CN207987660U - A kind of prepackage type cement road structure facilitating draining - Google Patents
A kind of prepackage type cement road structure facilitating draining Download PDFInfo
- Publication number
- CN207987660U CN207987660U CN201820248808.5U CN201820248808U CN207987660U CN 207987660 U CN207987660 U CN 207987660U CN 201820248808 U CN201820248808 U CN 201820248808U CN 207987660 U CN207987660 U CN 207987660U
- Authority
- CN
- China
- Prior art keywords
- link block
- cavity
- drainage
- type cement
- road structure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Road Paving Structures (AREA)
Abstract
The utility model is related to road structures, specifically disclose a kind of prepackage type cement road structure facilitating draining, including base, and several prefabricated boards being set in base and mutually splice, several chimbs are vertically offered on the opposite face of two blocks of contiguous prefabricated plates, it is provided with the connector matched with its chimb for interconnection between two blocks of contiguous prefabricated plates, the connector includes and the matched link block of chimb on two blocks of contiguous prefabricated plates, several drainage cavities being opened in link block, and link block offers the inlet opening communicated with drainage cavity above drainage cavity, the drainage pipeline communicated with sewer is provided in the drainage cavity, its key points of the technical solution are that having the advantages that surface gathered water is prevented to be destroyed probability to reduce road.
Description
Technical field
The utility model is related to road structure, more particularly to a kind of prepackage type cement road structure facilitating draining.
Background technology
Currently, there are two types of the road common types of our countries:Cement pavement and asphalt concrete pavement.Either which
Kind pavement structure is all to use cast-in-place form of construction work:On the one hand, it is longer to pour the time, is unfavorable for shortening the construction period;It is another
Aspect, pavement structure once destroy, and to employ big machinery and dig up road surface and could repair, once injuring roadbed, repair
Expense will greatly improve needed for multiple, and maintenance is inconvenient;Cement and bituminous paving service life are conditional, after the aging of road surface
It is easy to be damaged by pressure by loaded vehicle, it is also possible to injure roadbed, the road after aging is very bothered or dug when building again and spreads again
If roadbed or can only abandon, Xin Lu is built again.
Thus assembled cement concrete pavement comes into being, and has the protrusions such as can be mass, construction speed is fast excellent
Point, but its there are still some problems.This kind of cement road is when raining or there is ponding on road surface, due to the physical characteristic of cement,
Moisture content can long-term accumulated on road surface, it has not been convenient to the sewer well head of both sides of the road drain, also can not penetrate cement pavement into
And the roadbed of gap downwards that can be also penetrated to subsurface wastewater infiltration system or even ponding between prefabricated board is permeated, and is damaged.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of prepackage type water facilitating draining
Muddy road line structure has the advantages that surface gathered water is prevented to be destroyed probability to reduce road.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of prepackage type cement road structure facilitating draining, including base and it is several be set in base and mutually
The prefabricated board of splicing vertically offers several chimbs, two pieces of phases on the opposite face of two blocks of contiguous prefabricated plates
The connector matched with its chimb for interconnection is provided between adjacent prefabricated board, the connector includes adjacent with two pieces
The matched link block of chimb, several drainage cavities being opened in link block and link block are above drainage cavity on prefabricated board
The inlet opening communicated with drainage cavity is offered, the drainage pipeline communicated with sewer is provided in the drainage cavity.
So set, being connected by link block between two pieces of adjacent prefabricated boards, and coordinate upper chimb so that mutually interconnect
What is connect is even closer, and flow is not easy the gap between link block and prefabricated board and flows down, prevent base below prefabricated board by
The setting of inlet opening and drainage cavity to damage, and on link block so that the ponding on prefabricated board is entered by inlet opening
In drainage cavity, ponding on prefabricated board is prevented, the flow entered in drainage cavity is drained by drainage pipeline in sewer, will not
Influence other road structures, prevent the ponding on prefabricated board on the whole and reduce flow be flowed into prefabricated board it
Under, the road structures such as base are influenced, reducing road with this is destroyed probability, improves the service life of road.
Further preferably:The connector includes several is set between chimb and link block for pouring articulamentum
It pours cavity and several are set in link block and pour channel with pour that cavity communicates.
So set, by the past liquid for pouring channel and being passed through articulamentum, liquid, which enters, pours cavity, and is pouring sky
Intracavitary solidifies, and forms the articulamentum for playing the role of being fixedly connected between chimb and link block, and prefabricated board is improved in even with this
The connectivity robustness of block is connect, the effect of articulamentum can limit small micro- offset of prefabricated board and link block, and articulamentum is
In the small space being arranged between chimb and link block, it will not cause link block that cannot be detached with prefabricated board.
Further preferably:The channel that pours is set as to the adjacent arc for pouring cavity and being bent far from direction.
So set, be arranged to the adjacent arc for pouring cavity and being bent far from direction by pouring channel, it is logical pouring
Road one end is communicated with cavity is poured, and the other end can reduce that pour opening up for cavity strong to connecting block structure far from pouring cavity
The influence of degree so that the structural strength of link block is smaller by being influenced.
Further preferably:Be provided with connecting pipe between described two adjacent row water cavities, the drainage pipeline with connect
The drainage cavity of block end communicates.
So set, connecting pipe is arranged by two adjacent row water cavities so that the flow in several drainage cavities can flow
Lead to, only needs a drainage pipeline to be connected with one of drainage cavity at this time, it is therefore prevented that more drainage pipeline is set
Setting reduces the structural strength of link block, and then ensures the structural strength of road entirety, ensures the service life of road, plays section
The effect of energy.
Further preferably:Several connecting pipes are set as tilting to the same side, and the drainage pipeline is arranged with end
Water cavity communicates.
So set, being set as tilting and tilting to the same side down by the way that connecting pipe is arranged, on the one hand can accelerate
Flow flowing in drainage cavity so that flow can flow to drainage pipeline faster;Still further aspect, connecting pipe is inclined to be set
It sets so that there can be certain ponding in each drainage cavity, will not be completely drained, play the role of water storage, it is more dry in summer
Dry weather, this part water can be reduced the temperature of road by the form up evaporated, prevent pavement of road temperature excessively high, lead
Cause road surface is easier to damage or fracture.
Further preferably:The first waterproof layer is provided on the inner wall of the drainage cavity.
So set, due to long-time ponding in drainage cavity, it is easy draining cavity wall to corrode, by the way that the first waterproof is arranged
Layer, plays the role of isolation, prevents draining cavity wall damage, ensures the structural strength of link block, and then ensures road entirety
Structural strength improves the service life of road, plays energy-efficient effect.
Further preferably:The prefabricated board is provided with the positioning plugged with link block between adjacent chimb and reinforces
Muscle.
So set, due to the connection of link block and prefabricated board, it is inadequate to depend merely on chimb, by the way that the company of being mutually inserted is arranged
Connect the positioning reinforcing rib of form so that interconnection more securely, and link block can be played and connect positioning with prefabricated board
Effect.
Further preferably:The second waterproof layer is provided between the base and prefabricated board.
So set, by the way that the second waterproof layer is arranged between prefabricated board and base, two parts are separated, can prevent ground
Lower water up impacts prefabricated board, while can also prevent the ponding of prefabricated plate surface down to the damage of base.
In conclusion the utility model having the beneficial effect that in contrast to the prior art:By the way that connection is arranged between prefabricated board
Block is attached, and pours articulamentum between the chimb and link block on prefabricated board, while playing connection function, but also
Link block is connect even closer with prefabricated board, plays the role of preventing oozing under water;And inlet opening and row are set on link block
Water cavity, then be connected with sewer by drainage pipeline, ponding on prefabricated board can be prevented.
Description of the drawings
Fig. 1 is the entirety sectional view of embodiment;
Fig. 2 is the sectional view of link block side view in embodiment Fig. 1.
Reference numeral:1, base;2, prefabricated board;21, chimb;22, spliced eye;23, groove;3, connector;31, it connects
Block;32, drainage cavity;33, inlet opening;34, cavity is poured;35, channel is poured;4, drainage pipeline;5, connecting pipe;6, first is anti-
Water layer;7, reinforcing rib is positioned;8, the second waterproof layer.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
A kind of prepackage type cement road structure facilitating draining, referring to Fig.1 shown in, including base 1, prefabricated board 2, second be anti-
Water layer 8.
Base 1 is located at the bottom of entire road, and the second waterproof layer 8 is set on 1 top plan of base, and prefabricated board 2 is set
It sets on the second waterproof layer 8, chimb 21 is provided on the opposite face of two blocks of contiguous prefabricated plates 2, chimb 21 is set as rectangular, and
The connector 3 matched with chimb 21 for interconnection is provided between two blocks of contiguous prefabricated plates 2.
Shown in referring to Fig.1, connector 3 includes and the 21 matched link block 31 of chimb on two blocks of contiguous prefabricated plates 2, company
Connect 31 both sides of block offer with 21 matched groove 23 of chimb, offer several drainage cavities along its length in link block 31
32 are provided with the first waterproof layer 6 along the width direction of prefabricated board 2, in drainage cavity 32, in drainage cavity 32 on link block 31
Top offers the inlet opening 33 communicated with drainage cavity 32 simultaneously, is provided in one of drainage cavity 32 and sewer(In figure
It is not shown)The drainage pipeline 4 communicated(See Fig. 2), drainage pipeline 4 communicates across the first waterproof layer 6 with drainage cavity 32.
Connector 3 further includes that several be set between chimb 21 and link block 31 pours sky for pour articulamentum simultaneously
Chamber 34 and it is several be set in link block 31 and pour channel 35 with pour that cavity 34 communicates, pour channel 35 and be set as
To the adjacent arc for pouring cavity 34 and being bent far from direction.
It is worth noting that with reference to shown in Fig. 2, the company communicated with drainage cavity 32 is provided between two adjacent row water cavities 32
Take over road 5, and connecting pipe 5 is set as tilting, and due to 32 more than two of drainage cavity, i.e. connecting pipe 5 is more than one, if
Dry connecting pipe 5 is tilted to the same side, and is tilted down, and drainage pipeline 4 is connected with the drainage cavity 32 of end.
It is noted that link block 31 offers spliced eye 22 between adjacent grooves 23, prefabricated board 2 is in adjacent chimb
The positioning reinforcing rib 7 plugged with spliced eye 22 is provided between 21.
The course of work:
Base 1 is first poured, the second waterproof layer 8 is then poured in base 1,2 He of prefabricated board is placed on the second waterproof layer 8
Link block 31, link block 31 and the prefabricated board 2 of wherein side plug, i.e. groove 23 and 21 grafting of chimb, spliced eye 22 with it is fixed
Position reinforcing rib 7 plugs, then the groove 23 by other one piece of prefabricated board 2 in 31 other side of link block, 22 phase of spliced eye
Grafting is formed whole.
Then toward the liquid for pouring injection in channel 35 and being formed articulamentum, liquid enters by pouring channel 35 and pours sky
In chamber 34, articulamentum is formed after liquid solidifies.
When, there are when ponding, flow is entered out of inlet opening 33 in drainage cavity 32, using draining on 2 surface of prefabricated board
Pipeline 4 is drained into sewer.
The above is only the exemplary embodiment of the utility model, the protection model rather than limited the present invention
It encloses, the scope of protection of the utility model is determined by the attached claims.
Claims (8)
1. a kind of prepackage type cement road structure facilitating draining, including base (1) and several it is set in base (1) simultaneously
The prefabricated board (2) mutually spliced, it is characterized in that:It is vertically offered on the opposite face of two pieces of contiguous prefabricated plates (2)
Several chimbs (21) are provided between two pieces of contiguous prefabricated plates (2) and are matched for interconnection with its chimb (21)
Connector (3), the connector (3) include with chimb (21) matched link block (31) on two pieces of contiguous prefabricated plates (2) if,
The dry drainage cavity (32) being opened in link block (31) and link block (31) are offered above drainage cavity (32) and drainage cavity
(32) inlet opening (33) communicated is provided with the drainage pipeline (4) communicated with sewer on the drainage cavity (32).
2. a kind of prepackage type cement road structure facilitating draining according to claim 1, it is characterized in that:The connector
(3) include that several be set between chimb (21) and link block (31) pours cavity (34), Yi Jiruo for pour articulamentum
It is dry to be set in link block (31) and pour channel (35) with pour that cavity (34) communicates.
3. a kind of prepackage type cement road structure facilitating draining according to claim 2, it is characterized in that:It is described pour it is logical
Road (35) is set as pouring cavity to adjacent(34)Arc far from direction bending.
4. a kind of prepackage type cement road structure facilitating draining according to claim 1 or 2, it is characterized in that:Described two
It is provided with connecting pipe (5), the drainage pipeline between a adjacent row water cavity (32)(4)With the drainage cavity of link block (31) end
(32) it communicates.
5. a kind of prepackage type cement road structure facilitating draining according to claim 4, it is characterized in that:If the involvement
Take over road(5)It is set as tilting to the same side, the drainage pipeline(4)It is communicated with end drainage cavity (32).
6. a kind of prepackage type cement road structure facilitating draining according to claim 5, it is characterized in that:The drainage cavity
(32) the first waterproof layer (6) is provided on inner wall.
7. a kind of prepackage type cement road structure facilitating draining according to claim 1, it is characterized in that:The prefabricated board
(2) in adjacent chimb(21)Between be provided with the positioning reinforcing rib (7) plugged with link block (31).
8. a kind of prepackage type cement road structure facilitating draining according to claim 1, it is characterized in that:The base
(1) the second waterproof layer (8) is provided between prefabricated board (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820248808.5U CN207987660U (en) | 2018-02-11 | 2018-02-11 | A kind of prepackage type cement road structure facilitating draining |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820248808.5U CN207987660U (en) | 2018-02-11 | 2018-02-11 | A kind of prepackage type cement road structure facilitating draining |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207987660U true CN207987660U (en) | 2018-10-19 |
Family
ID=63825625
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820248808.5U Expired - Fee Related CN207987660U (en) | 2018-02-11 | 2018-02-11 | A kind of prepackage type cement road structure facilitating draining |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207987660U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110644317A (en) * | 2019-09-17 | 2020-01-03 | 长安大学 | Integrally assembled waste plastic pavement structure and processing method |
CN114508016A (en) * | 2022-02-10 | 2022-05-17 | 北京市城远市政工程有限责任公司 | Assembly type pavement structure and installation method thereof |
-
2018
- 2018-02-11 CN CN201820248808.5U patent/CN207987660U/en not_active Expired - Fee Related
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110644317A (en) * | 2019-09-17 | 2020-01-03 | 长安大学 | Integrally assembled waste plastic pavement structure and processing method |
CN114508016A (en) * | 2022-02-10 | 2022-05-17 | 北京市城远市政工程有限责任公司 | Assembly type pavement structure and installation method thereof |
CN114508016B (en) * | 2022-02-10 | 2023-11-28 | 北京市城远市政工程有限责任公司 | Assembled pavement structure and installation method thereof |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207987660U (en) | A kind of prepackage type cement road structure facilitating draining | |
CN205276099U (en) | Drainage formula brick that permeates water | |
CN210066775U (en) | Be used for reinforced (rfd) anticreep rain-proof water of ground side slope to erode slope protection structure | |
KR20100067266A (en) | Vertical drain induction type retaining wall reinforced by nailing | |
CN211522710U (en) | Municipal administration paving brick | |
CN213086850U (en) | Prefabricated assembled hydraulic retaining wall | |
JP2006132320A5 (en) | ||
CN105178134B (en) | Road green color transformation method | |
CN209099313U (en) | A kind of hydraulic engineering modified channel building lining structure | |
KR200306432Y1 (en) | Drain a waterway of concrete | |
CN209722651U (en) | A kind of water-permeable brick and its pavement with the water-permeable brick | |
CN211571261U (en) | Garden road structure | |
CN214271534U (en) | Ecological garden city road structure | |
CN211522740U (en) | Town road drainage structures | |
CN108487301A (en) | Fractured Rock Slope original position Gravity Retaining Wall structure | |
CN201981463U (en) | Drainage flat stone for road paving | |
CN209244167U (en) | A kind of assembled multifunctional water-proofing shower platform | |
CN205296365U (en) | Eco -drainage ditch | |
JP5451709B2 (en) | Free slope combined with bottom groove | |
CN215441955U (en) | Ecological slope protection brick | |
CN2644481Y (en) | Dewatering flat stone | |
CN215164265U (en) | Concrete pavement brick structure | |
CN217810797U (en) | Concrete protection and building structure | |
JP2799845B2 (en) | Construction method of underground seepage type gutter | |
CN213296241U (en) | Slope protection structure of river bank side slope |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20181019 Termination date: 20210211 |
|
CF01 | Termination of patent right due to non-payment of annual fee |