CN207959262U - Modular assembly formula pipe gallery - Google Patents

Modular assembly formula pipe gallery Download PDF

Info

Publication number
CN207959262U
CN207959262U CN201620093345.0U CN201620093345U CN207959262U CN 207959262 U CN207959262 U CN 207959262U CN 201620093345 U CN201620093345 U CN 201620093345U CN 207959262 U CN207959262 U CN 207959262U
Authority
CN
China
Prior art keywords
subdivision
pipe gallery
modular assembly
assembly formula
formula pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201620093345.0U
Other languages
Chinese (zh)
Inventor
邓云纲
秦绍清
朱孟君
王志勇
胡启文
吴福宝
杨湖平
王银刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Siyuan Survey and Design Group Co Ltd
Original Assignee
China Railway Siyuan Survey and Design Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Siyuan Survey and Design Group Co Ltd filed Critical China Railway Siyuan Survey and Design Group Co Ltd
Priority to CN201620093345.0U priority Critical patent/CN207959262U/en
Application granted granted Critical
Publication of CN207959262U publication Critical patent/CN207959262U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of modular assembly formula pipe gallery, it includes several subdivisions, and the structure size of each subdivision is all made of modularization setting;It is reserved with connecting hole on the side wall of each subdivision, each cabin is attached by connector across connecting hole by when assembling.The utility model is individually prefabricated by each subdivision, the size that prefabricated piping lane section can be reduced, makes precast assembly technology adequately be used, and has saved the duration simultaneously and can directly install new prefabricated cabin additional on existing piping lane, without in addition creating a piping lane, cost is saved.

Description

Modular assembly formula pipe gallery
Technical field
The utility model is related to the prefabricated components for assembling underground pipe gallery, and in particular to be a kind of modular assembly formula Pipe gallery.
Background technology
Pipe gallery is a kind of novel municipal pipeline tunnel, is promoted recently as domestic urbanization, more and more newly City is in planning construction pipe gallery, at present in the ground such as Shanghai, Kunming, Guangzhou, Suzhou, Shenyang, Suzhou, Wuxi planning construction It is more than the pipe gallery of 300km, the pipeline that pipe gallery accommodates includes power cable, communication and controls optical cable, high-quality (miscellaneous Matter) water pipe, hot-water line, cooling pipeline etc., it is arranged according to the section of pipe gallery, some requirement of engineering are set as double cabins or three Which kind of form of fracture no matter cabin, use, the mode of the construction method of pipe gallery precast assembly and branch module and cast-in-situ nothing more than.Formwork It is cast-in-place very simple, it is exactly the actual profile size according to piping lane, cage of wire-tiing installs masterplate, then casting concrete;Prefabricated spelling Dress is exactly the segment that piping lane is divided into in precast plant according to the ability of piping lane section size and lifting, transporting equipment certain length It carries out prefabricated, then transports to construction site and installed.And the cross dimensions of the pipe gallery of domestic construction all compares at present Greatly, some sections for being even up to 3 cabins or 4 cabins, single-unit weight is big, and not only prefabricated difficulty is big in this way, but also to on-site hoisting The requirement of equipment is also very high, and construction cost is caused to increase, and also limits the application range of precast assembly construction method.Also have by Piping lane section be divided into top plate and bottom plate, middle plate, side plate etc. individually it is prefabricated, then installed again, although it is this alleviate it is pre- The weight of product, but trouble is installed, globality is bad, is easy leak.
It is therefore desirable to design a kind of novel modular assembly formula pipe gallery, to overcome the above problem.
Utility model content
The purpose of the utility model is to overcome the defect of the prior art, it is individually prefabricated to provide a kind of each subdivision, can be with Reduce the modular assembly formula pipe gallery of the size of prefabricated piping lane section.
The utility model is realized in this way:
A kind of modular assembly formula pipe gallery, it includes several subdivisions, and the structure size of each subdivision is all made of mould Numberization is arranged;Be reserved with connecting hole on the side wall of each subdivision, when assembling by connector pass through connecting hole by each cabin into Row connection.
The modular assembly formula pipe gallery, it is characterised in that:
Further, the basic module for the modularization that each subdivision structure size uses is 100mm.
Further, the structure size of each subdivision may be the same or different.
Further, it is both provided with mounting bracket on the side wall of each subdivision.
Further, the mounting bracket and each subdivision are removable connection.
Further, the mounting bracket is that integral type is connect with each subdivision.
Further, the no connecting hole of the which part is blocked by waterproof material.
The utility model has the advantages that compared with prior art:
It is individually prefabricated by each subdivision, it is possible to reduce the size of prefabricated piping lane section makes precast assembly technology obtain fully Utilization, saved the duration, while when built piping lane needs increase-volume, can directly have been installed additional on existing piping lane new prefabricated Cabin saves cost without in addition creating a piping lane.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model modular assembly formula pipe gallery embodiment one
Fig. 2 is the structural schematic diagram of the utility model modular assembly formula pipe gallery embodiment two
Fig. 3 is the structural schematic diagram of the utility model modular assembly formula pipe gallery embodiment three
Fig. 4 is the structural schematic diagram of the utility model modular assembly formula pipe gallery example IV
As shown in the figure:1, subdivision, 1.1, connecting hole, 2, connector, 3, mounting bracket.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The all other embodiment obtained, shall fall within the protection scope of the present invention.
As shown in figures 1-4, it includes several subdivisions, and the structure size of each subdivision 1 is all made of modularization setting;Institute It states and is reserved with connecting hole 1.1 on the side wall of each subdivision, each cabin is attached by connector 2 across connecting hole by when assembling. Embodiment one:
As shown in Figure 1, a kind of newly-built double cabins piping lane, the wide size of height of first subdivision and the second subdivision is all made of modulus Change (such as integral multiple of 1m), the modulus of two subdivisions described in figure is identical, on four side walls of two subdivisions between reserved cabin The connecting hole 1.1 of connection, when installation, are connected each cabin across hole by connector 2 (the present embodiment, which is all made of, to be bolted) It is blocked using waterproof material after connecing, unwanted connecting hole 1.1 is then blocked using waterproof material.In each subdivision 1 Mounting bracket 3 is provided on side wall, for fixing various pipelines (power cable, communication and control optical cable, hot-water line, cooling pipeline Deng), can be as needed between the mounting bracket 3 and subdivision 1 integral type connection can also be removable connection.If piping lane When being extended, the closure of the reserving hole of the side installed additional will be needed to remove as needed, after installation bolt is fixed, use waterproof Material is blocked.
Embodiment two:
As shown in Fig. 2, a kind of newly-built double cabins piping lane, the wide size of height of two subdivision 1 is all made of modularization (such as 1m Integral multiple), the moduluses of two subdivisions described in figure is different, wherein the first subdivision is the integral multiple of the second subdivision modulus, at each point The connecting hole 1.1 connected between reserved cabin on four side walls in cabin, when installation, are connected each cabin across hole by bolt It is blocked using waterproof material after connecing, the hole that need not be connected then is blocked using waterproof material.In the side of each subdivision Mounting bracket 3 is provided on wall, for fixing various pipelines (power cable, communication and control optical cable, hot-water line, cooling pipeline Deng).When piping lane is extended, the closure of the reserving hole of the side installed additional will be needed to remove as needed, installation bolt is fixed Afterwards, it is blocked with waterproof material.
Embodiment three:
As shown in figure 3, a kind of three cabin piping lanes of enlarging, first subdivision and the second subdivision are built subdivision, third point Cabin is to increase to build subdivision, and the high wide size of each subdivision is all made of modularization (such as integral multiple of 1m), three subdivisions described in figure Modulus it is identical, the structure size of subdivision is identical.When piping lane is extended, the second subdivision is needed into the side installed additional as needed Reserving hole closure removal, after third subdivision and the second subdivision are fixed by installation bolt, sealed with waterproof material It is stifled.The hole that need not be connected then is blocked using waterproof material.It is provided with mounting bracket 3 on the side wall of each subdivision, is used for Fixed various pipelines (power cable, communication and control optical cable, hot-water line, cooling pipeline etc.).
Example IV:
As shown in figure 4, a kind of three cabin piping lanes of enlarging, first subdivision and the second subdivision are built subdivision, third point Cabin is to increase to build subdivision, and the high wide size of each subdivision is all made of modularization (such as integral multiple of 1m), three subdivisions described in figure Modulus it is different, the structure size of the subdivision is also different.Second subdivision is the integral multiple of the modulus of first subdivision. The modulus of the third subdivision and the second subdivision is identical.When piping lane is extended, as needed by the first subdivision and the second subdivision The closure of the reserving hole of the side installed additional is needed to remove, by the company of third subdivision and the first subdivision and the second subdivision adjacent wall After hole is connect by installation bolt and the fixation of the first subdivision and the second subdivision, blocked with waterproof material.The hole that need not be connected Hole is then blocked using waterproof material.Mounting bracket 3 is provided on the side wall of each subdivision, for fixing various pipeline (electric power Cable, communication and control optical cable, hot-water line, cooling pipeline etc.).
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection domain within.

Claims (6)

1. a kind of modular assembly formula pipe gallery, it is characterised in that:It includes several subdivisions, the structure size of each subdivision It is all made of modularization setting;Connecting hole, the length side in the direction and subdivision of connecting hole are reserved on the side wall of each subdivision To vertical, each cabin is attached by connector across connecting hole by when assembling, and is blocked by waterproof material, middle part No connecting hole is divided to be blocked by waterproof material.
2. modular assembly formula pipe gallery according to claim 1, it is characterised in that:Each subdivision structure size is adopted The basic module of modularization is 100mm.
3. modular assembly formula pipe gallery according to claim 2, it is characterised in that:The structure size of each subdivision It may be the same or different.
4. modular assembly formula pipe gallery according to claim 1, it is characterised in that:On the side wall of each subdivision It is provided with mounting bracket.
5. modular assembly formula pipe gallery according to claim 4, it is characterised in that:The mounting bracket and each subdivision are equal For removable connection.
6. modular assembly formula pipe gallery according to claim 4, it is characterised in that:The mounting bracket and each subdivision are equal It is connected for integral type.
CN201620093345.0U 2016-01-29 2016-01-29 Modular assembly formula pipe gallery Active CN207959262U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201620093345.0U CN207959262U (en) 2016-01-29 2016-01-29 Modular assembly formula pipe gallery

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201620093345.0U CN207959262U (en) 2016-01-29 2016-01-29 Modular assembly formula pipe gallery

Publications (1)

Publication Number Publication Date
CN207959262U true CN207959262U (en) 2018-10-12

Family

ID=63722809

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201620093345.0U Active CN207959262U (en) 2016-01-29 2016-01-29 Modular assembly formula pipe gallery

Country Status (1)

Country Link
CN (1) CN207959262U (en)

Similar Documents

Publication Publication Date Title
CN105544605B (en) A kind of modular assembly formula pipe gallery
CN101761344B (en) Preparation method of prefabricated pipe section for shield tunnel
CN106284412A (en) A kind of prefabricated pipe gallery and construction method
CN107516866A (en) A kind of Prefabricated cable duct
CN109972655A (en) A kind of prefabricated piping lane machinery and Combined hydraulic type, which are integrally pacified, tears steel form and installation method open
CN110107972A (en) Cabin-type refrigerating plant room and its construction method
CN207499427U (en) Assembly integrated precast superimposed sheet support system
CN106759478A (en) A kind of prefabricated piping lane construction method
CN110295624B (en) Construction method for co-building structure of crossroad underground sidewalk and comprehensive pipe rack
CN110318427A (en) A kind of prefabricated pipe gallery construction method of segmentation
CN207959262U (en) Modular assembly formula pipe gallery
CN202865996U (en) Room modular structure for nuclear power plant
CN206034639U (en) A I shaped steel connects bracket for prefabricating assembled concrete corner post
CN202280073U (en) Precast assembly type equipment foundation
CN205954678U (en) Prefabricated utility tunnel hoisting point structure of assembled
CN207646753U (en) Single single cabin formula of pier support makes somebody a mere figurehead pipe gallery
CN103276840B (en) Nuclear power plant composite floor slab module and construction method thereof
CN207846241U (en) Whole assembly overlapping box culvert
CN108086523B (en) Light steel concrete block composite wall and construction method thereof
CN106088758B (en) A kind of bilayer assembled underground granary
CN209817044U (en) Prefabricated assembly type folded plate type deep tunnel drainage shaft structure
CN211446942U (en) Supporting structure
CN205063097U (en) Civil engineering is with preventing hot wall
CN106759687A (en) Prefabricated two-layer equation Homofloor drainage system and its construction method
CN207646757U (en) The aerial pipe gallery of double-cabin type wiring

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant