CN207844260U - A kind of intelligence Production Scheduling System - Google Patents

A kind of intelligence Production Scheduling System Download PDF

Info

Publication number
CN207844260U
CN207844260U CN201820086631.3U CN201820086631U CN207844260U CN 207844260 U CN207844260 U CN 207844260U CN 201820086631 U CN201820086631 U CN 201820086631U CN 207844260 U CN207844260 U CN 207844260U
Authority
CN
China
Prior art keywords
band
lifting platform
pile
transfer module
separation assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820086631.3U
Other languages
Chinese (zh)
Inventor
徐强
徐龙平
向存林
熊恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Feng Qi Feng Printing Technology Shanghai Pty Ltd
Long Li De Ld Intelligent Technology Corp ltd
Original Assignee
Bin Printing Technology (shanghai) Co Ltd
LONG LI DE PACKAGING AND PRINTING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bin Printing Technology (shanghai) Co Ltd, LONG LI DE PACKAGING AND PRINTING Co Ltd filed Critical Bin Printing Technology (shanghai) Co Ltd
Priority to CN201820086631.3U priority Critical patent/CN207844260U/en
Application granted granted Critical
Publication of CN207844260U publication Critical patent/CN207844260U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to automated material separation and pre-stored technical field, and in particular to a kind of intelligence Production Scheduling System.This system includes disk pile separation assembly and storage band;The disk pile separation assembly includes charging band to band transfer module, lifting platform and the discharging band to band transfer module being sequentially connected along cardboard pile travel path;Have between lifting platform and charging band to band transfer module for pushing away paper baffle along vertical to the gap being put into;The memory block includes the storage band of the twice being arranged in juxtaposition or more, the material direction of travel of the material direction of travel parallel discs pile separation assembly of the storage band;Cross track is set between disk pile separation assembly and memory block;Placement feed ferry bus on cross track.The utility model has automation and produces the advantage that continuity degree is high, functional reliability is strong, construction is compact and simple and efficient to handle, it efficient can realize that the online of cardboard pile and pallet detaches and pre-stored operation, to promote the real work efficiency of subsequent handling.

Description

A kind of intelligence Production Scheduling System
Technical field
The utility model belongs to automated material separation and pre-stored technical field, and in particular to a kind of intelligent production tune Degree system.
Background technology
Corrugated board is also known as corrugated cardboard, is bonded by least one layer of corrugated paper and one layer of boxboard, has preferable Elasticity and extensibility.Corrugated board can support collision in by handling process and fall and fall because of high mechanical strength, be mainly used for Manufacture sandwich and delicate articles the packaging material of carton, carton.In process of production, by warehouse area transport Lai corrugated paper Plate needs on fitly pile to pallet, in order to subsequently carry out the printing processing of batch.Specifically, corrugated board supplied materials Later, need to move cardboard pile to printing machine platform by the disk that manually puts one's child in a boarding nursery, then by it is artificial a little bring up to printing machine namely life Producing line inlet.Artificial feeding mode labor intensity is big, while being also difficult to keep up with the productive temp of existing automatic production line, into And greatly constrain the production efficiency of existing production line.In addition, artificial feeding be difficult to ensure after cardboard pile discharging still in Under neat specification condition;Cause cardboard pile not neat after artificial feeding, will cardboard pile can not be successfully via processing district Printing machine import enters production line, can also influence actual production, these are all to compel technical problem to be solved.
Invention content
The purpose of the utility model is to overcome above-mentioned the deficiencies in the prior art, provide a kind of intelligence reasonable for structure and practical Change Production Scheduling System, has that automation and production continuity degree are high, functional reliability is strong, construction is compact and easy to operate Quick advantage efficient can realize that the online of cardboard pile and pallet detaches and pre-stored operation, to promote subsequent handling Real work efficiency.
To achieve the above object, the utility model uses following technical scheme:
A kind of intelligence Production Scheduling System, it is characterised in that:This system includes for detaching pallet and cardboard pile online Disk pile separation assembly and pre-stored so as in due course to the memory block of production line feeding for realizing cardboard pile;The Pan Duo points Include charging band to band transfer module, lifting platform and the discharging band to band transfer module being sequentially connected along cardboard pile travel path from component;Lifting platform Have high-order and two kinds of location status of low level, when lifting platform is in it is high-order when, lifting platform for shelving cardboard pile and pallet The conveyor surface of table top and charging band to band transfer module is in the same plane, and when lifting platform is in low level, the table top of lifting platform is less than Expect the conveyor surface of band to band transfer module and the vertical between the table top of lifting platform and the conveyor surface for the band to band transfer module that discharges is equal to pallet to distance Highly;Have for pushing away paper baffle along vertical to the gap being put between lifting platform and charging band to band transfer module, disk pile separation assembly is also Include for drive push away paper baffle along vertical to the vertical driving portion of action and driving push away paper baffle along lifting table table top It is horizontally disposed and push away paper baffle plate length direction and vertically discharge the haul side of Transport Desk to push away paper baffle plate body for the horizontal drive portion of action To;When lifting platform is in a high position, the either flush of paper baffle is pushed away or less than charging Transport Desk conveyor surface;When lifting platform is in low When position, the bottom surface of paper baffle is pushed away concordantly or higher than the pallet upper disk surface being now placed on lifting platform, so that pushing away paper baffle can push away Paper feeding straight sheet pile leaves pallet upper disk surface and is moved at the conveyor surface of discharging band to band transfer module;The memory block includes two be arranged in juxtaposition Storage band more than road, the material direction of travel of the material direction of travel parallel discs pile separation assembly of the storage band;In Pan Duo Separation assembly and the object of setting cross track and the guide direction vertical disk pile separation assembly of the cross track between memory block Expect direction of travel;Cross slide way extends to production line inlet along itself guide direction;Be mounted on cross track for realizing Discharge the feed ferry bus that material conveys between material conveying and storage band and production line between band to band transfer module and storage band.
Preferably, the disk pile separation assembly is arrangement more than two and alongside one another;Disk pile separation assembly and production line It is arranged at the homonymy of cross track;Storage band is located at the other side of cross track.
Preferably, the storage band is parallel by axis each other and more rollers of coplanar arrangement are constituted, same storage band Each roller by stepper motor drive to constitute one of rollgang;The cardboard pile isolated by disk pile separation assembly is according to confession Expect the transport sequence of ferry bus, and the conveying direction by each cardboard pile along storage band is held on one by one on each road rollgang;Together Photoelectric sensor is set between adjacent two rollers of one storage band, the photoelectric sensor induction end radiation exposure direction is hung down Directly upward.
Preferably, table top when the charging conveyor surface of band to band transfer module, the lifting platform at each disk pile separation assembly are in high-order with And discharging band to band transfer module conveyor surface, feed ferry bus set charge level, storage band conveyor surface be all in the same horizontal plane;It is described into Expect the conveyor surface of band to band transfer module, lifting platform table top, the conveyor surface for the band to band transfer module that discharges and feed ferry bus set charge level be can edge The conveyer belt of material transferring action is made in set direction, and the material conveying direction of each conveyer belt is parallel to each other.
Preferably, the horizontal drive portion includes the guide rail pushed away at lifting platform at paper baffle travel path both sides that is placed in, The forward surface of twice guide rail constitutes the guide surface for making the action of sliding rail guiding for guide runner, and each sliding block is with corresponding power source It is driven;Arrange that vertical driving portion, the vertical driving portion are vertical cylinder at the forward surface of two sliding blocks, the vertical driving The casing wall in portion is fixed on sliding block, and the tailpiece of the piston rod vertical of vertical driving portion extends downwardly and is fixed in the respective plate for pushing away paper baffle At end.
Preferably, described to push away paper baffle shape in rectangular plate and push away paper baffle plate face plumbing arrangement.
Preferably, platform support is set at the lifting platform below conveyer belt;Lifting platform further includes for driving conveyer belt And platform support make vertical to lifting action jacking cylinder, the tailpiece of the piston rod vertical of jacking cylinder upwardly extends and is fixed on On platform support.
The beneficial effects of the utility model are:
1), the utility model with disk pile separation assembly come realize cardboard pile and pallet online quick separating operate, then with Memory block detaches the interim storage function of back cardboard pile to realize, is fed at any time so as to the needs according to production line.Simultaneously, It is fed the setting of ferry bus, then is realized between discharging band to band transfer module and storage band between material conveying and storage band and production line Material conveys.When specific operation, for disk pile separation assembly, the utility model is then to feed band to band transfer module as undertaking pallet And the feed end of cardboard pile, using discharge band to band transfer module as transported sheet straight sheet pile discharge end, and with lifting platform with push away taking for paper baffle Match to realize cardboard pile and autonomous separating effect of the pallet at lifting platform, it is final to realize under few artificial even no manual intervention Cardboard pile detaches purpose with the automatic on-line of pallet.And for storing band, shape by multiple tracks arrangement arranged side by side At memory block, and transversely orbit transports direction is laid out in block form.It is fed at ferry bus one side take-up reel pile separation assembly Cardboard pile, and by the transversely displacement function of track and by the in due course transport of cardboard pile to specified storage band, so as to Realize the pre-stored function of cardboard pile;On the other hand, when production line needs, feed ferry bus is stored from certain together again to be connect with from Material, and by transport to the production line inlet being similarly positioned at cross track side, to ensure that the continuity of production, into And efficient can realize that cardboard pile detaches and be pre-stored operation with the online of pallet, the real work efficiency of subsequent handling can obtain To significant increase.
2), further to promote the working efficiency of whole system, disk pile separation assembly can arrange it is multigroup, to adapt to store The quick feed demand of band.It certainly, when specific operation, can be depending on the item number of production line.Disk pile separation assembly and production line cloth It is placed at the homonymy of cross track, and stores band and be located at the other side of cross track, this is because disk pile separation assembly and life The usual item number of producing line is less, thus can integral arrangement in the side of cross track, and store band and usually require a large amount of to accommodate cardboards Pile, therefore usually arrangement is compared with multiple tracks, by the other side for storing band and being arranged in cross track obviously help storage band placement and Planning, the place space availability ratio of workshop can be also effectively ensured.
3), for storing band, it is essentially all to form rollgang by more rollers that per pass, which stores band,.It is storing When band pan feeding, rollgang is inverted such that at feed ferry bus that cardboard pile can smoothly immerse storage band.In storage band discharging, Rollgang rotates forward in order to the setting on charge level into feed ferry bus of cardboard pile sequentially at rollgang, and then is put by feed The production line inlet that these cardboard piles are sent into cross track other end by vehicle is crossed, each section division of labor is clear and clear.And Photoelectric sensor can be set between the adjacent rollers of per pass rollgang, photoelectric sensor can arrange one also arrange it is several A, function is to monitor right over the photoelectric sensor whether have cardboard pile, how many thus judges on the rollgang Cardboard pile and whether need to feed, then conventional central production control unit of arranging in pairs or groups, it is clear that can be achieved it is efficient and automation into Discharging monitoring and operating function.
4), when practical operation, band to band transfer module and discharging band to band transfer module is fed or conveyer belt can be used to realize actively conveying, even Manual power assisting can be used to push or realize that the traveling of cardboard pile or even pallet acts using individual pushing mechanism.When cardboard pile And after pallet is acted to lifting platform table top, lifting platform can sink a lattice automatically at this time, and originally buried in lifting platform and charging The paper baffle that pushes away of gap location starts to be lifted and make horizontal balance between band to band transfer module, is realized only to paper to be bonded pallet upper disk surface The scraping effect of straight sheet pile, and then push to cardboard pile is entire at discharging band to band transfer module;Meanwhile pallet can be lost because of difference in height It stays on lifting platform, you can realize the quick separating effect of pallet and cardboard pile, simple operation and functional reliability and efficiency It can be effectively ensured.
5), as the further preferred scheme of said program, the conveyor surface of band to band transfer module is fed, when lifting platform is in high-order Table top and discharge band to band transfer module conveyor surface, feed ferry bus set charge level, storage band conveyor surface be all in the same horizontal plane. In other words, when cardboard pile is advanced along the transport path of above each equipment, be along same level and straight line is advanced.It is above-mentioned Horizontal traveling mode helps to ensure that the traveling stationarity of cardboard pile, and discharges to memory block conducive to side pan feeding and the other side Or production line entrance, to increase the efficiency of production procedure.
6), as one of the utility model core component, the traveling action of paper baffle is pushed away, directly determines cardboard The separation reliability and efficiency of pile and pallet.The utility model using guide rail as the guide part along cardboard pile direction of travel, and Make the guide end that vertical acts using vertical cylinder as paper baffle is pushed away, and then realizes the aforementioned pusher function of pushing away paper baffle.Specifically For, when being run to lifting platform cardboard pile and pallet edge charging band to band transfer module, paper baffle is pushed away at this time by vertical cylinder action And gap between charging band to band transfer module and lifting platform is sunk to, to avoid the travel path of material.And when cardboard pile is risen with pallet When drop platform acts on and comes downwards to specified altitude assignment, pushing away paper baffle is then first risen by vertical cylinder action, then preceding by railway effect Row, and then realize the push function to cardboard pile, the final conveying for enabling cardboard pile reliably to be pushed to discharging band to band transfer module At face.
7), further, charging band to band transfer module, lifting platform and discharging band to band transfer module along set direction can make material transferring The conveyer belt of action is as table top or conveyor surface, to realize the full-automatic traveling purpose of material.For lifting platform, After pallet is detached with cardboard pile and lifting platform replys high-order, lifting platform table top can be made to invert, so that at lifting platform Pallet be reversed at the conveyor surface for being delivered to charging band to band transfer module, at this time or charging band to band transfer module continues reversion or artificial support of taking Disk, to realize the self-emptying function of pallet, in order to which separator can be added in cardboard pile of the next group with pallet as early as possible.And Conveyer belt then relies on platform support as support at lifting platform, and is used as driving source by jacking cylinder, to realize lifting platform Autonomous lifting effect, just repeats no more herein.
Description of the drawings
Fig. 1 is each component layout area schematic diagram of the utility model;
When Fig. 2 is that lifting platform is in high-order and feeds band to band transfer module feeding, the action schematic diagram of disk pile separation assembly;
The schematic top plan view of disk pile separation assembly when Fig. 3 is state shown in Fig. 2;
When Fig. 4 is that lifting platform is in low level and pushes away paper baffle uplink, the action schematic diagram of disk pile separation assembly;
The schematic top plan view of disk pile separation assembly when Fig. 5 is state shown in Fig. 4;
When Fig. 6 is that lifting platform is in low level and pushes away paper baffle horizontal pusher, the action schematic diagram of disk pile separation assembly;
The schematic top plan view of disk pile separation assembly when Fig. 7 is state shown in Fig. 6;
Fig. 8 is the structural schematic diagram for storing band.
The practical correspondence of each label of the utility model and component names is as follows:
A- cardboard pile b- pallet c- production lines
10- disk pile separation assemblies
11- feeds band to band transfer module
12- lifting platform 12a- platform support 12b- jacking cylinders
13- discharging band to band transfer module
14a- pushes away paper baffle 14b- guide rail 14c- sliding block 14d- vertical cylinders
21- storage band 21a- roller 21b- photoelectric sensors
22- is fed ferry bus 23- cross tracks
Specific implementation mode
For ease of understanding, here in connection with attached drawing, concrete structure and working method to the utility model are made further below Description:
The utility model is mainly used as paper process on the front end of corrugated case factory, and purpose is mainly automatically by cardboard pile a It is detached with pallet b, then automatic pre- material stock, and relies on feed ferry bus 22 to go to print to transport cardboard pile a in response to production line c Dataller's sequence namely production line entrance.The utility model concrete structure is shown referring to Fig.1, and agent structure includes disk pile separation assembly 10, it stores band 21 and positioned at the feed ferry bus 22 for playing linking between the two, feed ferry bus 22 relies on cross track 23 and make reciprocating action.
For disk pile separation assembly 10:Feed band to band transfer module 11 and head and the tail of the band to band transfer module 13 as entire defiber that discharge End, undertakes the pan feeding of the cardboard pile a with pallet b and the discharging functions of simple cardboard pile a respectively.Feed band to band transfer module 11 with Band to band transfer module 13 discharge using conveyer belt as conveyor surface, to realize the traveling function along set direction of above-mentioned material.And it is right For lifting platform 12, it is arranged between charging band to band transfer module 11 and discharging band to band transfer module 13, to play linking fade function.Often When the cardboard pile a with pallet b advances along the conveyor surface of charging band to band transfer module 11, initially enters lifting platform 12 and realize cardboard pile The online lock out operation of a and pallet b, hereafter individual cardboard pile a enter discharging band to band transfer module 13 and discharge, pallet b is then being lifted While platform 12 replys a high position, by lifting platform 12 and feeds the reversion action of 11 conveyer belt of band to band transfer module and take out of.
On the basis of above structure, to realize the online separation function of cardboard pile a and pallet b, one side of the utility model Face is by jacking cylinder 12b collocation platform support 12a, to realize the controllable sedimentation of conveyer belt and lifting work(at lifting platform 12 Energy;And on the other hand, by as illustrated in figs. 2-7 push away paper baffle 14a, to realize the push purpose of cardboard pile a.Push away paper baffle The vertical of 14a is realized to lifting action by vertical cylinder 14d, and horizontal direction displacement then comes by guide rail 14b and sliding block 14c Ensure.When on the shelf or charging band to band transfer module 11 is in feed state, pushing away paper baffle 14a can be in the work of vertical cylinder 14d Lifting platform 12 is sunk to lower and is fed in the gap between band to band transfer module 11, as Figure 2-3, to ensure to push away paper baffle 14a The feed operation of cardboard pile a will not be hampered.
For ease of further understanding the utility model, illustrate that the real work flow of disk pile separation assembly 10 is as follows herein:
1), cardboard pile a of the neat pile on pallet b, by forklift to charging band to band transfer module 11.At this point, charging transmission Photoelectric sensor scanning at platform 11 is to having on material, and charging band to band transfer module 11 advances automatically, as Figure 2-3.Later, cardboard Pile a proceeds to lifting platform 12, and the photoelectric sensor Scanning Detction at lifting platform 12 enters to entire pallet b, feeds band to band transfer module 11 Stop transmission.
2), lifting platform 12 starts to act, and jacking cylinder 12b starts to bounce back, and then drives platform support 12a and lifting platform 12 Place's conveyer belt drops to low-end trim automatically.At this point, the table top falling head of lifting platform 12 is just pallet b height, such as Fig. 4-7 It is shown.Wait for that lifting platform 12 drops to after low level, gap location pushes away paper baffle between charging band to band transfer module 11 and lifting platform 12 14a starts to make uplink action as shown in Figure 4.
3) after, pushing away the 14a rises of paper baffle, the bottom surfaces paper baffle 14a is pushed away and preferably just touch the surfaces pallet b, then push away paper gear The beginnings of plate 14a as shown in fig. 6-7 move forward automatically close to pallet b upper disk surfaces so that cardboard pile a is pushed into out from pallet b On the conveyor surface for expecting band to band transfer module 13.
4), when cardboard pile a has just touched the conveyor surface of discharging band to band transfer module 13, the photoelectric sensor at the band to band transfer module 13 that discharges Incuded and drive the automatic rolls forward of conveyor surface at discharging band to band transfer module 13, so as to coordinate push away paper baffle 14a drive cardboard pile a from Open pallet b.Later, paper baffle 14a self-returns are pushed away to gap between charging band to band transfer module 11 and lifting platform 12 as Figure 2-3 Place.Meanwhile lifting platform 12 can reply a high position, then conveyer belt counter motion at lifting platform 12 sends pallet b back to charging band to band transfer module 11 conveyor surface;After again, the conveyor surface also counter motion of band to band transfer module 11 is fed, to send pallet b back to starting points, entire at this time point It is fully completed from movement.
After disk pile separation assembly 10 isolates cardboard pile a, cardboard pile a can be transported to feed along discharging band to band transfer module 13 At ferry bus 22.Backstage is differentiated and is needed in that production line c productions and production sequence according to the order information in system, from And judge cardboard pile a placement regions.It is as shown in Figure 1, feed ferry bus 22 according to the judging result on backstage, and it is in due course should Cardboard pile a is delivered at corresponding storage band 21 as shown in Figure 1, to realize the pre-stored function of cardboard pile a.Cardboard pile a After being sent to storage band 21, the light eye of the photoelectric sensor 21b between the corresponding correspondence roller 21a to storage band 21 is blocked, can Obtain actual cardboard pile a storage conditions in each storage band 21;The position of photoelectric sensor 21b is with reference to shown in Fig. 8.And When feeding similarly, from the background according to the order information in system, to judge to need, from feeding in any road storage band 21, to be fed at this time Transversely track 23 marches to splicing at this to ferry bus 22, and by material transportation to the inlet production line c.

Claims (7)

1. a kind of intelligence Production Scheduling System, it is characterised in that:This system includes for detaching pallet and cardboard pile online Disk pile separation assembly (10) and pre-stored so as in due course to the memory block of production line feeding for realizing cardboard pile;The Pan Duo Separation assembly (10) includes charging band to band transfer module (11), lifting platform (12) and the discharging being sequentially connected along cardboard pile travel path Band to band transfer module (13);Lifting platform (12) has high-order and two kinds of location status of low level, when lifting platform (12) is in a high position, lifting platform (12) conveyor surface of the table top and charging band to band transfer module (11) for shelving cardboard pile and pallet is in the same plane, works as lifting When platform (12) is in low level, the table top of lifting platform (12) is less than the conveyor surface of discharging band to band transfer module (13) and the table top of lifting platform (12) Vertical between the conveyor surface of discharging band to band transfer module (13) is equal to pallet height to distance;Lifting platform (12) and charging band to band transfer module (11) have between for pushing away paper baffle (14a) along vertical to the gap being put into, disk pile separation assembly (10) further includes for driving The dynamic paper baffle (14a) that pushes away pushes away paper baffle (14a) along lifting table (12) along vertical to the vertical driving portion of action and driving It is horizontally disposed and push away paper baffle (14a) plate length direction and vertically discharge to push away paper baffle (14a) plate body for the horizontal drive portion of table top action The haul direction of Transport Desk;When lifting platform (12) is in a high position, the either flush of paper baffle (14a) is pushed away or less than charging transport Platform conveyor surface;When lifting platform (12) is in low level, the bottom surface for pushing away paper baffle (14a) is concordant or higher than being now placed in lifting platform (12) the pallet upper disk surface on leaves pallet upper disk surface and is moved to discharging so that pushing away paper baffle (14a) and can push cardboard pile At the conveyor surface of band to band transfer module (13);The memory block includes the storage band (21) of the twice being arranged in juxtaposition or more, the storage band (21) the material direction of travel of material direction of travel parallel discs pile separation assembly (10);In disk pile separation assembly (10) and storage The material of cross track (23) and the guide direction vertical disk pile separation assembly (10) of the cross track (23) is set between area Direction of travel;Cross slide way (14b) extends to production line inlet along itself guide direction;It is disposed on cross track (23) useful In realize discharging band to band transfer module (13) with storage band (21) between material conveying and store with (21) material between production line it is defeated The feed ferry bus (22) sent.
2. a kind of intelligent Production Scheduling System according to claim 1, it is characterised in that:The disk pile separation assembly (10) it is arrangement more than two and alongside one another;Disk pile separation assembly (10) is with production-line arrangement in the same of cross track (23) At side;Storage band (21) is located at the other side of cross track (23).
3. a kind of intelligent Production Scheduling System according to claim 2, it is characterised in that:The storage band (21) is by that This axis is parallel and more rollers (21a) of coplanar arrangement are constituted, and each roller (21a) of same storage band (21) is by stepping electricity Machine driving is to constitute one of rollgang;The cardboard pile isolated by disk pile separation assembly (10) is according to feed ferry bus (22) Transport sequence, and by each cardboard pile along storage band (21) conveying direction be held on one by one on each road rollgang;Same storage Deposit setting photoelectric sensor (21b) between adjacent two rollers (21a) of band (21), the photoelectric sensor (21b) induction Extreme ray direction of illumination is vertically upward.
4. a kind of intelligent Production Scheduling System according to claim 1 or 2 or 3, it is characterised in that:Each Pan Duo separation group Table top when conveyor surface, the lifting platform (12) of charging band to band transfer module (11) at part (10) are in high-order and discharging band to band transfer module (13) Conveyor surface, feed ferry bus (22) set charge level, storage band (21) conveyor surface be all in the same horizontal plane;The charging passes Conveyor surface, lifting platform (12) table top, the conveyor surface of discharging band to band transfer module (13) and the setting for feed ferry bus (22) of defeated (11) Charge level is that can make the conveyer belt of material transferring action along set direction, and the material conveying direction of each conveyer belt is put down each other Row.
5. a kind of intelligent Production Scheduling System according to claim 4, it is characterised in that:The horizontal drive portion includes Be placed in the guide rail (14b) pushed away at lifting platform (12) at paper baffle (14a) travel path both sides, twice guide rail (14b) it is opposite Face constitutes the guide surface for making the action of sliding rail guiding for guide runner (14c), and each sliding block (14c) is subject to corresponding power source Driving;Arrange that vertical driving portion, the vertical driving portion are vertical cylinder (14d), the lead at the forward surface of two sliding blocks (14c) The casing wall of vertical driving portion is fixed on sliding block (14c), and the tailpiece of the piston rod vertical of vertical driving portion, which is extended downwardly and is fixed in, pushes away paper At the respective plate end of baffle (14a).
6. a kind of intelligent Production Scheduling System according to claim 4, it is characterised in that:It is described to push away paper baffle (14a) Shape is in rectangular plate and pushes away paper baffle (14a) plate face plumbing arrangement.
7. a kind of intelligent Production Scheduling System according to claim 4, it is characterised in that:It is defeated at the lifting platform (12) Send band lower section setting platform support (12a);Lifting platform (12) further includes for driving conveyer belt and platform support (12a) to make vertical To lifting action jacking cylinder (12b), the tailpiece of the piston rod vertical of jacking cylinder (12b) upwardly extends and is fixed on platform branch On frame (12a).
CN201820086631.3U 2018-01-17 2018-01-17 A kind of intelligence Production Scheduling System Expired - Fee Related CN207844260U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820086631.3U CN207844260U (en) 2018-01-17 2018-01-17 A kind of intelligence Production Scheduling System

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820086631.3U CN207844260U (en) 2018-01-17 2018-01-17 A kind of intelligence Production Scheduling System

Publications (1)

Publication Number Publication Date
CN207844260U true CN207844260U (en) 2018-09-11

Family

ID=63415149

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820086631.3U Expired - Fee Related CN207844260U (en) 2018-01-17 2018-01-17 A kind of intelligence Production Scheduling System

Country Status (1)

Country Link
CN (1) CN207844260U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110188951A (en) * 2019-05-30 2019-08-30 重庆大学 A kind of method for building up of the optimizing scheduling of the brick field ferry bus based on least energy consumption

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110188951A (en) * 2019-05-30 2019-08-30 重庆大学 A kind of method for building up of the optimizing scheduling of the brick field ferry bus based on least energy consumption

Similar Documents

Publication Publication Date Title
WO2021109512A1 (en) Production line for practical training for automatic gear pump assembly
CN201694418U (en) Paperboard automatic conveying device of beverage paper box forming machine
CN106586355B (en) A kind of disc material double computer cooperation automatic access system
CN108263800A (en) For the full-automatic intelligent logistics system and method for carton production
CN201264722Y (en) Array machine
EP0259892A2 (en) Workload regulator for automated production
CN107973041B (en) All-round goods arrive people letter sorting commodity circulation device
CN107055070A (en) A kind of photovoltaic module Transmission system
CN103922136B (en) The intensive picking method of small lot cigarette and the order-picking trucks that shuttles back and forth
CN209403339U (en) A kind of full-automatic unstacking and stacking machine
CN204568889U (en) Cardboard automatic charging machine
CN207844097U (en) A kind of full-automatic intelligent logistics system for carton production
CN214455585U (en) Automatic feeding device of corrugated board automatic production equipment
CN104876039A (en) Automatic paper board feeding machine
CN205440995U (en) Automatic vanning system of two dai lile bricks milk package gift box
CN207844260U (en) A kind of intelligence Production Scheduling System
CN207827129U (en) A kind of goods of Almightiness type sorts logistics device to people
CN207844287U (en) A kind of intelligence production material separator
CN108058972A (en) A kind of intelligence production material separator
CN107187883B (en) Stacker crane
CN210339806U (en) Collecting device used after paperboard cutting
CN105501992A (en) Automatic low stacking machine
CN109526880A (en) A kind of full-automatic unstacking and stacking machine
CN218557499U (en) Full-automatic preparation maintenance circulation system of environmental protection brick
CN210654941U (en) Auxiliary feeding mechanism for conveying belt on corrugated paper production line

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 239400 No. 150 Sports Road, Mingguang Industrial Park, Chuzhou, Anhui

Co-patentee after: FENG QI FENG PRINTING TECHNOLOGY (SHANGHAI) Pty Ltd.

Patentee after: LONG LI DE (LD) INTELLIGENT TECHNOLOGY Corp.,Ltd.

Address before: 239400 No. 150 Sports Road, Mingguang Industrial Park, Chuzhou, Anhui

Co-patentee before: FENG QI FENG PRINTING TECHNOLOGY (SHANGHAI) Pty Ltd.

Patentee before: LONGLIDE (LD) PACKAGING AND PRINTING CO.,LTD.

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180911

CF01 Termination of patent right due to non-payment of annual fee