- CN207920083U CN207920083U CN201820040193.7U CN201820040193U CN207920083U CN 207920083 U CN207920083 U CN 207920083U CN 201820040193 U CN201820040193 U CN 201820040193U CN 207920083 U CN207920083 U CN 207920083U
- Authority
- CN
- China
- Prior art keywords
- hot
- water heating
- heating casing
- floor slab
- bottom plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Steam Or Hot-Water Central Heating Systems (AREA)
Abstract
A kind of hot-water heating casing in being poured the utility model discloses typical floor reserves positioning device, solves the problems, such as hot-water heating casing location difficulty when during concrete floor slab placement is constructed using aluminum alloy pattern plate.It is included in concrete floor slab placement aluminum dipping form bottom plate(1)On be provided with the round bed die positioning plate of hot-water heating casing(2), in round bed die positioning plate(2)On be snapped with hot-water heating casing(8), in hot-water heating casing(8)Top be provided with circular cover(9), in concrete floor slab placement aluminum dipping form bottom plate(1), round bed die positioning plate(2)And circular cover(9)Between wear and be connected to split bolt(3), in concrete floor slab placement aluminum dipping form bottom plate(1)On hot-water heating casing(8)Outside be provided with concrete layer to be poured(11).The utility model effectively improves the setting accuracy of reserving hole, improves the perception degree after form removal, improves integral construction efficiency.
Description
Technical field
A kind of sleeve pipe pre-embedding in being poured the utility model is related to floor plates reserves positioning device, more particularly to one kind is in aluminium
Under template cast-in-place concrete structure, the positioning device of set aside pre-embedded of hot-water heating casing for typical floor.
Background technology
In the floor face of typical floor pours, it is in the template that floor pours reserved water heating coil through hole, the hole
It is reserved to realize that casing is set, casing is fixed on the reinforcing bar of floor by tying up silk, but in the casting process of concrete,
Often there is a phenomenon where tube displacements, and the later stage is needed to carry out after-treatment.Currently, aluminum alloy mould plate is as New Type Architecture Mode
System is just promoted the use of in construction, and aluminum alloy pattern plate technique can be realized preferably relative to traditional plank sheathing technique
Entity quality, but also reserved installation pre-buried to hot-water heating is accurately positioned that more stringent requirements are proposed simultaneously.Because aluminum alloy mould plate is
Assembled at the scene to complete, technological requirement cannot random trepanning on aluminum alloy pattern plate so that hot-water heating casing early period is pre-buried to meet difficulty.
Invention content
The utility model provides the hot-water heating casing during a kind of typical floor pours and reserves positioning device, solves in floor
When using aluminum alloy pattern plate in pouring construction the technical issues of hot-water heating casing location difficulty.
The utility model is to solve the above technical problem by the following technical programs:
A kind of hot-water heating casing during typical floor pours reserves positioning device, including concrete floor slab placement aluminum dipping form bottom plate and hot-water heating set
Pipe, is provided with the round bed die positioning plate of hot-water heating casing, the snapping on round bed die positioning plate on concrete floor slab placement aluminum dipping form bottom plate
Have hot-water heating casing, the top of hot-water heating casing be provided with circular cover, concrete floor slab placement aluminum dipping form bottom plate, round bed die positioning plate and
It is worn between circular cover and is connected to split bolt, cover board fixing nut is provided on the split bolt above circular cover, in building
Plate pour is provided on the split bolt below aluminum dipping form bottom plate sleeve fix lower nut, above round bed die positioning plate to draw
Be provided with sleeve on bolt and fix top nut, be provided on the outside of the hot-water heating casing on concrete floor slab placement aluminum dipping form bottom plate wait pouring it is mixed
Solidifying soil layer.
It is respectively arranged with left fixing screws and right fixed spiral shell between concrete floor slab placement aluminum dipping form bottom plate and round bed die positioning plate
Nail.
The utility model effectively improves the setting accuracy of reserving hole, solves floor concrete casting and be easy to cause
The problem of reserved sleeve drift, the perception degree after form removal is improved, integral construction efficiency is improved.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Specific implementation mode
The utility model is described in detail below in conjunction with the accompanying drawings:
A kind of hot-water heating casing during typical floor pours reserves positioning device, including concrete floor slab placement aluminum dipping form bottom plate 1 and hot-water heating
Casing 8 is provided with the round bed die positioning plate 2 of hot-water heating casing, in round bed die positioning plate 2 on concrete floor slab placement aluminum dipping form bottom plate 1
On be snapped with hot-water heating casing 8, the top of hot-water heating casing 8 is provided with circular cover 9, in concrete floor slab placement aluminum dipping form bottom plate 1, circular base
It is worn between mould positioning plate 2 and circular cover 9 and is connected to split bolt 3, lid is provided on the split bolt 3 above circular cover 9
Plate fixing nut 10 is provided with sleeve on the split bolt 3 below concrete floor slab placement aluminum dipping form bottom plate 1 and fixes lower nut 4, in circle
It is provided with sleeve on the split bolt 3 of 2 top of bottom mould postioning plate and fixes top nut 5, the hot-water heating on concrete floor slab placement aluminum dipping form bottom plate 1
The outside of casing 8 is provided with concrete layer 11 to be poured.
It is respectively arranged with left fixing screws 6 and right fixation between concrete floor slab placement aluminum dipping form bottom plate 1 and round bed die positioning plate 2
Screw 7 plays the role of fixed round bed die positioning plate 2 very well, prevents its rotation.By fastening the nut on split bolt 3,
Hot-water heating casing 8 can be positioned and fixed securely, in the casting process of concrete, position will not shift, and greatly improve
The accuracy of the position positioning of the hot-water heating casing reserving holes of entire stair.
Claims (2)
1. the hot-water heating casing during a kind of typical floor pours reserves positioning device, including concrete floor slab placement aluminum dipping form bottom plate(1)And hot-water heating
Casing(8), which is characterized in that in concrete floor slab placement aluminum dipping form bottom plate(1)On be provided with the round bed die positioning plate of hot-water heating casing(2),
In round bed die positioning plate(2)On be snapped with hot-water heating casing(8), in hot-water heating casing(8)Top be provided with circular cover(9),
In concrete floor slab placement aluminum dipping form bottom plate(1), round bed die positioning plate(2)And circular cover(9)Between wear and be connected to split bolt(3),
Circular cover(9)The split bolt of top(3)On be provided with cover board fixing nut(10), in concrete floor slab placement aluminum dipping form bottom plate(1)Under
The split bolt of side(3)On be provided with sleeve fix lower nut(4), in round bed die positioning plate(2)The split bolt of top(3)
On be provided with sleeve fix top nut(5), in concrete floor slab placement aluminum dipping form bottom plate(1)On hot-water heating casing(8)Outside setting need
Casting concrete layer(11).
2. the hot-water heating casing during a kind of typical floor according to claim 1 pours reserves positioning device, which is characterized in that
In concrete floor slab placement aluminum dipping form bottom plate(1)With round bed die positioning plate(2)Between be respectively arranged with left fixing screws(6)With right fixed spiral shell
Nail(7).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820040193.7U CN207920083U (en) | 2018-01-10 | 2018-01-10 | Hot-water heating casing during typical floor pours reserves positioning device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820040193.7U CN207920083U (en) | 2018-01-10 | 2018-01-10 | Hot-water heating casing during typical floor pours reserves positioning device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207920083U true CN207920083U (en) | 2018-09-28 |
Family
ID=63617327
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820040193.7U Active CN207920083U (en) | 2018-01-10 | 2018-01-10 | Hot-water heating casing during typical floor pours reserves positioning device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207920083U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219455A (en) * | 2019-06-28 | 2019-09-10 | 中建二局第二建筑工程有限公司 | A kind of adjustable direct burial sleeve |
CN116397904A (en) * | 2023-06-08 | 2023-07-07 | 山西三建集团有限公司 | Positioning method of positioning mechanism for reserved steel sleeve on cast-in-situ floor plate of high-rise building |
-
2018
- 2018-01-10 CN CN201820040193.7U patent/CN207920083U/en active Active
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110219455A (en) * | 2019-06-28 | 2019-09-10 | 中建二局第二建筑工程有限公司 | A kind of adjustable direct burial sleeve |
CN110219455B (en) * | 2019-06-28 | 2023-11-17 | 中建二局第二建筑工程有限公司 | Adjustable directly buries sleeve |
CN116397904A (en) * | 2023-06-08 | 2023-07-07 | 山西三建集团有限公司 | Positioning method of positioning mechanism for reserved steel sleeve on cast-in-situ floor plate of high-rise building |
CN116397904B (en) * | 2023-06-08 | 2023-08-08 | 山西三建集团有限公司 | Positioning method of positioning mechanism for reserved steel sleeve on cast-in-situ floor plate of high-rise building |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN207920083U (en) | Hot-water heating casing during typical floor pours reserves positioning device | |
CN206616862U (en) | Formwork root bracing means | |
CN109930455B (en) | Municipal road curb mounting structure, construction device and construction method | |
CN108755972B (en) | Foot pad for prefabricated part and using method thereof | |
CN206458083U (en) | A kind of adjustable building template | |
CN207063522U (en) | A kind of frame column high-supported formwork | |
CN109555311A (en) | Adjustable waterproof guide wall form board support construction and its operational method | |
CN103568109A (en) | Hole forming method of precast concrete hollow component | |
CN205976167U (en) | Based on cast -in -place floor structures of detachable positioning control spare | |
KR20000017883A (en) | Incremental launching method type pc box girder bridge making mold system and segment making method thereof | |
CN215106098U (en) | Prefabricated post connection structure | |
CN105135889A (en) | Construction method for fireproof material of throat part of grate cooler | |
CN107989069A (en) | Pre-embedded bolt, the pre-buried prefabricated piping lane and method for prefabricating for hanging nail | |
CN216819253U (en) | Be used for disposable pre-buried crane span structure transition festival piece | |
CN207405882U (en) | A kind of steel bar positioning frame | |
CN107386633A (en) | A kind of multifunctional building template system | |
CN207829483U (en) | Slab thickness controller | |
CN206267520U (en) | A kind of self-supporting post-cast strip is poured with hanging mould | |
CN205955225U (en) | Thick controlling means of cast in situ concrete floor board | |
CN211817287U (en) | GBF honeycomb core plate construction auxiliary device | |
CN207620379U (en) | A kind of side mould fixing device | |
CN209194876U (en) | Novel hoisting and anchoring integrated PC component lifting appliance | |
CN207193782U (en) | A kind of pole type box culvert supporting embedded part of primary concreting Underground Culvert | |
CN204875498U (en) | Device of steel sheet installation under supplementary bridge beam supports | |
CN207296115U (en) | A kind of cast-in-situ floor high accuracy positioning control system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |