CN208039261U CN201721859467.7U CN201721859467U CN208039261U CN 208039261 U CN208039261 U CN 208039261U CN 201721859467 U CN201721859467 U CN 201721859467U CN 208039261 U CN208039261 U CN 208039261U
Authority
CN
China
Prior art keywords
foundation pit
show area
engineering
area
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721859467.7U
Other languages
Chinese (zh)
Inventor
叶文弘
李克
李彬
肖中林
上官伟
钟岩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Cross Strait Construction Investment Development Co Ltd
Original Assignee
China Cross Strait Construction Investment Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Cross Strait Construction Investment Development Co Ltd filed Critical China Cross Strait Construction Investment Development Co Ltd
Priority to CN201721859467.7U priority Critical patent/CN208039261U/en
Application granted granted Critical
Publication of CN208039261U publication Critical patent/CN208039261U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a kind of Metro Deep Excavation construction experience apparatus comprising foundation pit ontology, foundation pit ontology are surrounded by ground-connecting-wall, and the head clearance of ground-connecting-wall both sides is supported equipped with multiple concretes, and multiple bracing members are equipped at intervals in the middle part of ground-connecting-wall both sides;One end of the foundation pit ontology is equipped with step structure, and the other end of foundation pit ontology is equipped with top plate, middle plate and bottom plate, forms station hall layer between top plate and middle plate from bottom to up, and station layer is formed between middle plate and bottom plate, and the lower section of top plate is equipped with form work engineering show area;Bottom plate is equipped with main body cast in place reinforced bar engineering show area close to one end of step structure;The surface of top plate is equipped with waterproofing work show area.The utility model can simulate the deep basal pit during subway work and illustrate Sloping engineering, main body cast in place reinforced bar engineering, waterproofing work and the form work engineering of underground station etc. of the construction of subway open cut engineering method, give visitor feeling on the spot in person, to promote cognition of the visitor to subway deep foundation pit construction.

Description

A kind of Metro Deep Excavation construction experience apparatus
Technical field
The utility model is related to subway work field more particularly to a kind of Metro Deep Excavation construction experience apparatus.
Background technology
Deep foundation pit construction is mainly concerned with the Sloping engineering of underground station, main body cast in place reinforced bar structure in subway work Engineering, waterproofing work and form work engineering etc..However existing many people are only limited to the introduction of knowledge on books, it can not be personally real Experience Metro Deep Excavation construction in border.
Invention content
In order to solve deficiency in the prior art, the purpose of this utility model is to provide one kind capable of showing true deep base The Metro Deep Excavation construction experience apparatus of hole construction.
To achieve the above object, the utility model uses following technical scheme:
A kind of Metro Deep Excavation construction experience apparatus, including foundation pit ontology, foundation pit ontology are surrounded by ground-connecting-wall, and ground connects The head clearance of wall both sides is supported equipped with multiple concretes, and multiple bracing members are equipped at intervals in the middle part of ground-connecting-wall both sides;The foundation pit sheet One end of body is equipped with step structure, and the other end of foundation pit ontology is equipped with top plate, middle plate and bottom plate from bottom to up, top plate and middle plate it Between form station hall layer, form station layer between middle plate and bottom plate, the lower section of the top plate is equipped with form work engineering show area;The bottom Plate is equipped with main body cast in place reinforced bar engineering show area close to one end of step structure;The surface of the top plate is equipped with waterproofing work exhibition Show area.
The form work engineering show area is made of panel system show area and support system show area.
The main body cast in place reinforced bar engineering show area is by column cast in place reinforced bar configuration shows area, plate body cast in place reinforced bar structure exhibition Show area and side wall cast in place reinforced bar configuration shows district's groups at.
The waterproofing work show area is by base show area, first pass waterproof show area, second time waterproof show area and attached Add a layer show area composition.
The side wall of the foundation pit ontology is equipped with different process and the standardized display board of process in deep foundation pit construction.
The utility model uses above technical scheme, simulates the deep basal pit during subway work and to illustrate subway bright Sloping engineering, main body cast in place reinforced bar engineering, waterproofing work and the form work engineering of underground station etc. for digging engineering method construction, to ginseng Onlooker's feeling on the spot in person, to promote cognition of the visitor to subway deep foundation pit construction.
Description of the drawings
The utility model is described in further details below in conjunction with the drawings and specific embodiments;
Fig. 1 is the internal view of the utility model;
Fig. 2 is the vertical view of the utility model.
Specific implementation mode
As shown in Figure 1 or 2, the utility model includes foundation pit ontology 1, and foundation pit ontology 1 is surrounded by ground-connecting-wall 2, ground Even the head clearance of 2 both sides of wall is equipped with multiple concretes and supports 3, and ground-connecting-wall is equipped at intervals with multiple bracing members 4 in the middle part of 2 both sides;It is described One end of foundation pit ontology 1 is equipped with step structure 5, and the other end of foundation pit ontology 1 is equipped with top plate 6, middle plate 7 and bottom plate 8 from bottom to up, Station hall layer is formed between top plate 6 and middle plate 7, forms station layer between middle plate 7 and bottom plate 8, and the lower section of the top plate 6 is equipped with template Engineering show area 9;The bottom plate is equipped with main body cast in place reinforced bar engineering show area 10 by one end of 8 close-table stage structures 5;The top The surface of plate 6 is equipped with waterproofing work show area 12.
The form work engineering show area 9 is made of panel system show area 91 and support system show area 92.
The main body cast in place reinforced bar engineering show area 10 is by column cast in place reinforced bar configuration shows area 101, plate body cast in place reinforced bar Configuration shows area 102 and side wall cast in place reinforced bar configuration shows area 103 form.
The waterproofing work show area 12 is by base show area 121,122nd area of first pass waterproof show area, second time waterproof Show area 123 and extra play show area 124 form.
The side wall of the foundation pit ontology 1 is equipped with different process and the standardized display board of process in deep foundation pit construction(Figure In be not shown).
The utility model uses above technical scheme, simulates the deep basal pit during subway work and to illustrate subway bright Sloping engineering, main body cast in place reinforced bar engineering, waterproofing work and the form work engineering of underground station etc. for digging engineering method construction, to ginseng Onlooker's feeling on the spot in person, to promote cognition of the visitor to subway deep foundation pit construction.

Claims (5)

  1. The experience apparatus 1. a kind of Metro Deep Excavation is constructed, it is characterised in that:Including foundation pit ontology, foundation pit ontology is surrounded by ground The head clearance of even wall, ground-connecting-wall both sides is supported equipped with multiple concretes, and multiple bracing members are equipped at intervals in the middle part of ground-connecting-wall both sides;Institute The one end for stating foundation pit ontology is equipped with step structure, and the other end of foundation pit ontology is equipped with top plate, middle plate and bottom plate, top plate from bottom to up Station hall layer is formed between middle plate, forms station layer between middle plate and bottom plate, and the lower section of the top plate is shown equipped with form work engineering Area;The bottom plate is equipped with main body cast in place reinforced bar engineering show area close to one end of step structure;The surface of the top plate is equipped with Waterproofing work show area.
  2. The experience apparatus 2. a kind of Metro Deep Excavation according to claim 1 is constructed, it is characterised in that:The form work engineering exhibition Show that area is made of panel system show area and support system show area.
  3. The experience apparatus 3. a kind of Metro Deep Excavation according to claim 1 is constructed, it is characterised in that:The cast-in-place steel of main body Muscle engineering show area is by column cast in place reinforced bar configuration shows area, plate body cast in place reinforced bar configuration shows area and side wall cast in place reinforced bar structure Show area forms.
  4. The experience apparatus 4. a kind of Metro Deep Excavation according to claim 1 is constructed, it is characterised in that:The waterproofing work exhibition Show that area is made of base show area, first pass waterproof show area, second time waterproof show area and extra play show area.
  5. The experience apparatus 5. a kind of Metro Deep Excavation according to claim 1 is constructed, it is characterised in that:The foundation pit ontology Side wall is equipped with different process and the standardized display board of process in deep foundation pit construction.
CN201721859467.7U 2017-12-26 2017-12-26 A kind of Metro Deep Excavation construction experience apparatus Expired - Fee Related CN208039261U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721859467.7U CN208039261U (en) 2017-12-26 2017-12-26 A kind of Metro Deep Excavation construction experience apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721859467.7U CN208039261U (en) 2017-12-26 2017-12-26 A kind of Metro Deep Excavation construction experience apparatus

Publications (1)

Publication Number Publication Date
CN208039261U true CN208039261U (en) 2018-11-02

Family

ID=63955971

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721859467.7U Expired - Fee Related CN208039261U (en) 2017-12-26 2017-12-26 A kind of Metro Deep Excavation construction experience apparatus

Country Status (1)

Country Link
CN (1) CN208039261U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109538245A (en) * 2018-12-04 2019-03-29 中铁十二局集团有限公司 A kind of no column stalk vault subway station formwork jumbo and its construction method
CN111828013A (en) * 2020-07-21 2020-10-27 中铁隧道局集团有限公司 Ground shield tunnel experiment entity model and construction method thereof

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109538245A (en) * 2018-12-04 2019-03-29 中铁十二局集团有限公司 A kind of no column stalk vault subway station formwork jumbo and its construction method
CN109538245B (en) * 2018-12-04 2020-05-15 中铁十二局集团有限公司 Construction method of template trolley for non-column straight-wall vault subway station
CN111828013A (en) * 2020-07-21 2020-10-27 中铁隧道局集团有限公司 Ground shield tunnel experiment entity model and construction method thereof
CN111828013B (en) * 2020-07-21 2022-05-03 中铁隧道局集团有限公司 Ground shield tunnel experiment entity model and construction method thereof

Similar Documents

Publication Publication Date Title
CN208039261U (en) A kind of Metro Deep Excavation construction experience apparatus
CN208884795U (en) A kind of shock isolating pedestal of platform steel reinforced concrete curtain wall column
CN109184150A (en) A kind of existing multi-storey building of cold district installs the prefabricated assembled hoistway of elevator and its construction method additional
CN103938652A (en) Underground rail transit station architectural structure
Orlenko et al. Art-clusters as a new type of buildings: The specificity of the spatial solution and the features of restoration during the redevelopment process (the experience of Poland)
CN107299764A (en) A kind of concrete apparatus and construction method for being conveniently constructed the positioning of post cage bar
CN103578346B (en) A kind of simply supported girder bridge teaching simulation structure
CN206189288U (en) Municipal works are with wall that gives sound insulation
Shackel Local identity, national memory, and heritage tourism: Creating a sense of place with archaeology
CN103696618A (en) Assembled guard handrail for constructional engineering and road engineering
CN207143746U (en) Support beam template system under concrete support trestle plate
CN208848485U (en) Shear wall and raft foundation construction teaching facilities
CN106097876A (en) Board-like concrete stair structure model and manufacture method
CN208501694U (en) A kind of prefabricated component for close to type foundation pit
CN208848484U (en) Housing construction teaching facilities
CN203834516U (en) Rail transit underground station building structure
CN203588579U (en) Teaching simulation structural body of simply supported beam bridge
CN106088599B (en) Basement ground floor structure is first open rear enclosed construction method between groups of building
CN104895196A (en) Hidden steel corbel type beam column hinged node and construction method thereof
PL1936039T3 (en) Method of strengthening foundations comprising a slab buried in the ground, in particular foundations for pylons, and structure obtained
CN206513056U (en) Prefabricated porous plate end anti-slip ruggedized construction
CN207211471U (en) A kind of Buddhism dome innervation scale moulding anti-deformation design structure
CN206805907U (en) The experience apparatus of steel construction potential safety hazard
CN106157794A (en) Column foundation model and preparation method with anchor bolt box
CN201195894Y (en) Heat-insulation sound-blocking and weight-losing device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181102