CN207988462U - A kind of succinct steel construction elevator hoistway construction platform - Google Patents

A kind of succinct steel construction elevator hoistway construction platform Download PDF

Info

Publication number
CN207988462U
CN207988462U CN201820252143.5U CN201820252143U CN207988462U CN 207988462 U CN207988462 U CN 207988462U CN 201820252143 U CN201820252143 U CN 201820252143U CN 207988462 U CN207988462 U CN 207988462U
Authority
CN
China
Prior art keywords
support arm
supporting frame
succinct
elevator hoistway
support bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820252143.5U
Other languages
Chinese (zh)
Inventor
张剑云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Flan Space Membrane Structure Co ltd
Original Assignee
Shenzhen City's Construction Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen City's Construction Engineering Co Ltd filed Critical Shenzhen City's Construction Engineering Co Ltd
Priority to CN201820252143.5U priority Critical patent/CN207988462U/en
Application granted granted Critical
Publication of CN207988462U publication Critical patent/CN207988462U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Types And Forms Of Lifts (AREA)

Abstract

The utility model is related to operation platform fields, and in particular to a kind of succinct steel construction elevator hoistway construction platform.Including fastening bolt, left support bar, supporting frame, right support bar, crossbeam, drag link, mounting hole, pedal unit and support arm.The pedal unit is connected to the support arm;The left support bar and right support bar is connected to the supporting frame and the support arm;The drag link is located on the support arm, and the mounting hole is located on the support arm;The supporting frame is located at the top of the support arm;The crossbeam is connected to the supporting frame;The pedal unit is located at the lower section of the supporting frame.The utility model simplifies the structure of support, its support strength is ensure that while optimizing structure, advantageously reduces production cost, improves the profit of enterprise, is advantageously implemented mechanization production.

Description

A kind of succinct steel construction elevator hoistway construction platform
Technical field
The utility model is related to operation platform fields, and in particular to a kind of succinct steel construction elevator hoistway construction platform.
Background technology
Elevator hoistway construction platform can be seen everywhere on the market current, on the building site of major construction, every household family Family must all install elevator.Elevator is related to the technical field of construction.Using novel by external mold and internal model and through-wall bolt Composition, internal model is by inner template, angle of rotation module, horizontal extension mandril group, chassis, chassis support leg and the straight adjuster of inner template dolly Composition.External mold therein and inner template are all made of back-shaped hook by more than one piece shaping combined steel shuttering assembling combination, and by through-wall bolt Connection molding.The utility model cancels the horizontally-supported of prior art exterior sheathing use, stull and diagonal brace, entirely with steel generation wood Well mould can be reused, and create conditions for the mechanization of building operation of hoistway formwork.The structure of the platform of most of elevator is multiple It is miscellaneous, and the insufficient rigidity of elevator, it is be easy to cause accident, and very inconvenience is installed, consumes many time, drop The efficiency of low building is unfavorable for reducing building cost.
Utility model content
To solve the above, the utility model provides a kind of succinct steel construction elevator hoistway construction platform, optimizes building Ensure its rigidity while structure, advantageously reduces production cost.
A kind of succinct steel construction elevator hoistway construction platform, including fastening bolt, left support bar, supporting frame, right support bar, Crossbeam, drag link, mounting hole, pedal unit and support arm.The pedal unit is connected to the support arm;The left support Bar and right support bar are connected to the supporting frame and the support arm;The drag link is located at the support arm On, the mounting hole is located on the support arm;The supporting frame is located at the top of the support arm;Described Crossbeam is connected to the supporting frame;The pedal unit is located at the lower section of the supporting frame.
Preferably, the pedal unit is welded on the support arm.
Preferably, the right support bar is welded the supporting frame.
Preferably, the supporting frame is connected through a screw thread the crossbeam.
Preferably, the quantity of the drag link is 9.
Preferably, there are two the pedal units, it is separately positioned on the right and left of support arm.
The beneficial effects of the utility model:The utility model simplifies the structure of support, keeps installation more convenient, when saving Between, its support strength is ensure that while optimizing structure, advantageously reduces production cost, improves the profit of enterprise.
Description of the drawings
Fig. 1 is a kind of front view of succinct steel construction elevator hoistway construction platform of the utility model.
Fig. 2 is a kind of side view of succinct steel construction elevator hoistway construction platform of the utility model.
In figure:1- fastening bolts;2- left support bars;3- supporting frames;4- right support bars;5- crossbeams;6- drag links;7- pacifies Fill hole;8- pedal units;9- support arms.
Specific implementation mode
In order to make the purpose of the utility model, technical solutions and advantages more clearly understood, below in conjunction with attached drawing and implementation Example, the present invention will be further described in detail.It should be appreciated that specific embodiment described herein is only explaining this Utility model is not used to limit the utility model.
As depicted in figs. 1 and 2, a kind of succinct steel construction elevator hoistway construction platform, including fastening bolt 1, left support bar 2, Supporting frame 3, right support bar 4, crossbeam 5, drag link 6, mounting hole 7, pedal unit 8 and support arm 9.The pedal unit 8 connects The support arm 9, there are two the pedal units 8, is separately positioned on the right and left of support arm 9;The left support bar 2 It is connected to the supporting frame 3 and the support arm 9 with right support bar 4;The drag link 6 is located at the support arm On 9, the mounting hole 7 is located on the support arm 9;The supporting frame 3 is located at the top of the support arm 9; The crossbeam 5 is connected to the supporting frame 3.
Concrete operating principle:As depicted in figs. 1 and 2, when accessory reaches building site, start to install, staff steps on foot It steps on device to be climbed to the drag link 6, and is climbed upwards to the supporting frame 3, staff along drag link 6 In the installation for carrying out elevator structure and irrigate concrete.After staff has configured safety rope, the weight of body is placed to institute On the crossbeam 5 stated.The pedal unit 8 is welded on the support arm 9.The right support bar 4 is welded the branch Support frame 3.The supporting frame 3 is connected through a screw thread the crossbeam 5.The quantity of the drag link 6 is 9.It is described Right support bar 4 be located at the front of the left support bar 2.The drag link 6 is combined with the mounting hole 7 positioned at described Support arm 9 on.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Any modification, equivalent replacement or improvement etc., should be included in the utility model made by within the spirit and principle of utility model Protection domain within.

Claims (6)

1. a kind of succinct steel construction elevator hoistway construction platform, it is characterised in that:Including fastening bolt, left support bar, supporting frame, Right support bar, crossbeam, drag link, mounting hole, pedal unit and support arm, the pedal unit are connected to the support arm;Institute The left support bar and right support bar stated are connected to the supporting frame and the support arm;The drag link is located at described Support arm on, the mounting hole is located on the support arm;The supporting frame is located at the upper of the support arm Side;The crossbeam is connected to the supporting frame;The pedal unit is located at the lower section of the supporting frame.
2. a kind of succinct steel construction elevator hoistway construction platform according to claim 1, it is characterised in that:The pedal unit It is welded on the support arm.
3. a kind of succinct steel construction elevator hoistway construction platform according to claim 1, it is characterised in that:The right support Bar is welded the supporting frame.
4. a kind of succinct steel construction elevator hoistway construction platform according to claim 1, it is characterised in that:The support edge Frame is connected through a screw thread the crossbeam.
5. a kind of succinct steel construction elevator hoistway construction platform according to claim 1, it is characterised in that:The drag link Quantity be 9.
6. a kind of succinct steel construction elevator hoistway construction platform according to claim 1, it is characterised in that:The pedal unit has Two, it is separately positioned on the right and left of support arm.
CN201820252143.5U 2018-02-12 2018-02-12 A kind of succinct steel construction elevator hoistway construction platform Expired - Fee Related CN207988462U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820252143.5U CN207988462U (en) 2018-02-12 2018-02-12 A kind of succinct steel construction elevator hoistway construction platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820252143.5U CN207988462U (en) 2018-02-12 2018-02-12 A kind of succinct steel construction elevator hoistway construction platform

Publications (1)

Publication Number Publication Date
CN207988462U true CN207988462U (en) 2018-10-19

Family

ID=63824676

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820252143.5U Expired - Fee Related CN207988462U (en) 2018-02-12 2018-02-12 A kind of succinct steel construction elevator hoistway construction platform

Country Status (1)

Country Link
CN (1) CN207988462U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113530190A (en) * 2021-07-19 2021-10-22 江苏太平洋精锻科技股份有限公司 Steel construction roofing bottom plate construction platform

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113530190A (en) * 2021-07-19 2021-10-22 江苏太平洋精锻科技股份有限公司 Steel construction roofing bottom plate construction platform

Similar Documents

Publication Publication Date Title
CN204112696U (en) For the electric hoist elevator shaft platform of main building construction
CN207988462U (en) A kind of succinct steel construction elevator hoistway construction platform
CN106144832A (en) A kind of special extended type wall-attached frame and preparation method thereof
KR200415037Y1 (en) Gang Form Level Adjusting Apparatus for Guide Climbing System
CN212249184U (en) Electric creeping formwork device for building construction
CN201367730Y (en) A die plate supporting device convenient for dismounting die plates
CN201148725Y (en) Trolley type inclining-proof device adhering to elevating scaffold
CN201502170U (en) Horizontal supporting device of building external frame
CN206051211U (en) A kind of special extended type wall-attached frame
CN203257075U (en) Core tube inner lifting type multifunctional operating platform for high-rise building construction
CN209703979U (en) A kind of construction coherent-wall scaffolding cantilever arrangement
CN203392657U (en) Machine maintenance platform
CN220521117U (en) Climbing formwork hanging seat system for concave concrete structure
CN221703062U (en) Quick-dismantling scaffold for building engineering
CN214658668U (en) Protective operation platform for elevator shaft opening shaping steel plate
CN212773380U (en) Lower hanger structure for scaffold
CN205739892U (en) A kind of lower beam assembly of elevator
CN206829587U (en) A kind of hydraulic climbing formwork wall-attached frame
CN201206332Y (en) Rectangular cross-section chimney slipform
CN215716210U (en) Full-bolt buckling-restrained brace
CN212024482U (en) Novel construction elevator platform
CN110306741A (en) A kind of lightweight steel construction stair
CN204590563U (en) A kind of Novel dismountable scaffold
CN216406126U (en) Novel climbing frame is with down tube horizontal support truss structure
CN215052128U (en) Platform in tower column shaft

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address
CP03 Change of name, title or address

Address after: 518172 1527, building 4, Qidi Xiexin, No. 333, Longfei Avenue, huanggekeng community, Longcheng street, Longgang District, Shenzhen, Guangdong Province

Patentee after: Shenzhen flan Space Membrane Structure Co.,Ltd.

Address before: 518000 2108, building 1, Liutang building, southwest of Baomin Road, Xixiang street, Bao'an District, Shenzhen, Guangdong Province

Patentee before: SHENZHEN FULAN CONSTRUCTION ENGINEERING CO.,LTD.

CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181019