanging ring for coordinating lifting appliance operation.
As shown in Fig. 2, the perforation of the girder 11 setting, at least three and parallel interval are arranged, the secondary beam 12 has
The four rows and setting that is mutually parallel is between girder 11;The roof bracket 13 is mounted on girder 11, protective layer, roof branch
It is bolted between frame 13 and girder 11 after fixing and forms 1 ceiling of protection canopy;Counterweight platform 3 includes square floor 31, sets
It sets the frame in 31 edge position of bottom plate, column 2, clump weight 32 and is arranged universal below the four corners of bottom plate 31
33 are taken turns, is also provided on universal wheel 33 for preventing counterweight platform 3 from generating sliding dynamic stop during construction operation
Device, and then improve construction safety coefficient;It is connected by column 2 between counterweight platform 3 and girder 11.Wherein, column 2 at least six
Root is simultaneously symmetricly set on one group of opposite side of bottom plate 31, and 2 bottom of column is fixedly connected with bottom plate 31,2 top of column and parapet
The girder 11 of medial surface is fixedly connected with the connecting node of secondary beam 12.
Together refering to Fig. 5, external platform hanging 4 includes steel pedal 41, protection post 42, protection network 43, is arranged in steel pedal 41 4
The supporting rod in 41 bottom of steel pedal is arranged in the frame of circumferential edges position and at least three parallel interval fittings, referring to Fig. 3,4
It is shown.It protection post 42 at least four and is vertically installed on four angles of steel pedal 41, between steel pedal 41 and girder 11
It is connected by protection post 42;42 bottom of protection post is fixedly connected with steel pedal 41,42 top of protection post and parapet lateral surface
Girder 11 is fixedly connected with the connecting node of secondary beam 12.
Protection network 43 is vertically mounted on three edges of the steel pedal 41 far from parapet and is fixed with 42 lower part of protection post
Connection;There are the construction spaces being adapted with parapet to be built by laying bricks or stones between counterweight platform 3 and external platform hanging 4.Wherein, frame and anti-
The material of guard post 42 is L4 angle steel.4 load-bearing of external platform hanging that the utility model provides parapet construction operation platform is 40-
100kg can simultaneously be used at most 2 workers.
The specific making and use method of the utility model, following steps:
Step 1:Parapet construction operation platform is hung to roofing with tower crane, adjusts parapet construction operation platform position
It sets, starts retainer;
Step 2:Appropriate clump weight 32 is placed in counterweight platform 3;Clump weight 32 can be sandbag;
Step 3:Construction personnel enters external platform hanging 4 and constructs;
Step 4:After daughter's wall form installs, construction personnel leaves external platform hanging 4, unified casting concrete;
Step 5:With tower crane ground is hung to by parapet construction operation platform is operated.
When the utility model is used, parapet construction operation platform operation platform is hoisted to by tower crane to can be used,
No longer the scene of wasting time is needed to set for this platform, platform need not be also removed after use, handling can carry out subsequently after walking
Construction procedure greatly shortens the construction period.Construction cost and cost of labor can be substantially reduced while accelerating construction progress,
Meet requirement of the country to green construction.
The foregoing is merely the preferable specific implementation mode of the utility model, but the scope of protection of the utility model not office
Be limited to this, variation that any one skilled in the art is expected within the technical scope disclosed by the utility model or
It replaces, should be covered within the scope of the utility model.
Claims (10)
1. parapet construction operation platform, which is characterized in that including protection canopy(1), be arranged parapet medial surface match galassing
Platform(3)And the external platform hanging in parapet lateral surface is set(4),
Protection canopy(1)Including girder(11), secondary beam(12), reverse V-shaped roof bracket(13)With the roof bracket that is laid in(13)On
Protective layer, the girder(11)At least three and parallel interval setting, the secondary beam(12)There are four rows and is mutually parallel
Setting in girder(11)Between;The roof bracket(13)Mounted on girder(11)On, protective layer, roof bracket(13)With master
Beam(11)Between be bolted it is fixed after form protection canopy(1)Ceiling;
Counterweight platform(3)Including square floor(31), be arranged in bottom plate(31)Frame, the column of edge position(2), counterweight
Block(32)With setting in bottom plate(31)Universal wheel below four corners(33);Counterweight platform(3)With girder(11)Between pass through
Column(2)Connection;
External platform hanging(4)Including steel pedal(41), protection post(42), protection network(43)With setting in steel pedal(41)Edge
The frame of position;Protection post(42)At least four and it is vertically installed at steel pedal(41)On four angles, steel pedal(41)With
Girder(11)Between pass through protection post(42)Connection;Protection network(43)It is vertically mounted on steel pedal(41)Three far from parapet
On edge and and protection post(42)Lower part is fixedly connected;
Counterweight platform(3)With external platform hanging(4)Between there are with parapet to be built by laying bricks or stones be adapted construction space.
2. parapet construction operation platform as described in claim 1, which is characterized in that the protection post(42)Bottom is stepped on steel
Plate(41)It is fixedly connected, protection post(42)The girder at top and parapet lateral surface(11)With secondary beam(12)Connecting node fix
Connection.
3. parapet construction operation platform as described in claim 1, which is characterized in that girder(11)On be additionally provided with for matching
Close the hanging ring for hanging equipment operation.
4. parapet construction operation platform as described in claim 1, which is characterized in that column(2)At least six roots of sensation and symmetrical
It is arranged in bottom plate(31)One group of opposite side on, column(2)Bottom and bottom plate(31)It is fixedly connected, column(2)Top and parapet
The girder of medial surface(11)With secondary beam(12)Connecting node be fixedly connected.
5. parapet construction operation platform as described in claim 1, which is characterized in that girder(11)Length is more than secondary beam(12)
Length.
6. parapet construction operation platform as described in claim 1, which is characterized in that girder(11)And secondary beam(12)Material
It is I16 I-steel.
7. parapet construction operation platform as described in claim 1, which is characterized in that universal wheel(33)On be additionally provided with stop
Device.
8. parapet construction operation platform as described in claim 1, which is characterized in that external platform hanging(4)Further include at least three
The fitting of root parallel interval is arranged in steel pedal(41)The supporting rod of bottom.
9. parapet construction operation platform as described in claim 1, which is characterized in that frame and protection post(42)Material it is equal
For L4 angle steel.
10. parapet construction operation platform as described in claim 1, which is characterized in that external platform hanging(4)Load-bearing is 40-
100kg。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820420856.8U CN208039789U (en) | 2018-03-27 | 2018-03-27 | Parapet construction operation platform |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820420856.8U CN208039789U (en) | 2018-03-27 | 2018-03-27 | Parapet construction operation platform |
Publications (1)
Publication Number | Publication Date |
---|---|
CN208039789U true CN208039789U (en) | 2018-11-02 |
Family
ID=63945888
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820420856.8U Active CN208039789U (en) | 2018-03-27 | 2018-03-27 | Parapet construction operation platform |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN208039789U (en) |
-
2018
- 2018-03-27 CN CN201820420856.8U patent/CN208039789U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103758341B (en) | Steel column drum rack support type hydraulic lifting overall steel platform cross truss layer construction method | |
CN103741947B (en) | Tube-frame-supporting type hydraulic climbing integral steel platform formwork truss layer construction method | |
US10731327B2 (en) | Structure and method of making the same | |
CN110512719B (en) | Construction method of large-span interval corridor high-altitude formwork steel platform for high-rise residence | |
CN108331336A (en) | The integrated lifting steel plateform system and its construction method of floor synchronous construction | |
CN109457951A (en) | Contracture shear wall form frame system and its construction method | |
CN107816173A (en) | Building in the style of the ancients wood eave-rafter and cast-in-situ steel reinforced concrete Guttr board monolithic construction method | |
CN108049666B (en) | A kind of echelon installation method of super plane multilayer steel truss electronic workshop steel construction | |
US3364647A (en) | Method for erecting tall buildings with balconies | |
CN102912996A (en) | Steel tube concrete column high-altitude construction safety protection system | |
CN209620571U (en) | Contracture shear wall form frame system | |
CN202954552U (en) | Steel tube concrete column high-altitude construction safety protection system | |
CN107100361A (en) | Inner support aluminum dipping form device and its installation method are climbed outside a kind of | |
CN208039789U (en) | Parapet construction operation platform | |
CN105625732B (en) | Superelevation overhanging steel structure truss support free construction method | |
CN107268971A (en) | A kind of super high rise building it is dual from hoisting type outer climbing frame and application process | |
CN201714056U (en) | Truss-type operating platform | |
CN108331326A (en) | Monoblock type mould bases and its construction method for Super High fission conjoined composite structure | |
CN209482678U (en) | Integrally hoisting steel platform for irregular wall construction | |
CN204876516U (en) | Hard protector of core section of thick bamboo inner tube upper portion die carrier system | |
CN208734045U (en) | Monoblock type mould bases for Super High fission conjoined composite structure | |
CN107035037B (en) | Tower top curtain wall frame and mounting method thereof | |
CN105781159A (en) | Construction process for reinforced concrete coal hopper of power plant main building | |
CN211597658U (en) | Movable overhanging scaffold | |
CN208152551U (en) | There is the dedicated rack device that climbs of skin concrete structure outer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |