CN201362959Y - Floor slab preformed hole device - Google Patents
Floor slab preformed hole device Download PDFInfo
- Publication number
- CN201362959Y CN201362959Y CNU2009200036578U CN200920003657U CN201362959Y CN 201362959 Y CN201362959 Y CN 201362959Y CN U2009200036578 U CNU2009200036578 U CN U2009200036578U CN 200920003657 U CN200920003657 U CN 200920003657U CN 201362959 Y CN201362959 Y CN 201362959Y
- Authority
- CN
- China
- Prior art keywords
- preformed hole
- tapping screw
- cover plate
- floor slab
- screw
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Abstract
A floor slab preformed hole device relates to the field of building installation, in particular to a floor slab preformed hole device. The floor slab preformed hole device consists of a sleeve (1), a cover plate (2) and a self-tapping screw (3), wherein the sleeve (1) is arranged at a position of the preformed hole above a plywood formwork (4), the front cover plate (2) is arranged on the sleeve (1), the self-tapping screw (3) penetrates through the middle of the cover plate (2), and the front end of the self-tapping screw (3) is screwed into the plywood formwork (4). By utilizing the floor slab preformed hole device, the preformed hole can be completed with fast and simple process, can be positioned by the self-tapping screw (3) with firm fixation and can not be shifted during casting process, thereby guaranteeing accurate position of the hole.
Description
Technical field:
The utility model relates to a kind of construction and installation field, is specifically related to a kind of floor hole to be provided device.
Background technology:
In the project subject structure construction procedure,, on floor, there is a large amount of reservations hole to stay in the design and establishes because installing engineering needs.These holes generally all adopted the nail tub to reserve with the fixing mode of iron wire colligation in the past, but this exist spillage of material big, complexity is installed and exists the floor concrete to build in the process problems such as easy off normal.
The utility model content:
The purpose of this utility model provides a kind of floor hole to be provided device, and this device is difficult for moving in the floor casting process, can guarantee the accurate of hole to be provided position; And this device puts for shaping tool makeup, can reuse economical with materials.In order to solve the existing problem of background technology, the utility model is by the following technical solutions: it is made up of sleeve pipe 1, cover plate 2, tapping screw 3, sleeve pipe 1 is placed on the position of the top hole to be provided of glued mould 4, cover plate 2 be provided with fugitive pipe 1 above, tapping screw 3 passes the centre of cover plate 2, and the front end of tapping screw 3 screws in glued mould 4; Be provided with the lumps of wood 5 below the glued mould 4, the lumps of wood 5 be placed on steel pipe framed bent 6 above.The utility model is in application, sleeve pipe 1 is placed on the position that needs box out, cover cover plate 2 then, passing cover plate 2 with tapping screw 3 is fixed on the glued mould 4, be used for fixing sleeve pipe 1, pour into a mould then, approximately casting complete is that dismountable tapping screw 3, cover plate 2, sleeve pipe 1 can be finished hole to be provided after 24 hours, the hole to be provided that the utility model is finished, the process simple and fast, hole to be provided is located fixation with tapping screw 3, in the process of building, can not produce the problem of displacement, guarantee that openings position is accurate.
Description of drawings:
Fig. 1 is the structural representation before the utility model is installed after-pouring, and Fig. 2 is that the utility model is installed the later structural representation of after-pouring, and Fig. 3 is the structural representation that the utility model is removed the back hole to be provided, and Fig. 4 is the structure for amplifying schematic diagram of tapping screw 3.
The specific embodiment:
Referring to Fig. 1-4, this specific embodiment is by the following technical solutions: it is made up of sleeve pipe 1, cover plate 2, tapping screw 3, sleeve pipe 1 is placed on the position of the top hole to be provided of glued mould 4, cover plate 2 be arranged on sleeve pipe 1 above, tapping screw 3 passes the centre of cover plate 2, and the front end of tapping screw 3 screws in glued mould 4; Be provided with the lumps of wood 5 below the glued mould 4, the lumps of wood 5 prevents on steel pipe framed bent 6.This specific embodiment is in application, sleeve pipe 1 is placed on the position that needs box out, cover cover plate 2 then, passing cover plate 2 with tapping screw 3 is fixed on the glued mould 4, be used for fixing sleeve pipe 1, water the build floor concrete then, build approximately that to finish after 24 hours be that dismountable tapping screw 3, cover plate 2, sleeve pipe 1 can be finished hole to be provided.
Described tapping screw 3, referring to Fig. 4, it is made up of handle 3-1, screw post 3-2, cone screw head 3-3, pad 3-4, block 3-5, handle 3-1 is arranged on screw post 3-2 upper end, cone screw head 3-3 is arranged on the lower end of screw post 3-2, cone screw head 3-3 is provided with tapered thread, and screw post 3-2 is provided with block 3-5, is provided with pad 3-4 below the block 3-5.
Claims (2)
1, floor hole to be provided device, it is characterized in that it is made up of sleeve pipe (1), cover plate (2), tapping screw (3), sleeve pipe (1) is placed on the position of the top hole to be provided of glued mould (4), cover plate (2) be arranged on sleeve pipe (1) above, tapping screw (3) passes the centre of cover plate (2), and the front end of tapping screw (3) screws in glued mould (4).
2, floor hole to be provided device according to claim 1, it is characterized in that described tapping screw (3), it is made up of handle (3-1), screw post (3-2), cone screw head (3-3), pad (3-4), block (3-5), handle (3-1) is arranged on screw post (3-2) upper end, cone screw head (3-3) is arranged on the lower end of screw post (3-2), cone screw head (3-3) is provided with tapered thread, screw post (3-2) is provided with block (3-5), is provided with pad (3-4) below the block (3-5).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2009200036578U CN201362959Y (en) | 2009-01-19 | 2009-01-19 | Floor slab preformed hole device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CNU2009200036578U CN201362959Y (en) | 2009-01-19 | 2009-01-19 | Floor slab preformed hole device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN201362959Y true CN201362959Y (en) | 2009-12-16 |
Family
ID=41473620
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CNU2009200036578U Expired - Fee Related CN201362959Y (en) | 2009-01-19 | 2009-01-19 | Floor slab preformed hole device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN201362959Y (en) |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102364004A (en) * | 2011-11-02 | 2012-02-29 | 中建三局第二建设工程有限责任公司 | Concrete floor hole reserving device capable of being quickly assembled and disassembled |
CN102587651A (en) * | 2012-04-01 | 2012-07-18 | 吴强 | Method for manufacturing reserved concrete hole of floor and mold |
CN104563498A (en) * | 2013-12-17 | 2015-04-29 | 中太建设集团股份有限公司 | PPR combined mold used for floor slab reserved hole construction |
CN104695705A (en) * | 2015-03-25 | 2015-06-10 | 中国建筑第八工程局有限公司 | Reserved hole sleeve and method for constructing reserved hole by using same |
CN106760514A (en) * | 2017-01-23 | 2017-05-31 | 中国华冶科工集团有限公司 | Downcomer hole to be provided service sleeve and built-in process |
CN108265976A (en) * | 2017-12-05 | 2018-07-10 | 徐硕 | A kind of pipe hole preformed device and operating method |
-
2009
- 2009-01-19 CN CNU2009200036578U patent/CN201362959Y/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102364004A (en) * | 2011-11-02 | 2012-02-29 | 中建三局第二建设工程有限责任公司 | Concrete floor hole reserving device capable of being quickly assembled and disassembled |
CN102587651A (en) * | 2012-04-01 | 2012-07-18 | 吴强 | Method for manufacturing reserved concrete hole of floor and mold |
CN104563498A (en) * | 2013-12-17 | 2015-04-29 | 中太建设集团股份有限公司 | PPR combined mold used for floor slab reserved hole construction |
CN104695705A (en) * | 2015-03-25 | 2015-06-10 | 中国建筑第八工程局有限公司 | Reserved hole sleeve and method for constructing reserved hole by using same |
CN106760514A (en) * | 2017-01-23 | 2017-05-31 | 中国华冶科工集团有限公司 | Downcomer hole to be provided service sleeve and built-in process |
CN108265976A (en) * | 2017-12-05 | 2018-07-10 | 徐硕 | A kind of pipe hole preformed device and operating method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201362959Y (en) | Floor slab preformed hole device | |
CN206616862U (en) | Formwork root bracing means | |
CN201056841Y (en) | Shaping device for pre-opened hole of cast-in-situ reinforced concrete plate | |
CN208702140U (en) | A kind of shear wall joint part formwork reinforcement structure | |
CN200985564Y (en) | TT-type built-in autospasy type anchorage | |
CN201671356U (en) | Early form removal supporting system | |
CN204081445U (en) | To encorbelment i iron anchor device | |
CN207919773U (en) | A kind of assembled toilet dash lead wall | |
CN201406834Y (en) | Reserved opening die for top plate | |
CN201276842Y (en) | Construction barrel mold for reserved opening of simple building | |
CN202882438U (en) | Cast-in-situ concrete inclined wall and inclined column tumbling barrel | |
CN208267362U (en) | A kind of constructing device of deformation joint concrete wall formwork | |
CN201474296U (en) | Floor slab back casting hole moulding board support structure | |
CN207920083U (en) | Hot-water heating casing during typical floor pours reserves positioning device | |
CN201225008Y (en) | Self-locking type fastener of building floor preformed hole core die | |
CN206030177U (en) | Precast box girder prevents centre form come -up structure | |
CN201424811Y (en) | Special die for reserving opening on concrete cast-in-situ slab pipeline | |
CN201635404U (en) | Precise positioning structure of preserved pipeline | |
CN201738499U (en) | Steel bar protective layer position limiting cushion block of cast steel bar concrete beam post | |
CN201172966Y (en) | Securing fixture for bidirectionally adjusting cast-in-situ concrete shuttering | |
CN201362961Y (en) | Split-type opposite-drawing screw rod | |
CN209429531U (en) | A kind of tightening formula concrete floor hole reservation device | |
CN207620379U (en) | A kind of side mould fixing device | |
CN202164555U (en) | Bottom support of concrete box culvert template bracket post | |
CN207700692U (en) | A kind of floor cave entrance reservation structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20091216 Termination date: 20110119 |