CN201214564Y - Partition wall slat conveying line - Google Patents

Partition wall slat conveying line Download PDF

Info

Publication number
CN201214564Y
CN201214564Y CNU2008200846960U CN200820084696U CN201214564Y CN 201214564 Y CN201214564 Y CN 201214564Y CN U2008200846960 U CNU2008200846960 U CN U2008200846960U CN 200820084696 U CN200820084696 U CN 200820084696U CN 201214564 Y CN201214564 Y CN 201214564Y
Authority
CN
China
Prior art keywords
partition wall
traversing
wall batten
board bracket
conveying
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Lifetime
Application number
CNU2008200846960U
Other languages
Chinese (zh)
Inventor
柴标
穆罕莫德·麦迪·杰德
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CNU2008200846960U priority Critical patent/CN201214564Y/en
Application granted granted Critical
Publication of CN201214564Y publication Critical patent/CN201214564Y/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Intermediate Stations On Conveyors (AREA)

Abstract

The utility model relates to a transport production line, in particular to a partition slat conveying line. The conveying line consists of two groups of traverse hoister sets which are respectively arranged at the two ends of the conveying line, a plurality of conveying long frames 1 and a plurality of slat brackets 2; each group of traverse hoister sets comprise of two traverse hoisters; a parallel conveyor 4 is also arranged between the two traverse hoisters; and the conveying long frames 1 is in multi-layer. When the utility model is used, the partition slats arranged on the slat brackets can move forwards simultaneously and slowly in the multi-layer way, and the time for drying the partition slats in the limited transmission path is sufficient. The utility model has the advantages of reasonable and simple structure, high degree of automation, high production efficiency, stable product quality and the like.

Description

A kind of partition wall batten conveying line
Technical field
The utility model relates to a kind of product travel line, especially relates to the improvement that a kind of partition wall batten conveying line is formed.
Background technology
Common travel line is used for assembling line or process line more, and its composition generally is the single line type, and individual layer arranges that chain or steel rope etc. carries out direct drive or transmits by pallet, dolly.But the conveying of such travel line incompatibility partition wall batten.Because the plasticity partition wall batten just pushes out, rigidity and intensity are very low, can not directly move, and also need the oven dry of a few hours.Because output is big, single line is carried, and certainly will need very long travel line.As per hour producing 100 meters, drying time calculated in 4 hours, and the wall scroll travel line just reaches 400 meters so, and obvious like this is unpractical.Therefore be necessary to develop a kind of later-model partition wall batten conveying line, the partition wall batten of output is just in time sent and oven dry in time.
The utility model content
The utility model mainly is in order to solve prior art at the novel wall section bar---the difficult problem that partition wall batten is carried, and it mainly is to be achieved by following technical proposals:
A kind of partition wall batten conveying line by two groups of traversing lifting units at the travel line two that is placed in, carries long frame 1 and some bar board brackets 2 to form for some, and described traversing lifting unit has two traversing gigs 3 for every group; Also be provided with parallel conveyer 4 in the middle of two traversing gigs 3; The long frame 1 of described conveying is a multilayer mechanism.The travel line arrival end just the traversing gig of delivery end enter assigned address and insert the bar board bracket unstow, the traversing then parallel conveyer 4 to partition wall batten make-up machine extruding outlet loads partition wall batten, every bar board bracket 2 is equipped with two and just pushes out partition wall batten, and last traversing lifting unit is responsible for toward the equivalent layer of the carrying long frame 1 bar board bracket 2 of packing into.The traversing lifting unit of batten exit end then is responsible for receiving to carry on the long frame having dried partition wall batten on the bar board bracket on each equivalent layer, traversing then parallel conveyer 4 to partition wall batten recovery place, behind the removal partition wall batten, empty bar board bracket is sent back to the equivalent layer of carrying long frame.Because of the bar board bracket is distributed on the whole piece travel line, head and the tail are the top mutually, and bar board bracket of every conveying carries the long frame other end to go out a bar board bracket by pushing tow to carrying on the long frame.Because of partition wall batten and the bar board bracket that has just made moves together, and the as prescribed order is delivered to many each layers of carrying long frame.So partition wall batten has adequate time to dry when slowly moving.
The technical solution of the utility model can also be further perfect,
As preferably, a kind of partition wall batten conveying line, the long frame 1 of described conveying can be the even number bar, each bar carries long frame 1 only corresponding with the traversing gig of opposing parallel conveyer the same side; Carry long frame 1 to establish three layers for every, each layer all can transmit the bar board bracket; Wherein the orlop of two of the close parallel conveyer long framves 1 of conveying is that empty bar board bracket returns a layer 1a, and upper two layers is partition wall batten transfer layer 1b.The long frame of general conveying has 4, carries three layers on long frame for every, and the orlop of wherein middle two long framves of conveying is that the bar board bracket of unstowing returns a layer 1a, and upper two layers is partition wall batten transfer layer 1b.Three layers of two partition wall batten conveying lines in the outside all is partition wall batten transfer layer 1b.Promptly carry long frame for 4, have 10 layers and carry partition wall batten, have 2 layers to be used to return sky bar board bracket.Just carry traversing gig and receive two that traversing gig is responsible for its homonymy and carry long framves for every, the conveying partition wall batten that is of five storeys has 1 layer to be used to return the bar board bracket of unstowing.
As preferably, a kind of partition wall batten conveying line, described traversing lifting unit, form by placing two traversing gigs 3 on the guide rail, every traversing gig comprises frame 5, laterally drive system, jacking system, bar board bracket loading and unloading system 6 again, and described jacking system comprises chain that the lifting motor 7 be located on the frame top drives, hangs the bracing frame 8 and the clump weight 9 at chain two respectively; Described horizontal drive system comprises traversing motor 10, chain, sprocket wheel, sprocket shaft and establishes roller 11, the guide rail 12 at sprocket shaft two ends.Jacking system can be realized bracing frame 8 layerings stop.Laterally drive system moves to traversing gig 3 and carries on the long frame 1 same straight line, realizes loading and unloading bar board bracket by bar board bracket loading and unloading system 6.Be specially: laterally drive system moves traversing gig to parallel conveyer 4, first upper strata upper surface with bar board bracket 2 drops to the position a little less than parallel conveyer 4, insert the partition wall batten of first new system, progressively promote bar board bracket 2 then, first lower floor's upper surface with bar board bracket 2 rises to the position a little less than parallel conveyer 4, insert the partition wall batten of second new system, then before moving to the long frame of conveying.At this moment on the same group another traversing gig moves the partition wall batten that connects new system.
As preferably, a kind of partition wall batten conveying line, described board bracket 2 is quadra, and batten carriage side is provided with the protrusion column cap 2a of even layout, and the high size of bar board bracket 2 length and width adapts with the size of the batten that transports.Such bar board bracket 2 can enough load two partition wall battens.Upper strata upper surface and lower floor's upper surface are the carrying surface of partition wall batten.
As preferably, a kind of partition wall batten conveying line, each layer entrance of the long frame 1 of the conveying of described batten conveying line can be provided with a push system.Push system is made up of sprocket wheel, chain that thrust motor 13 drives; Chain belt is provided with batten carriage side and protrudes the holder 14 that column cap 2a adapts.Holder 14 pushing tow batten carriage sides protrusion column cap 2a on the chain advances forward.The bar board bracket just suspends in carrying long frame 1 after leaving the chain of push system, up to next bar board bracket enter carry long frame 1 just the meeting bar board bracket that just entered push ahead the distance of a bar board bracket length.
Therefore, the utlity model has rational in infrastructure simple, the degree of automation height, the production efficiency height is in time sent the new system partition wall batten into drying line, realizes characteristics such as oven dry in time.
Description of drawings
Fig. 1 is the scheme drawing of structure of the present utility model;
Fig. 2 is the lateral plan of Fig. 1 of the present utility model;
Fig. 3 is the birds-eye view of Fig. 1 of the present utility model;
Among the figure 1, carry long frame; 1a, bar board bracket return layer; 1b partition wall batten transfer layer; 2, bar board bracket; 2a protrudes column cap; 3, bar board bracket; 4, parallel conveyer; 5, frame; 6, bar board bracket loading and unloading system; 7, lifting motor; 8, bracing frame; 9, clump weight; 10, traversing motor; 11, roller; 12, guide rail; 13, thrust motor; 14, holder.
The specific embodiment
Below by embodiment and in conjunction with Fig. 1,2,3, the technical solution of the utility model is further described in detail.
Embodiment 1: a kind of partition wall batten conveying line, its action is controlled by PLC, specifically by two groups of traversing lifting units at the travel line two that is placed in, carry long frame 1 and be paved with the bar board bracket 2 of carrying long frame for 4 and form, described traversing lifting unit has two traversing gigs 3 for every group; Also be provided with a parallel conveyer 4 in the middle of two traversing gigs 3; The long frame 1 of described conveying is three layers of mechanism, and the orlop of wherein middle two long framves of conveying is that the bar board bracket of unstowing returns a layer 1a, and upper two layers is partition wall batten transfer layer 1b.Three layers of two partition wall batten conveying lines in the outside all is partition wall batten transfer layer 1b.Promptly carry long frame for 4, have 10 layers and carry partition wall batten, have 2 layers to be used to return sky bar board bracket.Be responsible for toward the equivalent layer of the carrying long frame 1 bar board bracket 2 of packing at the traversing lifting unit of delivery end, bar board bracket 2 is a quadra, batten carriage side is provided with the protrusion column cap 2a of even layout, and the high size of bar board bracket length and width adapts with the size of the batten that transports.Just carry traversing gig and receive two that traversing gig is responsible for its homonymy and carry long framves for every, finish 5 layers of partition wall batten of conveying and 1 layer and return the bar board bracket of unstowing and pick task.The traversing gig of travel line inlet enters assigned address and inserts the bar board bracket 2 of unstowing, and the traversing then parallel conveyer 4 to partition wall batten make-up machine extruding outlet loads partition wall batten.The traversing lifting unit of travel line exit end then is responsible for receiving and is carried the bar board bracket of having dried partition wall batten on the long frame on the partition wall batten transfer layer 1b, traversing then parallel conveyer 4 to partition wall batten recovery place, behind the removal partition wall batten, the empty bar board bracket of empty bar board bracket being sent back to the long frame of conveying returns a layer 1a.Each layer entrance of the long frame 1 of the conveying of described batten conveying line is provided with push system, specifically is to carry the superiors and the interlayer of the arrival end of long framves 1 that a push system respectively is set at middle two, and new system sent into partition wall batten transfer layer 1b.Carry the orlop of the exit end of long frame 1 that a push system is set, the bar board bracket of unstowing is sent into sky bar board bracket return a layer 1a for middle two.And 1 upper, middle and lower-ranking at arrival end of two long framves of conveying in addition in the outside respectively is provided with a push system, new system send into partition wall batten transfer layer 1b, by these two the bar board brackets of carrying long framves 1, be that empty bar board bracket from middle two long framves 1 of conveying returns layer 1a and turns back to extruding of new system partition wall batten.Push system is made up of sprocket wheel, chain that thrust motor 13 drives; Chain is provided with batten carriage side and protrudes the holder 14 that column cap 2a adapts.When chain rotated, holder 14 batten carriage side protrusion column cap 2a with regard to pushing tow and is moved forward.Because of the bar board bracket is distributed on the whole piece travel line, head and the tail are the top mutually, and bar board bracket of every conveying carries the long frame other end to go out a bar board bracket by pushing tow to carrying on the long frame 1.Because of partition wall batten and the bar board bracket 2 that has just made moves together, need not directly move partition wall batten, guarantee that it is excellent.Bar board bracket 2 as prescribed order are delivered to many each partition wall batten transfer layer 1b that carries long frame, so partition wall batten has adequate time to dry when carrying long frame slowly to move.Aforesaid traversing lifting unit, specifically by placing two traversing gigs 3 on the guide rail to form, every traversing gig comprises frame 5, laterally drive system, jacking system, bar board bracket loading and unloading system 6 again, and described jacking system comprises chain that the lifting motor 7 be located on the frame top drives, hangs the bracing frame 8 and the clump weight 9 at chain two respectively; Described horizontal drive system comprises traversing motor 10, chain, sprocket wheel, sprocket shaft and establishes roller 11, the guide rail 12 at sprocket shaft two ends.Jacking system can be realized the layering stop of bracing frame 8.Move on the parallel conveyer 4, first upper strata upper surface with bar board bracket 2 drops to the position a little less than parallel conveyer 4, insert the partition wall batten of first new system, progressively promote bar board bracket 2 then, first lower floor's upper surface with bar board bracket 2 rises to the position a little less than parallel conveyer 4, accepts the partition wall batten of second new system.Etc. every bar board bracket 2 install two just push out partition wall batten after, laterally drive system with traversing gig 3 move to carry long frame 1 before, realize loading and unloading the bar board brackets by bar board bracket loading and unloading system 6, send into partition wall batten transfer layer 1b.At this moment on the same group another traversing gig moves the partition wall batten that connects new system.The coordinating operation that comes to this of two traversing gigs is on the same group realized fast traffic.
Embodiment 2: a kind of partition wall batten conveying line, and have only 2 to carry long frame 1, this travel line has only 4 layers of partition wall batten transfer layer 1b and two-layer empty bar board bracket to return a layer 1a.Other principle of work embodiment 1 is as good as, and this travel line adapts to the lower slightly workshop of partition wall batten output capacity.Its total length also can suitably be adjusted according to the needs of drying time, and the traversing gig at travel line two ends, every end have one.
Embodiment 3: as required, change the software setting, also can adjust number and position that partition wall batten transfer layer 1b and empty bar board bracket return layer 1a.Because moving velocity is slow, multilayer is gone forward side by side, and the length of this travel line is 65 meters, can be arranged in the ordinary plant, and the new system partition wall batten is dried along with moving of bar board bracket, also can guarantee enough drying times.

Claims (5)

1. a partition wall batten conveying line by two groups of traversing lifting units at the travel line two that is placed in, is carried long frame (1) and some bar board brackets (2) to form, be it is characterized in that described traversing lifting unit has two traversing gigs (3) for every group for some; Also be provided with parallel conveyer (4) in the middle of two traversing gigs (3); The long frame of described conveying (1) is a multilayer mechanism.
2. partition wall batten conveying line according to claim 1 is characterized in that the long frame of described conveying (1) is the even number bar, and each bar carries long frame (1) only corresponding with the traversing gig of opposing parallel conveyer the same side; Carry long frame (1) to establish three layers for every, each layer all can transmit the bar board bracket; Wherein the orlop of two of the close parallel conveyer long framves of conveying (1) is that the bar board bracket of unstowing returns layer (1a), and upper two layers is partition wall batten transfer layer (1b).
3. partition wall batten conveying line according to claim 1 and 2, it is characterized in that described traversing lifting unit, form by placing two the traversing gigs (3) on the guide rail, every traversing gig comprises frame (5), laterally drive system, jacking system, bar board bracket loading and unloading system (6) again, and described jacking system comprises the chain being located at the lifting motor (7) on the frame top and driving, hangs the bracing frame (8) and the clump weight (9) at chain two respectively; Described horizontal drive system comprises traversing motor (10), chain, sprocket wheel, sprocket shaft and establishes the roller (11) at sprocket shaft two ends, guide rail (12).
4. partition wall batten conveying line according to claim 1 is characterized in that described board bracket (2) is quadra, and bar grillage side is provided with the protrusion column cap (2a) of even layout, and the high size of bar board bracket length and width adapts with the size of the partition wall batten that transports.
5. partition wall batten conveying line according to claim 3 is characterized in that each layer of the long frame of conveying (1) of described partition wall batten conveying line can be provided with push system, and push system is made up of sprocket wheel, chain that thrust motor (13) drives; Chain belt is provided with bar grillage side and protrudes the holder (14) that column cap (2a) adapts.
CNU2008200846960U 2008-04-02 2008-04-02 Partition wall slat conveying line Expired - Lifetime CN201214564Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CNU2008200846960U CN201214564Y (en) 2008-04-02 2008-04-02 Partition wall slat conveying line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CNU2008200846960U CN201214564Y (en) 2008-04-02 2008-04-02 Partition wall slat conveying line

Publications (1)

Publication Number Publication Date
CN201214564Y true CN201214564Y (en) 2009-04-01

Family

ID=40519770

Family Applications (1)

Application Number Title Priority Date Filing Date
CNU2008200846960U Expired - Lifetime CN201214564Y (en) 2008-04-02 2008-04-02 Partition wall slat conveying line

Country Status (1)

Country Link
CN (1) CN201214564Y (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102417089A (en) * 2011-10-09 2012-04-18 周俊雄 Conveying mechanism
CN101722575B (en) * 2008-10-31 2012-04-25 柴标 Partition wall batten conveying line and drying method thereof
CN104692065A (en) * 2015-03-11 2015-06-10 安徽科达机电有限公司 Saddle frame circulating system of aerated concrete plate line
CN109773937A (en) * 2019-03-17 2019-05-21 杭州裕登农业技术开发有限公司 A kind of gardens Floor production device

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101722575B (en) * 2008-10-31 2012-04-25 柴标 Partition wall batten conveying line and drying method thereof
CN102417089A (en) * 2011-10-09 2012-04-18 周俊雄 Conveying mechanism
CN104692065A (en) * 2015-03-11 2015-06-10 安徽科达机电有限公司 Saddle frame circulating system of aerated concrete plate line
CN109773937A (en) * 2019-03-17 2019-05-21 杭州裕登农业技术开发有限公司 A kind of gardens Floor production device
CN109773937B (en) * 2019-03-17 2021-12-24 杭州裕登农业技术开发有限公司 Garden floor production device

Similar Documents

Publication Publication Date Title
CN103552832B (en) The unloading brick piling unit and unload brick palletizing method of a kind of fired brick
CN105438707A (en) Method and device for automatically storing and taking goods in intensive storehouse
CN110342177A (en) Interactive elevator and the tiered warehouse facility for using it
CN1371844A (en) System for supplying package material to package machine
CN201180039Y (en) Horizontal movement hoisting machine group
CN205240472U (en) Automatic device that accesses goods in intensive warehouse
CN206032715U (en) Heated board pile up neatly system and destacking feeding system
CN205875844U (en) Modularization matrix stereo garage
CN201214564Y (en) Partition wall slat conveying line
CN109798000A (en) A kind of horizontal mobile modularization intelligent parking systems
CN101722575B (en) Partition wall batten conveying line and drying method thereof
CN110371371A (en) A kind of lute in automatic boxing stacking assembly line
CN106241399B (en) A kind of thermal insulation board palletizing system and destacking feeding system
CN104443976A (en) Layer switching method of intensive stereoscopic warehouse shuttle vehicle and single-column lifter adopted by method
CN105712023A (en) Wall and floor brick warehousing system convenient for realizing automatic storage and taking
JPS623042B2 (en)
CN100523412C (en) One laneway built-out hoistway layered transportation rolling way parallel parking type mechanical parking system
CN111731736A (en) Article storing and taking system
CN203921785U (en) The intensive storing/conveying system of a kind of filter tip stick
CN220843979U (en) Multilayer shuttle system integrating layer changing and warehouse-in and warehouse-out lifting machine
CN212333653U (en) Article storing and taking system
CN205708378U (en) Facilitate implementation the Wall or floor tile warehousing system of automatization's access
CN105692029B (en) A kind of intelligent logistics system suitable for corrugated board production
CN104384371A (en) Automatic bottom cap discharging mechanism
CN217675317U (en) Finished brick product conveyor

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
AV01 Patent right actively abandoned

Granted publication date: 20090401

Effective date of abandoning: 20080402