CN208009896U - A kind of construction column template and the fixed attachment device of wall - Google Patents

A kind of construction column template and the fixed attachment device of wall Download PDF

Info

Publication number
CN208009896U
CN208009896U CN201820358114.7U CN201820358114U CN208009896U CN 208009896 U CN208009896 U CN 208009896U CN 201820358114 U CN201820358114 U CN 201820358114U CN 208009896 U CN208009896 U CN 208009896U
Authority
CN
China
Prior art keywords
formwork
wall
fixed
template
rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820358114.7U
Other languages
Chinese (zh)
Inventor
张大海
火高德
张鑫
杨雪芳
孙雁斌
樵永康
何军
韩雪兰
王天亮
刘小锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu 6th Construction Group Ltd Co
Original Assignee
Gansu 6th Construction Group Ltd Co
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu 6th Construction Group Ltd Co filed Critical Gansu 6th Construction Group Ltd Co
Priority to CN201820358114.7U priority Critical patent/CN208009896U/en
Application granted granted Critical
Publication of CN208009896U publication Critical patent/CN208009896U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model is related to technical field of building construction, its purpose is to provide a kind of construction column templates and the fixed attachment device of wall, the fixation of existing construction column template and wall, which can effectively be solved, can destroy wall, the high problem of working strength, including screw rod through walls, collapsible form and fixed form, the collapsible form and fixed form are made of the first template and the second template being hinged, it is both provided with reinforcing plate in first template and the second template, groove is installed in reinforcing plate, top is provided with card slot, the through-hole to match with screw rod through walls is installed on groove, connecting hole is offered among one end, connecting hole is movably connected with supporting rod and supporting rod seat bottom end, advantage is:By the way that original template is changed into two plate body structures being hinged, and so that the angle at itself and wall turning is more agreed with by the cooperation of supporting rod and supporting rod seat, and then reduce the recondition in later stage, helps to improve working efficiency, reduce working strength.

Description

一种构造柱模板与墙体固定的连接装置A connection device for fixing a structural column formwork to a wall

技术领域technical field

本实用新型涉及建筑施工技术领域,尤其涉及一种构造柱模板与墙体固定的连接装置。The utility model relates to the technical field of building construction, in particular to a connection device for fixing a construction column formwork and a wall.

背景技术Background technique

构造柱是砖混结构建筑中重要的砼构件。为提高多层建筑砌体结构的抗震性能,规范要求应在房屋的砌体内适宜部位设置钢筋混凝土柱并与圈梁连接,共同加强建筑物的稳定性。这种钢筋混凝土柱通常就被称为构造柱。构造柱,主要不是承担竖向荷载的,而是抗击剪力,抗震等横向荷载的。构造柱通常设置在楼梯间的休息平台处,纵横墙交界处,墙的转角处,墙长达到五米的中间部位要设构造柱。近年来为提高砌体结构的承载能力或稳定性而又不增大截面尺寸,墙中的构造柱已不仅仅设置在房屋墙体转角、边缘部位,而按需要设置在墙体的中间部位,圈梁必须设置成封闭状。现有构造柱均通过构造柱模板浇筑而成,在浇筑混凝土的时候,通常需要先用建筑板组装成构造柱盒子,随后将混凝土倒在该盒子内,待混凝土完全干透,再将建筑板取下,此时便完成构造柱成型。现在对于端部构造柱建筑板的加固,大部分都是采用传统步步紧进行夹紧加固,但是步步紧在使用的时候,需要一端固定,而后敲打活动端去夹紧固定模板,但在使用步步紧进行夹紧之前,要在已经砌筑好的填充墙上打洞,此举极易对墙体造成损坏,在使用步步紧夹紧固定模板的时候,由于步步紧能够覆盖的面积比较狭小,并且步步紧作为一种简单的机械结构,在使用的过程中难免会出现偏差或者损坏,由此而产生不能完全夹紧而发生爆模漏浆的危险,严重影响施工进度,降低工程施工效率。因而设计一种能够降低对墙体损坏的构造柱模板与墙体固定的连接装置是非常有必要的。Structural columns are important concrete components in brick-concrete structures. In order to improve the seismic performance of the masonry structure of multi-storey buildings, the code requires that reinforced concrete columns should be installed in appropriate parts of the masonry of the house and connected with ring beams to jointly enhance the stability of the building. Such reinforced concrete columns are often called structural columns. Structural columns are not mainly used to bear vertical loads, but to resist shear forces, earthquakes and other lateral loads. Structural columns are usually set at the rest platform in the stairwell, at the junction of vertical and horizontal walls, at the corner of the wall, and at the middle part of the wall up to five meters long. In recent years, in order to improve the bearing capacity or stability of the masonry structure without increasing the cross-sectional size, the structural columns in the wall are not only set at the corners and edges of the wall of the house, but also in the middle of the wall as required. The ring beam must be set in a closed shape. The existing structural columns are all poured through the structural column formwork. When pouring concrete, it is usually necessary to assemble the structural column box with the building board first, and then pour the concrete into the box. After the concrete is completely dry, the building board is removed. Next, the formation of the structural column is completed at this time. Now, for the reinforcement of the end construction column building board, most of them are clamped and reinforced by traditional step-by-step tightening, but when step-by-step tightening is used, one end needs to be fixed, and then the movable end is tapped to clamp and fix the formwork, but in Before using step by step to clamp, it is necessary to make holes in the infill wall that has been built. This is very easy to cause damage to the wall. When using step by step to clamp and fix the formwork, because step by step can cover The area is relatively small, and as a simple mechanical structure, it is inevitable that there will be deviation or damage during use, resulting in the risk of mold explosion and slurry leakage due to incomplete clamping, which seriously affects the construction progress. , reducing construction efficiency. Therefore, it is very necessary to design a connection device for fixing the structural column formwork and the wall that can reduce the damage to the wall.

实用新型内容Utility model content

本实用新型所要解决的技术问题在于,针对现有构造柱模板与墙体的固定会破坏墙体、工作强度高、不易固定的问题,提供了一种构造柱模板与墙体固定的连接装置,通过将构造柱单个模板改变为两个相互铰接的板体结构,并通过支撑杆和支撑杆座的配合使用能够使其与墙拐角的角度更加契合,进而降低后期的修整工作,有助于降低工作人员的工作强度,同时通过穿墙螺杆将两个模板进行固定,能够在不破坏墙体的前提下对构造柱模板进行固定,进而降低对墙体的破坏,有助于提高工作效率。The technical problem to be solved by the utility model is to provide a connection device for fixing the structural column formwork and the wall in view of the problems that the fixing of the existing structural column formwork and the wall will destroy the wall, the work strength is high, and it is not easy to fix. By changing the single formwork of the structural column into two mutually hinged plate structures, and through the use of the supporting rod and the supporting rod seat, it can be more in line with the angle of the corner of the wall, thereby reducing the later repair work and helping to reduce The working strength of the staff, and at the same time, the two formworks are fixed by the through-wall screw, which can fix the structural column formwork without destroying the wall, thereby reducing the damage to the wall and helping to improve work efficiency.

为了实现上述目的,本实用新型采用的技术方案是:In order to achieve the above object, the technical solution adopted by the utility model is:

一种构造柱模板与墙体固定的连接装置,包括活动模板1和固定模板2,所述活动模板1和固定模板2之间贯穿设置有穿墙螺杆6,其特征在于:A connection device for fixing a construction column formwork to a wall, comprising a movable formwork 1 and a fixed formwork 2, and a wall-penetrating screw 6 is arranged between the movable formwork 1 and the fixed formwork 2, and is characterized in that:

所述活动模板1和固定模板2均由相互铰接的第一模板101和第二模板102构成,第一模板101和第二模板102上均焊接固定设置有加强板8;Both the movable formwork 1 and the fixed formwork 2 are composed of a first formwork 101 and a second formwork 102 hinged to each other, and the first formwork 101 and the second formwork 102 are welded and fixed with a reinforcing plate 8;

所述加强板8通过模具浇筑而来,其上留设有凹槽7,顶部设置有若干间断的卡槽5,凹槽7中间为矩形,其上留设有与穿墙螺杆6相匹配的通孔10,靠近第一模板101和第二模板102铰接处的一端与加强板8的末端在同一个面上,另一端中间为半圆形,其上开设有用于连接孔11;The reinforcing plate 8 is poured through a mold, and a groove 7 is left on it, and a number of intermittent slots 5 are arranged on the top. The through hole 10, one end close to the hinge of the first template 101 and the second template 102, is on the same surface as the end of the reinforcing plate 8, and the middle of the other end is a semicircle, on which there is a connection hole 11;

所述连接孔11分别通过转轴与位于支撑杆3和支撑杆座9底端的连接座12活动连接在一起,所述支撑杆3主要由连接座12和连杆本体302组成,连杆本体302的自由端设置有螺纹端301,所述支撑杆座9主要由顶板901、固定杆902、底板903、圆孔904和连接座12组成,底板903固定设置在连接座12顶端,其上两端分别固定设置有固定杆902,固定杆902的顶端固定设置有顶板901,顶板901上留设有与螺纹端301相匹配的圆孔904。The connecting holes 11 are movably connected to the connecting seat 12 at the bottom of the supporting rod 3 and the supporting rod seat 9 through the rotating shaft respectively. The supporting rod 3 is mainly composed of the connecting seat 12 and the connecting rod body 302. The connecting rod body 302 The free end is provided with a threaded end 301. The support rod seat 9 is mainly composed of a top plate 901, a fixed rod 902, a bottom plate 903, a round hole 904 and a connecting seat 12. The bottom plate 903 is fixedly arranged on the top of the connecting seat 12, and the two ends on it are respectively A fixed rod 902 is fixedly arranged, and a top plate 901 is fixedly arranged on the top of the fixed rod 902 , and a circular hole 904 matching the threaded end 301 is left on the top plate 901 .

所述活动模板1和固定模板2的内表面上均涂刷有混凝土脱模剂。Both the inner surfaces of the movable formwork 1 and the fixed formwork 2 are coated with a concrete release agent.

所述穿墙螺杆6上位于活动模板1和固定模板2中间的位置上套设有PVC管4。A PVC pipe 4 is sheathed on the wall-through screw 6 at a position between the movable formwork 1 and the fixed formwork 2 .

本实用新型的有益效果:通过将构造柱单个模板改变为两个相互铰接的板体结构,并通过支撑杆和支撑杆座的配合使用能够使其与墙拐角的角度更加契合,进而降低后期的修整工作,同时通过穿墙螺杆将两个模板进行固定,能够在不破坏墙体的前提下对构造柱模板进行固定,进而降低对墙体的破坏,有助于提高工作效率,另外穿墙螺杆上PVC管的套设,便于后期穿墙螺杆的脱离,减少了工作强度,此外活动模板和固定模板内侧面涂刷的混凝土脱模剂能够有效保护模板,延长模板的寿命,可确保模板置于室外或阴雨天而不生锈,还能够提高构造柱的外观质量。Beneficial effects of the utility model: by changing the single formwork of the construction column into two mutually hinged plate structures, and through the cooperative use of the support rod and the support rod seat, the angle of the corner of the wall can be more compatible, thereby reducing the later stage. Repairing work, at the same time, the two formworks are fixed by the through-wall screw, which can fix the structural column formwork without destroying the wall, thereby reducing the damage to the wall and helping to improve work efficiency. In addition, the through-wall screw The upper PVC pipe is set to facilitate the detachment of the wall-penetrating screw in the later stage, reducing the work intensity. In addition, the concrete release agent painted on the inner side of the movable formwork and the fixed formwork can effectively protect the formwork, prolong the life of the formwork, and ensure that the formwork is placed It will not rust outdoors or in rainy days, and it can also improve the appearance quality of the structural column.

附图说明Description of drawings

图1是本实用新型实施例的结构示意图。Fig. 1 is a schematic structural view of an embodiment of the utility model.

图2是本实用新型实施例的结构主视图。Fig. 2 is a structural front view of the embodiment of the utility model.

图3是本实用新型实施例的结构侧视图。Fig. 3 is a structural side view of the embodiment of the utility model.

图4是本实用新型实施例活动模板的结构示意图。Fig. 4 is a schematic structural diagram of the movable formwork of the embodiment of the present invention.

图5是本实用新型实施例支撑杆的结构示意图。Fig. 5 is a schematic structural view of a support rod in an embodiment of the present invention.

图6是本实用新型实施例的支撑杆座结构示意图。Fig. 6 is a schematic diagram of the structure of the support rod base of the embodiment of the present invention.

附图序号及名称:活动模板1、固定模板2、支撑杆3、PVC管4、卡槽5、穿墙螺杆6、凹槽7、加强板8、支撑杆座9、通孔10、连接孔11、连接座12、第一模板101、第二模板102、螺纹端301、连杆本体302、顶板901、固定杆902、底板903、圆孔904。The serial number and name of the drawings: movable formwork 1, fixed formwork 2, support rod 3, PVC pipe 4, card slot 5, wall-through screw 6, groove 7, reinforcement plate 8, support rod seat 9, through hole 10, connection hole 11. Connecting seat 12, first template 101, second template 102, threaded end 301, connecting rod body 302, top plate 901, fixing rod 902, bottom plate 903, round hole 904.

具体实施方式Detailed ways

下面将结合附图以及具体实施例来详细说明本实用新型,在此本实用新型的示意性实施例以及说明来解释本实用新型,但并不作为对本实用新型的限定。The utility model will be described in detail below in conjunction with the accompanying drawings and specific embodiments, and the schematic embodiments and descriptions of the utility model explain the utility model here, but are not intended to limit the utility model.

如图1-6所示,本实用新型所述的一种构造柱模板与墙体固定的连接装置,包括活动模板1和固定模板2,所述活动模板1和固定模板2之间贯穿设置有穿墙螺杆6,所述活动模板1和固定模板2均由相互铰接的第一模板101和第二模板102构成,第一模板101和第二模板102上均焊接固定设置有加强板8;As shown in Figures 1-6, a connection device for fixing a structural column formwork and a wall according to the utility model includes a movable formwork 1 and a fixed formwork 2, and a cross-section is provided between the movable formwork 1 and the fixed formwork 2. Through the wall screw 6, the movable formwork 1 and the fixed formwork 2 are composed of a first formwork 101 and a second formwork 102 hinged to each other, and the first formwork 101 and the second formwork 102 are all welded and fixed with a reinforcing plate 8;

所述加强板8通过模具浇筑而来,其上留设有凹槽7,顶部设置有若干间断的卡槽5,凹槽7中间为矩形,其上留设有与穿墙螺杆6相匹配的通孔10,靠近第一模板101和第二模板102铰接处的一端与加强板8的末端在同一个面上,另一端中间为半圆形,其上开设有用于连接孔11;The reinforcing plate 8 is poured through a mold, and a groove 7 is left on it, and a number of intermittent slots 5 are arranged on the top. The through hole 10, one end close to the hinge of the first template 101 and the second template 102, is on the same surface as the end of the reinforcing plate 8, and the middle of the other end is a semicircle, on which there is a connection hole 11;

所述连接孔11分别通过转轴与位于支撑杆3和支撑杆座9底端的连接座12活动连接在一起,所述支撑杆3主要由连接座12和连杆本体302组成,连杆本体302的自由端设置有螺纹端301,所述支撑杆座9主要由顶板901、固定杆902、底板903、圆孔904和连接座12组成,底板903固定设置在连接座12顶端,其上两端分别固定设置有固定杆902,固定杆902的顶端固定设置有顶板901,顶板901上留设有与螺纹端301相匹配的圆孔904。The connecting holes 11 are movably connected to the connecting seat 12 at the bottom of the supporting rod 3 and the supporting rod seat 9 through the rotating shaft respectively. The supporting rod 3 is mainly composed of the connecting seat 12 and the connecting rod body 302. The connecting rod body 302 The free end is provided with a threaded end 301. The support rod seat 9 is mainly composed of a top plate 901, a fixed rod 902, a bottom plate 903, a round hole 904 and a connecting seat 12. The bottom plate 903 is fixedly arranged on the top of the connecting seat 12, and the two ends on it are respectively A fixed rod 902 is fixedly arranged, and a top plate 901 is fixedly arranged on the top of the fixed rod 902 , and a circular hole 904 matching the threaded end 301 is left on the top plate 901 .

所述活动模板1和固定模板2的内表面上均涂刷有混凝土脱模剂。Both the inner surfaces of the movable formwork 1 and the fixed formwork 2 are coated with a concrete release agent.

所述穿墙螺杆6上位于活动模板1和固定模板2中间的位置上套设有PVC管4。A PVC pipe 4 is sheathed on the wall-through screw 6 at a position between the movable formwork 1 and the fixed formwork 2 .

所述卡槽5为L型结构,其侧边与活动模板1和固定模板2的外侧壁之间为横杆的插入提供了空间,能够用于强化第一模板101和第二模板102形成的直线角度。The draw-in groove 5 is an L-shaped structure, and a space is provided for the insertion of a cross bar between its side and the outer side walls of the movable formwork 1 and the fixed formwork 2, which can be used to strengthen the formed structure of the first formwork 101 and the second formwork 102. line angle.

所述连接座12通过底端上的圆孔与连接孔11内部的转轴相连接,连接孔11为一矩形凹槽,其内部转轴的两端固定设置在加强板8上。The connecting base 12 is connected to the rotating shaft inside the connecting hole 11 through the round hole on the bottom end. The connecting hole 11 is a rectangular groove, and the two ends of the rotating shaft inside are fixedly arranged on the reinforcing plate 8 .

所述PVC管4的长度与墙体的长度相同。The length of described PVC pipe 4 is identical with the length of body of wall.

本实用新型在使用时,存在两种工作形式:①在用于墙体中间位置的构造柱时,只需要将组成活动模板1和固定模板2的第一模板101和第二模板102展开,并在其外侧边的卡槽上插入横杆,使其为一直板,随后将活动模板1和固定模板2通过穿墙螺杆6进行固定,穿墙螺杆6的固定端固定在固定模板2上,活动端通过螺母固定在活动模板1上,在调节固定好后直接进行混凝土浇筑即可;②在用于拐角墙体的拐角处时,只需要将组成活动模板1和固定模板2的第一模板101和第二模板102绕着铰接处进行折叠,根据拐角的角度,是第一模板101和第二模板102形成的夹角与拐角的角度相同即可,随后先固定穿墙螺杆6,再将支撑杆3的螺纹端301插入支撑杆座9顶端的圆孔904上,并通过螺母进行固定即可,然后进行混凝土浇筑即可,值得注意的是,由于拐角外部边长与内部边长不一致,因而需要保持穿墙螺杆6与墙体垂直才能够进行浇筑;在浇筑完成并且构造柱成型后,取下活动模板1和固定模板2,随后取下穿墙螺杆6,并对PVC管4所留孔洞进行修补即可。When the utility model is in use, there are two working forms: ① When it is used for the construction column in the middle of the wall, it is only necessary to unfold the first formwork 101 and the second formwork 102 that form the movable formwork 1 and the fixed formwork 2, and Insert the crossbar into the draw-in groove on its outer side to make it a straight board, then fix the movable formwork 1 and the fixed formwork 2 through the wall-through screw 6, and fix the fixed end of the wall-through screw 6 on the fixed formwork 2, The movable end is fixed on the movable formwork 1 by nuts, and the concrete can be poured directly after the adjustment and fixation; ②When it is used at the corner of a corner wall, only the first formwork consisting of the movable formwork 1 and the fixed formwork 2 needs to be placed 101 and the second formwork 102 are folded around the hinge, according to the angle of the corner, the angle formed by the first formwork 101 and the second formwork 102 is the same as the angle of the corner, and then the wall-through screw 6 is first fixed, and then the The threaded end 301 of the support rod 3 is inserted into the round hole 904 at the top of the support rod seat 9, and fixed by a nut, and then the concrete is poured. Therefore, it is necessary to keep the wall-through screw 6 perpendicular to the wall before pouring can be performed; after the pouring is completed and the structural column is formed, the movable formwork 1 and the fixed formwork 2 are removed, and then the wall-through screw 6 is removed, and the PVC pipe 4 is left. Holes can be repaired.

在本实用新型中,通过将构造柱单个模板改变为两个相互铰接的板体结构,并通过支撑杆3和支撑杆座9的配合使用能够使其与墙拐角的角度更加契合,进而降低后期的修整工作,同时通过穿墙螺杆6将两个模板进行固定,能够在不破坏墙体的前提下对构造柱模板进行固定,进而降低对墙体的破坏,有助于提高工作效率,另外穿墙螺杆6上PVC管4的套设,便于后期穿墙螺杆6的脱离,减少了工作强度,此外活动模板1和固定模板2内侧面涂刷的混凝土脱模剂能够有效保护模板,延长模板的寿命,可确保模板置于室外或阴雨天而不生锈,还能够提高构造柱的外观质量。In the utility model, by changing the single formwork of the construction column into two mutually hinged plate structures, and through the cooperative use of the support rod 3 and the support rod seat 9, it can be more compatible with the angle of the corner of the wall, thereby reducing the later stage. At the same time, the two formworks are fixed through the wall screw 6, which can fix the structural column formwork without destroying the wall, thereby reducing the damage to the wall and helping to improve work efficiency. The sheathing of the PVC pipe 4 on the wall screw 6 facilitates the detachment of the wall-through screw 6 in the later stage and reduces the work intensity. In addition, the concrete release agent painted on the inner side of the movable formwork 1 and the fixed formwork 2 can effectively protect the formwork and prolong the life of the formwork. The service life can ensure that the template will not rust when it is placed outdoors or in rainy days, and it can also improve the appearance quality of the construction column.

以上对本实用新型实施例所提供的技术方案进行了详细介绍,本文中应用了具体个例对本实用新型实施例的原理以及实施方式进行了阐述,以上实施例的说明只适用于帮助理解本实用新型实施例的原理;同时,对于本领域的一般技术人员,依据本实用新型实施例,在具体实施方式以及应用范围上均会有改变之处,综上所述,本说明书内容不应理解为对本实用新型的限制。The technical solutions provided by the embodiments of the present invention have been introduced in detail above. In this paper, specific examples have been used to illustrate the principles and implementation methods of the embodiments of the present invention. The descriptions of the above embodiments are only applicable to help understand the present invention. The principle of the embodiment; at the same time, for those of ordinary skill in the art, according to the embodiment of the present invention, there will be changes in the specific implementation and the scope of application. Utility model restrictions.

本实用新型未详尽描述的技术均为公知技术。The technologies not exhaustively described in the utility model are known technologies.

Claims (3)

1.一种构造柱模板与墙体固定的连接装置,包括活动模板(1)和固定模板(2),所述活动模板(1)和固定模板(2)之间贯穿设置有穿墙螺杆(6),其特征在于:1. A connection device for constructing column formwork and body of wall is fixed, comprises movable formwork (1) and fixed formwork (2), runs through and is provided with through the wall screw rod ( 6), characterized in that: 所述活动模板(1)和固定模板(2)均由相互铰接的第一模板(101)和第二模板(102)构成,第一模板(101)和第二模板(102)上均焊接固定设置有加强板(8);Both the movable formwork (1) and the fixed formwork (2) are composed of a first formwork (101) and a second formwork (102) hinged to each other, and the first formwork (101) and the second formwork (102) are all welded and fixed A reinforcing plate (8) is provided; 所述加强板(8)通过模具浇筑而来,其上留设有凹槽(7),顶部设置有若干间断的卡槽(5),凹槽(7)中间为矩形,其上留设有与穿墙螺杆(6)相匹配的通孔(10),靠近第一模板(101)和第二模板(102)铰接处的一端与加强板(8)的末端在同一个面上,另一端中间为半圆形,其上开设有用于连接孔(11);The reinforcing plate (8) is poured through a mould, and there are grooves (7) left on it, and several intermittent slots (5) are arranged on the top, and the middle of the groove (7) is rectangular, and there are grooves (7) on it. The through hole (10) matched with the wall-through screw (6), one end close to the hinge of the first formwork (101) and the second formwork (102) is on the same surface as the end of the reinforcing plate (8), and the other end The middle is a semicircle, which is provided with a connecting hole (11); 所述连接孔(11)分别通过转轴与位于支撑杆(3)和支撑杆座(9)底端的连接座(12)活动连接在一起,所述支撑杆(3)主要由连接座(12)和连杆本体(302)组成,连杆本体(302)的自由端设置有螺纹端(301),所述支撑杆座(9)主要由顶板(901)、固定杆(902)、底板(903)、圆孔(904)和连接座(12)组成,底板(903)固定设置在连接座(12)顶端,其上两端分别固定设置有固定杆(902),固定杆(902)的顶端固定设置有顶板(901),顶板(901)上留设有与螺纹端(301)相匹配的圆孔(904)。The connecting holes (11) are movably connected to the connecting seat (12) at the bottom of the supporting rod (3) and the supporting rod seat (9) through the rotating shaft respectively, and the supporting rod (3) is mainly composed of the connecting seat (12) Composed of connecting rod body (302), the free end of connecting rod body (302) is provided with threaded end (301), and the support rod seat (9) is mainly composed of top plate (901), fixed rod (902), bottom plate (903 ), a round hole (904) and a connecting seat (12), the bottom plate (903) is fixedly arranged on the top of the connecting seat (12), and the upper two ends are respectively fixedly provided with a fixing rod (902), and the top of the fixing rod (902) A top plate (901) is fixedly arranged, and a round hole (904) matching the threaded end (301) is left on the top plate (901). 2.根据权利要求1所述的一种构造柱模板与墙体固定的连接装置,其特征在于:所述活动模板(1)和固定模板(2)的内表面上均涂刷有混凝土脱模剂。2. A connection device for fixing a structural column formwork and a wall according to claim 1, characterized in that: the inner surfaces of the movable formwork (1) and the fixed formwork (2) are all painted with concrete demoulding agent. 3.根据权利要求1所述的一种构造柱模板与墙体固定的连接装置,其特征在于:所述穿墙螺杆(6)上位于活动模板(1)和固定模板(2)中间的位置上套设有PVC管(4)。3. A connection device for fixing a construction column formwork to a wall according to claim 1, characterized in that: the wall-through screw (6) is located in the middle of the movable formwork (1) and the fixed formwork (2) The upper sleeve is provided with a PVC pipe (4).
CN201820358114.7U 2018-03-16 2018-03-16 A kind of construction column template and the fixed attachment device of wall Active CN208009896U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820358114.7U CN208009896U (en) 2018-03-16 2018-03-16 A kind of construction column template and the fixed attachment device of wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820358114.7U CN208009896U (en) 2018-03-16 2018-03-16 A kind of construction column template and the fixed attachment device of wall

Publications (1)

Publication Number Publication Date
CN208009896U true CN208009896U (en) 2018-10-26

Family

ID=63888777

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820358114.7U Active CN208009896U (en) 2018-03-16 2018-03-16 A kind of construction column template and the fixed attachment device of wall

Country Status (1)

Country Link
CN (1) CN208009896U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113463613A (en) * 2021-07-12 2021-10-01 甘肃第六建设集团股份有限公司 Supporting structure for sand inclusion stone soil layer convenient to installation is dismantled
CN113882661A (en) * 2021-10-19 2022-01-04 张鑫 Concrete structure template for civil engineering

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113463613A (en) * 2021-07-12 2021-10-01 甘肃第六建设集团股份有限公司 Supporting structure for sand inclusion stone soil layer convenient to installation is dismantled
CN113463613B (en) * 2021-07-12 2022-08-09 甘肃第六建设集团股份有限公司 Supporting structure for sand inclusion stone soil layer convenient to installation is dismantled
CN113882661A (en) * 2021-10-19 2022-01-04 张鑫 Concrete structure template for civil engineering

Similar Documents

Publication Publication Date Title
CN102808509B (en) Pouring construction method for anchor assembly of prefabricated concrete prefabricated external wall panel
CN208009896U (en) A kind of construction column template and the fixed attachment device of wall
CN206801028U (en) A kind of building template supporting construction
CN206289968U (en) Square column mould facade formwork erecting structure and wall placing installation
CN206091289U (en) A formwork support for pouring frame post
CN206928642U (en) A kind of safety and environmental protection movable formwork support
CN105178593A (en) Method and structure for erecting forms of structural columns of filler walls
CN204510817U (en) Hole to be provided regularization adjustable steel frame template
CN204781944U (en) A mode structure of infilled wall constructional column
CN103195079B (en) Installing type template, installing type template group and complete installing type plate device
CN221912487U (en) A prefabricated column grouting and sealing steel mold
CN209384646U (en) A kind of die-filling structure of the construction of deformation joint
CN103669831B (en) A kind of transformer station's cast-in-situ wall combined steel and construction method thereof
CN218757600U (en) Mould fixing device is hung to piece assembled piping lane roof post-cast joint
CN206928648U (en) A kind of aluminium alloy wafer cone
CN110056181A (en) A kind of subsided rest room assembly steel form and construction method
CN105648991B (en) The construction method of power station bulb-type tubular hydro set flow passage gradual change section
CN211974316U (en) Bathroom of adjustable size hangs mould
CN209509172U (en) A kind of assembly concrete column and connecting node
CN115162402A (en) A processing device and construction method for a prefabricated pipe trench
CN209907923U (en) The formwork system for the simultaneous pouring of the water stop table and the floor descending plate in the kitchen and bathroom
CN211772881U (en) A prefabricated box girder formwork
CN221646378U (en) Formwork device for concrete independent column
CN207176736U (en) A kind of pipe gallery formwork for placing unit and by its assembled formwork for placing
CN206289971U (en) Framed bent core and wall placing installation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant