CN203487542U - Building envelope in combination of mixed reinforced H-shaped sheet piles and five-shaft cement mixed walls - Google Patents

Building envelope in combination of mixed reinforced H-shaped sheet piles and five-shaft cement mixed walls Download PDF

Info

Publication number
CN203487542U
CN203487542U CN201320234070.4U CN201320234070U CN203487542U CN 203487542 U CN203487542 U CN 203487542U CN 201320234070 U CN201320234070 U CN 201320234070U CN 203487542 U CN203487542 U CN 203487542U
Authority
CN
China
Prior art keywords
stake
template
hybrid reinforcement
enclosing structure
space enclosing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CN201320234070.4U
Other languages
Chinese (zh)
Inventor
谢晓东
周玉石
谢益飞
赵伟明
黄立伟
鲍国强
汤武
张群
邢克伦
施问知
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai City Ground Ground Design Co Ltd
SHANGHAI CHENGDI CONSTRUCTION CO Ltd
Original Assignee
Shanghai City Ground Ground Design Co Ltd
SHANGHAI CHENGDI CONSTRUCTION CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai City Ground Ground Design Co Ltd, SHANGHAI CHENGDI CONSTRUCTION CO Ltd filed Critical Shanghai City Ground Ground Design Co Ltd
Priority to CN201320234070.4U priority Critical patent/CN203487542U/en
Application granted granted Critical
Publication of CN203487542U publication Critical patent/CN203487542U/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model relates to a building envelope in combination of mixed reinforced H-shaped sheet piles and five-shaft cement mixed walls. The building envelope is applicable to ground pit and riverway containment for soil blocking and water stopping. High-strength steel bars and normal steel bars are arranged in the mixed reinforced H-shaped sheet pile at the same time and are respectively connected with pile caps. The pile caps are connected with each other to form the H-shaped sheet pile building envelope. Compared with the prior art, the building envelope is good in bending resistance and shearing resistance, low in brittleness, good in ductility, low in cost, high in efficacy and pollution-free; in addition, multiple segments can be connected to be long and deep.

Description

The space enclosing structure that the stake of hybrid reinforcement H template is combined with five axle Soil-cement Walls
Technical field
The utility model relates to the space enclosing structure that the stake of hybrid reinforcement H template is combined with five axle Soil-cement Walls.This space enclosing structure is applicable to foundation ditch and the native sealing of gear is gone along with sb. to guard him in river course.
Background technology
The developed areas such as China's Yangtze River Delta, the annual expense for bracing of foundation pit is up to more than 100,000,010,000 yuan, the soil-baffling structure adopting in China's bracing of foundation pit at present mainly contains diaphragm wall, castinplace pile, the stake of SMW engineering method, soil nail wall and piled anchor structure, and the construction technology of these structures respectively has pluses and minuses.
Shallow foundation utilizes the situation of two axle mixing pile construction gravity dams a lot of in hole, two axle agitation pile technology are born in the eighties and are adopted so far always, frame is well cabinet frame, walk tubular type walking, stability extreme difference, work efficiency is very low, and labour intensity is large, another unit head partly adopts the conventional motor of 37kw, and starting is short of power.The darkest stake is long only has 18m, and bottom drilling rod only has two road blades, stirs inhomogeneously, and three stir two is sprayed into quality of pile and is also difficult to guarantee, 1.2 meters one group of each pile, causes the cold seam of stake overlap joint many, easily causes the phenomenon such as leak.
In SMW engineering method employing triaxial cement mixing pile, insert H shaped steel and come sealing and gear soil.This engineering method has that cost is relatively low, the duration is short, water-resisting property is strong, to features such as surrounding environment influence are little.After basement construction completes, H shaped steel can be extracted from cement mixing method, reaches the object that reclaims and again utilize.Therefore it is short that this engineering method is compared not only the duration with the form of going along with sb. to guard him of routine, and work progress is pollution-free, place clean and tidy clean, noise is little, and can save social resources, avoids safeguarding that body forever leaves in underground after basement construction, becomes underground obstacle.But there is following shortcoming in the stake of SMW engineering method: in the stake of SMW engineering method, mostly use H shaped steel.In actual construction work use procedure, the freight of shaped steel and lease expenses are all very high, and especially, in longer situation of duration, the lease expenses of shaped steel can increase use cost greatly.SMW engineering method pile driving construction need to be jet in addition, and cement mixing content is large (20%-22%), has the displacement soil of 20%-30% in work progress, cause environment pollution, and pile strength of the mixing pile is lower.
The cost of castinplace pile campshed enclosure wall is relatively excessive, and when construction the peripheral water seal curtain of need first constructing, then the castinplace pile campshed of constructing, has caused the dilatory of duration like this.
Consideration based on duration and cost aspect, the form of going along with sb. to guard him of implanting in recent years preformed pile in agitation pile is more and more subject to insider's concern, has also had a lot of Project cases simultaneously, and after construction, effect is better.But the method for implanting preformed pile in conventional agitation pile is: with motor eccentric vibrating hammer shake into.It is large that this method has vibration wave, shakes into the feature such as speed is slow.Preformed pile arrangement of reinforcement can be used high strength cast iron in addition, high tensile reinforcement tensile strength is high and low relaxes, has good upsetting performance, but high strength cast iron bendability and welding performance are very poor, so cause the bad overlap joint in preformed pile pile cover place with high strength cast iron arrangement of reinforcement, can only do single-unit stake.
The utility model has solved the deficiency of above-mentioned several techniques, has merged the bending resistance of prefabricated units and the stagnant water effect of structural performance and agitation pile simultaneously, than traditional space enclosing structure the utility model can significantly shorten the construction period, pollution-free, reduced cost.
Utility model content
The purpose of this utility model be exactly in order to overcome the defect that above-mentioned prior art exists, provide that a kind of bending resistance shear behavior is good, cost is low, effect is high, pollution-free, more piece can connect and can do the long space enclosing structure that dark novel hybrid reinforcement H template stake is combined with five axle Soil-cement Walls of doing.
The purpose of this utility model can be achieved through the following technical solutions:
The space enclosing structure that the stake of a kind of hybrid reinforcement H template is combined with five axle Soil-cement Walls, described space enclosing structure comprises, hybrid reinforcement H template stake and five axle Soil-cement Walls wherein, dispose high strength cast iron and conventional reinforcing bar in described hybrid reinforcement H template stake simultaneously.
Described high strength cast iron and conventional reinforcing bar are provided with many, and are distributed in respectively in the stake of H template.
Described its pile body diameter of five axle Soil-cement Walls is 500mm-1200mm.
Described hybrid reinforcement H template stake comprises middle interconnecting piece and two ends connecting portion, and middle interconnecting piece both sides and connecting portion termination, two ends are all provided with embedded iron.
In described hybrid reinforcement H template stake, high strength cast iron is through anchor plate, by anchorage head, realizes and being connected of anchor plate, and conventional reinforcing bar is realized and being connected of anchor plate by welding.
Described high strength cast iron is steel bar for prestressed concrete, is also tubular pile wire, PC rod iron, and its tensile strength is not less than 1420Mpa, and reinforcing bar adopts interior indentation.
Between described hybrid reinforcement H template stake, by welding between embedded iron separately, form more piece form.
Compared with prior art, the utlity model has following advantage:
1. a hybrid reinforcement H template stake, it has improved the rigidity of sheet pile, has increased the durability of sheet pile, has reduced vibration and elastic deformation, has strengthened bending resistance shear behavior, can greatly reduce the deflection of foundation ditch.
2. keep off soil with conventional insert H shaped steel, the conventional steel bar concrete sheet pile of H type and bored pile in cement-soil, Soil-cement sealing is compared, and can reduce costs 10-40%.
3. the stake of hybrid reinforcement H template is that batch production is produced, and to Site Welding, length is controlled, for underground 1~4 layer depth Foundation Pit Support Engineering of foundation ditch, is widely used.
4. hybrid reinforcement H template Zhuan Shi factory is customized, to on-the-spot just welding, then inserts in five axle cement mixing methods, and pollution-free without mud, the duration shortens greatly, and civilized construction degree is high.
5. former diaxon stirs because blade only has two roads, reaching that quality requirement need stir is that two sprays three are stirred, i.e. Three Up Three Down, and existing five axle cement mixing method technology adopt blades to increase by 2.5 times, reached one on the other the mixing effect of Three Up Three Down, whitewashing when lower brill is carried brill together.
6. in addition, compared with prior art, five five of axle cement mixing method one time piles adopt the piling of high-frequency hydraulic vibration hammer simultaneously, and pile sinking speed is fast, and efficiency of construction is high.
Accompanying drawing explanation
Fig. 1 is the utility model hybrid reinforcement H template stake pile cover place sectional view;
Fig. 2 is the utility model hybrid reinforcement H template stake connection layout;
Fig. 3 is the space enclosing structure that the stake of the utility model hybrid reinforcement H template is combined with five axle Soil-cement Walls;
Fig. 4 is the utility model hybrid reinforcement H template stake sectional drawing.
Wherein: cement mixing method 1(five axle cement mixing method 1-1), hybrid reinforcement H template stake 2, embedded iron 3-1, more piece connects iron plate 3-2, high strength cast iron 4, conventional reinforcing bar 5, anchor plate 6.
The specific embodiment
Below in conjunction with the drawings and specific embodiments, the utility model is elaborated.
Embodiment
As Figure 1-4, the space enclosing structure that the stake of a kind of hybrid reinforcement H template is combined with five axle Soil-cement Walls is applicable to foundation ditch and the native sealing of gear is gone along with sb. to guard him in river course, the stake of this hybrid reinforcement H template, comprise middle interconnecting piece and two ends connecting portion, wherein, middle interconnecting piece both sides are all provided with embedded iron 3-1 with connecting portion termination, two ends and are connected iron plate 3-2 with more piece.Interior high strength cast iron 4 and the conventional reinforcing bar 5 of simultaneously disposing of described hybrid reinforcement H template stake 2.Described high strength cast iron 4 and conventional reinforcing bar 5 are provided with many and (can prepare according to the size requirement of actual stake, as 7 of 4 preparations of high strength cast iron in the present embodiment, 16 of conventional reinforcing bar 5 preparations), be distributed in the stake of hybrid reinforcement H template (7 high strength cast irons 4,5 each one sides that are distributed in the connecting portion of two ends wherein in the present embodiment, 2 are distributed on middle interconnecting piece, 16 conventional reinforcing bars 5 are 12 each one sides that are distributed in the connecting portion of two ends wherein, 4 are distributed on middle interconnecting piece, as shown in Figure 1).High strength cast iron 4 is through anchor plate 6, by anchorage head, realizes and being connected of anchor plate 6.Conventional reinforcing bar 5 is realized and being connected of anchor plate 6 by welding.
Between the stake of more piece hybrid reinforcement H template, embedded iron 3-1 is connected iron plate 3-2 connection with more piece, as shown in Figure 2, connects welding between iron plate 3-2 meet the needs that ultra-deep foundation pit is gone along with sb. to guard him by embedded iron 3-1 and more piece.

Claims (7)

1. the space enclosing structure that hybrid reinforcement H template stake is combined with five axle Soil-cement Walls, it is characterized in that, described space enclosing structure comprises, hybrid reinforcement H template stake and five axle Soil-cement Walls, wherein, in described hybrid reinforcement H template stake, dispose high strength cast iron and conventional reinforcing bar simultaneously.
2. the space enclosing structure that hybrid reinforcement H template according to claim 1 stake is combined with five axle Soil-cement Walls, is characterized in that, described high strength cast iron and conventional reinforcing bar are provided with many, and is distributed in respectively in the stake of H template.
3. the space enclosing structure that hybrid reinforcement H template according to claim 1 stake is combined with five axle Soil-cement Walls, is characterized in that, described its pile body diameter of five axle Soil-cement Walls is 500mm-1200mm.
4. the space enclosing structure that hybrid reinforcement H template according to claim 1 stake is combined with five axle Soil-cement Walls, it is characterized in that, described hybrid reinforcement H template stake comprises middle interconnecting piece and two ends connecting portion, and middle interconnecting piece both sides and connecting portion termination, two ends are all provided with embedded iron.
5. the space enclosing structure that hybrid reinforcement H template according to claim 1 stake is combined with five axle Soil-cement Walls, it is characterized in that, in described hybrid reinforcement H template stake, high strength cast iron is through anchor plate, by anchorage head, realize and being connected of anchor plate, conventional reinforcing bar is realized and being connected of anchor plate by welding.
6. the space enclosing structure that hybrid reinforcement H template according to claim 1 stake is combined with five axle Soil-cement Walls, is characterized in that, described high strength cast iron is steel bar for prestressed concrete, also be tubular pile wire, PC rod iron, its tensile strength is not less than 1420Mpa, and reinforcing bar adopts interior indentation.
7. the space enclosing structure that hybrid reinforcement H template according to claim 1 stake is combined with five axle Soil-cement Walls, is characterized in that, between described hybrid reinforcement H template stake, by welding between embedded iron separately, forms more piece form.
CN201320234070.4U 2013-05-03 2013-05-03 Building envelope in combination of mixed reinforced H-shaped sheet piles and five-shaft cement mixed walls Expired - Lifetime CN203487542U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201320234070.4U CN203487542U (en) 2013-05-03 2013-05-03 Building envelope in combination of mixed reinforced H-shaped sheet piles and five-shaft cement mixed walls

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201320234070.4U CN203487542U (en) 2013-05-03 2013-05-03 Building envelope in combination of mixed reinforced H-shaped sheet piles and five-shaft cement mixed walls

Publications (1)

Publication Number Publication Date
CN203487542U true CN203487542U (en) 2014-03-19

Family

ID=50258384

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201320234070.4U Expired - Lifetime CN203487542U (en) 2013-05-03 2013-05-03 Building envelope in combination of mixed reinforced H-shaped sheet piles and five-shaft cement mixed walls

Country Status (1)

Country Link
CN (1) CN203487542U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131568A (en) * 2013-05-03 2014-11-05 上海城地建设股份有限公司 Novel mixed reinforcement H-shaped sheet pile and five (six)-shaft cement soil mixing wall combined building envelope and construction method thereof
CN104278671A (en) * 2014-10-28 2015-01-14 南京工业大学 Stiff cement-soil stirring support pile inserted into inverted cup-shaped steel barrel and construction method thereof
CN107882017A (en) * 2016-09-30 2018-04-06 上海城地建设股份有限公司 The building enclosure and construction method that prefabricated components are combined with stirring wall
CN114657987A (en) * 2022-04-02 2022-06-24 北京建材地质工程有限公司 Construction method for inserting steel pipe into cement soil pile without vibration sense

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104131568A (en) * 2013-05-03 2014-11-05 上海城地建设股份有限公司 Novel mixed reinforcement H-shaped sheet pile and five (six)-shaft cement soil mixing wall combined building envelope and construction method thereof
CN104278671A (en) * 2014-10-28 2015-01-14 南京工业大学 Stiff cement-soil stirring support pile inserted into inverted cup-shaped steel barrel and construction method thereof
CN104278671B (en) * 2014-10-28 2016-01-27 南京工业大学 Stiff cement-soil stirring support pile inserted into inverted cup-shaped steel barrel and construction method thereof
CN107882017A (en) * 2016-09-30 2018-04-06 上海城地建设股份有限公司 The building enclosure and construction method that prefabricated components are combined with stirring wall
CN114657987A (en) * 2022-04-02 2022-06-24 北京建材地质工程有限公司 Construction method for inserting steel pipe into cement soil pile without vibration sense
CN114657987B (en) * 2022-04-02 2024-01-23 北京建材地质工程有限公司 Construction method for inserting cement soil pile into steel pipe without shock sensation

Similar Documents

Publication Publication Date Title
CN104594372B (en) A kind of blower fan pile pier basis and construction method thereof
CN105649090A (en) Construction method for support combining steel sheet piles and stirring piles
JP6279945B2 (en) Soil surface anti-slip method for earth structure
CN106677205A (en) Fabricated special-shaped steel pipe pile combined retaining wall
CN203487542U (en) Building envelope in combination of mixed reinforced H-shaped sheet piles and five-shaft cement mixed walls
CN201512810U (en) Retaining wall
CN203080551U (en) Vertical building envelope comprising occlusive cast-in-place piles and mixing piles
CN203238642U (en) Supporting retaining wall of foundation pit
CN206503157U (en) The embedding rock mixing pile foundation of offshore wind farm
CN206942196U (en) The structure of attached assembling type node power consumption frame strengthening outside a kind of existing framework
CN104131568A (en) Novel mixed reinforcement H-shaped sheet pile and five (six)-shaft cement soil mixing wall combined building envelope and construction method thereof
CN102493439A (en) Building fundamental pile constructional element
CN210194604U (en) Stirring grooving insertion type combined prefabricated special-shaped section composite foundation structure
JP2016053273A (en) Slope stabilizing method as countermeasure to earthquake and rain in soil structure with pressure insertion type bar reinforcement
CN203334288U (en) Novel vertical foundation pit space enclosing structure
CN201531021U (en) Prefabricated member cement-treated-soil drilling and filling pile
CN101666086B (en) Cement cast-in-situ pile of prefabricated part and construction method thereof
CN103410155B (en) A kind of recyclable preposition assembling braced cuts structure and application process thereof
CN107882017A (en) The building enclosure and construction method that prefabricated components are combined with stirring wall
CN205475211U (en) A mix soil extrusion solidification precast pile for soft base is handled
CN204780943U (en) H type precast concrete pile and excavation supporting device
CN209260899U (en) A kind of steel pipe connecting node of assembly concrete column
CN202466575U (en) Concave-convex square prefabricated concrete section pile
CN202466573U (en) Bamboo-shaped precast concrete section pile
CN208501724U (en) A kind of assembled transmission line of electricity anchor rod static pressure Minitype pile foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CX01 Expiry of patent term
CX01 Expiry of patent term

Granted publication date: 20140319