CN207989045U - The feeding-distribution device of tunnel double-lining concreting - Google Patents
The feeding-distribution device of tunnel double-lining concreting Download PDFInfo
- Publication number
- CN207989045U CN207989045U CN201820074296.5U CN201820074296U CN207989045U CN 207989045 U CN207989045 U CN 207989045U CN 201820074296 U CN201820074296 U CN 201820074296U CN 207989045 U CN207989045 U CN 207989045U
- Authority
- CN
- China
- Prior art keywords
- feed bin
- feeding
- concrete
- distribution device
- chute
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009826 distribution Methods 0.000 title claims abstract description 27
- 239000004567 concrete Substances 0.000 claims abstract description 58
- 229910000831 Steel Inorganic materials 0.000 claims description 13
- 239000000463 material Substances 0.000 claims description 13
- 239000010959 steel Substances 0.000 claims description 13
- 238000003466 welding Methods 0.000 claims description 8
- 229910000851 Alloy steel Inorganic materials 0.000 claims description 4
- 229910000976 Electrical steel Inorganic materials 0.000 claims description 3
- 229910000639 Spring steel Inorganic materials 0.000 claims description 3
- 229910001315 Tool steel Inorganic materials 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 238000010276 construction Methods 0.000 abstract description 16
- 238000005266 casting Methods 0.000 abstract description 6
- 230000007547 defect Effects 0.000 abstract description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000002689 soil Substances 0.000 description 3
- 238000007711 solidification Methods 0.000 description 3
- 230000008023 solidification Effects 0.000 description 3
- 239000010935 stainless steel Substances 0.000 description 3
- 229910001220 stainless steel Inorganic materials 0.000 description 3
- 238000005516 engineering process Methods 0.000 description 2
- 230000035515 penetration Effects 0.000 description 2
- 230000003014 reinforcing effect Effects 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 238000005345 coagulation Methods 0.000 description 1
- 230000015271 coagulation Effects 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000004927 fusion Effects 0.000 description 1
- 230000005484 gravity Effects 0.000 description 1
- 239000004615 ingredient Substances 0.000 description 1
- 238000005304 joining Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Landscapes
- On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)
Abstract
The utility model provides a kind of feeding-distribution device of tunnel double-lining concreting, the feeding-distribution device includes feed bin (10), silo support (30) and two chutes (20), the silo support (30) is used to support the feed bin (10) from the feed bin (10) bottom, it is provided with concrete feeding mouth (101) at the top of the feed bin (10), the side wall of the feed bin (10) is opened up there are two opposite concrete discharge port (102), two concrete discharge ports (102) respectively with corresponding chute (20) seamless connection, the chute (20) is used for will be from the concrete conveyance that the concrete discharge port (102) is flowed out to corresponding low-level device.The feeding-distribution device of the tunnel double-lining concreting of the utility model can efficiently reduce the time interval in casting process, to reduce the defect of concrete initial set time difference caused by due to pouring time difference and the influence construction quality such as the open roof formed or concrete watermark.
Description
Technical field
The utility model is related to constructing tunnel fields, and in particular, to a kind of sub-material dress of tunnel double-lining concreting
It sets.
Background technology
In tunnel double-lining concrete construction, pours the general mould that pours for using 12m long and build trolley, according to tunnel side wall height
It pours to be reserved at left and right sides of trolley when mould builds trolley in manufacture and pours skylight, per 3 layers of side, 3 every layer, totally 18 skylights,
When carrying out tunnel double-lining concreting, concrete pump is sent to the master for being mounted on and pouring mould and building trolley top platform by delivery pump
Feed bin, by main chute by the concrete conveyance in major ingredient storehouse to subordinate's feed bin, then by dividing chute will be mixed in subordinate's feed bin
Solidifying soil is transported to string bucket, finally divides sliding slot by concrete by pouring skylight under between skylight through being connected to string bucket and pouring again
Upward laminated pouring operation, left and right alternately pours between two lining templates and the hole wall just served as a contrast one by one, to complete concreting.
It is this to pour mode speed slowly and be susceptible to open roof common fault in casting process, it is poured when carrying out two lining concrete
When building construction, usually according to sequence first one task that pours for pouring skylight of completion is poured, it then can just be moved to next pour
It builds skylight and carries out pouring construction, each pour between skylight that there are construction time intervals in this way, and pour into each skylight that pours
The setting time of concrete will have that setting time is poor, the concrete that the meeting of the concrete first poured into is poured into earlier than after and coagulate
Gu therefore from when solidification of the different joining places for pouring the concrete that skylight pours into because of concrete after entire pouring construction
Between difference it is possible that fusion is bad, open roof common fault or apparent concrete watermark are easily formed after form removal, these all will
Influence final construction quality, it is also possible to the problems such as causing the tunnel double-lining poured there are safe mass hidden danger.
Utility model content
For the drawbacks described above or deficiency of the prior art, the utility model provides a kind of tunnel double-lining concreting
Feeding-distribution device can reduce the problems such as existing tunnel two serves as a contrast the open roof occurred in concreting process, watermark.
To achieve the above object, the utility model provides a kind of feeding-distribution device of tunnel double-lining concreting, described
Feeding-distribution device includes feed bin, silo support and two chutes, and the silo support is used to support the material from the bin bottom
Storehouse, is provided with concrete feeding mouth at the top of the feed bin, and the side wall of the feed bin opens up that there are two opposite concrete to discharge
Mouthful, two concrete discharge ports are respectively with corresponding chute seamless connection, and the chute from the concrete for that will go out
The concrete conveyance of material mouth outflow is to corresponding low-level device.
Preferably, the feeding-distribution device further includes supporting rod, and branch is reinforced to the feed bin for the side wall from the feed bin
Support.
Preferably, the feed bin is welded by multiple steel plates.
Preferably, the thickness of the steel plate is 3mm~5mm.
Preferably, the material of the feed bin is any one in steel alloy, stainless steel, tool steel, spring steel, silicon steel.
Preferably, the volume of the feed bin is 0.5m3~0.8m3。
Preferably, the chute is arc chute.
Preferably, the silo support is formed by more reinforcement weldings.
Preferably, the feeding-distribution device further includes feed bin cover board, and the feed bin cover board removably covers conjunction in the feed bin
Top.
The feeding-distribution device of tunnel double-lining concreting provided by the utility model is by feed bin, the feed bin of the support feed bin
Holder and two chute compositions are opened up in the side wall of the feed bin there are two opposite concrete discharge port, described mixed at two
By chute seamless connection between solidifying soil discharge port and string bucket, concrete when pouring in feed bin discharges from two concrete
It mouthful flows out simultaneously, flow direction, which is arranged, builds two string buckets of both sides on trolley pouring mould, then pours into concrete through string bucket and pour day
Window, it is this to pour pouring mode and can efficiently reducing concrete in casting process for skylight penetration concrete to two simultaneously
Setting time is poor, influences the defect of construction quality to reduce open roof or concrete watermark etc..
Other features and advantages of the utility model will be described in detail in subsequent specific embodiment part.
Description of the drawings
Fig. 1 is the structural representation according to the feeding-distribution device of the tunnel double-lining concreting of the utility model embodiment
Figure;
Fig. 2 is according to silo support in the feeding-distribution device of the tunnel double-lining concreting of the utility model embodiment
Structural schematic diagram.
Reference sign
10 feed bin, 20 chute
30 silo support, 40 supporting rod
101 concrete feeding mouth, 102 concrete discharge port
50 feed bin cover boards
Specific implementation mode
Specific embodiment of the present utility model is described in detail below in conjunction with attached drawing.It should be understood that herein
Described specific implementation mode is only used for describing and explaining the present invention, and is not intended to limit the utility model.
It should be noted that in the absence of conflict, the feature in the embodiments of the present invention and embodiment can
To be combined with each other.
In the present invention, in the absence of explanation to the contrary, the noun of locality used such as " upper and lower, top, bottom " is usually
Be for direction shown in the drawings either for it is vertical, vertically or on gravity direction for each component mutual alignment
Relationship description word.
The utility model will be described in detail below with reference to the accompanying drawings and embodiments.
As shown in Figure 1, being the feeding-distribution device of tunnel double-lining concreting provided by the utility model, the feeding-distribution device
Including feed bin 10, silo support 30 and two chutes 20, the silo support 30 is used for from described in the support of 10 bottom of the feed bin
Feed bin 10, the top of the feed bin 10 are provided with concrete feeding mouth 101, and the side wall of the feed bin 10 opens up that there are two opposite
Concrete discharge port 102, two concrete discharge ports 102 respectively with 20 seamless connection of corresponding chute, the chute 20
For will be from the concrete conveyance that the concrete discharge port 102 flows out to corresponding low-level device (such as go here and there bucket).
Wherein, the feed bin 10 is welded by plurality of steel plates, and the steel plate of welding feed bin 10 can be made using construction site
Used waste and old steel plate not only can be salvaged but also can save production cost, and the steel plate thickness for welding the feed bin 10 is 3mm
~5mm, it is preferable that the steel plate thickness is 4mm, and the material of the feed bin 10 can be steel alloy, stainless steel, tool steel, bullet
Any one in spring steel, silicon steel, in one embodiment, construction site is possible to the waste and old steel with a variety of unlike materials
Plate, such as have steel alloy steel plate and stainless-steel sheet, it, can also if one of which material not enough makes a feed bin 10
It is used as the material of a feed bin 10 using both materials simultaneously.
In order to ensure pouring quality and pour efficiency, the volume of the feed bin 10 is 0.5m3~0.8m3, in casting process
In, the volume of feed bin 10 should not be too large or too small, if 10 volume of feed bin is excessive, be easy to cause 10 inner concrete of feed bin and overflows
Go out, if volume is too small, and be easy to cause under feeding in casting process, frequently occurs and pour time interval and cause open roof
Phenomenon occurs.Opposite concrete discharge port 102 there are two being opened up on 10 side wall of the feed bin, the concrete discharge port
102 position is opened on the side wall of the side wall of feed bin 10 and the feed bin 10 of the bottom intersection of feed bin 10, contributes to expect in this way
Concrete in storehouse 10 flows out and is not easy to accumulate in the bottom of feed bin 10.
The feed bin 10 is supported by silo support 30.As shown in Figure 2, it is preferable that the silo support 30 is by more steel
Muscle is welded.According to a kind of embodiment, the silo support 30 have four equal lengths support leg and with four branch
The support ring support of support leg welding, the setting of the feed bin 10, can be by welding by feed bin 10 and feed bins on support ring support
Holder 30 is fixedly connected, and feed bin 10 can be also directly placed in support ring support according to the contour structures of feed bin 10, the feed bin
10 can be designed as the infundibulate that size from the top to the bottom is gradually reduced, this shape stream out of feed bin 10 convenient for concrete
Go out.
In order to ensure production safety, contingency is prevented, as shown in Figure 1, the feeding-distribution device further includes supporting rod
40, the feed bin 10 is reinforced for the side wall from the feed bin 10 and is supported, supporting rod 40 is installed additional in the side wall of feed bin 10 so that
Feed bin 10 is more firm safe in use.
According to a kind of embodiment, silo support 30 is formed by more reinforcement weldings, and coagulation is filled in the feed bin 10
After soil, the weight of entire feed bin 10 and concrete is very heavy, therefore in order to ensure silo support 30 by enough support strengths, weldering
The bar diameter d for connecing the silo support 30 is:20mm≤d≤28mm, if reinforcing bar is too thin, it is possible to cannot support and fill
The feed bin 10 of concrete and cause construction accident, and if reinforcing bar is too thick, and cause the unnecessary wasting of resources.
Technical solution according to the present utility model, it is preferable that the chute 20 is arc chute.The both ends of the chute 20
It connect with the concrete discharge port 102 and low-level device of feed bin 10, in one embodiment, is slipped described using bolt respectively
Slot 20 is connect with feed bin 10, bolt outside diameter d1Meet:18mm≤d1≤ 22mm, this connection type is convenient for assembling and removes, another
In one embodiment, the mode that welding may be used with feed bin 10 for the chute 20 is fixed.
Water loss in concrete in order to prevent, it is preferable that the feeding-distribution device further includes feed bin cover board 50, the feed bin
Cover board 50 removably covers conjunction at 10 top of the feed bin, and the moistening for keeping concrete prevents the solidification that concrete is too fast,
It ensures the construction quality.
Feeding-distribution device in the utility model can use three sub-materials simultaneously when carrying out tunnel double-lining concreting
Device point upper, middle and lower to be arranged pour trolley both sides pour skylight carry out pouring construction, such construction efficiency higher, because
To pour skylight penetration concrete to trolley both sides simultaneously, then when three layer concretes poured into just have identical solidification
Between, can thus solve caused by the concrete set time difference generated by construction time interval in construction open roof or
The generation of watermark phenomenon, and pour more efficient.
The feeding-distribution device of tunnel double-lining concreting in the utility model can efficiently reduce in casting process when
Between be spaced, the concrete initial set time caused by reduce due to pouring time difference is different and the open roof or concrete that are formed
Watermark etc. influences the defect of construction quality.
Preferred embodiments of the present invention, still, the utility model and unlimited are described in detail above in association with attached drawing
Detail in the above embodiment can be to the skill of the utility model in the range of the technology design of the utility model
Art scheme carries out a variety of simple variants, these simple variants belong to the scope of protection of the utility model.
It is further to note that specific technical features described in the above specific embodiments, in not lance
It in the case of shield, can be combined by any suitable means, in order to avoid unnecessary repetition, the utility model is to each
The possible combination of kind no longer separately illustrates.
In addition, arbitrary combination can also be carried out between a variety of different embodiments of the utility model, as long as it is not disobeyed
The thought for carrying on the back the utility model, equally should be considered as content disclosed in the utility model.
Claims (7)
1. a kind of feeding-distribution device of tunnel double-lining concreting, which is characterized in that the feeding-distribution device includes feed bin (10), material
Bin bracket (30), supporting rod (40), feed bin cover board (50) and two chutes (20), the silo support (30) are used for from the material
Storehouse (10) bottom supports the feed bin (10), and concrete feeding mouth (101), the feed bin are provided at the top of the feed bin (10)
(10) side wall is opened up there are two opposite concrete discharge port (102), two concrete discharge ports (102) respectively with it is right
Chute (20) seamless connection answered, concrete of the chute (20) for that will be flowed out from the concrete discharge port (102) are defeated
It is sent to corresponding low-level device, the supporting rod (40) is used to reinforce branch to the feed bin (10) from the side wall of the feed bin (10)
Support, the feed bin cover board (50) removably cover conjunction at the top of the feed bin (10).
2. feeding-distribution device according to claim 1, which is characterized in that the feed bin (10) is welded by multiple steel plates.
3. feeding-distribution device according to claim 2, which is characterized in that the thickness of the steel plate is 3mm~5mm.
4. feeding-distribution device according to claim 2, which is characterized in that the material of the feed bin (10) is steel alloy, stainless
Any one in steel, tool steel, spring steel, silicon steel.
5. feeding-distribution device according to claim 1, which is characterized in that the volume of the feed bin (10) is 0.5m3~0.8m3。
6. feeding-distribution device according to claim 1, which is characterized in that the chute (20) is arc chute.
7. feeding-distribution device according to claim 1, which is characterized in that the silo support (30) by more reinforcement weldings and
At.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820074296.5U CN207989045U (en) | 2018-01-16 | 2018-01-16 | The feeding-distribution device of tunnel double-lining concreting |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820074296.5U CN207989045U (en) | 2018-01-16 | 2018-01-16 | The feeding-distribution device of tunnel double-lining concreting |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207989045U true CN207989045U (en) | 2018-10-19 |
Family
ID=63820324
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820074296.5U Expired - Fee Related CN207989045U (en) | 2018-01-16 | 2018-01-16 | The feeding-distribution device of tunnel double-lining concreting |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207989045U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110454198A (en) * | 2019-08-26 | 2019-11-15 | 洛阳兴坤隧道工程机械有限公司 | A kind of trolley concrete running gate system |
-
2018
- 2018-01-16 CN CN201820074296.5U patent/CN207989045U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110454198A (en) * | 2019-08-26 | 2019-11-15 | 洛阳兴坤隧道工程机械有限公司 | A kind of trolley concrete running gate system |
CN110454198B (en) * | 2019-08-26 | 2021-01-26 | 洛阳兴坤隧道工程机械有限公司 | Trolley concrete pouring system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106320377B (en) | A kind of rich water soft clay area deep basal pit covered back-digging construction method | |
CN108580758A (en) | A kind of double layer bar plate machining device | |
CN206174120U (en) | Prefabricated constructional column and structure thereof | |
CN108726348A (en) | A kind of prefabricated overturning and hoisting method of piping lane segment prostrate | |
CN207989045U (en) | The feeding-distribution device of tunnel double-lining concreting | |
CN210263131U (en) | Assembled is from stagnant water underground pipe gallery structure | |
CN208071101U (en) | A kind of piping lane precast segment overturning and hoisting device | |
CN101906757A (en) | Assembly method for replacing plate type rubber support on abutment of highway bridge | |
CN109056595A (en) | A kind of grout sleeve Joining Technology of prefabricated overhead guardrail board | |
CN211036991U (en) | Fishbone string barrel suitable for deep foundation pit concrete warehousing pouring | |
CN208792746U (en) | A kind of expansion joint regularization same tool steel plate template | |
CN110700264A (en) | Fishbone string barrel suitable for deep foundation pit concrete warehousing pouring | |
CN207958977U (en) | A kind of device to bind for bridge hollow pier | |
CN208650086U (en) | A kind of movable type streetlamp foundation | |
CN207308898U (en) | A kind of coated sand core shooting machine adds sand system | |
CN205224044U (en) | Steel lining bottom plate concrete placement device | |
CN106836948B (en) | A kind of construction technology of reinforced concrete structure | |
CN105696739A (en) | Cast-in-situ cavity floor adopting steel net cages with ribs | |
CN205242407U (en) | A cluster pipe, chute combination system for deep basal pit concrete placement | |
CN108457671A (en) | One kind two serves as a contrast sliding slot and enters mould constructing device by window | |
CN113565205A (en) | One-time pouring forming method for interlayer beam | |
CN105369809B (en) | Steel lining bottom plate concrete pouring device and construction method | |
CN208148158U (en) | It is a kind of live with strength mortar preparation facilities | |
CN208450478U (en) | A kind of double layer bar plate machining device | |
CN209760594U (en) | Device is pour in grades to structure post concrete |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181019 |