CN207048356U CN201720690631.XU CN201720690631U CN207048356U CN 207048356 U CN207048356 U CN 207048356U CN 201720690631 U CN201720690631 U CN 201720690631U CN 207048356 U CN207048356 U CN 207048356U
Authority
CN
China
Prior art keywords
ring girder
foundation ring
foundation
along
guardrail
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720690631.XU
Other languages
Chinese (zh)
Inventor
胡二永
王艳民
范建威
杨振伟
任宏飞
张飞
马建坡
张彦峰
郑远征
邢付强
周成军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720690631.XU priority Critical patent/CN207048356U/en
Application granted granted Critical
Publication of CN207048356U publication Critical patent/CN207048356U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

Building foundation pit construction safety barrier, the foundation ring girder that armored concrete pours is used including some hounds, the guardrail body of some pieces of platy structures and along the ground on foundation ditch periphery, some horizontally disposed connecting bolts are embedded with foundation ring girder, connecting bolt is uniformly arranged along the length direction of foundation ring girder, and the inner of connecting bolt protrudes from foundation ring girder medial surface;On the outside of foundation ring girder upper surface support slot is prefabricated with along the length direction of foundation ring girder, guardrail body lower side is along in support slot, the side of adjacent two pieces of guardrail bodies is connected along docking between guardrail body inner surface top and connecting bolt by described hound.The utility model is simple in construction, easy for installation, stability is strong, and wind resistance is good, and the scope of application is big, as long as ensuring that foundation ring girder upper surface keeps smooth and is applicable to set guardrail on uneven ground.

Description

Building foundation pit construction safety barrier
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of building foundation pit construction safety barrier.
Background technology
The foundation ditch of construction needs to set guardrail around foundation ditch in work progress, and existing guardrail includes guardrail sheet Body and support feet, guardrail body are the platy structure of rectangle, and support feet is fixedly connected with guardrail body and support feet stands in ground On face.In use, multiple guardrails are sequentially connected with along the edge of foundation ditch, using iron wire binding connection between two neighboring guardrail. It can only be provisional, less stable using the foundation ditch guardrail of this structure, run into strong wind and be easy for being blown over and fall down to the ground and damage, So as to have influence on the security that guardrail should play.
Utility model content
The utility model is in order to solve weak point of the prior art, there is provided a kind of stability is good, is easy to dismounting, safety Highly reliable building foundation pit construction safety barrier.
In order to solve the above technical problems, the utility model adopts the following technical scheme that:Building foundation pit construction safety barrier, Poured including some hounds, the guardrail body of some pieces of platy structures and along the ground on foundation ditch periphery using armored concrete Foundation ring girder, using foundation ring girder adjacent to foundation ditch one side as inner side, one side of the foundation ring girder away from foundation ditch is outside, base Some horizontally disposed connecting bolts are embedded with plinth collar tie beam, connecting bolt is uniform along the length direction of foundation ring girder Set, the inner of connecting bolt protrudes from foundation ring girder medial surface;
Support slot is prefabricated with along the length direction of foundation ring girder on the outside of foundation ring girder upper surface, and guardrail body lower side is along position In in support slot, the side of adjacent two pieces of guardrail bodies is fixedly connected with fixed plate along docking, guardrail body inner surface top, The upper end of hound is fixedly connected with upper junction plate, and the lower end of hound is fixedly connected with lower connecting plate, upper junction plate and fixation Correspond to inside and outside plate and connected by fastening bolt, mounting hole is provided with lower connecting plate, connecting bolt is inner to pass through mounting hole simultaneously Lower connecting plate is contacted with foundation ring girder medial surface top pressure by clamp nut.
Some locating dowels being arranged in vertical, length side of the locating dowel along foundation ring girder are embedded with foundation ring girder To being uniformly arranged, locating dowel upper end protrudes from foundation ring girder, and the bottom of guardrail body medial surface is vertically fixedly connected with Locating sleeve, locating dowel are plugged in locating sleeve.
Locating dowel bottom is fixedly connected with some first reinforcements being embedded in foundation ring girder, and connecting bolt outer end is consolidated Surely some second reinforcements being embedded in foundation ring girder are connected with.
Using above-mentioned technical proposal, the utility model pours basic circle on the ground on foundation ditch periphery using armored concrete Beam, guardrail body are arranged on foundation ring girder, and foundation ring girder has extremely strong stability, and guardrail body arranges cloth along support slot Put, locating sleeve coordinates with locating dowel grafting, limits position of the guardrail body on foundation ring girder, and uses hound by guardrail Body support is firm.Bolted removably is respectively adopted by guardrail body and foundation ring girder in hound top and bottom Connect as one, improve wind resistance, and be easy to dismount, the components such as guardrail body, hound, locating sleeve is repeatedly weighed It is multiple to use.First reinforcement and the second reinforcement can ensure that locating dowel and connecting bolt are securely connected as one with foundation ring girder Body.
In summary, the utility model is simple in construction, easy for installation, stability is strong, and wind resistance is good, and the scope of application is big, As long as ensure that foundation ring girder upper surface keeps smooth and is applicable to set guardrail on uneven ground.
Brief description of the drawings
Fig. 1 is structural representation of the present utility model;
Fig. 2 is Fig. 1 right view.
Embodiment
As depicted in figs. 1 and 2, building foundation pit construction safety barrier of the present utility model, including some hounds 1, The guardrail body 2 of some pieces of platy structures and the foundation ring girder 3 that is poured using armored concrete of ground 14 along foundation ditch periphery, with Foundation ring girder 3 is inner side adjacent to the one side of foundation ditch, and one side of the foundation ring girder 3 away from foundation ditch is outside, pre- in foundation ring girder 3 Some horizontally disposed connecting bolts 4 are embedded with, length direction of the connecting bolt 4 along foundation ring girder 3 is uniformly arranged, even The inner of connecting bolt 4 protrudes from the medial surface of foundation ring girder 3.
On the outside of the upper surface of foundation ring girder 3 support slot, the lower side of guardrail body 2 are prefabricated with along the length direction of foundation ring girder 3 Along in support slot, along docking, the inner surface top of guardrail body 2 is fixedly connected with for the side of adjacent two pieces of guardrail bodies 2 Fixed plate 5, the upper end of hound 1 are fixedly connected with upper junction plate 6, and the lower end of hound 1 is fixedly connected with lower connecting plate 7, on Connecting plate 6 is corresponding with inside and outside fixed plate 5 and is connected by fastening bolt 8, and mounting hole, connecting bolt 4 are provided with lower connecting plate 7 The inner with foundation ring girder 3 medial surface top pressure is contacted lower connecting plate 7 through mounting hole and by clamp nut 9.
It is embedded with some locating dowels being arranged in vertical 10 in foundation ring girder 3, locating dowel 10 is along foundation ring girder 3 Length direction is uniformly arranged, and the upper end of locating dowel 10 protrudes from foundation ring girder 3, and the bottom of the medial surface of guardrail body 2 is vertically Locating sleeve 11 is fixedly connected with, locating dowel 10 is plugged in locating sleeve 11.
The bottom of locating dowel 10 is fixedly connected with some first reinforcements 12 being embedded in foundation ring girder 3, connecting bolt 4 Outer end is fixedly connected with some second reinforcements 13 being embedded in foundation ring girder 3.
The utility model pours foundation ring girder 3 on the ground 14 on foundation ditch periphery using armored concrete, and guardrail body 2 is set On foundation ring girder 3, foundation ring girder 3 has extremely strong stability, and guardrail body 2 is along support slot arranged, locating sleeve 11 Coordinate with the grafting of locating dowel 10, limit 2 position on foundation ring girder 3 of guardrail body, and use hound 1 by guardrail body 2 It is firm to support.Bolted removably is respectively adopted by guardrail body 2 and foundation ring girder 3 in the top and bottom of hound 1 Connect as one, improve wind resistance, and be easy to dismount, make the components such as guardrail body 2, hound 1, locating sleeve 11 can be more Secondary reuse.First reinforcement 12 and the second reinforcement 13 can ensure that locating dowel 10 and connecting bolt 4 securely enclose with basis Beam 3 connects as one.
The present embodiment not makees any formal limitation, every foundation to shape of the present utility model, material, structure etc. Any simple modification, equivalent change and modification that the technical essence of the utility model is made to above example, belongs to this reality With the protection domain of new technique scheme.

Claims (3)

1. building foundation pit construction safety barrier, it is characterised in that:Guardrail including some hounds, some pieces of platy structures Body and use the foundation ring girder that pours of armored concrete, the one side with foundation ring girder adjacent to foundation ditch along the ground on foundation ditch periphery For inner side, one side of the foundation ring girder away from foundation ditch is outside, be embedded with foundation ring girder some it is horizontally disposed Connecting bolt, connecting bolt are uniformly arranged along the length direction of foundation ring girder, and the inner of connecting bolt is protruded from foundation ring girder Side;
Support slot is prefabricated with along the length direction of foundation ring girder on the outside of foundation ring girder upper surface, guardrail body lower side is along positioned at branch Support in groove, along docking, guardrail body inner surface top is fixedly connected with fixed plate, diagonal brace for the side of adjacent two pieces of guardrail bodies The upper end of bar is fixedly connected with upper junction plate, and the lower end of hound is fixedly connected with lower connecting plate, upper junction plate with fixed plate Outer correspondence is simultaneously connected by fastening bolt, and mounting hole is provided with lower connecting plate, and connecting bolt is inner to be passed through mounting hole and pass through Clamp nut contacts lower connecting plate with foundation ring girder medial surface top pressure.
2. building foundation pit construction safety barrier according to claim 1, it is characterised in that:If it is embedded with foundation ring girder The locating dowel that dry root is arranged in vertical, locating dowel are uniformly arranged along the length direction of foundation ring girder, locating dowel upper end protrusion In foundation ring girder, the bottom of guardrail body medial surface is vertically fixedly connected with locating sleeve, and locating dowel is plugged in positioning In sleeve pipe.
3. building foundation pit construction safety barrier according to claim 2, it is characterised in that:Locating dowel bottom is fixedly connected There are some first reinforcements being embedded in foundation ring girder, connecting bolt outer end, which is fixedly connected with, to be embedded in foundation ring girder Some second reinforcements.
CN201720690631.XU 2017-06-14 2017-06-14 Building foundation pit construction safety barrier Expired - Fee Related CN207048356U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720690631.XU CN207048356U (en) 2017-06-14 2017-06-14 Building foundation pit construction safety barrier

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720690631.XU CN207048356U (en) 2017-06-14 2017-06-14 Building foundation pit construction safety barrier

Publications (1)

Publication Number Publication Date
CN207048356U true CN207048356U (en) 2018-02-27

Family

ID=61493749

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720690631.XU Expired - Fee Related CN207048356U (en) 2017-06-14 2017-06-14 Building foundation pit construction safety barrier

Country Status (1)

Country Link
CN (1) CN207048356U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115262955A (en) * 2022-08-23 2022-11-01 中国十七冶集团有限公司 Construction method of profile steel post-cast strip independent support system
CN115323858A (en) * 2022-08-30 2022-11-11 中国十七冶集团有限公司 Reinforcing construction method for section steel combined disc buckling frame ground garage top plate roadway

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115262955A (en) * 2022-08-23 2022-11-01 中国十七冶集团有限公司 Construction method of profile steel post-cast strip independent support system
CN115323858A (en) * 2022-08-30 2022-11-11 中国十七冶集团有限公司 Reinforcing construction method for section steel combined disc buckling frame ground garage top plate roadway

Similar Documents

Publication Publication Date Title
CN102704491B (en) Sectional steel and reinforced concrete beam combination foundation pit supporting protection surrounding purlin and construction method of purlin
CN207436373U (en) A kind of assembled is bolted steel core concrete column entirely
CN205502577U (en) A thimble assembly for buried sleeve one shot forming construction in piping shaft
CN207048356U (en) Building foundation pit construction safety barrier
KR101319784B1 (en) Reinforcement structure of steel tower and reinforcement method thereof
CN106545111A (en) For the prefabricated constructional column at body of wall external corner, rammed earth wall construction and its construction method
CN103469735B (en) The mounting method of curve ultrahigh hollow column plate type pier top solid section template
CN102733398B (en) Combined recyclable supporting upright post in foundation pit support
CN105544559B (en) The structure and method of pattern foundation pit supporting structure are carried out using prefabricated components
CN202969387U (en) Pile hole lattice column locating device
CN205637641U (en) Limit safety protection warning rail is faced in construction
CN204023422U (en) A kind of assembling Coping Construction operating platform
CN206530144U (en) Translation component building fencing device for construction
CN102418414A (en) Long-slab-span prefabricated beam floor formwork system
CN204266111U (en) Deep foundation ditch steel trestle
CN203429557U (en) Anchor pole back beam applied to underpass bridge jacking construction
CN203393661U (en) Anti-collision guardrail device of medial strip
CN207277373U (en) A kind of riding track being used in foundation pit construction
CN208310277U (en) A kind of newly-increased floor reinforcing frame trestle and foundation connection structure
CN106869515A (en) The dismountable top plate supporting device of regularization
CN201671105U (en) Framed tower foundation embedded part
CN206971228U (en) A kind of double-row pile foundation pit support structure
CN207392189U (en) Unilateral template structure is consolidated to assembled stagnant water screw rod
CN206273897U (en) A kind of recyclable foundation pit enclosure structure
CN205558302U (en) T shaped steel muscle adds builder's temporary shed

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180227

CF01 Termination of patent right due to non-payment of annual fee