CN207959262U - Modular assembly formula pipe gallery - Google Patents
Modular assembly formula pipe gallery Download PDFInfo
- Publication number
- CN207959262U CN207959262U CN201620093345.0U CN201620093345U CN207959262U CN 207959262 U CN207959262 U CN 207959262U CN 201620093345 U CN201620093345 U CN 201620093345U CN 207959262 U CN207959262 U CN 207959262U
- Authority
- CN
- China
- Prior art keywords
- subdivision
- pipe gallery
- modular assembly
- assembly formula
- formula pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Abstract
The utility model provides a kind of modular assembly formula pipe gallery, it includes several subdivisions, and the structure size of each subdivision is all made of modularization setting;It is reserved with connecting hole on the side wall of each subdivision, each cabin is attached by connector across connecting hole by when assembling.The utility model is individually prefabricated by each subdivision, the size that prefabricated piping lane section can be reduced, makes precast assembly technology adequately be used, and has saved the duration simultaneously and can directly install new prefabricated cabin additional on existing piping lane, without in addition creating a piping lane, cost is saved.
Description
Technical field
The utility model is related to the prefabricated components for assembling underground pipe gallery, and in particular to be a kind of modular assembly formula
Pipe gallery.
Background technology
Pipe gallery is a kind of novel municipal pipeline tunnel, is promoted recently as domestic urbanization, more and more newly
City is in planning construction pipe gallery, at present in the ground such as Shanghai, Kunming, Guangzhou, Suzhou, Shenyang, Suzhou, Wuxi planning construction
It is more than the pipe gallery of 300km, the pipeline that pipe gallery accommodates includes power cable, communication and controls optical cable, high-quality (miscellaneous
Matter) water pipe, hot-water line, cooling pipeline etc., it is arranged according to the section of pipe gallery, some requirement of engineering are set as double cabins or three
Which kind of form of fracture no matter cabin, use, the mode of the construction method of pipe gallery precast assembly and branch module and cast-in-situ nothing more than.Formwork
It is cast-in-place very simple, it is exactly the actual profile size according to piping lane, cage of wire-tiing installs masterplate, then casting concrete;Prefabricated spelling
Dress is exactly the segment that piping lane is divided into in precast plant according to the ability of piping lane section size and lifting, transporting equipment certain length
It carries out prefabricated, then transports to construction site and installed.And the cross dimensions of the pipe gallery of domestic construction all compares at present
Greatly, some sections for being even up to 3 cabins or 4 cabins, single-unit weight is big, and not only prefabricated difficulty is big in this way, but also to on-site hoisting
The requirement of equipment is also very high, and construction cost is caused to increase, and also limits the application range of precast assembly construction method.Also have by
Piping lane section be divided into top plate and bottom plate, middle plate, side plate etc. individually it is prefabricated, then installed again, although it is this alleviate it is pre-
The weight of product, but trouble is installed, globality is bad, is easy leak.
It is therefore desirable to design a kind of novel modular assembly formula pipe gallery, to overcome the above problem.
Utility model content
The purpose of the utility model is to overcome the defect of the prior art, it is individually prefabricated to provide a kind of each subdivision, can be with
Reduce the modular assembly formula pipe gallery of the size of prefabricated piping lane section.
The utility model is realized in this way:
A kind of modular assembly formula pipe gallery, it includes several subdivisions, and the structure size of each subdivision is all made of mould
Numberization is arranged;Be reserved with connecting hole on the side wall of each subdivision, when assembling by connector pass through connecting hole by each cabin into
Row connection.
The modular assembly formula pipe gallery, it is characterised in that:
Further, the basic module for the modularization that each subdivision structure size uses is 100mm.
Further, the structure size of each subdivision may be the same or different.
Further, it is both provided with mounting bracket on the side wall of each subdivision.
Further, the mounting bracket and each subdivision are removable connection.
Further, the mounting bracket is that integral type is connect with each subdivision.
Further, the no connecting hole of the which part is blocked by waterproof material.
The utility model has the advantages that compared with prior art:
It is individually prefabricated by each subdivision, it is possible to reduce the size of prefabricated piping lane section makes precast assembly technology obtain fully
Utilization, saved the duration, while when built piping lane needs increase-volume, can directly have been installed additional on existing piping lane new prefabricated
Cabin saves cost without in addition creating a piping lane.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model modular assembly formula pipe gallery embodiment one
Fig. 2 is the structural schematic diagram of the utility model modular assembly formula pipe gallery embodiment two
Fig. 3 is the structural schematic diagram of the utility model modular assembly formula pipe gallery embodiment three
Fig. 4 is the structural schematic diagram of the utility model modular assembly formula pipe gallery example IV
As shown in the figure:1, subdivision, 1.1, connecting hole, 2, connector, 3, mounting bracket.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work
The all other embodiment obtained, shall fall within the protection scope of the present invention.
As shown in figures 1-4, it includes several subdivisions, and the structure size of each subdivision 1 is all made of modularization setting;Institute
It states and is reserved with connecting hole 1.1 on the side wall of each subdivision, each cabin is attached by connector 2 across connecting hole by when assembling.
Embodiment one:
As shown in Figure 1, a kind of newly-built double cabins piping lane, the wide size of height of first subdivision and the second subdivision is all made of modulus
Change (such as integral multiple of 1m), the modulus of two subdivisions described in figure is identical, on four side walls of two subdivisions between reserved cabin
The connecting hole 1.1 of connection, when installation, are connected each cabin across hole by connector 2 (the present embodiment, which is all made of, to be bolted)
It is blocked using waterproof material after connecing, unwanted connecting hole 1.1 is then blocked using waterproof material.In each subdivision 1
Mounting bracket 3 is provided on side wall, for fixing various pipelines (power cable, communication and control optical cable, hot-water line, cooling pipeline
Deng), can be as needed between the mounting bracket 3 and subdivision 1 integral type connection can also be removable connection.If piping lane
When being extended, the closure of the reserving hole of the side installed additional will be needed to remove as needed, after installation bolt is fixed, use waterproof
Material is blocked.
Embodiment two:
As shown in Fig. 2, a kind of newly-built double cabins piping lane, the wide size of height of two subdivision 1 is all made of modularization (such as 1m
Integral multiple), the moduluses of two subdivisions described in figure is different, wherein the first subdivision is the integral multiple of the second subdivision modulus, at each point
The connecting hole 1.1 connected between reserved cabin on four side walls in cabin, when installation, are connected each cabin across hole by bolt
It is blocked using waterproof material after connecing, the hole that need not be connected then is blocked using waterproof material.In the side of each subdivision
Mounting bracket 3 is provided on wall, for fixing various pipelines (power cable, communication and control optical cable, hot-water line, cooling pipeline
Deng).When piping lane is extended, the closure of the reserving hole of the side installed additional will be needed to remove as needed, installation bolt is fixed
Afterwards, it is blocked with waterproof material.
Embodiment three:
As shown in figure 3, a kind of three cabin piping lanes of enlarging, first subdivision and the second subdivision are built subdivision, third point
Cabin is to increase to build subdivision, and the high wide size of each subdivision is all made of modularization (such as integral multiple of 1m), three subdivisions described in figure
Modulus it is identical, the structure size of subdivision is identical.When piping lane is extended, the second subdivision is needed into the side installed additional as needed
Reserving hole closure removal, after third subdivision and the second subdivision are fixed by installation bolt, sealed with waterproof material
It is stifled.The hole that need not be connected then is blocked using waterproof material.It is provided with mounting bracket 3 on the side wall of each subdivision, is used for
Fixed various pipelines (power cable, communication and control optical cable, hot-water line, cooling pipeline etc.).
Example IV:
As shown in figure 4, a kind of three cabin piping lanes of enlarging, first subdivision and the second subdivision are built subdivision, third point
Cabin is to increase to build subdivision, and the high wide size of each subdivision is all made of modularization (such as integral multiple of 1m), three subdivisions described in figure
Modulus it is different, the structure size of the subdivision is also different.Second subdivision is the integral multiple of the modulus of first subdivision.
The modulus of the third subdivision and the second subdivision is identical.When piping lane is extended, as needed by the first subdivision and the second subdivision
The closure of the reserving hole of the side installed additional is needed to remove, by the company of third subdivision and the first subdivision and the second subdivision adjacent wall
After hole is connect by installation bolt and the fixation of the first subdivision and the second subdivision, blocked with waterproof material.The hole that need not be connected
Hole is then blocked using waterproof material.Mounting bracket 3 is provided on the side wall of each subdivision, for fixing various pipeline (electric power
Cable, communication and control optical cable, hot-water line, cooling pipeline etc.).
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this
Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model
Protection domain within.
Claims (6)
1. a kind of modular assembly formula pipe gallery, it is characterised in that:It includes several subdivisions, the structure size of each subdivision
It is all made of modularization setting;Connecting hole, the length side in the direction and subdivision of connecting hole are reserved on the side wall of each subdivision
To vertical, each cabin is attached by connector across connecting hole by when assembling, and is blocked by waterproof material, middle part
No connecting hole is divided to be blocked by waterproof material.
2. modular assembly formula pipe gallery according to claim 1, it is characterised in that:Each subdivision structure size is adopted
The basic module of modularization is 100mm.
3. modular assembly formula pipe gallery according to claim 2, it is characterised in that:The structure size of each subdivision
It may be the same or different.
4. modular assembly formula pipe gallery according to claim 1, it is characterised in that:On the side wall of each subdivision
It is provided with mounting bracket.
5. modular assembly formula pipe gallery according to claim 4, it is characterised in that:The mounting bracket and each subdivision are equal
For removable connection.
6. modular assembly formula pipe gallery according to claim 4, it is characterised in that:The mounting bracket and each subdivision are equal
It is connected for integral type.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620093345.0U CN207959262U (en) | 2016-01-29 | 2016-01-29 | Modular assembly formula pipe gallery |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201620093345.0U CN207959262U (en) | 2016-01-29 | 2016-01-29 | Modular assembly formula pipe gallery |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207959262U true CN207959262U (en) | 2018-10-12 |
Family
ID=63722809
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201620093345.0U Active CN207959262U (en) | 2016-01-29 | 2016-01-29 | Modular assembly formula pipe gallery |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207959262U (en) |
-
2016
- 2016-01-29 CN CN201620093345.0U patent/CN207959262U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105544605B (en) | A kind of modular assembly formula pipe gallery | |
CN101761344B (en) | Preparation method of prefabricated pipe section for shield tunnel | |
CN106284412A (en) | A kind of prefabricated pipe gallery and construction method | |
CN107516866A (en) | A kind of Prefabricated cable duct | |
CN109972655A (en) | A kind of prefabricated piping lane machinery and Combined hydraulic type, which are integrally pacified, tears steel form and installation method open | |
CN110107972A (en) | Cabin-type refrigerating plant room and its construction method | |
CN207499427U (en) | Assembly integrated precast superimposed sheet support system | |
CN106759478A (en) | A kind of prefabricated piping lane construction method | |
CN110295624B (en) | Construction method for co-building structure of crossroad underground sidewalk and comprehensive pipe rack | |
CN110318427A (en) | A kind of prefabricated pipe gallery construction method of segmentation | |
CN207959262U (en) | Modular assembly formula pipe gallery | |
CN202865996U (en) | Room modular structure for nuclear power plant | |
CN206034639U (en) | A I shaped steel connects bracket for prefabricating assembled concrete corner post | |
CN202280073U (en) | Precast assembly type equipment foundation | |
CN205954678U (en) | Prefabricated utility tunnel hoisting point structure of assembled | |
CN207646753U (en) | Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery | |
CN103276840B (en) | Nuclear power plant composite floor slab module and construction method thereof | |
CN207846241U (en) | Whole assembly overlapping box culvert | |
CN108086523B (en) | Light steel concrete block composite wall and construction method thereof | |
CN106088758B (en) | A kind of bilayer assembled underground granary | |
CN209817044U (en) | Prefabricated assembly type folded plate type deep tunnel drainage shaft structure | |
CN211446942U (en) | Supporting structure | |
CN205063097U (en) | Civil engineering is with preventing hot wall | |
CN106759687A (en) | Prefabricated two-layer equation Homofloor drainage system and its construction method | |
CN207646757U (en) | The aerial pipe gallery of double-cabin type wiring |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |