CN207917807U - A kind of Belt Conveying equipment with belt replacing device - Google Patents

A kind of Belt Conveying equipment with belt replacing device Download PDF

Info

Publication number
CN207917807U
CN207917807U CN201721509165.7U CN201721509165U CN207917807U CN 207917807 U CN207917807 U CN 207917807U CN 201721509165 U CN201721509165 U CN 201721509165U CN 207917807 U CN207917807 U CN 207917807U
Authority
CN
China
Prior art keywords
belt
roller bearing
roller
belt conveyor
rack
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721509165.7U
Other languages
Chinese (zh)
Inventor
张振军
何险峰
韦孜
赵伟伟
罗全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GUANGXI HUAYIN ALUMINIUM CO Ltd
Original Assignee
GUANGXI HUAYIN ALUMINIUM CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GUANGXI HUAYIN ALUMINIUM CO Ltd filed Critical GUANGXI HUAYIN ALUMINIUM CO Ltd
Priority to CN201721509165.7U priority Critical patent/CN207917807U/en
Application granted granted Critical
Publication of CN207917807U publication Critical patent/CN207917807U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structure Of Belt Conveyors (AREA)

Abstract

The utility model is related to belt feeder technical fields, a kind of Belt Conveying equipment with belt replacing device, including rack, belt conveyor and roller devices, being arranged side by side before and after the conveying direction of rack upper edge belt conveyor has the first belt guide device and the second belt guide device, first belt guide device includes the first fixed frame for being vertically vertically set on rack both sides, it is provided with the first roller bearing and the second roller bearing between first fixed frame, the first roller bearing and the second roller bearing are arranged in the top of belt conveyor and vertical with the length direction of belt conveyor;Second belt guide device includes the second fixed frame for being vertically vertically set on rack both sides, is provided with third roller bearing and the 4th roller bearing between the second fixed frame, and third roller bearing and the 4th roller bearing are arranged in the top of belt conveyor and vertical with the length direction of belt conveyor.The utility model is simple in structure, and the replacement belt time is short, efficient, easy to operate, and belt is not easy skidding or sideslip, is conducive to being smoothed out for production.

Description

A kind of Belt Conveying equipment with belt replacing device
Technical field
The utility model is related to belt feeder technical field, more particularly to a kind of Belt Conveying with belt replacing device is set It is standby.
Background technology
Belt feeder is a kind of common material transport equipment, since belt machine equipment longtime running and material are to belt Abrasion, can inevitably be caused to damage to belt, after the service life of belt expires, in order to not influence producing and avoiding safety hidden Suffer from, the belt on belt feeder must just be replaced at interval of the regular hour.
It when aluminium ore conveys, needs aluminium ore being transported to above the ground along slope under ground, the belt of belt feeder is up to 300 More meters, during replacing whole belt, typically first belt is placed on skylight on ready-made support, is then taped against old defeated It send on belt, allows old belt conveyor to drive one week together with new belt conveyor, then vulcanized joint.Skin is rotated after connector Band allows old belt conveyor to go out from weight port, during old belt conveyor is seen off, frequent old belt conveyor and new conveying Belt leads to old belt conveyor sideslip, stuck since pulling force is different, replaces a belt and needs to put into Liang Ge teams and groups, used time 20 Hour or more, replace less efficient, belt downtime is long, causes the waste of human and material resources, particularly with being used in aluminium ore industry Large-scale belt transportation system, maintenance, replace belt needed for time can also extend, and belt feeder for a long time shut down meeting shadow Being normally carried out to production is rung, unnecessary economic loss is brought to enterprise.
Utility model content
The Belt Conveying equipment with belt replacing device that the purpose of this utility model is to provide a kind of, it is simple in structure, The replacement belt conveyor time is short, efficient, saves manually, easy to operate, and belt conveyor is not easy skidding or sideslip, defeated It send belt downtime short, is conducive to being smoothed out for production.
In order to achieve the above objectives, technical solution used by the utility model is:
A kind of Belt Conveying equipment with belt replacing device, including rack, belt conveyor and roller devices, the idler wheel Device includes two idler wheels, and the idler wheel is mounted side by side in the rack, and the idler wheel of the roller devices passes through belt conveyor It is sequentially connected, being arranged side by side before and after the conveying direction of belt conveyor described in the rack upper edge has the first belt guide device and the Two belt guide devices, the first belt guide device include vertically being vertically set on the first of the rack both sides to fix Frame is provided with the first roller bearing and the second roller bearing between first fixed frame, and first roller bearing is located under second roller bearing Side, first roller bearing and the second roller bearing are arranged in the top of the belt conveyor and hang down with the length direction of the belt conveyor Directly;The second belt guide device includes the second fixed frame for being vertically vertically set on the rack both sides, and described second is solid Determine to be provided with third roller bearing and the 4th roller bearing between frame, the third roller bearing is located at below the 4th roller bearing, the third rolling Axis and the 4th roller bearing are arranged in the top of the belt conveyor and vertical with the length direction of the belt conveyor.
Further, the roller devices include driving roller, driven roller and driving roller driving motor, the active Idler wheel and the driven roller are separately mounted to the both ends of the rack, and the belt conveyor is around being located at the driving roller and institute It states on driven roller, the driving roller driving motor connects with the driving roller and the driving roller is driven to rotate.
Further, the relatively described rack of the first belt guide device is close to the driven roller, first skin With the belt winder being provided with above guide device for winding old belt conveyor, the belt winder includes that support is rolled up Bar, winder driving motor and two supporting racks, support frame as described above setting are rolled up on the support roll bar both ends, the support roll bar It is provided around the short belt for connecting old belt conveyor, the length of the short belt is 5-10 meters, the winder driving electricity Machine connect with one end of the support roll bar and the support roll bar is driven to rotate.
Further, the first belt guide device and the second belt guide device are at a distance of 1-2 meters.
Further, the belt conveyor is 100-350 meters long.
Further, first fixed frame and the second fixed frame are respectively welded in the rack, and described first fixes It is welded with reinforcing rib between frame and the rack, between second fixed frame and the rack.
Further, the application method of the Belt Conveying equipment with belt replacing device of the utility model includes following step Suddenly:
(1) new belt conveyor is positioned over to the top of the second belt guide device, old belt conveyor is cut off, and will Close to the second belt guide device old belt conveyor end punching, with iron wire by the end of new belt conveyor with it is old defeated Send belt to connect, then the end of the other end of old belt conveyor punched, with iron wire will support the short belt in roll bar with it is old defeated Belt is sent to connect;
(2) it is beginning close to the end in belt exit from it by old belt conveyor, starts the winder driving motor, So that the belt conveyor winder is lifted old belt conveyor upwards, and old belt conveyor is made to draw successively around first belt The top for leading the lower part of the first roller bearing of device and the second roller bearing of the first belt guide device, winds old belt conveyor;
(3) at the same time, the new belt conveyor is under the traction of the old belt conveyor, make new belt conveyor successively around The third roller bearing and the 4th roller bearing for crossing the second belt guide device, into belt feeder;
(4) by after the old belt conveyor completely winding, then the new belt conveyor is at least about being located at the roller devices One week, old belt conveyor and new belt conveyor are disconnected, and the vulcanization of the both ends of new belt conveyor is fixedly connected.
Due to the adoption of the above technical scheme, the utility model has the advantages that:
1, the utility model is made by the way that the first belt guide device and the second belt guide device are arranged in the rack Old belt conveyor can be exported along the first belt guide device, being capable of leading in old belt conveyor with stylish belt conveyor Enter in the roller devices along the second belt guide device under drawing, in such a way that the sides Bian Pu are received, so as to quick Complete the replacement of belt.On the one hand the first belt guide device and the second belt guide device can play the work of tensioning With preventing in replacement process belt to have skidded or deviation phenomenon, on the other hand can play guiding role, using parallel The position of first roller bearing and the second roller bearing, third roller bearing and the 4th roller bearing limitation belt prevents in replacement process belt vertical Play on direction.Compared with the traditional way, the utility model saves a large amount of human and material resources, and the replacement belt time is short, imitates Rate is high, and easy to operate, belt downtime is short, is conducive to being smoothed out for production.
2, the utility model above the first belt guide device by being provided with for winding old belt conveyor Belt winder, while old belt conveyor is wound by the belt conveyor winder, additionally it is possible to pull described new defeated Belt is sent to enter in the roller devices of belt feeder, the replacement for new belt conveyor provides tractive force, improves belt replacing efficiency.
Description of the drawings
Fig. 1 is a kind of structural schematic diagram of the Belt Conveying equipment with belt replacing device of the utility model.
Fig. 2 is the signal that a kind of Belt Conveying equipment belt conveyor with belt replacing device of the utility model replaces state Figure.
Wherein, reference numeral is:1- racks;2- belt conveyors;3- the first belt guide devices;The second belt guides of 4- fill It sets;The first fixed frames of 5-;The first roller bearings of 6-;The second roller bearings of 7-;8- driving rollers;9- driven rollers;10- driving rollers drive Motor;11- supporting racks;12- supports roll bar;13- winder driving motors;14- reinforcing ribs, 15- third roller bearings;16- the 4th is rolled Axis;The new belt conveyors of 17-;The old belt conveyors of 18-;The short belts of 19-;The second fixed frames of 20-.
Specific implementation mode
The utility model is more fully retouched below with reference to relevant drawings for the ease of understanding the utility model, It states.The preferred embodiment of the utility model is given in attached drawing.But the utility model can in many different forms come in fact It is existing, however it is not limited to embodiment described herein.On the contrary, purpose of providing these embodiments is make it is disclosed by the utility model Content can understand more thorough and comprehensive.
In the present invention, in the absence of explanation to the contrary, the noun of locality used such as " upper and lower, left and right " typically refers to Upper and lower, left and right in attached drawing, in addition, term " first ", " second " do not limit component for distinguishing different components System.
Embodiment one
Referring to Fig. 1, a kind of Belt Conveying equipment with belt replacing device, including rack 1, belt conveyor and idler wheel dress It sets, roller devices include two idler wheels, and idler wheel is mounted side by side in rack 1, and the idler wheel of roller devices is driven by belt conveyor It connects, being arranged side by side before and after the conveying direction of 1 upper edge belt conveyor of rack has the first belt guide device 3 and the second belt guide Device 4, the first belt guide device 3 include vertically being vertically set on the first fixed frame 5 of 1 both sides of rack, the first fixed frame 5 it Between be provided with the first roller bearing 6 and the second roller bearing 7, the first roller bearing 6 is located at 7 lower section of the second roller bearing, the first roller bearing 6 and the second roller bearing 7 It is arranged in the top of belt conveyor and vertical with the length direction of belt conveyor;Second belt guide device 4 includes vertical vertical The second fixed frame 20 in 1 both sides of rack is set, third roller bearing 15 and the 4th roller bearing 16 are provided between the second fixed frame 20, the Three roller bearings 15 are located at below the 4th roller bearing, third roller bearing 15 and the 4th roller bearing 16 be arranged the top of belt conveyor and with convey skin The length direction of band is vertical.
The utility model is made old by the way that the first belt guide device 3 and the second belt guide device 4 are arranged in rack 1 Belt conveyor 18 can be exported along the first belt guide device 3, can be in old belt conveyor 18 with stylish belt conveyor 17 Enter in roller devices along the second belt guide device 4 under traction, in such a way that the sides Bian Pu are received, so as to which skin is rapidly completed The replacement of band.First belt guide device 3 and 4 one side of the second belt guide device can play the role of tensioning, prevent more Belt has skidded or deviation phenomenon during changing, and on the other hand can play guiding role, utilize the first parallel roller bearing 6 The position that belt is limited with the second roller bearing 7, third roller bearing 15 and the 4th roller bearing 16 prevents in replacement process belt in vertical direction Upper play.
Roller devices include driving roller 8, driven roller 9 and driving roller driving motor 10, driving roller 8 and driven rolling Wheel 9 is separately mounted to the both ends of rack 1, and for belt conveyor around being located on driving roller 8 and driven roller 9, driving roller driving is electric Machine 10 and driving roller 8 connect and driving roller 8 are driven to rotate, and driving roller 8 drives driven roller 9 to rotate again.
In the present embodiment, in order to enhance the stability of the first fixed frame 5 and the second fixed frame 20, by 5 He of the first fixed frame Second fixed frame 20 is respectively welded in rack 1, between the first fixed frame 5 and rack 1, between the second fixed frame 20 and rack 1 It is welded with reinforcing rib 14.
Embodiment two
The present embodiment and the structure of embodiment one are essentially identical, the difference is that, in the present embodiment, the first belt guide Close to the driven roller 9, the top of the first belt guide device 3 is provided with old defeated for winding the relatively described rack 1 of device 3 It includes support roll bar 12, winder driving motor 13 and two supporting racks 11, branch to send the belt winder of belt 18, belt winder The setting of support 11 supports winding in roll bar 12 to be provided with the short belt for connecting old belt conveyor 18 at 12 both ends of support roll bar 19, the length of short belt 19 is 5-10 meters, and winder driving motor 13 connect with one end of support roll bar 12 and support is driven to roll up Bar 12 rotates, the length of preferably 10 meters of the short belt 19 of the present embodiment.By being provided in the top of the first belt guide device 3 Belt winder for winding old belt conveyor 18, while being wound old belt conveyor 18 by belt winder, moreover it is possible to It enough pulls new belt conveyor 17 to enter in the roller devices of belt feeder, tractive force is provided for the replacement of new belt conveyor 17, improve Belt replacing efficiency.
In the present embodiment, the (not shown) in the tunnel of underground is arranged in belt feeder, and is opened up on the top in tunnel One a length of 1.05 meters, the skylight that width is 1 meter is as the outlet for replacing belt, the first belt replacing device and the second belt replacing In the belt exit, belt winder is arranged outside tunnel and close to the belt exit device.
As shown in Fig. 2, a kind of application method of the Belt Conveying equipment with belt replacing device of the utility model is:
(1) new belt conveyor 17 is positioned over to the top of the second belt guide device 4, old belt conveyor 18 is cut off, and Will be close to the old belt conveyor 18 of the second belt guide device 4 end punching, with iron wire by the end of new belt conveyor 17 with Old belt conveyor 18 connects, then the end of the other end of old belt conveyor 18 is punched, and will be supported with iron wire short in roll bar 12 Belt 19 is connect with old belt conveyor 18;
(2) it is beginning close to the end in belt exit from it by old belt conveyor 18, starts winder driving motor 13, So that belt conveyor winder is lifted old belt conveyor 18 upwards, and so that old belt conveyor 18 is bypassed the first belt guide successively and fill The top for setting the lower part of 3 the first roller bearing 6 and the second roller bearing 7 of the first belt guide device 3, winds old belt conveyor 18;
(3) at the same time, new belt conveyor 17 makes new belt conveyor 17 bypass successively under the traction of old belt conveyor 18 The third roller bearing 15 and the 4th roller bearing 16 of the second belt guide device 4, into belt feeder;
(4) by after old belt conveyor 18 completely winding, then new belt conveyor 17, will be old at least about roller devices are located at one week Belt conveyor 18 is disconnected with new belt conveyor 17, and the vulcanization of the both ends of new belt conveyor 17 is fixedly connected.
The utility model saves a large amount of human and material resources, reduces working strength, and the replacement belt time is short, efficient, behaviour Make convenient and efficient, belt downtime is short, is conducive to being smoothed out for production.Belt is under the guiding of belt guide device, energy New belt conveyor 17 is completed while enough old belt conveyor 18 is pulled out, shortens whole belt replacing time.Replace one 325 meters of belt needs the worker for putting into Liang Ge teams and groups that it is more than hour to work 20, using this practicality by the way of traditional After the novel Belt Conveying equipment with belt replacing device, it is only necessary to which the worker for putting into 1 teams and groups works 15 hours, energy Belt replacing is good.Meanwhile the Belt Conveying equipment with belt replacing device of the utility model can also be same as other belts It replaces.
Above description is the detailed description for the preferable possible embodiments of the utility model, but embodiment is not limited to The patent claim of the utility model, the same changes or modifications completed under the technical spirit suggested by all the utility model Change, should all belong to the covered the scope of the claims of the utility model.

Claims (6)

1. a kind of Belt Conveying equipment with belt replacing device, including rack, belt conveyor and roller devices, the idler wheel dress It sets including two idler wheels, the idler wheel is mounted side by side in the rack, and the idler wheel of the roller devices is passed by belt conveyor Dynamic connection, it is characterised in that:Being arranged side by side before and after the conveying direction of belt conveyor described in the rack upper edge has the first belt to draw Device and the second belt guide device are led, the first belt guide device includes vertically being vertically set on the rack both sides First fixed frame, is provided with the first roller bearing and the second roller bearing between first fixed frame, and first roller bearing is located at described the Below two roller bearings, first roller bearing and the second roller bearing be arranged the top of the belt conveyor and with the length of the belt conveyor It is vertical to spend direction;The second belt guide device includes the second fixed frame for being vertically vertically set on the rack both sides, institute It states and is provided with third roller bearing and the 4th roller bearing between the second fixed frame, the third roller bearing is located at below the 4th roller bearing, institute Third roller bearing and the 4th roller bearing is stated to be arranged in the top of the belt conveyor and vertical with the length direction of the belt conveyor.
2. a kind of Belt Conveying equipment with belt replacing device according to claim 1, it is characterised in that:The idler wheel Device includes driving roller, driven roller and driving roller driving motor, and the driving roller and the driven roller are pacified respectively Mounted in the both ends of the rack, the belt conveyor around being located on the driving roller and the driven roller, roll by the active Wheel drive motor connects with the driving roller and the driving roller is driven to rotate.
3. a kind of Belt Conveying equipment with belt replacing device according to claim 2, it is characterised in that:Described first The relatively described rack of belt guide device is provided with above the driven roller, the first belt guide device to be used for The belt winder of old belt conveyor is wound, the belt winder includes support roll bar, winder driving motor and two supports Frame, support frame as described above setting is wound on the support roll bar both ends, the support roll bar to be provided with for connecting old conveying skin The length of the short belt of band, the short belt is 5-10 meters, and the winder driving motor and one end of the support roll bar connect It connects and the support roll bar is driven to rotate.
4. a kind of Belt Conveying equipment with belt replacing device according to claim 1, it is characterised in that:Described first Belt guide device and the second belt guide device are at a distance of 1-2 meters.
5. a kind of Belt Conveying equipment with belt replacing device according to claim 1, it is characterised in that:The conveying Belt is 100-350 meters long.
6. a kind of Belt Conveying equipment with belt replacing device according to claim 1, it is characterised in that:Described first Fixed frame and the second fixed frame are respectively welded in the rack, between first fixed frame and the rack, described second It is welded with reinforcing rib between fixed frame and the rack.
CN201721509165.7U 2017-11-13 2017-11-13 A kind of Belt Conveying equipment with belt replacing device Active CN207917807U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721509165.7U CN207917807U (en) 2017-11-13 2017-11-13 A kind of Belt Conveying equipment with belt replacing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721509165.7U CN207917807U (en) 2017-11-13 2017-11-13 A kind of Belt Conveying equipment with belt replacing device

Publications (1)

Publication Number Publication Date
CN207917807U true CN207917807U (en) 2018-09-28

Family

ID=63612916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721509165.7U Active CN207917807U (en) 2017-11-13 2017-11-13 A kind of Belt Conveying equipment with belt replacing device

Country Status (1)

Country Link
CN (1) CN207917807U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115092603A (en) * 2022-08-05 2022-09-23 安徽省亚邦工程科技有限公司 Quick-detachable and adjustable material carrying equipment of belt conveyor and transportation method of material carrying equipment

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115092603A (en) * 2022-08-05 2022-09-23 安徽省亚邦工程科技有限公司 Quick-detachable and adjustable material carrying equipment of belt conveyor and transportation method of material carrying equipment
CN115092603B (en) * 2022-08-05 2024-05-24 中科亚邦科技集团有限公司 Easily-detachable and adjustable belt conveyor material conveying equipment and conveying method thereof

Similar Documents

Publication Publication Date Title
CN102278131B (en) Duct piece conveying device for shield construction of tunnel with diameter of less than 6 meters and operation method
CN104773564A (en) Automatic edge-sealing adhesive tape pasting system for large-size roll material
CN101934915A (en) Method for replacing rubber belt by long-distance steel cord rubber belt conveyor
CN207917807U (en) A kind of Belt Conveying equipment with belt replacing device
CN107416426A (en) A kind of rock brocade feeding device
CN113021699A (en) Method for quickly replacing adhesive tape of long-distance large-bandwidth mining belt conveyor for ten million-ton mine
CN204607179U (en) A kind of large-scale coiled strip seals limit tape system automatically
CN103449115B (en) The collapsible fuselage of belt conveyer and extension band type conveyor
CN102794623A (en) Belt collecting device for long belt conveyor and method of application thereof
CN102031735B (en) Method and device for exchanging roller batteries
CN206457041U (en) A kind of belt crimpmg device
CN206358764U (en) A kind of storage belting for continuous conveyor system
CN206751054U (en) For conveying the conveying device of continuous band
CN107032052B (en) Seedling tray conveyor for long-distance non-upright-column seedling bed
CN205346440U (en) Coiling machine is cut to infantees
CN210140225U (en) Conveyor
CN107500017A (en) A kind of zero tension force pine cloth machine
CN208456591U (en) A kind of the Towing Device of Tunneller
CN205932596U (en) A belt winding and unwinding devices for belt conveyor
CN201254385Y (en) Roller conveying apparatus for belt conveyor maintenance
CN211168676U (en) Hanging belt type conveyor
CN212638906U (en) Carrier roller carrying device and conveying device of inclined-angle belt conveyor
CN108190361A (en) Intermediate turning extensible belt conveyor is transported under a kind of high-power high inclination-angle of long range
CN211642792U (en) Anchoring agent product traction device