CN207924081U - Circuit board automatic test equipment - Google Patents

Circuit board automatic test equipment Download PDF

Info

Publication number
CN207924081U
CN207924081U CN201721790298.6U CN201721790298U CN207924081U CN 207924081 U CN207924081 U CN 207924081U CN 201721790298 U CN201721790298 U CN 201721790298U CN 207924081 U CN207924081 U CN 207924081U
Authority
CN
China
Prior art keywords
test
test device
circuit board
board automatic
discharge component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721790298.6U
Other languages
Chinese (zh)
Inventor
谢小明
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Si Lin Automation Co Ltd
Original Assignee
Shenzhen Si Lin Automation Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Si Lin Automation Co Ltd filed Critical Shenzhen Si Lin Automation Co Ltd
Priority to CN201721790298.6U priority Critical patent/CN207924081U/en
Application granted granted Critical
Publication of CN207924081U publication Critical patent/CN207924081U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model provides a kind of circuit board automatic test equipment, including:First test device;First grabbing device is connected to first test device;Feeding assembly is connected to first test device;Second test device;Second grabbing device is connected to second test device;Material component is passed, first test device and second test device are connected;And discharge component, second test device is connected, the first discharge component and the second discharge component of interconnection are included.Foregoing circuit plate automatic test equipment automatically tests circuit board, and without human intervention, high degree of automation saves manpower, reduces production cost;Test quality and efficient, greatly improves production efficiency.

Description

Circuit board automatic test equipment
Technical field
The utility model is related to testing equipment field more particularly to a kind of circuit board automatic test equipment.
Background technology
During the manufacturing of each electronic product, need that all parts of product are detected and are tested, than Such as to the test of circuit board, defective component is isolated in time, to improve the quality of electronic product.
Currently, most of test jobs are manually carried out, still, present human resources shortage, front-line operator work is got over It is more difficult to recruit, human cost is also higher and higher;In manual testing, artificial taking laying board and the artificial day for pushing tester table are needed The 5-6 seconds time occupied by board group part, cause production efficiency relatively low;When improper operation occurs in manual work, operator can be given Bring security risk;Artificial detection production efficiency is relatively low, larger to the work load of worker, influences the yield of product.
Utility model content
In view of this, that it is necessary to provide a kind of safety coefficients is high, can reduce human cost, can improve testing efficiency and quality Circuit board automatic test equipment.
Circuit board automatic test equipment provided by the utility model, including:
First test device;
First grabbing device is connected to first test device;
Feeding assembly is connected to first test device;
Second test device;
Second grabbing device is connected to second test device;
Material component is passed, first test device and second test device are connected;And
Discharge component connects second test device, including the first discharge component of interconnection and the second discharging group Part.
Further, first grabbing device and second grabbing device respectively include runner assembly, the first sucker And second sucker, first sucker and second sucker are rotatably mounted to the runner assembly.
Further, the rotational angle of first sucker and second sucker is 90 degree.
Further, first test device is different with the test function of second test device, and described first surveys Trial assembly is set to device for testing functions, and second test device is simulating test device.
Further, first test device is identical with the test function of second test device, and described first surveys It is device for testing functions or simulating test device that trial assembly, which is set with second test device,.
Further, first discharge component and second discharge component are arranged in parallel, first discharge component Below second discharge component.
Further, first discharge component is defective products track, including sequentially connected first belt, the second belt And third belt, first belt are vertically arranged with second belt.
Further, second discharge component is non-defective unit track, including the 4th belt.
Further, the feeding assembly includes the first guide rail, the first pallet and the first feeding plate, and first pallet is slided It is installed on first guide rail dynamicly, the first feeding plate is fixed on one end of first guide rail and is tested with described first Device is adjacent.
Further, the material component of passing includes the second guide rail, the second pallet and the second feeding plate, and second pallet is slided It is installed on second guide rail dynamicly, the second feeding plate is fixed on one end of second guide rail and is tested with described second Device is adjacent.
As it can be seen that foregoing circuit plate automatic test equipment automatically tests circuit board, and without human intervention, automation Degree is high, saves manpower, reduces production cost;Test quality and efficient, greatly improves production efficiency.
Description of the drawings
Fig. 1 is the structural schematic diagram of the circuit board automatic test equipment of one embodiment of the utility model.
Specific implementation mode
In the following, the utility model is described in detail in conjunction with attached drawing.
Fig. 1 is please referred to, the circuit board automatic test equipment 100 of the utility model embodiment is shown, including:First test dress Set 110;First grabbing device 120 is connected to first test device 110;Feeding assembly 150 is connected to described first and surveys Trial assembly sets 110;Second test device 130;Second grabbing device 140 is connected to second test device 130;Pass material component 160, connect first test device 110 and second test device 130;And discharge component, connection described second are surveyed Trial assembly sets 130, includes the first discharge component 170 and the second discharge component 180 of interconnection.Feeding assembly 150 is used for will be electric Road plate is automatically delivered at the first grabbing device 120, and the first grabbing device 120 and the second grabbing device 140 are respectively used to certainly It is dynamic by electricity that at circuit board conveying to the first test device 110 and the second test device 130, discharge component is used to have tested Road plate is separately exported according to non-defective unit and defective products.Circuit board automatic test equipment 100 further includes controlling the control of above-mentioned hardware action Molding block.
Further, the feeding assembly 150 includes the first pallet 151, the first guide rail 152 and the first feeding plate 153, institute It states the first pallet 151 and is slidably mounted to first guide rail 152, the first feeding plate 153 is fixed on first guide rail 152 one end is simultaneously adjacent with first test device 110, for being corrected to circuit board.Described pass expects that component 160 includes Second pallet 161, the second guide rail 162 and the second feeding plate 163, second pallet 161 are slidably mounted to described second and lead Rail 162, the second feeding plate 163 be fixed on one end of second guide rail 162 and with 130 phase of the second test device Neighbour, for being corrected to circuit board.First pallet 151 and the second pallet 161 are respectively connected to driving device, such as cylinder, To be slided on the first guide rail 152 and the second guide rail 162 respectively.
In the present embodiment, it is preferred that the first grabbing device 120 and the second grabbing device 140 are can 360 degree of rotations Manipulator, there are four the first test device 110 and the second test device 130 are all provided with, each first test device 110, which is equipped with, to be surveyed Trial work position 111 and 112, each second test device is equipped with test station 131 and 132.Four the first test devices 110 and four A second test device 130 is respectively square arrangement, and the first grabbing device 120 is installed on four the first test devices 110 Center, the second grabbing device 140 are installed on the center of four the second test devices 130.Feeding assembly 150 is connected to two first Test device 110 passs material component 160 and is connected to other two first test device 110 and is connected to two the second test devices 130, thus by the first test device 110, the first grabbing device 120, the second test device 130 and the second grabbing device 140 Connect into an automatic test production line.
In other embodiments, the quantity of the first test device 110 and the second test device 130 can be according to service condition It is configured, moreover, the multiple crawl of first test device 110 and first dresses can be increased between feeding assembly 150 and discharge component Set 120 or multiple second test devices 130 or the second grabbing device 140.
Further, first grabbing device 120 includes runner assembly 121, the first sucker 122 and the second sucker 123, first sucker 122 and second sucker 123 are rotatably mounted to the runner assembly 121.It is filled with the first crawl Set 120 unanimously, the second grabbing device 140 includes runner assembly 141, third sucker 142 and the 4th sucker 143, the third Sucker 142 and the 4th sucker 143 are rotatably mounted to the runner assembly 141.First sucker 122,142 and described The rotational angle of second sucker 123,143 is 90 degree.
In the present embodiment, it is preferred that the first sucker 122,142 and the second sucker 123,143 are square-shaped, and first inhales Vacuum slot there are four being respectively set on the 122,142, second sucker of disk 123,143, first the 122,142, second sucker of sucker 123,143 circuit board is drawn or put down by vacuum slot.
Further, first test device 110 is different with the test function of second test device 130, described First test device 110 is device for testing functions (FT test devices), and second test device 130 is simulating test device (ADC test devices).
In the present embodiment, the first test device 110 and the second test device 130 differ to circuit board testing project Sample, the first test device 110 are used for each function of test circuit plate, and the second test device 130 is each for test circuit plate Kind analog parameter.
In other embodiments, the test function phase of first test device 110 and second test device 130 Together, first test device 110 and second test device 130 are device for testing functions (FT test devices) or mould Quasi- test device (ADC test devices).
Further, first discharge component 170 and second discharge component 180 are arranged in parallel, and described first goes out Material component 170 is located at second discharge component, 180 lower section.First discharge component 170 is defective products track, including successively The first belt 171, the second belt 172 and the third belt 173 of connection, first belt 171 and second belt 173 It is vertically arranged.Second discharge component 180 is non-defective unit track, including the 4th belt 181.
In the present embodiment, the first discharge component 170 and the second discharge component 180 are in be arranged in parallel up and down, the first belt 171, the second belt 172, third belt 173 and the 4th belt 181 are driven by motor respectively, to export non-defective unit circuit respectively Plate and defective products circuit board.First belt 171 and third belt 173 are mutually perpendicular to and are connected by the second belt 172, third skin With 173, one end far from the second belt 172 is additionally coupled to the buffer board 174 for accumulating defective products circuit board.
Fig. 1 is please referred to, the course of work of circuit board automatic checkout equipment 100 is illustrated below in conjunction with attached drawing:
When work, functional test (FT tests) is first carried out, circuit board under test is positioned over the first pallet 151 by the first step, is controlled Molding block controls the first pallet 151 and circuit board under test is transported at the first feeding plate 153;Second step, control module control It makes the first grabbing device 120 and circuit board under test is picked up to and is put into the first feeding plate 153, by the first feeding plate 153 to be measured Circuit board is corrected, and avoids being subject to crushing when testing due to circuit board under test is bad because placing;Third walks, control module control the Circuit board under test is picked up from the first feeding plate 153 and is sent to the first test device by the first sucker 122 of one grabbing device 120 At 110, rotates the second sucker 123 and inhale the circuit board for completing functional test (FT tests) from test station 111 or 112 It rises, then, circuit board under test is put into the test station 111 or 112 of the first test device 110 by the first grabbing device 120, most Afterwards, control module controls the first test device 110 and carries out functional test (FT tests) to circuit board under test.
Completing the circuit board of functional test (FT tests) can be passed and expect that component 160 is delivered to the second grabbing device 140 and the Simulation test (ADC tests), the testing procedure and simulation test (ADC of functional test (FT tests) are carried out at two test devices 130 Test) unanimously, herein not in repeated description.
Finally, it completes functional test (FT tests) and the circuit board of simulation test (ADC tests) is divided into non-defective unit circuit board With defective products circuit board, defective products circuit board is placed by the second grabbing device 140 to the first discharge component 170, the first belt 171, the second belt 172 and third belt 173 act successively, and defective products circuit board is sent to buffer board 174;Non-defective unit circuit Plate is placed by the second grabbing device 140 to the second discharge component 180, and the 4th belt 181 transports non-defective unit circuit board.So far, complete At to the test of circuit board under test and the classification of test product.
As it can be seen that foregoing circuit plate automatic test equipment 100 automatically tests circuit board, without human intervention, from Dynamicization degree is high, saves manpower, reduces production cost;Test quality and efficient, greatly improves production efficiency.
The above is only the preferred embodiment of the utility model only, is not intended to limit the utility model, all at this Within the spirit and principle of utility model, any modification, equivalent replacement, improvement and so on should be included in the utility model Protection domain within.

Claims (10)

1. a kind of circuit board automatic test equipment, which is characterized in that including:
First test device;
First grabbing device is connected to first test device;
Feeding assembly is connected to first test device;
Second test device;
Second grabbing device is connected to second test device;
Material component is passed, first test device and second test device are connected;And
Discharge component connects second test device, includes the first discharge component and the second discharge component of interconnection.
2. circuit board automatic test equipment as described in claim 1, which is characterized in that first grabbing device and described Two grabbing devices respectively include runner assembly, the first sucker and the second sucker, and first sucker and second sucker turn It is installed on the runner assembly dynamicly.
3. circuit board automatic test equipment as claimed in claim 2, which is characterized in that first sucker and described second is inhaled The rotational angle of disk is 90 degree.
4. circuit board automatic test equipment as described in claim 1, which is characterized in that first test device and described The test function of two test devices is different, and first test device is device for testing functions, and second test device is mould Quasi- test device.
5. circuit board automatic test equipment as described in claim 1, which is characterized in that first test device and described The test function of two test devices is identical, first test device and second test device be device for testing functions or Simulating test device.
6. circuit board automatic test equipment as described in claim 1, which is characterized in that first discharge component and described Two discharge components are arranged in parallel, and first discharge component is located at below second discharge component.
7. circuit board automatic test equipment as claimed in claim 6, which is characterized in that first discharge component is defective products Track, including sequentially connected first belt, the second belt and third belt, first belt hang down with second belt Straight setting.
8. circuit board automatic test equipment as claimed in claim 6, which is characterized in that second discharge component is non-defective unit rail Road, including the 4th belt.
9. circuit board automatic test equipment as described in claim 1, which is characterized in that the feeding assembly is led including first Rail, the first pallet and the first feeding plate, are installed on to first tray both slid first guide rail, and the first feeding plate is solid Due to one end of first guide rail and adjacent with first test device.
10. circuit board automatic test equipment as described in claim 1, which is characterized in that the material component of passing is led including second Rail, the second pallet and the second feeding plate, are installed on to second tray both slid second guide rail, and the second feeding plate is solid Due to one end of second guide rail and adjacent with second test device.
CN201721790298.6U 2017-12-20 2017-12-20 Circuit board automatic test equipment Expired - Fee Related CN207924081U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721790298.6U CN207924081U (en) 2017-12-20 2017-12-20 Circuit board automatic test equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721790298.6U CN207924081U (en) 2017-12-20 2017-12-20 Circuit board automatic test equipment

Publications (1)

Publication Number Publication Date
CN207924081U true CN207924081U (en) 2018-09-28

Family

ID=63607268

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721790298.6U Expired - Fee Related CN207924081U (en) 2017-12-20 2017-12-20 Circuit board automatic test equipment

Country Status (1)

Country Link
CN (1) CN207924081U (en)

Similar Documents

Publication Publication Date Title
CN110187257A (en) Pcb board automated test device
CN102323564B (en) Electric energy meter verification unit and working method thereof
CN104741326B (en) Fully automatic SMD LED disc-type spectrophotometer and operating method thereof
CN106824817B (en) A kind of automatic detecting machine of PCB circuit board
CN208437269U (en) A kind of transformer detection device
CN104267351B (en) A kind of battery automatically testing sorting equipment
CN109304608B (en) A kind of assembling mechanism can be realized the USB chip module that chip is held out against
CN101995526A (en) Apparatus for characteristic inspection and sorting of electronic component
CN203752405U (en) Automated production and detection device for insert injection moulding products
CN205816229U (en) Electronic product strong and weak electricity automatic detection device
CN109062186A (en) A kind of full-automatic assembling test production line of stand alone type ECU controller
CN105044484A (en) Visual sense based QFN integrated machine for IC test
CN105966863B (en) Automatic assembly line after a kind of sanitary ceramics kiln discharge
CN207924081U (en) Circuit board automatic test equipment
CN204866577U (en) WiFi module calibration number of writing test integration workstation
CN202177942U (en) Energy meter verification system
CN110125674A (en) A kind of automatic charging electric power connector assembling equipment
CN208728041U (en) A kind of fuse lead cap detection device
CN209707406U (en) A kind of scarce material image CCD detection device of moulding
CN207548071U (en) Net mouth transformer automatic assembly equipment
CN102735965A (en) Full-automatic efficient product function testing device
CN207096358U (en) A kind of power capacitor automatic detection device
CN109212390A (en) A kind of voltage-withstand test sorting equipment of rectifier bridge
CN102193043A (en) Testing integration method for bare board of circuit board
CN109244792A (en) A kind of automatic spigot equipment of double-station energy-saving plug and automatic spigot method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180928

Termination date: 20191220

CF01 Termination of patent right due to non-payment of annual fee