CN207893257U - A kind of combined type pipeline for construction site is arranged holder temporarily - Google Patents

A kind of combined type pipeline for construction site is arranged holder temporarily Download PDF

Info

Publication number
CN207893257U
CN207893257U CN201820176426.6U CN201820176426U CN207893257U CN 207893257 U CN207893257 U CN 207893257U CN 201820176426 U CN201820176426 U CN 201820176426U CN 207893257 U CN207893257 U CN 207893257U
Authority
CN
China
Prior art keywords
holder
construction
shaped card
combined type
type pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820176426.6U
Other languages
Chinese (zh)
Inventor
王健
叶建
樊志兵
陈小明
刘胜
崔文鹏
黄晓程
杨菊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201820176426.6U priority Critical patent/CN207893257U/en
Application granted granted Critical
Publication of CN207893257U publication Critical patent/CN207893257U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Supports For Pipes And Cables (AREA)

Abstract

It arranges temporarily holder the utility model discloses a kind of combined type pipeline for construction site, including rack body, expansion bolt, U-shaped card hoop, crane span structure, the rack body is welded by bracket upright post, rack beam and connect base, the connect base is fixed on field ground by expansion bolt, rack body is layered structure, bottom sets fireproof water tube by U-shaped card spider, middle layer passes through U-shaped card hoop erection construction water feed pipe, upper layer is equipped with crane span structure, is used for erection construction cable.The utility model is when in use, it can be according to the actual conditions of construction site and height, width dimensions and the number of plies of live number of lines and diameter dimension flexible design holder, it is equipped with the expansion bolt, U-shaped card hoop and crane span structure of dimension again, the combination that holder can be completed is built, overall structure is simple, it is easily manufactured, the construction pipeline arranged including fireproof water tube, construction water feed pipe and construction cable temporarily is can be used to, convenient for the management and maintenance at scene.

Description

A kind of combined type pipeline for construction site is arranged holder temporarily
Technical field
The utility model belongs to technical field of construction equipment, and in particular to a kind of combined type pipeline for construction site faces When arrange holder.
Background technology
When plain cloth is set at the construction field (site), the interim fireproof water tube in most of construction site, construction water feed pipe, construction electricity The interim water power such as line and cable and fire line dispersed placement and be mostly it is embedded on construction ground in, be not easy to mark, management and It safeguards, interim pipeline is easily dug disconnected in work progress, digs maintenance difficult of having no progeny, or even cause safety accident.
The interim water power arrangement holder of combined type that construction site plain cloth is set can by the main interim water power of construction site and Fire line integrative rack idle discharge cloth in smaller place is managed collectively and is safeguarded, effective solution construction site is all kinds of The problems such as interim pipeline dispersed placement is easy to be damaged, inconvenience management, advantageously ensures that construction site pipeline safety, improves pipeline Arrangement is normative.
Invention content
The purpose of this utility model is that overcome drawbacks described above existing in the prior art, provides one kind and is used for The combined type pipeline of construction site is arranged holder temporarily, the main interim pipeline in integrative rack idle discharge cloth construction site, in order to applying The interim pipeline in work scene is concentrated, effectively manages and safeguard.
The utility model is achieved through the following technical solutions above-mentioned purpose, a kind of combined type pipeline for construction site Interim arrangement holder, including rack body, expansion bolt, U-shaped card hoop and crane span structure, the rack body is by bracket upright post, holder Crossbeam and connect base are welded, and the connect base is fixed on field ground by expansion bolt, and rack body is layering Structure, bottom set fireproof water tube by U-shaped card spider, and middle layer passes through U-shaped card hoop erection construction water feed pipe, upper layer peace Equipped with crane span structure, it to be used for erection construction cable.
In above-mentioned technical proposal, the bracket upright post, rack beam, connect base are L50 × 3mm angle steel, after welding Holder is in rectangular configuration, wide 500mm, high 900mm, and short transverse is divided into three layers, bottom overhead is liftoff 200mm, remaining is per floor height 300mm, height, width dimensions and the number of plies of holder can according to the actual conditions of construction site, the type of pipeline, quantity and Diameter carries out flexible design.
In general, can reach the above technical solutions conceived by the present invention are compared with the prior art, with Lower advantageous effect:
1, holder is integrally welded using standard angle iron, simple in structure, easily manufactured, is equipped with U-shaped card hoop, expansion bolt Deng the common component in scene, you can be applied in combination, and scrap rear recyclable, concentration arrangement construction site mainly interim water power and fire-fighting Pipeline is convenient for field management and maintenance;
2, the number of plies in the height of holder, width dimensions and short transverse can be according to Different field pipeline type, number Amount carries out flexible design, meets the requirement that construction site uses temporarily.
Description of the drawings
Specific embodiment of the present utility model is further described in detail below in conjunction with the accompanying drawings, wherein:
Fig. 1 is that a kind of combined type pipeline for construction site of the utility model is arranged the front view of holder temporarily;
Fig. 2 is that the utility model combined type pipeline is arranged the left side view of holder temporarily;
In figure:1- bracket upright posts, 2- rack beams, 3- connect bases, 4- expansion bolts, 5-U type clips, 6- fire fighting supplies Pipe, 7- construction water feed pipes, 8- crane span structures, 9- construction cables.
Specific implementation mode
As depicted in figs. 1 and 2, be a kind of combined type pipeline for construction site arrange temporarily holder front view and a left side Side view, including rack body, expansion bolt 4, U-shaped card hoop 5 and crane span structure 8, the rack body are horizontal by bracket upright post 1, holder Beam 2 and connect base 3 are welded, and the connect base 3 is fixed on field ground by expansion bolt 4, and rack body is point Layer structure, bottom set up fireproof water tube 6 by U-shaped card hoop 5, middle layer by U-shaped card hoop 5 erection construction water feed pipe 7, Upper layer is equipped with crane span structure 8, is used for erection construction cable 9.
As a kind of technical optimization scheme of the utility model, the bracket upright post 1, rack beam 2, connect base 3 are L50 × 3mm angle steel, the holder after welding is in rectangular configuration, wide 500mm, high 900mm, and short transverse is divided into three layers, bottom overhead Liftoff 200mm, per floor height 300mm, height, width dimensions and the number of plies of holder can be according to the practical feelings of construction site for remaining Condition, type, quantity and the diameter of pipeline carry out flexible design.
When the utility model is used, can be flexible according to the actual conditions of construction and live number of lines and diameter dimension The height of holder, the length dimension of width dimensions namely bracket upright post 1 and rack beam 2 are designed, according still further to the class of live pipeline The number of plies of type rationale design of scaffolds namely the number of rack beam 2 select the connect base 3 and bracket upright post for having certain length 1, rack beam 2 welds, then is equipped with the expansion bolt 4, U-shaped card hoop 5 and crane span structure 8 of dimension, you can building for holder is completed, The construction pipeline arranged including fireproof water tube 6, construction water feed pipe 7 and construction cable 9 temporarily is can be used to, convenient for existing The management and maintenance of field.
As it will be easily appreciated by one skilled in the art that the above is only the preferred embodiment of the utility model only, not For limiting the utility model, any modification made within the spirit and principle of the present invention, equivalent replacement and change Into etc., it should be included within the scope of protection of this utility model.

Claims (5)

  1. The holder 1. a kind of combined type pipeline for construction site is arranged temporarily, including rack body, expansion bolt(4), U-shaped card Hoop(5), crane span structure(8), the rack body is by bracket upright post(1), rack beam(2)And connect base(3)It is welded, it is described Connect base(3)Pass through expansion bolt(4)It is fixed on field ground, it is characterised in that:Rack body is layered structure, and bottom is logical Cross U-shaped card hoop(5)Set up fireproof water tube(6), middle layer passes through U-shaped card hoop(5)Erection construction water feed pipe(7), upper layer Crane span structure is installed(8), it is used for erection construction cable(9).
  2. The holder 2. combined type pipeline according to claim 1 is arranged temporarily, it is characterised in that:The bracket upright post(1)For L50 × 3mm angle steel, length 900mm.
  3. The holder 3. combined type pipeline according to claim 1 is arranged temporarily, it is characterised in that:The rack beam(2)For L50 × 3mm angle steel, length 500mm.
  4. The holder 4. combined type pipeline according to claim 3 is arranged temporarily, it is characterised in that:The rack beam(2)Have Three, bottom rack beam(2)Distance from the ground is 200mm, remaining every layer spacing is 300mm.
  5. The holder 5. combined type pipeline according to claim 1 is arranged temporarily, it is characterised in that:The connect base(3)For L50 × 3mm angle steel, length 250mm.
CN201820176426.6U 2018-02-01 2018-02-01 A kind of combined type pipeline for construction site is arranged holder temporarily Active CN207893257U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820176426.6U CN207893257U (en) 2018-02-01 2018-02-01 A kind of combined type pipeline for construction site is arranged holder temporarily

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820176426.6U CN207893257U (en) 2018-02-01 2018-02-01 A kind of combined type pipeline for construction site is arranged holder temporarily

Publications (1)

Publication Number Publication Date
CN207893257U true CN207893257U (en) 2018-09-21

Family

ID=63542819

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820176426.6U Active CN207893257U (en) 2018-02-01 2018-02-01 A kind of combined type pipeline for construction site is arranged holder temporarily

Country Status (1)

Country Link
CN (1) CN207893257U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109378781A (en) * 2018-11-12 2019-02-22 北京国电龙源环保工程有限公司 A kind of high-temp liquid pipe and cable testing bridge isolating and protecting system and its erection method
CN111895184A (en) * 2020-07-16 2020-11-06 五冶集团上海有限公司 Comprehensive pipeline supporting and hanging frame in limited space

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109378781A (en) * 2018-11-12 2019-02-22 北京国电龙源环保工程有限公司 A kind of high-temp liquid pipe and cable testing bridge isolating and protecting system and its erection method
CN109378781B (en) * 2018-11-12 2023-08-08 国能龙源环保有限公司 High-temperature liquid pipe and cable bridge isolation protection system and supporting method thereof
CN111895184A (en) * 2020-07-16 2020-11-06 五冶集团上海有限公司 Comprehensive pipeline supporting and hanging frame in limited space

Similar Documents

Publication Publication Date Title
CN204530433U (en) Steel pipe pile foundation combination steel trestle
CN207893257U (en) A kind of combined type pipeline for construction site is arranged holder temporarily
CN206971689U (en) Support operating platform that is detachable and recycling
CN109780330A (en) The fixed bracket of multi-pipeline and its construction method
CN206816265U (en) A kind of air channel arch combined retaining structure
CN206873495U (en) A kind of Portable piping lane side wall formwork jumbo
CN202925957U (en) Instrumentalized extension-type safety protection shed
CN206972259U (en) A kind of movable guard rail of hydraulic pressure inverted arch trestle
CN206346754U (en) Tunnel excavation support chassis
CN206093192U (en) Novel comprehensive pipe support
CN106504674A (en) Billboard
CN204311457U (en) A kind of Metro station excavation excavation construction composite retaining structure system
CN204213482U (en) A kind of for the cable bearer in cable inspection-pit
CN203499259U (en) Tool type cantilevered unloading platform
CN205472340U (en) People's passageway on instrument formula tower crane
CN202577162U (en) Combined-type steel pipe bracket
CN207048356U (en) Building foundation pit construction safety barrier
CN107217685A (en) A kind of Portable piping lane side wall formwork jumbo
CN206279539U (en) Assembled equalizer bar foundation pit support system
CN207277373U (en) A kind of riding track being used in foundation pit construction
CN206363731U (en) Billboard
CN206570703U (en) A kind of working job platform of pier stud reinforcing bar
CN104563554A (en) Combined lattice beam for integrated framework of 500kV transformer substation
CN205955150U (en) Instrument formula windrow operation integration platform
CN219912019U (en) Pipeline bracket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant