CN207987660U - A kind of prepackage type cement road structure facilitating draining - Google Patents

A kind of prepackage type cement road structure facilitating draining Download PDF

Info

Publication number
CN207987660U
CN207987660U CN201820248808.5U CN201820248808U CN207987660U CN 207987660 U CN207987660 U CN 207987660U CN 201820248808 U CN201820248808 U CN 201820248808U CN 207987660 U CN207987660 U CN 207987660U
Authority
CN
China
Prior art keywords
link block
cavity
drainage
type cement
road structure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820248808.5U
Other languages
Chinese (zh)
Inventor
孟云如
周新明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Hongyuan Construction Group Co Ltd
Original Assignee
Jiangsu Hongyuan Construction Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Hongyuan Construction Group Co Ltd filed Critical Jiangsu Hongyuan Construction Group Co Ltd
Priority to CN201820248808.5U priority Critical patent/CN207987660U/en
Application granted granted Critical
Publication of CN207987660U publication Critical patent/CN207987660U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model is related to road structures, specifically disclose a kind of prepackage type cement road structure facilitating draining, including base, and several prefabricated boards being set in base and mutually splice, several chimbs are vertically offered on the opposite face of two blocks of contiguous prefabricated plates, it is provided with the connector matched with its chimb for interconnection between two blocks of contiguous prefabricated plates, the connector includes and the matched link block of chimb on two blocks of contiguous prefabricated plates, several drainage cavities being opened in link block, and link block offers the inlet opening communicated with drainage cavity above drainage cavity, the drainage pipeline communicated with sewer is provided in the drainage cavity, its key points of the technical solution are that having the advantages that surface gathered water is prevented to be destroyed probability to reduce road.

Description

A kind of prepackage type cement road structure facilitating draining
Technical field
The utility model is related to road structure, more particularly to a kind of prepackage type cement road structure facilitating draining.
Background technology
Currently, there are two types of the road common types of our countries:Cement pavement and asphalt concrete pavement.Either which Kind pavement structure is all to use cast-in-place form of construction work:On the one hand, it is longer to pour the time, is unfavorable for shortening the construction period;It is another Aspect, pavement structure once destroy, and to employ big machinery and dig up road surface and could repair, once injuring roadbed, repair Expense will greatly improve needed for multiple, and maintenance is inconvenient;Cement and bituminous paving service life are conditional, after the aging of road surface It is easy to be damaged by pressure by loaded vehicle, it is also possible to injure roadbed, the road after aging is very bothered or dug when building again and spreads again If roadbed or can only abandon, Xin Lu is built again.
Thus assembled cement concrete pavement comes into being, and has the protrusions such as can be mass, construction speed is fast excellent Point, but its there are still some problems.This kind of cement road is when raining or there is ponding on road surface, due to the physical characteristic of cement, Moisture content can long-term accumulated on road surface, it has not been convenient to the sewer well head of both sides of the road drain, also can not penetrate cement pavement into And the roadbed of gap downwards that can be also penetrated to subsurface wastewater infiltration system or even ponding between prefabricated board is permeated, and is damaged.
Utility model content
In view of the deficienciess of the prior art, the purpose of this utility model is to provide a kind of prepackage type water facilitating draining Muddy road line structure has the advantages that surface gathered water is prevented to be destroyed probability to reduce road.
The above-mentioned technical purpose of the utility model technical scheme is that:
A kind of prepackage type cement road structure facilitating draining, including base and it is several be set in base and mutually The prefabricated board of splicing vertically offers several chimbs, two pieces of phases on the opposite face of two blocks of contiguous prefabricated plates The connector matched with its chimb for interconnection is provided between adjacent prefabricated board, the connector includes adjacent with two pieces The matched link block of chimb, several drainage cavities being opened in link block and link block are above drainage cavity on prefabricated board The inlet opening communicated with drainage cavity is offered, the drainage pipeline communicated with sewer is provided in the drainage cavity.
So set, being connected by link block between two pieces of adjacent prefabricated boards, and coordinate upper chimb so that mutually interconnect What is connect is even closer, and flow is not easy the gap between link block and prefabricated board and flows down, prevent base below prefabricated board by The setting of inlet opening and drainage cavity to damage, and on link block so that the ponding on prefabricated board is entered by inlet opening In drainage cavity, ponding on prefabricated board is prevented, the flow entered in drainage cavity is drained by drainage pipeline in sewer, will not Influence other road structures, prevent the ponding on prefabricated board on the whole and reduce flow be flowed into prefabricated board it Under, the road structures such as base are influenced, reducing road with this is destroyed probability, improves the service life of road.
Further preferably:The connector includes several is set between chimb and link block for pouring articulamentum It pours cavity and several are set in link block and pour channel with pour that cavity communicates.
So set, by the past liquid for pouring channel and being passed through articulamentum, liquid, which enters, pours cavity, and is pouring sky Intracavitary solidifies, and forms the articulamentum for playing the role of being fixedly connected between chimb and link block, and prefabricated board is improved in even with this The connectivity robustness of block is connect, the effect of articulamentum can limit small micro- offset of prefabricated board and link block, and articulamentum is In the small space being arranged between chimb and link block, it will not cause link block that cannot be detached with prefabricated board.
Further preferably:The channel that pours is set as to the adjacent arc for pouring cavity and being bent far from direction.
So set, be arranged to the adjacent arc for pouring cavity and being bent far from direction by pouring channel, it is logical pouring Road one end is communicated with cavity is poured, and the other end can reduce that pour opening up for cavity strong to connecting block structure far from pouring cavity The influence of degree so that the structural strength of link block is smaller by being influenced.
Further preferably:Be provided with connecting pipe between described two adjacent row water cavities, the drainage pipeline with connect The drainage cavity of block end communicates.
So set, connecting pipe is arranged by two adjacent row water cavities so that the flow in several drainage cavities can flow Lead to, only needs a drainage pipeline to be connected with one of drainage cavity at this time, it is therefore prevented that more drainage pipeline is set Setting reduces the structural strength of link block, and then ensures the structural strength of road entirety, ensures the service life of road, plays section The effect of energy.
Further preferably:Several connecting pipes are set as tilting to the same side, and the drainage pipeline is arranged with end Water cavity communicates.
So set, being set as tilting and tilting to the same side down by the way that connecting pipe is arranged, on the one hand can accelerate Flow flowing in drainage cavity so that flow can flow to drainage pipeline faster;Still further aspect, connecting pipe is inclined to be set It sets so that there can be certain ponding in each drainage cavity, will not be completely drained, play the role of water storage, it is more dry in summer Dry weather, this part water can be reduced the temperature of road by the form up evaporated, prevent pavement of road temperature excessively high, lead Cause road surface is easier to damage or fracture.
Further preferably:The first waterproof layer is provided on the inner wall of the drainage cavity.
So set, due to long-time ponding in drainage cavity, it is easy draining cavity wall to corrode, by the way that the first waterproof is arranged Layer, plays the role of isolation, prevents draining cavity wall damage, ensures the structural strength of link block, and then ensures road entirety Structural strength improves the service life of road, plays energy-efficient effect.
Further preferably:The prefabricated board is provided with the positioning plugged with link block between adjacent chimb and reinforces Muscle.
So set, due to the connection of link block and prefabricated board, it is inadequate to depend merely on chimb, by the way that the company of being mutually inserted is arranged Connect the positioning reinforcing rib of form so that interconnection more securely, and link block can be played and connect positioning with prefabricated board Effect.
Further preferably:The second waterproof layer is provided between the base and prefabricated board.
So set, by the way that the second waterproof layer is arranged between prefabricated board and base, two parts are separated, can prevent ground Lower water up impacts prefabricated board, while can also prevent the ponding of prefabricated plate surface down to the damage of base.
In conclusion the utility model having the beneficial effect that in contrast to the prior art:By the way that connection is arranged between prefabricated board Block is attached, and pours articulamentum between the chimb and link block on prefabricated board, while playing connection function, but also Link block is connect even closer with prefabricated board, plays the role of preventing oozing under water;And inlet opening and row are set on link block Water cavity, then be connected with sewer by drainage pipeline, ponding on prefabricated board can be prevented.
Description of the drawings
Fig. 1 is the entirety sectional view of embodiment;
Fig. 2 is the sectional view of link block side view in embodiment Fig. 1.
Reference numeral:1, base;2, prefabricated board;21, chimb;22, spliced eye;23, groove;3, connector;31, it connects Block;32, drainage cavity;33, inlet opening;34, cavity is poured;35, channel is poured;4, drainage pipeline;5, connecting pipe;6, first is anti- Water layer;7, reinforcing rib is positioned;8, the second waterproof layer.
Specific implementation mode
The utility model is described in further detail below in conjunction with attached drawing.
A kind of prepackage type cement road structure facilitating draining, referring to Fig.1 shown in, including base 1, prefabricated board 2, second be anti- Water layer 8.
Base 1 is located at the bottom of entire road, and the second waterproof layer 8 is set on 1 top plan of base, and prefabricated board 2 is set It sets on the second waterproof layer 8, chimb 21 is provided on the opposite face of two blocks of contiguous prefabricated plates 2, chimb 21 is set as rectangular, and The connector 3 matched with chimb 21 for interconnection is provided between two blocks of contiguous prefabricated plates 2.
Shown in referring to Fig.1, connector 3 includes and the 21 matched link block 31 of chimb on two blocks of contiguous prefabricated plates 2, company Connect 31 both sides of block offer with 21 matched groove 23 of chimb, offer several drainage cavities along its length in link block 31 32 are provided with the first waterproof layer 6 along the width direction of prefabricated board 2, in drainage cavity 32, in drainage cavity 32 on link block 31 Top offers the inlet opening 33 communicated with drainage cavity 32 simultaneously, is provided in one of drainage cavity 32 and sewer(In figure It is not shown)The drainage pipeline 4 communicated(See Fig. 2), drainage pipeline 4 communicates across the first waterproof layer 6 with drainage cavity 32.
Connector 3 further includes that several be set between chimb 21 and link block 31 pours sky for pour articulamentum simultaneously Chamber 34 and it is several be set in link block 31 and pour channel 35 with pour that cavity 34 communicates, pour channel 35 and be set as To the adjacent arc for pouring cavity 34 and being bent far from direction.
It is worth noting that with reference to shown in Fig. 2, the company communicated with drainage cavity 32 is provided between two adjacent row water cavities 32 Take over road 5, and connecting pipe 5 is set as tilting, and due to 32 more than two of drainage cavity, i.e. connecting pipe 5 is more than one, if Dry connecting pipe 5 is tilted to the same side, and is tilted down, and drainage pipeline 4 is connected with the drainage cavity 32 of end.
It is noted that link block 31 offers spliced eye 22 between adjacent grooves 23, prefabricated board 2 is in adjacent chimb The positioning reinforcing rib 7 plugged with spliced eye 22 is provided between 21.
The course of work:
Base 1 is first poured, the second waterproof layer 8 is then poured in base 1,2 He of prefabricated board is placed on the second waterproof layer 8 Link block 31, link block 31 and the prefabricated board 2 of wherein side plug, i.e. groove 23 and 21 grafting of chimb, spliced eye 22 with it is fixed Position reinforcing rib 7 plugs, then the groove 23 by other one piece of prefabricated board 2 in 31 other side of link block, 22 phase of spliced eye Grafting is formed whole.
Then toward the liquid for pouring injection in channel 35 and being formed articulamentum, liquid enters by pouring channel 35 and pours sky In chamber 34, articulamentum is formed after liquid solidifies.
When, there are when ponding, flow is entered out of inlet opening 33 in drainage cavity 32, using draining on 2 surface of prefabricated board Pipeline 4 is drained into sewer.
The above is only the exemplary embodiment of the utility model, the protection model rather than limited the present invention It encloses, the scope of protection of the utility model is determined by the attached claims.

Claims (8)

1. a kind of prepackage type cement road structure facilitating draining, including base (1) and several it is set in base (1) simultaneously The prefabricated board (2) mutually spliced, it is characterized in that:It is vertically offered on the opposite face of two pieces of contiguous prefabricated plates (2) Several chimbs (21) are provided between two pieces of contiguous prefabricated plates (2) and are matched for interconnection with its chimb (21) Connector (3), the connector (3) include with chimb (21) matched link block (31) on two pieces of contiguous prefabricated plates (2) if, The dry drainage cavity (32) being opened in link block (31) and link block (31) are offered above drainage cavity (32) and drainage cavity (32) inlet opening (33) communicated is provided with the drainage pipeline (4) communicated with sewer on the drainage cavity (32).
2. a kind of prepackage type cement road structure facilitating draining according to claim 1, it is characterized in that:The connector (3) include that several be set between chimb (21) and link block (31) pours cavity (34), Yi Jiruo for pour articulamentum It is dry to be set in link block (31) and pour channel (35) with pour that cavity (34) communicates.
3. a kind of prepackage type cement road structure facilitating draining according to claim 2, it is characterized in that:It is described pour it is logical Road (35) is set as pouring cavity to adjacent(34)Arc far from direction bending.
4. a kind of prepackage type cement road structure facilitating draining according to claim 1 or 2, it is characterized in that:Described two It is provided with connecting pipe (5), the drainage pipeline between a adjacent row water cavity (32)(4)With the drainage cavity of link block (31) end (32) it communicates.
5. a kind of prepackage type cement road structure facilitating draining according to claim 4, it is characterized in that:If the involvement Take over road(5)It is set as tilting to the same side, the drainage pipeline(4)It is communicated with end drainage cavity (32).
6. a kind of prepackage type cement road structure facilitating draining according to claim 5, it is characterized in that:The drainage cavity (32) the first waterproof layer (6) is provided on inner wall.
7. a kind of prepackage type cement road structure facilitating draining according to claim 1, it is characterized in that:The prefabricated board (2) in adjacent chimb(21)Between be provided with the positioning reinforcing rib (7) plugged with link block (31).
8. a kind of prepackage type cement road structure facilitating draining according to claim 1, it is characterized in that:The base (1) the second waterproof layer (8) is provided between prefabricated board (2).
CN201820248808.5U 2018-02-11 2018-02-11 A kind of prepackage type cement road structure facilitating draining Expired - Fee Related CN207987660U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820248808.5U CN207987660U (en) 2018-02-11 2018-02-11 A kind of prepackage type cement road structure facilitating draining

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820248808.5U CN207987660U (en) 2018-02-11 2018-02-11 A kind of prepackage type cement road structure facilitating draining

Publications (1)

Publication Number Publication Date
CN207987660U true CN207987660U (en) 2018-10-19

Family

ID=63825625

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820248808.5U Expired - Fee Related CN207987660U (en) 2018-02-11 2018-02-11 A kind of prepackage type cement road structure facilitating draining

Country Status (1)

Country Link
CN (1) CN207987660U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644317A (en) * 2019-09-17 2020-01-03 长安大学 Integrally assembled waste plastic pavement structure and processing method
CN114508016A (en) * 2022-02-10 2022-05-17 北京市城远市政工程有限责任公司 Assembly type pavement structure and installation method thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110644317A (en) * 2019-09-17 2020-01-03 长安大学 Integrally assembled waste plastic pavement structure and processing method
CN114508016A (en) * 2022-02-10 2022-05-17 北京市城远市政工程有限责任公司 Assembly type pavement structure and installation method thereof
CN114508016B (en) * 2022-02-10 2023-11-28 北京市城远市政工程有限责任公司 Assembled pavement structure and installation method thereof

Similar Documents

Publication Publication Date Title
CN207987660U (en) A kind of prepackage type cement road structure facilitating draining
CN205276099U (en) Drainage formula brick that permeates water
CN210066775U (en) Be used for reinforced (rfd) anticreep rain-proof water of ground side slope to erode slope protection structure
KR20100067266A (en) Vertical drain induction type retaining wall reinforced by nailing
CN211522710U (en) Municipal administration paving brick
CN213086850U (en) Prefabricated assembled hydraulic retaining wall
JP2006132320A5 (en)
CN105178134B (en) Road green color transformation method
CN209099313U (en) A kind of hydraulic engineering modified channel building lining structure
KR200306432Y1 (en) Drain a waterway of concrete
CN209722651U (en) A kind of water-permeable brick and its pavement with the water-permeable brick
CN211571261U (en) Garden road structure
CN214271534U (en) Ecological garden city road structure
CN211522740U (en) Town road drainage structures
CN108487301A (en) Fractured Rock Slope original position Gravity Retaining Wall structure
CN201981463U (en) Drainage flat stone for road paving
CN209244167U (en) A kind of assembled multifunctional water-proofing shower platform
CN205296365U (en) Eco -drainage ditch
JP5451709B2 (en) Free slope combined with bottom groove
CN215441955U (en) Ecological slope protection brick
CN2644481Y (en) Dewatering flat stone
CN215164265U (en) Concrete pavement brick structure
CN217810797U (en) Concrete protection and building structure
JP2799845B2 (en) Construction method of underground seepage type gutter
CN213296241U (en) Slope protection structure of river bank side slope

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181019

Termination date: 20210211

CF01 Termination of patent right due to non-payment of annual fee