CN210134344U - Trolley for mounting bridge center joint drain pipe - Google Patents

Trolley for mounting bridge center joint drain pipe Download PDF

Info

Publication number
CN210134344U
CN210134344U CN201920935039.0U CN201920935039U CN210134344U CN 210134344 U CN210134344 U CN 210134344U CN 201920935039 U CN201920935039 U CN 201920935039U CN 210134344 U CN210134344 U CN 210134344U
Authority
CN
China
Prior art keywords
group
bridge
trolley
drain pipe
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920935039.0U
Other languages
Chinese (zh)
Inventor
董贺辉
姚帅鹏
徐镭
张玉斌
王博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Seventh Engineering Division Corp Ltd
Original Assignee
China Construction Seventh Engineering Division Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Seventh Engineering Division Corp Ltd filed Critical China Construction Seventh Engineering Division Corp Ltd
Priority to CN201920935039.0U priority Critical patent/CN210134344U/en
Application granted granted Critical
Publication of CN210134344U publication Critical patent/CN210134344U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a platform truck for installation of bridge centre joint wash-out pipe, reach the operation platform that links to each other with the support unit including the support unit, the support unit includes the supporting seat, and the bottom of supporting seat is provided with the universal wheel, and the supporting seat is provided with two, and two supporting seats set up respectively on the both sides bridge floor of bridge centre joint, the operation platform is located the below of bridge centre joint, is connected with crossbeam group between two supporting seats, crossbeam group with through cantilever jib group link between the operation platform. The utility model discloses it is easy, simple structure, convenient to use to draw materials, has both effectively improved the efficiency of construction, has guaranteed construction safety again, has fine popularization application prospect.

Description

一种用于桥梁中缝泄水管安装的台车A trolley for installation of drain pipes in the middle of bridges

技术领域technical field

本实用新型涉及桥梁施工技术领域,特别是指一种用于桥梁中缝泄水管安装的台车。The utility model relates to the technical field of bridge construction, in particular to a trolley used for the installation of a middle seam drain pipe of a bridge.

背景技术Background technique

在桥梁施工中,由于工序原因,泄水管安装必须在桥面系施工完成后进行,而桥面系施工完成后安装泄水管,经常存在施工平台不便搭设的问题。正常施工时应采用桥检车进行泄水管安装,但由于受到施工成本及特种设备紧缺等因素的影响,现场往往采用搭设简易支架的方法进行泄水管安装施工。这种方式虽可满足施工要求,但无法保证施工质量且存在较大安全隐患,另外还存在施工效率的问题。In bridge construction, due to process reasons, the installation of the drainage pipe must be carried out after the completion of the bridge deck construction, and the installation of the drainage pipe after the completion of the bridge deck construction often has the problem of inconvenient construction of the construction platform. During normal construction, bridge inspection trucks should be used to install the drain pipe. However, due to factors such as construction cost and shortage of special equipment, the method of erecting simple brackets is often used on site to install the drain pipe. Although this method can meet the construction requirements, it cannot guarantee the construction quality and has a great potential safety hazard. In addition, there are problems of construction efficiency.

实用新型内容Utility model content

针对上述背景技术中的不足,本实用新型提出一种用于桥梁中缝泄水管安装的台车,解决了现有桥梁泄水管安装时,使用桥检车数量紧缺且成本高,采用简易支架无法保证施工质量、效率低且存在较大安全隐患的技术问题。In view of the above-mentioned deficiencies in the background technology, the utility model proposes a trolley for the installation of the water discharge pipe in the middle of the bridge, which solves the problem that when the existing bridge water discharge pipe is installed, the number of bridge inspection vehicles used is in short supply and the cost is high. The technical problems of construction quality, low efficiency and great potential safety hazards.

本实用新型的技术方案是这样实现的:一种用于桥梁中缝泄水管安装的台车,包括支撑单元及与支撑单元相连的作业平台,所述支撑单元包括支撑座,支撑座的底端设置有万向轮,支撑座设置有两个,两个支撑座分别设置在桥梁中缝的两侧桥面上,所述作业平台位于桥梁中缝的下方,两个支撑座之间连接有横梁组,横梁组与所述作业平台之间通过悬臂吊杆组连接。The technical scheme of the present utility model is realized as follows: a trolley for installing a drain pipe in a middle seam of a bridge includes a support unit and a working platform connected with the support unit, the support unit includes a support seat, and the bottom end of the support seat is provided with There are universal wheels, two support bases are provided, the two support bases are respectively arranged on the bridge decks on both sides of the middle seam of the bridge, the operation platform is located below the middle seam of the bridge, and a cross beam group is connected between the two support bases, and the cross beam The group and the working platform are connected by a cantilever boom group.

所述支撑座的顶端均设置有立杆组,所述横梁组连接在两个立杆之间。The top end of the support base is provided with a vertical rod group, and the cross beam group is connected between the two vertical rods.

所述横梁组包括前横梁组-和后横梁组-,前横梁组-和后横梁组-均为水平间隔设置在立杆组之间的双拼工字钢。The cross-beam group includes a front cross-beam group- and a rear cross-beam group-, and the front cross-beam group- and the rear cross-beam group-are double-jointed I-beams arranged at horizontal intervals between the vertical rod groups.

所述悬臂吊杆组包括前悬臂吊杆-和后悬臂吊杆-,前悬臂吊杆-和后悬臂吊杆-的上端部均设置有销轴,前悬臂吊杆-和后悬臂吊杆-通过销轴分别与前横梁组-和后横梁组-相连。The cantilever boom group includes a front cantilever boom- and a rear cantilever boom-, the upper ends of the front cantilever boom- and the rear cantilever boom- are provided with pin shafts, the front cantilever boom- and the rear cantilever boom- They are respectively connected with the front beam group- and the rear beam group- through pin shafts.

所述作业平台包括与悬臂吊杆组的下端部固定连接的工字钢框架,工字钢框架的边框之间焊接有螺纹钢筋支撑底,工字钢框架的边框上端面焊接有螺纹钢筋护栏,螺纹钢筋护栏的外部设置有安全防护网。The working platform includes an I-beam frame fixedly connected with the lower end of the cantilever boom group, a threaded steel bar support bottom is welded between the frames of the I-beam frame, and a threaded steel bar guardrail is welded on the upper end of the frame of the I-beam frame. A safety net is provided on the outside of the threaded steel guardrail.

所述螺纹钢筋支撑底上方铺设有竹胶板,工字钢框架与悬臂吊杆组的下端部之间设置有角钢斜撑。Bamboo plywood is laid above the support bottom of the threaded steel bar, and an angle steel diagonal brace is arranged between the I-beam frame and the lower end of the cantilever hanger group.

所述支撑座与立杆组之间设置有第一钢筋剪力撑、立杆组与横梁组之间均设置有第二钢筋剪力撑。A first steel bar shear brace is arranged between the support base and the vertical pole group, and a second steel bar shear brace is arranged between the vertical pole group and the beam group.

本实用新型的制作材料不仅能够现场取材、结构简单,而且施工人员可以在桥梁中缝下方的作业平台上便捷地进行泄水管的安装操作,既不用搭设施工平台,也不用搭设简易的临时支架。另外,本实用新型还可以通过支撑座下方的万向轮沿着桥梁的长度方向进行移动,避免了传统施工中需要分段施工的问题,不用拆卸搬运和重复组装来分段安装泄水管。本实用新型取材容易、结构简单、使用便捷,既有效提高了施工效率,又保证了施工安全,具有很好的推广应用前景。The manufacturing material of the utility model not only can be obtained on site and has a simple structure, but also the construction personnel can conveniently carry out the installation operation of the drain pipe on the working platform under the middle seam of the bridge, without setting up a construction platform or a simple temporary support. In addition, the utility model can also move along the length direction of the bridge through the universal wheel under the support seat, avoiding the problem of segmented construction in traditional construction, and installing the drain pipe segmentally without disassembly, handling and repeated assembly. The utility model is easy to obtain materials, has a simple structure and is convenient to use, which not only effectively improves the construction efficiency, but also ensures the construction safety, and has a good prospect of popularization and application.

附图说明Description of drawings

为了更清楚地说明本实用新型实施例,下面将对实施例描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图仅仅是本实用新型的一些实施例,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to illustrate the embodiments of the present invention more clearly, the following briefly introduces the accompanying drawings used in the description of the embodiments. Obviously, the drawings in the following description are only some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained from these drawings without any creative effort.

图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;

图2为图1的俯视图;Fig. 2 is the top view of Fig. 1;

图3为立杆组与支撑座连接的结构示意图。FIG. 3 is a schematic structural diagram of the connection between the vertical pole group and the support base.

具体实施方式Detailed ways

下面将结合本实用新型实施例中的附图,对本实用新型实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有付出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions in the embodiments of the present utility model will be clearly and completely described below with reference to the accompanying drawings in the embodiments of the present utility model. Obviously, the described embodiments are only a part of the embodiments of the present utility model, rather than all the implementations. example. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative efforts shall fall within the protection scope of the present invention.

实施例1,一种用于桥梁中缝泄水管安装的台车,如图1所示,包括支撑单元及与支撑单元相连的作业平台,施工工人在作业平台上进行泄水管的安装。Embodiment 1, a trolley for installation of drain pipes in the middle of bridges, as shown in FIG. 1 , includes a support unit and a work platform connected to the support unit, and construction workers install the drain pipes on the work platform.

所述支撑单元包括支撑座1,支撑座1由施工现场的工字钢焊接而成,不仅成本低廉、而且取材及制作非常便捷。支撑座1的底端设置有万向轮2,在万向轮2的作用下,施工工人可以推动支撑座1进行便捷地移动位置,以此适应不同位置泄水管的安装需求。The support unit includes a support base 1, and the support base 1 is welded by I-beam on the construction site, which is not only low in cost, but also very convenient in material acquisition and manufacture. The bottom end of the support base 1 is provided with a universal wheel 2. Under the action of the universal wheel 2, the construction worker can push the support base 1 to move the position conveniently, so as to meet the installation requirements of the drainage pipe in different positions.

所述支撑座1设置有两个,两个支撑座1分别设置在桥梁中缝的两侧桥面上,所述作业平台位于桥梁中缝的下方,两个支撑座1之间连接有横梁组,横梁组与所述作业平台之间通过悬臂吊杆组连接。两个支撑座1在桥梁中缝两侧的桥面上既起到支撑作用,还起到前后移动的作用,既便于前后两侧泄水管的安装,又便于来回移动进行验收和检修。There are two said support bases 1 , the two support bases 1 are respectively arranged on the bridge decks on both sides of the middle seam of the bridge, the working platform is located below the middle seam of the bridge, and a cross beam group is connected between the two support bases 1 . The group and the working platform are connected by a cantilever boom group. The two support bases 1 not only play a supporting role on the bridge deck on both sides of the bridge mid-seam, but also play a role of moving back and forth, which is convenient for the installation of the drain pipes on both sides of the front and back, and is easy to move back and forth for acceptance and maintenance.

如图2所示,所述支撑座1的顶端均设置有立杆组4,所述横梁组连接在两个立杆4之间。横梁组包括前横梁组3-1和后横梁组3-2,前横梁组3-1和后横梁组3-2均为水平间隔设置在立杆组4之间的双拼工字钢。As shown in FIG. 2 , the top end of the support base 1 is provided with a vertical rod group 4 , and the cross beam group is connected between the two vertical rods 4 . The beam group includes a front beam group 3-1 and a rear beam group 3-2. The front beam group 3-1 and the rear beam group 3-2 are double-jointed I-beams arranged between the vertical rod groups 4 at horizontal intervals.

所述悬臂吊杆组包括前悬臂吊杆5-1和后悬臂吊杆5-2,前悬臂吊杆5-1和后悬臂吊杆5-2的上端部均设置有销轴6,销轴6插设在双拼工字钢之间。前悬臂吊杆5-1和后悬臂吊杆5-2通过销轴6分别与前横梁组3-1和后横梁组3-2相连。双拼工字钢、销轴6和悬臂吊杆组均为施工现场的就地取材,既降低了施工成本,又加快了施工效率。The cantilever hanger group includes a front cantilever hanger rod 5-1 and a rear cantilever hanger rod 5-2. The upper ends of the front cantilever hanger rod 5-1 and the rear cantilever hanger rod 5-2 are both provided with pin shafts 6. The pin shafts 6 is inserted between the double I-beams. The front cantilever suspension rod 5-1 and the rear cantilever suspension rod 5-2 are respectively connected with the front beam group 3-1 and the rear beam group 3-2 through the pin shaft 6. The double-jointed I-beam, the pin shaft 6 and the cantilever hanger group are all locally sourced materials on the construction site, which not only reduces the construction cost, but also speeds up the construction efficiency.

实施例2,一种用于桥梁中缝泄水管安装的台车,如图1所示,所述作业平台包括与悬臂吊杆组的下端部固定连接的工字钢框架7,工字钢框架7的边框上端面焊接有螺纹钢筋护栏8,螺纹钢筋护栏8的外部设置有安全防护网。工字钢框架7的边框之间焊接有螺纹钢筋支撑底,螺纹钢筋支撑底上方铺设有竹胶板,施工工人站立在竹胶板上进行泄水管的安装操作。Embodiment 2, a trolley used for the installation of drain pipes in the middle of bridges, as shown in Figure 1, the work platform includes an I-beam frame 7 that is fixedly connected to the lower end of the cantilever boom group, and the I-beam frame 7 The upper end surface of the frame is welded with a threaded steel bar guardrail 8, and a safety net is provided on the outside of the threaded steel bar guardrail 8. A threaded steel bar support bottom is welded between the frames of the I-beam frame 7, a bamboo plywood is laid above the threaded steel bar support bottom, and construction workers stand on the bamboo plywood to install the drain pipe.

本实施例的其他结构与实施例1相同。The other structures of this embodiment are the same as those of the first embodiment.

实施例3,一种用于桥梁中缝泄水管安装的台车,如图1所示,所述工字钢框架7与悬臂吊杆组的下端部之间设置有角钢斜撑9,角钢斜撑9的设置进一步保证了作业平台的稳定性和安全性。如图2和图3所示,所述支撑座1与立杆组4之间设置有第一钢筋剪力撑11、立杆组4与横梁组之间均设置有第二钢筋剪力撑10。第一钢筋剪力撑11和第二钢筋剪力撑10的设置,充分保证了各个连接结构之间的稳定性和结构强度。Embodiment 3, a kind of trolley for the installation of the middle seam drain pipe of the bridge, as shown in Figure 1, between the I-beam frame 7 and the lower end of the cantilever hanger group is provided with angle steel diagonal braces 9, angle steel diagonal braces The setting of 9 further ensures the stability and safety of the work platform. As shown in FIG. 2 and FIG. 3 , a first steel bar shear brace 11 is arranged between the support base 1 and the vertical rod group 4 , and a second steel bar shear brace 10 is arranged between the vertical rod group 4 and the beam group. . The arrangement of the first reinforced shear bracing 11 and the second reinforced shear bracing 10 fully guarantees the stability and structural strength of each connection structure.

本实施例的其他结构与实施例2相同。The other structures of this embodiment are the same as those of the second embodiment.

本实用新型未详尽之处均为本领域技术人员所公知的常规技术手段。The non-detailed parts of the present invention are conventional technical means known to those skilled in the art.

以上所述仅为本实用新型的较佳实施例而已,并不用以限制本实用新型,凡在本实用新型的精神和原则之内,所作的任何修改、等同替换、改进等,均应包含在本实用新型的保护范围之内。The above are only preferred embodiments of the present invention, and are not intended to limit the present invention. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention shall be included in the within the protection scope of the present invention.

Claims (7)

1.一种用于桥梁中缝泄水管安装的台车,包括支撑单元及与支撑单元相连的作业平台,其特征在于:所述支撑单元包括支撑座(1),支撑座(1)的底端设置有万向轮(2),支撑座(1)设置有两个,两个支撑座(1)分别设置在桥梁中缝的两侧桥面上,所述作业平台位于桥梁中缝的下方,两个支撑座(1)之间连接有横梁组,横梁组与所述作业平台之间通过悬臂吊杆组连接。1. A trolley for installation of a middle seam drain pipe of a bridge, comprising a support unit and a work platform connected with the support unit, characterized in that: the support unit comprises a support seat (1), and the bottom end of the support seat (1) A universal wheel (2) is provided, two support seats (1) are provided, and the two support seats (1) are respectively arranged on the bridge decks on both sides of the middle seam of the bridge, and the working platform is located below the middle seam of the bridge. A beam group is connected between the support bases (1), and the beam group and the working platform are connected by a cantilever hanger group. 2.根据权利要求1所述的用于桥梁中缝泄水管安装的台车,其特征在于:所述支撑座(1)的顶端均设置有立杆组(4),所述横梁组连接在两个立杆组(4)之间。2. The trolley for installation of the middle seam drain pipe of a bridge according to claim 1, characterized in that: the top of the support seat (1) is provided with a vertical rod group (4), and the cross beam group is connected to two between the pole groups (4). 3.根据权利要求2所述的用于桥梁中缝泄水管安装的台车,其特征在于:所述横梁组包括前横梁组(3-1)和后横梁组(3-2),前横梁组(3-1)和后横梁组(3-2)均为水平间隔设置在立杆组(4)之间的双拼工字钢。3 . The trolley for installing the drain pipe in the middle of the bridge according to claim 2 , wherein the cross beam group comprises a front cross beam group (3-1) and a rear cross beam group (3-2), and the front cross beam group (3-1) and the rear beam group (3-2) are both double-jointed I-beams arranged at horizontal intervals between the vertical rod groups (4). 4.根据权利要求3所述的用于桥梁中缝泄水管安装的台车,其特征在于:所述悬臂吊杆组包括前悬臂吊杆(5-1)和后悬臂吊杆(5-2),前悬臂吊杆(5-1)和后悬臂吊杆(5-2)的上端部均设置有销轴(6),前悬臂吊杆(5-1)和后悬臂吊杆(5-2)通过销轴(6)分别与前横梁组(3-1)和后横梁组(3-2)相连。4. The trolley for installation of the middle seam drain pipe of a bridge according to claim 3, characterized in that: the cantilever suspension rod group comprises a front cantilever suspension rod (5-1) and a rear cantilever suspension rod (5-2) , the upper ends of the front cantilever boom (5-1) and the rear cantilever boom (5-2) are provided with pins (6), the front cantilever boom (5-1) and the rear cantilever boom (5-2) ) are respectively connected with the front beam group (3-1) and the rear beam group (3-2) through the pin shaft (6). 5.根据权利要求1-4任一项所述的用于桥梁中缝泄水管安装的台车,其特征在于:所述作业平台包括与悬臂吊杆组的下端部固定连接的工字钢框架(7),工字钢框架(7)的边框之间焊接有螺纹钢筋支撑底,工字钢框架(7)的边框上端面焊接有螺纹钢筋护栏(8),螺纹钢筋护栏(8)的外部设置有安全防护网。5. The trolley for the installation of the middle seam drain pipe of a bridge according to any one of claims 1-4, characterized in that: the work platform comprises an I-beam frame ( 7), a threaded steel bar support bottom is welded between the frames of the I-beam frame (7), a threaded steel bar guardrail (8) is welded on the upper end of the frame of the I-beam frame (7), and the external setting of the threaded steel bar guardrail (8) There are safety nets. 6.根据权利要求5所述的用于桥梁中缝泄水管安装的台车,其特征在于:所述螺纹钢筋支撑底上方铺设有竹胶板,工字钢框架(7)与悬臂吊杆组的下端部之间设置有角钢斜撑(9)。6 . The trolley for installing the drain pipe in the middle of the bridge according to claim 5 , characterized in that: a bamboo plywood is laid above the support bottom of the threaded steel bar, and the I-beam frame (7) and the cantilever hanger group are connected to each other. 7 . Angle steel diagonal braces (9) are arranged between the lower ends. 7.根据权利要求6所述的用于桥梁中缝泄水管安装的台车,其特征在于:所述支撑座(1)与立杆组(4)之间设置有第一钢筋剪力撑(11)、立杆组(4)与横梁组之间均设置有第二钢筋剪力撑(10)。7 . The trolley for installing the drain pipe in the middle of the bridge according to claim 6 , characterized in that: a first reinforced shear brace ( 11 ) is arranged between the support base ( 1 ) and the vertical rod group ( 4 ). 8 . ), a second steel bar shear brace (10) is arranged between the vertical pole group (4) and the beam group.
CN201920935039.0U 2019-06-20 2019-06-20 Trolley for mounting bridge center joint drain pipe Expired - Fee Related CN210134344U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920935039.0U CN210134344U (en) 2019-06-20 2019-06-20 Trolley for mounting bridge center joint drain pipe

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920935039.0U CN210134344U (en) 2019-06-20 2019-06-20 Trolley for mounting bridge center joint drain pipe

Publications (1)

Publication Number Publication Date
CN210134344U true CN210134344U (en) 2020-03-10

Family

ID=69706599

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920935039.0U Expired - Fee Related CN210134344U (en) 2019-06-20 2019-06-20 Trolley for mounting bridge center joint drain pipe

Country Status (1)

Country Link
CN (1) CN210134344U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112144393A (en) * 2020-10-23 2020-12-29 新疆北新路桥集团股份有限公司 Installation and construction method for water collecting pipe under bridge
CN113430929A (en) * 2021-08-04 2021-09-24 中交二公局第五工程有限公司 Self-propelled beam bottom working trolley at central separation zone of bridge

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112144393A (en) * 2020-10-23 2020-12-29 新疆北新路桥集团股份有限公司 Installation and construction method for water collecting pipe under bridge
CN113430929A (en) * 2021-08-04 2021-09-24 中交二公局第五工程有限公司 Self-propelled beam bottom working trolley at central separation zone of bridge

Similar Documents

Publication Publication Date Title
CN106939707B (en) A kind of restricted clearance large-scale steel structure supporting platform from method for improving
CN203188589U (en) Rigid-frame continuous beam zero block construction bracket supporting system
CN103643800B (en) The erection & lift system of buckling-restrained bracing member and construction method thereof
CN205012666U (en) High altitude steel construction vestibule integrally lift up support structure
CN212002170U (en) Adjustable support for elevator shaft operating platform
CN205775852U (en) Acting force conversion support for top of steel structure supporting jig frame
CN105952133A (en) Suspended large-span reinforced concrete structure construction steel platform and construction method
CN210134344U (en) Trolley for mounting bridge center joint drain pipe
CN206873307U (en) Movable type bridge justifies pier stud work high above the ground operating platform
CN203199913U (en) Assembling and disassembling type hoisting truss
CN101575914A (en) Retractable unit horizontal hard protection
CN209780193U (en) Suspension type scaffold
CN209081301U (en) A kind of special section structure
CN216515179U (en) Movable trolley for mounting and dismounting bridge guardrail template
CN217325024U (en) Wet seam construction trolley for ultra-wide prefabricated box girder
CN210134343U (en) A trolley used for installation of drain pipes on the outside of bridges
CN213329975U (en) Steel pull rod hanging and pulling overhanging bearing steel beam structure
CN213951981U (en) Basket is hung with safe type to bridge construction
CN223316290U (en) A main beam external windproof structure for outdoor gantry crane
CN207044363U (en) A kind of new precast beam protection and operating platform
CN223048204U (en) Sectional cantilever mounting device for high-altitude large-span steel girder
CN206800204U (en) A kind of highway bridge bent cap reinforcement cage mold
CN206581578U (en) Double-layer basket constructing device for overhanging scaffold
CN222990595U (en) Multifunctional portal for suspension bridge construction
CN113431358A (en) Building site is with portable protection canopy

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200310