CN207944460U - A kind of I-shaped cross-section support pile and cement earth pile Composite Supporting System - Google Patents

A kind of I-shaped cross-section support pile and cement earth pile Composite Supporting System Download PDF

Info

Publication number
CN207944460U
CN207944460U CN201721425750.9U CN201721425750U CN207944460U CN 207944460 U CN207944460 U CN 207944460U CN 201721425750 U CN201721425750 U CN 201721425750U CN 207944460 U CN207944460 U CN 207944460U
Authority
CN
China
Prior art keywords
wing
edge
shaped cross
web
cambered surface
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721425750.9U
Other languages
Chinese (zh)
Inventor
秦会来
油新华
马程昊
张伟
马庆松
许国光
张清林
杨春英
曹荣夏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China State Construction Engineering Corp Ltd CSCEC
China Construction Baili Engineering Technology Development Co Ltd
Original Assignee
China State Construction Engineering Corp Ltd CSCEC
China Construction Baili Engineering Technology Development Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China State Construction Engineering Corp Ltd CSCEC, China Construction Baili Engineering Technology Development Co Ltd filed Critical China State Construction Engineering Corp Ltd CSCEC
Priority to CN201721425750.9U priority Critical patent/CN207944460U/en
Application granted granted Critical
Publication of CN207944460U publication Critical patent/CN207944460U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

A kind of I-shaped cross-section support pile and cement earth pile Composite Supporting System, including I-shaped cross-section bored concrete pile and cement mixing method, I-shaped cross-section bored concrete pile includes the preceding edge of a wing, the rear edge of a wing and web, the preceding edge of a wing and the rear edge of a wing are along foundation pit side wall direction, the web is perpendicular to foundation pit side wall direction, it is connected by concaved circular cambered surface in front side between the preceding edge of a wing and web, is connected by concaved circular cambered surface in rear side between the rear edge of a wing and web;Cement mixing method is round stake, and round stake forms support system by being engaged the end-enclosed on the two neighboring preceding edge of a wing, and the front end face of concaved circular cambered surface, the side end face on the preceding edge of a wing and the preceding edge of a wing forms underground water around flow path in front side.The utility model is under conditions of same concrete material dosage; I-shaped cross-section bored concrete pile can obtain the cross sectional moment of inertia for being several times as much as circular cross-section; it is hereby achieved that being several times as much as the bending stiffness of traditional round stake; significantly improve the bending stiffness of building enclosure; the deformation for reducing support system is conducive to protect surrounding enviroment.

Description

A kind of I-shaped cross-section support pile and cement earth pile Composite Supporting System
Technical field
The utility model belongs to foundation field, and especially a kind of I-shaped cross-section stake and concrete stake close branch in combination Watch box system.
Background technology
Current deep-foundation pit engineering is mostly based on Deformation control, the change of the section bending stiffness of building enclosure to support system Shape amount is affected, therefore is also an important factor for influencing project cost.Campshed is to apply a kind of more building enclosure at present, It is limited to construction equipment and construction technology, the generally circular in cross section section bored concrete pile of campshed.By the knowledge of the mechanics of materials it is found that same cut Under the conditions of the area of face, namely under the conditions of same concrete material dosage, I-shaped cross-section can be obtained far above circular cross-section Section bending stiffness, it is seen then that there are apparent waste of material using cast-in-place pile with round cross-sec tion.
It is higher for level of ground water, the base pit engineering of water proof is needed, is arranged usually behind Row Piles Supporting Structure individual Closed water seal curtain, water seal curtain are generally cement mixing method, rotary churning pile etc..When individually closed water-stop curtain is set, It needs to be arranged along foundation pit periphery integrally closed, project cost is higher and occupied ground.To reduce water-stop curtain cost, engineering circles are made Many beneficial trials occur, using the building enclosure form of cast-in-place pile with round cross-sec tion occlusion cement earth pile, collecting sealing in the recent period Earth-retaining is integrated, and significantly reduces project cost.
Utility model content
The purpose of this utility model is to provide a kind of I-shaped cross-section support pile and cement earth pile Composite Supporting System, to solve The technical problem of certainly current retaining design section bending stiffness deficiency will solve the duration caused by independent closed water seal curtain Long, high cost technical problem will also solve the technologies such as high, the slurry coat method pollution environment of underground continuous wall-enclosure structure cost and ask Topic..
To achieve the above object, the utility model adopts the following technical solution:
A kind of I-shaped cross-section support pile and cement earth pile Composite Supporting System, including alternate the I-shaped being connected Tee section bored concrete pile and the front and back cement mixing method that a row is at least set,
The I-shaped cross-section bored concrete pile includes close to the preceding edge of a wing of the sides Ying Keng, before the rear edge of a wing and connection for meeting native side The web on the edge of a wing and the rear edge of a wing, the preceding edge of a wing and the rear edge of a wing are along foundation pit side wall direction, and the web is perpendicular to foundation pit side wall Direction,
It is connected by concaved circular cambered surface in front side between the preceding edge of a wing and web, by rear side between the rear edge of a wing and web Concaved circular cambered surface connects;The cement mixing method is round stake, the end-enclosed that round stake passes through the two neighboring preceding edge of a wing of occlusion Support system is formed,
The starting point of concaved circular cambered surface is the rear angle point on the preceding edge of a wing in the front side, and the terminal of concaved circular cambered surface is abdomen in the front side The middle part of plate, the starting point of concaved circular cambered surface is the middle part of web in the rear side, and the terminal of concaved circular cambered surface is front wing in the rear side The preceding angle point of edge,
Concaved circular cambered surface, the rear angle point on the preceding edge of a wing, the side end face on the preceding edge of a wing, the preceding angle point on the preceding edge of a wing and the preceding edge of a wing along front side Front end face be sequentially formed underground water around flow path.
Concaved circular cambered surface is identical with the radian of concaved circular cambered surface in rear side in the front side.
The preceding edge of a wing is identical as the thickness on the rear edge of a wing, the two it is of same size or different.
The cement mixing method is two rows or more, and the preceding edge of a wing is engaged with the cement mixing method near the sides Ying Keng.
Steel reinforcement cage in the I-shaped cross-section bored concrete pile includes longitudinal reinforcement, preceding edge of a wing stirrup, rear edge of a wing stirrup and abdomen Plate stirrup,
The web hooping penetrates through preceding edge of a wing stirrup and rear edge of a wing stirrup, web hooping and forward and backward edge of a wing intersection location First vertical muscle and the second vertical muscle need to be bound respectively in the front side of corresponding edge of a wing stirrup.
It is also banded with tension rib between longitudinal reinforcement in the middle part of web hooping.
The utility model has the characteristics that and advantageous effect compared with prior art:
The I-shaped cross-section bored concrete pile that the utility model is proposed goes along with sb. to guard him form with cement earth pile use in conjunction, by scene The I-shaped cross-section support pile of pile is perfused instead of traditional cast-in-place pile with round cross-sec tion, in the item of same concrete material dosage Under part, I-shaped cross-section bored concrete pile can obtain the cross sectional moment of inertia for being several times as much as circular cross-section, it is hereby achieved that being several times as much as passing The bending stiffness of system circle stake, significantly improves the bending stiffness of building enclosure, reduces the deformation of support system, is conducive to protect periphery Environment.
Supporting construction of the utility model by I-shaped cross-section bored concrete pile as base pit engineering, with typical round section stake phase Than Reinforcement can be intensively arranged in the tensile region far from section main shaft by I-shaped cross-section, be conducive to reinforcement property and sent out It waves, improves section anti-bending bearing capacity, save material utilization amount;Space between support pile is closed using cement mixing method and forms envelope Enclosed retaining design need not separately set individual closed water-stop curtain, significantly reduce project cost.
The utility model leads to compared with existing circular section bored concrete pile occlusion cement earth pile forms closing retaining design at present Edge of a wing overlap joint occlusion cement mixing method is crossed, longer around flow path at occlusion, water-stagnating effect is more preferable.
The utility model is the bending stiffness for striving for bigger, improves the shape of I-shaped cross-section, significantly improves supporting The overall stiffness of structural system.Under same support system Deformation control requirement condition, significantly improving for building enclosure rigidity is Reduce support stiffness, increase support level spacing, increase and support vertical spacing, reduces support road number etc. and create condition, to Material can be saved, facilitate construction, shorten the construction period and significantly reduce project cost etc..
The form of going along with sb. to guard him of the I-shaped cross-section bored concrete pile that the utility model is proposed and cement earth pile use in conjunction, it is I-shaped It is circular sliding slopes between the web and the edge of a wing of section bored concrete pile, is conducive to the drilling construction of double-jacket tube method.During immersed tube The measure that repeatedly lifting inner sleeve unloads soil may be used, so as to be substantially reduced stake plug effect, the resistance during reduction immersed tube Power is conducive to drilling construction.
Description of the drawings
The utility model is described in more detail below in conjunction with the accompanying drawings.
Fig. 1 is I-shaped cross-section support pile occlusion cement earth pile shield retaining design schematic diagram.
Fig. 2 is the section form of the first I-shaped cross-section bored concrete pile.
Fig. 3 is the section form of second of I-shaped cross-section bored concrete pile.
Fig. 4 is the section form of the third I-shaped cross-section bored concrete pile.
Fig. 5 is the sectional reinforcement of I-shaped cross-section bored concrete pile.
Reference numeral:The edge of a wing, 13- webs, the front sides 14- after the I-shaped cross-sections 1- bored concrete pile, the preceding edges of a wing 11-, 12- Concaved circular cambered surface, the side end faces 16-, 17- front end faces, 2- cement mixing methods, the longitudinal directions 3- steel on rear side of interior concaved circular cambered surface, 15- Muscle, 3a- first indulges muscle, 3b- second and indulges edge of a wing stirrup, 6- web hoopings, 7- drawknots after the preceding edge of a wing stirrup of muscle, 4-, 5- Muscle.
Specific implementation mode
Embodiment is referring to shown in Fig. 1-5, a kind of I-shaped cross-section support pile and cement earth pile Composite Supporting System, including Every the I-shaped cross-section bored concrete pile 1 and the front and back cement mixing method 2 that a row is at least arranged alternately being connected.A is to meet in Fig. 1 Side is cheated, B is to meet native side.
The I-shaped cross-section bored concrete pile 1 includes close to the preceding edge of a wing 11 of the sides Ying Keng, close to 12 and of the rear edge of a wing for meeting native side The web 13 on the preceding edge of a wing 11 and the rear edge of a wing 12 is connected, the preceding edge of a wing 11 and the rear edge of a wing 12 are along foundation pit side wall direction, the abdomen Plate 13 is perpendicular to foundation pit side wall direction.
It is connected by concaved circular cambered surface in front side 14 between the preceding edge of a wing 11 and web 13, between the rear edge of a wing 12 and web 13 It is connected by concaved circular cambered surface in rear side 15;The cement mixing method 2 is round stake, and round stake is by being engaged two neighboring front wing The end-enclosed of edge 11 forms support system.
The starting point of concaved circular cambered surface 14 is the rear angle point on the preceding edge of a wing 11 in the front side, the end of concaved circular cambered surface 14 in the front side Point is the middle part of web 13, and the starting point of concaved circular cambered surface 15 is the middle part of web 13 in the rear side, concaved circular cambered surface in the rear side 15 terminal is the preceding angle point on the preceding edge of a wing 11.
Concaved circular cambered surface 14, the rear angle point on the preceding edge of a wing, the side end face 16 on the preceding edge of a wing, the preceding angle point on the preceding edge of a wing and preceding along front side The front end face 17 on the edge of a wing is sequentially formed underground water around flow path.
Concaved circular cambered surface 14 is identical with the radian of concaved circular cambered surface in rear side 15 in the front side.The preceding edge of a wing 11 and the rear edge of a wing 12 thickness is identical, the two it is of same size or different.Referring to shown in Fig. 2-4, according to the size on the preceding edge of a wing 11 and the rear edge of a wing 12 Difference, the first preceding edge of a wing 11 and the rear edge of a wing 12 are identical, and second of preceding edge of a wing 11 is less than the rear edge of a wing 12, the third preceding edge of a wing 11 is big In the rear edge of a wing 12.
The cement mixing method is two rows or more, and the preceding edge of a wing is engaged with the cement mixing method near the sides Ying Keng.Institute It includes longitudinal reinforcement 3, preceding edge of a wing stirrup 4, rear edge of a wing stirrup 5 and web hooping 6 to state the steel reinforcement cage in the bored concrete pile of I-shaped cross-section.
The web hooping 6 penetrates through preceding edge of a wing stirrup 4 and rear edge of a wing stirrup 5, web hooping and forward and backward edge of a wing intersection location The first vertical vertical muscle 3b of muscle 3a and second need to bind respectively in the front side of corresponding edge of a wing stirrup.
Tension rib 7 is also banded between longitudinal reinforcement in the middle part of web hooping.When retaining design is constructed, constructing At beginning position, the cement mixing method for I-shaped cross-section support pile both sides of first constructing, before cement earth pile condensation hardening, water of constructing I-shaped cross-section bored concrete pile among soil stake, then construct successively cement mixing method, I-shaped cross-section bored concrete pile, most end form At closed retaining design.Cement mixing method part is excavated together with pit earthwork in Excavation Process.
The work progress of the utility model is as follows:
Step 1: according to the hydrogeologic condition in proposed place, excavation of foundation pit depth etc., is calculated by designing, determine work The parameters such as cross section geometry, arrangement of reinforcement and the level interval of shaped sections bored concrete pile;Determine the form of cement mixing method(Stake Diameter, lap width, columns, number of rows etc.), construction equipment and construction technology.
Step 2: along foundation pit periphery surveying setting-out, the position of retaining design is identified.
Step 3: in construction retaining design original position, the soil cement for I-shaped cross-section bored concrete pile both sides of first constructing stirs Mix stake.
Step 4: before cement mixing method condensation hardening, by between the two-tube heavy method construction cement mixing method that shakes I-shaped cross-section bored concrete pile.Hollow double-jacket tube is sunk to by vibration hammer vibration inside and outside being adapted with I-shaped cross-section bored concrete pile Then predetermined depth in stratum extracts inner sleeve soil taking hole forming, outer tube persists retaining wall in stratum, notable for stake plug effect, The measure that repeatedly lifting inner sleeve unloads soil may be used in the larger stratum of immersed tube resistance during immersed tube.After the completion of stake holes, Place I-shaped steel reinforcement cage, placing concrete, while placing concrete from pull out outer tube pile, the rising of outer tube is pulled out speed and is wanted It is adapted with the rate of flooding of concrete, ensures that distance of the outer tube low side away from concreting face is not less than 0.5m.It is required that work The preceding edge of a wing of shaped sections bored concrete pile is engaged with the cement mixing method first constructed near foundation pit side soil cement pile body overlap joint, Length of action is not less than 15cm per side.
Step 5: the cement mixing method at construction the next position.
Step 6: the I-shaped cross-section bored concrete pile between construction mixing pile.
Step 7: step 5 and step 6 are repeated in, until whole retaining designs are completed in construction.

Claims (6)

1. a kind of I-shaped cross-section support pile and cement earth pile Composite Supporting System, including alternate be connected it is I-shaped Section bored concrete pile(1)With the front and back cement mixing method that a row is at least arranged(2), it is characterised in that:
The I-shaped cross-section bored concrete pile(1)Include close to the preceding edge of a wing of the sides Ying Keng(11), close to meeting the rear edge of a wing of native side(12) With the preceding edge of a wing of connection(11)With the rear edge of a wing(12)Web(13), the preceding edge of a wing(11)With the rear edge of a wing(12)Along foundation pit side wall Direction, the web(13)Perpendicular to foundation pit side wall direction,
The preceding edge of a wing(11)With web(13)Between pass through concaved circular cambered surface in front side(14)Connection, the rear edge of a wing(12)With web (13)Between pass through concaved circular cambered surface in rear side(15)Connection;The cement mixing method(2)For round stake, round stake passes through cement Stirring is engaged the two neighboring preceding edge of a wing(11)End-enclosed formed support system,
Concaved circular cambered surface in the front side(14)Starting point be the preceding edge of a wing(11)Rear angle point, concaved circular cambered surface in the front side(14)'s Terminal is web(13)Middle part, concaved circular cambered surface in the rear side(15)Starting point be web(13)Middle part, in the rear side Concaved circular cambered surface(15)Terminal be the preceding edge of a wing(11)Preceding angle point,
The concaved circular cambered surface along front side(14), the rear angle point on the preceding edge of a wing, the preceding edge of a wing side end face(16), the preceding angle point on the preceding edge of a wing and preceding The front end face on the edge of a wing(17)Underground water is sequentially formed around flow path.
2. I-shaped cross-section support pile according to claim 1 and cement earth pile Composite Supporting System, it is characterised in that:Institute State concaved circular cambered surface in front side(14)With concaved circular cambered surface in rear side(15)Radian it is identical.
3. I-shaped cross-section support pile according to claim 1 or 2 and cement earth pile Composite Supporting System, feature exist In:The preceding edge of a wing(11)With the rear edge of a wing(12)Thickness it is identical, the two it is of same size or different.
4. I-shaped cross-section support pile according to claim 3 and cement earth pile Composite Supporting System, it is characterised in that:Institute It is two rows or more to state cement mixing method, and the preceding edge of a wing is engaged with the cement mixing method near the sides Ying Keng.
5. the I-shaped cross-section support pile according to claim 1,2 or 4 any one and cement earth pile Composite Supporting System, It is characterized in that:Steel reinforcement cage in the I-shaped cross-section bored concrete pile includes longitudinal reinforcement(3), preceding edge of a wing stirrup(4), the rear edge of a wing Stirrup(5)And web hooping(6), the first vertical muscle of web hooping and forward and backward edge of a wing intersection location(3a)With the second vertical muscle(3b) It need to bind respectively in the front side of corresponding edge of a wing stirrup.
6. I-shaped cross-section support pile according to claim 5 and cement earth pile Composite Supporting System, it is characterised in that:Position It is also banded with tension rib between longitudinal reinforcement in the middle part of the web hooping(7).
CN201721425750.9U 2017-10-31 2017-10-31 A kind of I-shaped cross-section support pile and cement earth pile Composite Supporting System Expired - Fee Related CN207944460U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721425750.9U CN207944460U (en) 2017-10-31 2017-10-31 A kind of I-shaped cross-section support pile and cement earth pile Composite Supporting System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721425750.9U CN207944460U (en) 2017-10-31 2017-10-31 A kind of I-shaped cross-section support pile and cement earth pile Composite Supporting System

Publications (1)

Publication Number Publication Date
CN207944460U true CN207944460U (en) 2018-10-09

Family

ID=63703547

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721425750.9U Expired - Fee Related CN207944460U (en) 2017-10-31 2017-10-31 A kind of I-shaped cross-section support pile and cement earth pile Composite Supporting System

Country Status (1)

Country Link
CN (1) CN207944460U (en)

Similar Documents

Publication Publication Date Title
CN103758134B (en) A kind of construction method combining Double-row Piles Support system
CN104612160A (en) Maintenance structure for foundation pit next to existing building and construction method
CN203729308U (en) Double-row pile supporting system of reinforced concrete pile combined structural steel cement mixing pile wall
CN108035361A (en) A kind of advanced support supporting construction and its construction method
CN109930609A (en) A kind of campshed composite supporting construction and its construction method for upper-soft lower-hard ground
CN109914422A (en) A kind of steel pipe and soil nailing combined type foundation pit supporting construction and construction method
CN104131566B (en) A kind of basement is without the construction method of horizontal support foundation ditch
CN205152983U (en) Stratum pre -reinforcing of underground space construction handles structure
CN105133622B (en) A kind of closed retaining design of odd-shaped cross section support pile and its construction method
CN208201874U (en) A kind of open-cell cloth bag grouting structure
CN208280140U (en) A kind of T section support pile closing retaining design and its construction casing
CN106930278A (en) A kind of method that compromise joint pipe is used for support pile occlusion
CN101725147B (en) Construction process of first-inserting last-jetting type steel churning pile enclosing structure under low net space
CN203866852U (en) Anti-floating pile structure composited by deep spiral-spraying cement soil plate and anchor rod
CN203487542U (en) Building envelope in combination of mixed reinforced H-shaped sheet piles and five-shaft cement mixed walls
CN106836205B (en) The Macadam Pile Construction method suitable for saturated soft soil
CN105178355B (en) The stratum pre-reinforcement processing method of underground space construction
CN207944460U (en) A kind of I-shaped cross-section support pile and cement earth pile Composite Supporting System
CN201406687Y (en) Deep foundation pit supporting structure
CN215977295U (en) Foundation pit supporting structure
CN206337566U (en) Foundation ditch vertical prestressing anchor pole supporting construction
CN106703023B (en) A kind of four wing prefabricated pile of hydraulic paddle type mill and its construction method
CN202139604U (en) Cast-in-situ abnormal reinforced concrete pile core cement soil underground continuous wall for retaining and protection for foundation excavation
CN203891028U (en) Supporting structure of reinforced steel sheet piles and core tube bracings in deep foundation pit
CN112796313A (en) Multi-shaft stirring stiff composite pile foundation and construction method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20181009

Termination date: 20201031

CF01 Termination of patent right due to non-payment of annual fee