CN207879048U - A kind of pre- protection diamond shape silk screen - Google Patents

A kind of pre- protection diamond shape silk screen Download PDF

Info

Publication number
CN207879048U
CN207879048U CN201820232031.3U CN201820232031U CN207879048U CN 207879048 U CN207879048 U CN 207879048U CN 201820232031 U CN201820232031 U CN 201820232031U CN 207879048 U CN207879048 U CN 207879048U
Authority
CN
China
Prior art keywords
rope
fixed
tie point
head
connecting plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820232031.3U
Other languages
Chinese (zh)
Inventor
王策
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anping Tianmai Wire Mesh Products Co Ltd
Original Assignee
Anping Tianmai Wire Mesh Products Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anping Tianmai Wire Mesh Products Co Ltd filed Critical Anping Tianmai Wire Mesh Products Co Ltd
Priority to CN201820232031.3U priority Critical patent/CN207879048U/en
Application granted granted Critical
Publication of CN207879048U publication Critical patent/CN207879048U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
  • Emergency Lowering Means (AREA)

Abstract

The utility model discloses a kind of pre- protection diamond shape silk screens, the interception net surface is arranged to make up the bearing net of diamond-shaped meshes by more head-rope transverse and longitudinals, the upper and lower ends of the fixed link are equipped with connecting plate, the fixed link both sides are equipped with mounting plate, the connecting plate and mounting plate are bolted, the head-rope transverse and longitudinal intersection constitutes the cross tie point of several cross shapes, the cross tie point is equipped with fixed structure, buffer structure is equipped in the mounting plate and connecting plate, the load-bearing network edge is mounted on by buffer structure in fixed link and connecting plate.Protection network provided by the utility model is improved on the basis of existing protecting screen structure, by one layer of bearing net of reinforcing on longitudinal steel wire, effectively improves whole intensity, and the structure of this protection network is simple, easy to process, can be used for a long time.When being impacted, protection network is integrally unlikely to deform under the action of buffer structure, is improved protection effect, has been ensured the safety used.

Description

A kind of pre- protection diamond shape silk screen
Technical field
The utility model is related to protection network technical field, more particularly to a kind of pre- protection diamond shape silk screen.
Background technology
Preceding protection network be widely used in place of military importance, prison, detention house, government bodies, bank and residence district enclosure wall, The protection in the places such as private residence, wall of the villa door and window, highway, railway guardrail, boundary line, mainly for preventing climbing Effect.
Current protection network includes mainly the steel wire of the steel wire and longitudinal (vertical direction) of more transverse directions (in horizontal direction) It is formed by fixedly connecting the reticular structure of single layer, the fixation with steel wire of more transverse directions is in the same side of more longitudinal steel wires, wherein vertical The steel wire in direction primarily serves the effect of support transverse steel wire, to increase the integral strength of protection network after molding.Through long-term real Verification is trampled, the intensity of the protection network itself of the structure is relatively low, when being impacted, is used for a long time that back protective net is integrally pliable sells off Shape influences protection effect;Tie point between the steel wire of existing double-layer structure silk screen is connected by a snap, this kind of structure is easy It falls off, without flexibility, insecure and not readily transportable, by the way of being fixedly connected, structure does not buffer work on silk screen four side With, and steel wire rope does not have tension, and when receiving instantaneous weight, steel wire rope is easy to shake off, and safety is not high.
Utility model content
It is mentioned above in the background art to solve the purpose of this utility model is to provide a kind of pre- protection diamond shape silk screen Problem.
To achieve the above object, the utility model provides the following technical solutions:
A kind of pre- protection diamond shape silk screen, including several suture ropes mutually stagger the interception for connecting and composing that mesh is hexagon Net, the intercept net are connected and are lengthened by fixed link, are provided with the pedestal for installation below fixed link, and the four of the intercept net Week is equipped with several supporting ropes, which is arranged to make up the bearing net of diamond-shaped meshes by more head-rope transverse and longitudinals, described solid The upper and lower ends of fixed pole are equipped with connecting plate, and the fixed link both sides are equipped with mounting plate, and the connecting plate and mounting plate pass through bolt Connection, the head-rope transverse and longitudinal intersection constitute the cross tie point of several cross shapes, and the cross tie point, which is equipped with, to be fixed Buffer structure is equipped in structure, the mounting plate and connecting plate, the load-bearing network edge is mounted on fixed link by buffer structure On connecting plate.Above-mentioned bearing net is arranged in the outside of intercept net, and the mesh of intercept net is less than the mesh of bearing net, intercepts in this way Net can intercept the smaller cargo or falling rocks of size, and bearing net is then responsible for compensator or trimmer pressure and accepts pressure, Double-protection knot Structure enhances the integral strength of the silk screen.
Preferably, the fixed structure includes being made of the fixed hinge rope right-angled intersection of two transverse and longitudinal settings, the transverse direction Fixed hinge rope one ends wound in the left end of cross tie point, the other end of the fixed hinge rope passes through from cross tie point bottom surface And it is wrapped in the right end of cross tie point, similarly the one ends wound of longitudinal fixed hinge rope is in the upper end of cross tie point, The other end passes through from cross tie point bottom surface and is wrapped in the lower end of cross tie point, constitutes cross shape and fixes tie point Come.
The both ends of lateral fixed hinge rope are wrapped on the head-rope of same root transverse direction, and longitudinal fixed hinge rope is then wound On the head-rope of same root longitudinal direction, the overlapping mode of the fixed hinge rope of transverse and longitudinal is consistent with the overlapping mode of head-rope.
Preferably, the buffer structure includes the inner and outer tubes slide construction being nested together, the bullet with cushioning effect The positive stop end of spring and the structure tail end, said inner tube are sleeved in outer tube, and are being internally provided with spring, and the head-rope passes through interior Pipe, spring and outer tube are simultaneously equipped with positive stop end in tail end.One end that inner tube stretches into outer tube is equipped with block, and the diameter of the block is more than interior The overall diameter of pipe, one end which connect with inner tube are equipped with the rib to match with block, and inner tube is limited to outer by rib In pipe, contained spring is high-strength spring.The rib is integrally formed with outer tube, and block is integrally formed with inner ring, in this way its tension Intensity is larger.
Preferably, described outer tube one end is equipped with fixed plate, and the fixed plate tail end is equipped with extension, the outer tube, fixation Plate and extension are integrally formed, and are being internally provided with for the through-hole across head-rope, and the positive stop end is equipped with extension tail end, And head-rope is fixed on positive stop end.The periphery of fixed plate and extension is provided with reinforcing rib, in this way in load-bearing rope tension Under the action of, fixed plate is unlikely to deform, while several buffer structures go out the disperses force suffered by bearing net, also improve and hold The service life netted again.
Preferably, the mounting plate and connecting plate are internally provided with mounting groove, and the outer end of said inner tube is fixed in mounting groove On wall, and protective case is equipped on the mounting groove, the protective case is bolted in mounting groove.On the one hand protective case prevents in Portion's buffer structure is impaired, on the other hand also provides certain fixation dynamics.
Preferably, the diameter of the fixed hinge rope is far longer than the diameter of head-rope and suture rope, is relatively large in diameter, is not easy to earn It is de-.
Preferably, the head-rope and supporting rope are twisted by several steel wire ropes, and the suture rope is steel wire rope.
Compared with prior art, the utility model has the beneficial effects that:
1, protection network provided by the utility model is improved on the basis of existing protecting screen structure, by longitudinal steel wire One layer of bearing net of upper reinforcing, effectively improves whole intensity, and the structure of this protection network is simple, easy to process, Ke Yichang Phase is used.When being impacted, protection network is integrally unlikely to deform under the action of buffer structure, improves protection effect, is protected The safety used is hindered;
2, right-angled intersection connection of restricting is cut with scissors by fixed between the utility model silk screen, and fixed hinge rope is wrapped in head-rope On, such tie point is not easily to fall off, has larger flexibility, fixed effect is more preferably.
Description of the drawings
Fig. 1 is a kind of pre- protection diamond shape silk screen integral installation schematic diagram;
Fig. 2 is cross tie point structural schematic diagram;
Fig. 3 is buffer structure schematic diagram;
Fig. 4 is base construction schematic diagram.
In figure:1- fixed links, 2- connecting plates, 3- suture ropes, 4- head-ropes, 5- cross tie points, 6- supporting ropes, 7- bases Seat, 8- mounting plates, 81- mounting grooves, 82- inner tubes, 83- outer tubes, 84- springs, 85- positive stop ends, 9- fix hinge rope.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
Please refer to Fig.1-4, a kind of pre- protection diamond shape silk screen, including several sutures restrict and 3 mutually stagger and connect and compose mesh and be The intercept net of hexagon, the intercept net are connected and are lengthened by fixed link 1, and 1 lower section of fixed link is provided with the pedestal for installation 7, the intercept net is surrounded by several supporting ropes 6, which is arranged to make up rhombus net by more 4 transverse and longitudinals of head-rope The upper and lower ends of the bearing net in hole, the fixed link 1 are equipped with connecting plate 2, and 1 both sides of the fixed link are equipped with mounting plate 8, the company Fishplate bar 2 and mounting plate 8 are bolted, and the intersection of 4 transverse and longitudinal of the head-rope constitutes the cross tie point 5 of several cross shapes, The cross tie point 5 is equipped with fixed structure, and buffer structure, the load-bearing selvage are equipped in the mounting plate 8 and connecting plate 2 Edge is mounted on by buffer structure in fixed link 1 and connecting plate 2.Above-mentioned bearing net is arranged in the outside of intercept net, intercept net Mesh is less than the mesh of bearing net, and such intercept net can intercept the smaller cargo or falling rocks of size, and bearing net is then responsible for Compensator or trimmer pressure and undertaking pressure, Double-protection structure enhance the integral strength of the silk screen.
Preferably, the fixed structure includes being made of 9 right-angled intersections of fixed hinge rope of two transverse and longitudinal settings, the transverse direction Fixed hinge 9 one ends wounds of rope in the left end of cross tie point 5, the other end of the fixed hinge rope 9 is from 5 bottom surface of cross tie point The right end of cross tie point 5 is passed through and is wrapped in, similarly the one ends wound of longitudinal fixed hinge rope 9 is in cross tie point 5 Upper end, the other end passes through from 5 bottom surface of cross tie point and is wrapped in the lower end of cross tie point 5, and constituting cross shape will be even Contact is fixed up.
The both ends of lateral fixed hinge rope 9 are wrapped on the head-rope 4 of same root transverse direction, and longitudinal fixed hinge rope 9 is then It is wrapped on the head-rope 4 of same root longitudinal direction, the overlapping mode of the fixed hinge rope 9 of transverse and longitudinal is consistent with the overlapping mode of head-rope 4.
Preferably, the buffer structure includes 83 slide construction of the inner tube 82 being nested together and outer tube, has cushioning effect Spring 84 and the structure tail end positive stop end 85, said inner tube 82 is sleeved in outer tube 83, and is being internally provided with spring 84, described Head-rope 4 passes through inner tube 82, spring 84 and outer tube 83 and is equipped with positive stop end 85 in tail end.One end that inner tube 82 stretches into outer tube 83 is set There is block, the diameter of the block is more than the overall diameter of inner tube 82, and one end which connect with inner tube 82 is equipped with and block phase Matched rib, inner tube 82 are limited to by rib in outer tube 83, and contained spring 84 is high-strength spring 84.The rib and outer tube 83 are integrally formed, and block is integrally formed with inner ring, its tensile strength is larger in this way.
Preferably, 83 one end of the outer tube be equipped with fixed plate, the fixed plate tail end be equipped with extension, the outer tube 83, Fixed plate and extension are integrally formed, and are being internally provided with for the through-hole across head-rope 4, and the positive stop end 85, which is equipped with, to be extended Pipe tail end, and head-rope 4 is fixed on positive stop end 85.The periphery of fixed plate and extension is provided with reinforcing rib, exists in this way Under the action of 4 pulling force of head-rope, fixed plate is unlikely to deform, while several buffer structures go out the disperses force suffered by bearing net It goes, also improves the service life of bearing net.
Preferably, the mounting plate 8 and connecting plate 2 are internally provided with mounting groove 81, and the outer end of said inner tube 82 is fixed on peace On 81 inner wall of tankage, and protective case is equipped on the mounting groove 81, the protective case is bolted in mounting groove 81.Protective case On the one hand it prevents cushion inner structure impaired, on the other hand also provides certain fixation dynamics.
Preferably, the diameter of the fixed hinge rope 9 is far longer than the diameter of head-rope 4 and suture rope 3, is relatively large in diameter, no Easily shake off.
Preferably, the head-rope 4 and supporting rope 6 are twisted by several steel wire ropes, and the suture rope 3 is steel wire rope.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this practicality is new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing in the equivalent requirements of the claims will be fallen All changes in justice and range are embraced therein.Any reference numeral in claim should not be considered as limitation Involved claim.

Claims (7)

1. a kind of pre- protection diamond shape silk screen, including several sutures rope(3)Mutually stagger the interception for connecting and composing that mesh is hexagon Net, the intercept net are connected and are lengthened, fixed link by fixed link(1)Lower section is provided with the pedestal for installation(7), the interception Net is surrounded by several supporting ropes(6), it is characterised in that:The interception net surface is by more head-ropes(4)Transverse and longitudinal is arranged to make up The bearing net of diamond-shaped meshes, the fixed link(1)Upper and lower ends be equipped with connecting plate(2), the fixed link(1)Both sides are equipped with peace Loading board(8), the connecting plate(2)And mounting plate(8)It is bolted, the head-rope(4)Transverse and longitudinal intersection constitutes several ten The tie point of word shape, the cross tie point(5)It is equipped with fixed structure, the mounting plate(8)And connecting plate(2)Inside it is equipped with Buffer structure, the load-bearing network edge are mounted on fixed link by buffer structure(1)And connecting plate(2)On.
2. a kind of pre- protection diamond shape silk screen according to claim 1, it is characterised in that:The fixed structure includes by two The fixed hinge rope of transverse and longitudinal setting(9)Right-angled intersection is constituted, the lateral fixed hinge rope(9)One ends wound is in cross tie point (5)Left end, the fixed hinge rope(9)The other end from cross tie point(5)Bottom surface passes through and is wrapped in cross tie point(5) Right end, similarly longitudinal fixed hinge rope(9)One ends wound in cross tie point(5)Upper end, the other end is from cross Tie point(5)Bottom surface passes through and is wrapped in cross tie point(5)Lower end, constitute cross shape tie point is fixed up.
3. a kind of pre- protection diamond shape silk screen according to claim 1, it is characterised in that:The buffer structure includes being sleeved on one The inner tube risen(82)And outer tube(83)Slide construction, the spring with cushioning effect(84)With the positive stop end of the structure tail end (85), said inner tube(82)It is sleeved on outer tube(83)It is interior, and it is being internally provided with spring(84), the head-rope(4)Across inner tube (82), spring(84)And outer tube(83)And it is equipped with positive stop end in tail end(85).
4. a kind of pre- protection diamond shape silk screen according to claim 3, it is characterised in that:The outer tube(83)One end is equipped with solid Fixed board, the fixed plate tail end are equipped with extension, the outer tube(83), fixed plate and extension be integrally formed, and set in inside It is useful for across head-rope(4)Through-hole, the positive stop end(85)Equipped with extension tail end, and by head-rope(4)It is fixed on limit Position end(85)On.
5. a kind of pre- protection diamond shape silk screen according to claim 3, it is characterised in that:The mounting plate(8)And connecting plate (2)It is internally provided with mounting groove(81), said inner tube(82)Outer end be fixed on mounting groove(81)On inner wall, and in the mounting groove (81)It is equipped with protective case, the protective case is bolted on mounting groove(81)It is interior.
6. a kind of pre- protection diamond shape silk screen according to claim 2, it is characterised in that:The fixed hinge rope(9)Diameter It is far longer than head-rope(4)It restricts with suture(3)Diameter.
7. a kind of pre- protection diamond shape silk screen according to claim 1, it is characterised in that:The head-rope(4)And supporting rope (6)It is formed by several steel wire rope process, the suture rope(3)For steel wire rope.
CN201820232031.3U 2018-02-09 2018-02-09 A kind of pre- protection diamond shape silk screen Active CN207879048U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820232031.3U CN207879048U (en) 2018-02-09 2018-02-09 A kind of pre- protection diamond shape silk screen

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820232031.3U CN207879048U (en) 2018-02-09 2018-02-09 A kind of pre- protection diamond shape silk screen

Publications (1)

Publication Number Publication Date
CN207879048U true CN207879048U (en) 2018-09-18

Family

ID=63498293

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820232031.3U Active CN207879048U (en) 2018-02-09 2018-02-09 A kind of pre- protection diamond shape silk screen

Country Status (1)

Country Link
CN (1) CN207879048U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110164068A (en) * 2019-06-06 2019-08-23 南京派光智慧感知信息技术有限公司 A kind of stress detection guardrail

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110164068A (en) * 2019-06-06 2019-08-23 南京派光智慧感知信息技术有限公司 A kind of stress detection guardrail
CN110164068B (en) * 2019-06-06 2024-04-26 南京派光智慧感知信息技术有限公司 Stress detection guardrail

Similar Documents

Publication Publication Date Title
CN103306193B (en) Vertical beam falling-off prevention system
CN203546647U (en) Steel rope type highway protective mesh fence
CN205622045U (en) Can eliminate safety protection lightning rod that swirl drops
JP6518849B1 (en) Guard fence
JP2013217020A (en) Falling body protection device and reinforcing method therefor
CN207879048U (en) A kind of pre- protection diamond shape silk screen
CN104674686A (en) Side slope rockfall cushioning and protection system
KR20120083874A (en) Rockfall protection fence for distributing and absorbing impect energy
JP2018178480A (en) Protective fence
CN107974926B (en) Self-balancing bridge damping device that resets
JP5919098B2 (en) Protective fence
JP6775313B2 (en) Flying object protection barrier
CN112854253B (en) Flexible glass mesh rockfall protection system for small-particle-size rockfall protection and design method thereof
CN104594178A (en) Suspension bridge with high torsional rigidity
JP2006322321A (en) Fence preventing stone from falling
CN209369392U (en) A kind of safety protective net structure of construction
CN208632988U (en) Protective net
CN209114300U (en) The strong Cable-Stayed Bridge Structure of wind resistance
CN113863710B (en) Energy-consuming swing substructure and method for reinforcing existing building
US11180895B2 (en) Safety net
JP3350814B2 (en) Impact absorbing net and impact absorbing method
CN107288234A (en) The inexpensive modular earthquake-resistant structure thing of cylindrical shell building unit and its composition
NO325255B1 (en) Rod, especially for use as a road mast.
JP3198604U (en) Rock fall protection fence
CN201459604U (en) Cross-arm structure between main cables and suitable for construction of steel-box-girder suspension bridge

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant