CN207987785U - A kind of upper front beam suspension system of suspended pouring construction hanging basket - Google Patents

A kind of upper front beam suspension system of suspended pouring construction hanging basket Download PDF

Info

Publication number
CN207987785U
CN207987785U CN201820002183.4U CN201820002183U CN207987785U CN 207987785 U CN207987785 U CN 207987785U CN 201820002183 U CN201820002183 U CN 201820002183U CN 207987785 U CN207987785 U CN 207987785U
Authority
CN
China
Prior art keywords
front beam
upper front
suspender belt
distribution
basket
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820002183.4U
Other languages
Chinese (zh)
Inventor
李玲玉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Middle Cross-Channel Bridge South Engineering Co Ltd
Road and Bridge International Co Ltd
Original Assignee
Middle Cross-Channel Bridge South Engineering Co Ltd
Road and Bridge International Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Middle Cross-Channel Bridge South Engineering Co Ltd, Road and Bridge International Co Ltd filed Critical Middle Cross-Channel Bridge South Engineering Co Ltd
Priority to CN201820002183.4U priority Critical patent/CN207987785U/en
Application granted granted Critical
Publication of CN207987785U publication Critical patent/CN207987785U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Load-Engaging Elements For Cranes (AREA)

Abstract

The utility model is related to a kind of upper front beam suspension systems of suspended pouring construction hanging basket, two short columns are fixedly installed on upper front beam, a connecting plate is respectively welded in the both sides of each short column, and the connecting plate of each short column both sides is connect with the gusset plate of a main couple by axis pin respectively;The bottom of upper front beam is equipped with multipair lifting lug, set a horizontally disposed distribution beam respectively below each pair of lifting lug, the both ends of every distribution beam are separately connected a vertically arranged flower basket bolt, the two flower basket bolt upper ends at every distribution beam both ends respectively with a pair of of lifting lug pin joint of upper front beam bottom, the lower end of flower basket bolt and distribution beam pin joint;1 or 2 suspender belts are separately connected in the middle part of every distribution beam, every suspender belt is connect with skid beam in the edge of a wing skid beam or case of Hanging Basket or bottom basket front beam respectively.

Description

A kind of upper front beam suspension system of suspended pouring construction hanging basket
Technical field
The utility model belongs to continuous beam, continuous rigid frame bridge cantilever construction engineering field, and in particular to a kind of cantilever is applied The upper front beam suspension system of work Hanging Basket.
Background technology
Continuous beam, continuous rigid frame bridge are built because its structure is with excellent mechanical property and economic performance across river valley bridge It is used widely in if, and cantilever method pouring construction technology is continuous beam, Continuous Rigid-framed Girder construction one preferred technique, Hanging Basket is then Cantilever method pouring construction necessary equipment.
As shown in Figure 1, the gusset plate 3 that upper front beam 1 is supported directly upon two main couple of Hanging Basket, 2 front end by traditional Hanging Basket pushes up Portion, the mounting means need 3 top-slitting of gusset plate, processing and installation required precision is high;For upper beam before installation and hang Band and the length for adjusting suspender belt, will be arranged operating platform 4 on preceding upper beam, and operating platform 4 hangs in the sky, difficulty above and below personnel Greatly, construction is inconvenient and there are security risks;It is directly connected to suspender belt 5 on upper front beam 1, since upper front beam position is higher, extends The length of suspender belt, causes suspender belt deflection bigger than normal, influences structural stability;Suspender belt length is not easy to adjust in above structure, especially It is complicated to tiny Pass line adjustment process and control difficulty is big.
Invention content
The purpose of this utility model is that for the above structure defect of existing Hanging Basket, one kind is provided and is easily installed, operates The upper front beam suspension system for the suspended pouring construction hanging basket that safety, stable structure, suspender belt length are conveniently adjusted.
The technical solution of the utility model is as follows:
A kind of upper front beam suspension system of suspended pouring construction hanging basket, including front beam on two main couples and one, feature exist In:Two short columns are fixedly installed on the upper front beam, a connecting plate is respectively welded in the both sides of each short column, each short vertical The connecting plate of column both sides is connect with the gusset plate of a main couple by axis pin respectively;The bottom of the upper front beam is equipped with multipair hang Ear, sets a horizontally disposed distribution beam respectively below each pair of lifting lug, and the both ends of every distribution beam are separately connected one and vertically set The flower basket bolt set, the two flower basket bolt upper ends at every distribution beam both ends respectively with a pair of of lifting lug pin joint of upper front beam bottom, The lower end of flower basket bolt and distribution beam pin joint;1 or 2 suspender belts, every suspender belt difference are separately connected in the middle part of every distribution beam It is connect with skid beam in the edge of a wing skid beam or case of Hanging Basket or bottom basket front beam.
The utility model gives full play to rod piece stress performance, and stress is clear, simple in structure, high capacity, upper front beam peace Dress is convenient, and construction personnel can be operated on bridge floor, it is not necessary to and high-altitude operation platform is set up, worker high-altitude suspension operation is reduced, Working security is improved, difficulty of construction is reduced;Suspender belt length adjustment is convenient, is especially adjusted to tiny absolute altitude accurate.
Description of the drawings
Fig. 1 is the upper front beam suspension system schematic diagram of existing suspended pouring construction hanging basket;
Fig. 2 is that the upper front beam suspension system side of the utility model is intended to;
Fig. 3 is the partial enlarged view in Fig. 2, the pin joint structure of upper beam and main truss gusset plate before showing;
Fig. 4 is intended to before front beam suspension system on the utility model;
Fig. 5 is the partial enlarged view in Fig. 4, the connection structure of display distribution beam and upper front beam and suspender belt.
Specific implementation mode
As shown in Fig. 2, Fig. 3, Fig. 4, Fig. 5, the utility model includes front beam 1 on two main couples 2 and one, the cross of going forward Two short columns 6 are fixedly installed on beam 1, a connecting plate 7 is respectively welded in the both sides of each short column 6, each short column both sides Connecting plate 7 is connect with the gusset plate of a main couple 3 by axis pin 8 respectively;The bottom of the upper front beam 1 is equipped with multipair lifting lug 9, Set a horizontally disposed distribution beam 10 respectively below each pair of lifting lug 9, the both ends of every distribution beam 10 are separately connected one vertically The flower basket bolt 11 of setting, two flower basket bolts, 11 upper end at every distribution beam both ends a pair of of lifting lug with upper front beam bottom respectively 9 pin joints, lower end and 10 pin joint of distribution beam of flower basket bolt 11;The middle part of every distribution beam 10 is separately connected 1 or 2 suspender belts 5, Every suspender belt 5 is connect with skid beam 13 in the edge of a wing skid beam 12 or case of Hanging Basket or bottom basket front beam 14 respectively.
As shown in Figure 4, Figure 5, the pedestal 15 of 1 or 2 inverted U, each bottom is fixedly installed in the top surface of every distribution beam 10 A centre-hole jack 16 is vertically installed in the top surface of seat 15, and each pedestal and jack pair should install a suspender belt 5, described to hang 5 Band uses fining twisted steel, every suspender belt 5 to sequentially pass through distribution beam 10, pedestal 15 and centre-hole jack 16 from bottom to top, hang The top of the jack 16 is protruded from 5 upper end, and first bolt-nut 17 that is spirally connected, be located at the pedestal 15 in suspender belt 5 Position between distribution beam 10 is spirally connected the second bolt-nut 18, sliding in the lower end of suspender belt 5 and the edge of a wing skid beam 12 or case of Hanging Basket Beam 13 or bottom basket front beam 14 connect.
The utility model can be pre-machined by factory, and upper front beam and distribution beam are made of Two bors d's oeuveres channel steel, are being constructed Scene is installed by bolt axis pin, when installation first by short column, connecting plate and upper front beam it is integrally mounted after integral hoisting arrive On main truss gusset plate.After upper front beam is installed in place, in below the crossbeam installation flower basket bolt and the distribution beam of going forward, installation, Depth of beam is distributed by adjusting the length adjustment of flower basket bolt, it is ensured that it is in proper height and facilitates operation.Then again Suspender belt is installed, skid beam in bottom basket and flange plate skid beam and case is connected finally by suspender belt.
When utility model works, when needing to adjust the height of distribution beam 10, it can be adjusted by rotating flower basket bolt 11. The length of suspender belt 5 can be adjusted by the cooperation of punching jack 16 and the first adjusting nut 17, the second adjusting nut 18.Fig. 4, Under state shown in fig. 5, when needing adjustment extension suspender belt 5 downwards, first the first adjusting nut 17 is rotated up, away from 16 top certain distance of centre-hole jack, then start jack 16 make its be elongated to top withstand the first nut 17 again, The second nut 18 is rotated then up away from 10 top surface certain distance of distribution beam, then shrinks jack 16, keeps suspender belt 5 whole It falls, recycles aforesaid operations, until suspender belt 5 reaches the length of needs;When needing to be lifted up suspender belt 5, operating process on the contrary, So that jack 16 is extended the first nut 17 of jacking upwards, so that the second nut 18 is left 10 top surface of distribution beam, then rotate down Second nut 18 makes it resist 10 top surface of distribution beam again, then shrinks jack 16, rotating the first nut 17 still further below makes it It resists at the top of jack 16, then extends the upward jacking of jack 16 again, recycle aforesaid operations, until the promotion of suspender belt 5 is arrived need to The height wanted.

Claims (2)

1. a kind of upper front beam suspension system of suspended pouring construction hanging basket, including front beam on two main couples and one, it is characterised in that: Two short columns are fixedly installed on the upper front beam, a connecting plate is respectively welded in the both sides of each short column, each short column The connecting plate of both sides is connect with the gusset plate of a main couple by axis pin respectively;The bottom of the upper front beam is equipped with multipair hang Ear, sets a horizontally disposed distribution beam respectively below each pair of lifting lug, and the both ends of every distribution beam are separately connected one and vertically set The flower basket bolt set, the two flower basket bolt upper ends at every distribution beam both ends respectively with a pair of of lifting lug pin joint of upper front beam bottom, The lower end of flower basket bolt and distribution beam pin joint;1 or 2 suspender belts, every suspender belt difference are separately connected in the middle part of every distribution beam It is connect with skid beam in the edge of a wing skid beam or case of Hanging Basket or bottom basket front beam.
2. the upper front beam suspension system of suspended pouring construction hanging basket according to claim 1, it is characterised in that:Every distribution beam Top surface be fixedly installed the pedestal of 1 or 2 inverted U, vertical one centre-hole jack of installation in the top surface of each pedestal, each bottom Seat and jack pair should install a suspender belt, and the suspender belt uses fining twisted steel, and every suspender belt sequentially passes through point from bottom to top With beam, pedestal and centre-hole jack, the upper end of suspender belt protrudes from the top of the jack, and first bolt-nut that is spirally connected, It is spirally connected the second bolt-nut at position of the suspender belt between the pedestal and distribution beam, the lower end of suspender belt and the edge of a wing of Hanging Basket are slided Skid beam or the connection of bottom basket front beam in beam or case.
CN201820002183.4U 2018-01-02 2018-01-02 A kind of upper front beam suspension system of suspended pouring construction hanging basket Active CN207987785U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820002183.4U CN207987785U (en) 2018-01-02 2018-01-02 A kind of upper front beam suspension system of suspended pouring construction hanging basket

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820002183.4U CN207987785U (en) 2018-01-02 2018-01-02 A kind of upper front beam suspension system of suspended pouring construction hanging basket

Publications (1)

Publication Number Publication Date
CN207987785U true CN207987785U (en) 2018-10-19

Family

ID=63819798

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820002183.4U Active CN207987785U (en) 2018-01-02 2018-01-02 A kind of upper front beam suspension system of suspended pouring construction hanging basket

Country Status (1)

Country Link
CN (1) CN207987785U (en)

Similar Documents

Publication Publication Date Title
CN107989380B (en) Steel truss gallery hydraulic synchronizing lifting construction technique
CN208815424U (en) A kind of bridge descending hanging basket
CN101284628B (en) Hoisting method for framework of large tonnage pressing machine
CN104878916B (en) With the dismantled and assembled simple and easy four-wheel Mobile operating platform of constructional materials elevating function
CN101503908B (en) Construction method for spacing suspension cable structural template support platform
CN109113320A (en) Construction operation method in a kind of elevator
CN102912736A (en) Vertical assembling construction method for trussed arch bridge
CN109081247A (en) A kind of hanging method of vestibule large-span steel girder
CN208415485U (en) The aerial steel vestibule Lift-on/Lift-off System of multilayer
CN204781879U (en) Dismantled and assembled simple and easy four -wheel of taking building material raising and lowering functions removes operation platform
CN214498388U (en) Assembled overhanging formwork support bent
CN207987785U (en) A kind of upper front beam suspension system of suspended pouring construction hanging basket
CN207243234U (en) A kind of steel structure modularization house universal hanger
CN202881858U (en) Jig frame used for vertical assembly construction of truss arc bridge
CN102926330B (en) Installation method of hanging basket suitable for bridge construction
CN210134344U (en) Trolley for mounting bridge center joint drain pipe
CN208748518U (en) A kind of formwork for placing support device
CN214942600U (en) Laborsaving advancing device suitable for installation of large-scale round pin axle of steel construction engineering
CN108612317A (en) A kind of band waves column type gate-type combination steel frame construction installation method
CN209923780U (en) Suspended support of segment prefabricated bent cap
CN210713861U (en) Deflection correcting device for upper and lower stoplogs during connection
CN111764623A (en) Lower hanging construction platform module of high-altitude large-cantilever steel roof truss and construction method
CN205741886U (en) A kind of extension die shoe frame for the construction of bridge rectangle pier
CN110273551B (en) Deflection correction device and correction method for upper and lower stopbeams during connection
CN109113321A (en) A kind of automatic leveling operating platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant