CN207844097U - A kind of full-automatic intelligent logistics system for carton production - Google Patents

A kind of full-automatic intelligent logistics system for carton production Download PDF

Info

Publication number
CN207844097U
CN207844097U CN201820086646.XU CN201820086646U CN207844097U CN 207844097 U CN207844097 U CN 207844097U CN 201820086646 U CN201820086646 U CN 201820086646U CN 207844097 U CN207844097 U CN 207844097U
Authority
CN
China
Prior art keywords
band
lifting platform
transfer module
pile
separation assembly
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn - After Issue
Application number
CN201820086646.XU
Other languages
Chinese (zh)
Inventor
徐强
徐龙平
向存林
熊恒
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Bin printing technology (Shanghai) Co., Ltd.
Dragon Lede intelligent Polytron Technologies Inc
Original Assignee
Bin Printing Technology (shanghai) Co Ltd
LONG LI DE PACKAGING AND PRINTING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Bin Printing Technology (shanghai) Co Ltd, LONG LI DE PACKAGING AND PRINTING Co Ltd filed Critical Bin Printing Technology (shanghai) Co Ltd
Priority to CN201820086646.XU priority Critical patent/CN207844097U/en
Application granted granted Critical
Publication of CN207844097U publication Critical patent/CN207844097U/en
Withdrawn - After Issue legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model belongs to automated material separation and pre-stored technical field, and in particular to a kind of full-automatic intelligent logistics system for carton production.This system includes disk pile separation assembly and storage band;Disk pile separation assembly includes charging band to band transfer module, lifting platform and discharging band to band transfer module;Have between lifting platform and charging band to band transfer module for pushing away paper baffle along vertical to the gap being put into;Memory block includes storage band, the material direction of travel of the material direction of travel parallel discs pile separation assembly of the storage band;Cross track is set between disk pile separation assembly and memory block;Placement feed ferry bus on cross track;This system further includes burden charging carriage and dispensing track.The utility model has automation and produces the advantage that continuity degree is high, functional reliability is strong, construction is compact and simple and efficient to handle, it efficient can realize that cardboard pile detaches and be pre-stored operation with the online of pallet, the real work efficiency of whole system can be promoted therewith.

Description

A kind of full-automatic intelligent logistics system for carton production
Technical field
The utility model belongs to intelligent logistlcs technology field, and in particular to a kind of fully-automatic intelligent for carton production Compound streaming system.
Background technology
Corrugated board is also known as corrugated cardboard, is bonded by least one layer of corrugated paper and one layer of boxboard, has preferable Elasticity and extensibility.Corrugated board can support collision in by handling process and fall and fall because of high mechanical strength, be mainly used for Manufacture sandwich and delicate articles the packaging material of carton, carton.In process of production, by warehouse area transport Lai corrugated paper Plate needs on fitly pile to pallet, in order to subsequently carry out the printing processing of batch.Specifically, corrugated board supplied materials Later, need to move cardboard pile to printing machine platform by the disk that manually puts one's child in a boarding nursery, then by it is artificial a little bring up to printing machine namely life Producing line inlet.Artificial feeding mode labor intensity is big, while being also difficult to keep up with the productive temp of existing automatic production line, into And greatly constrain the production efficiency of existing production line.In addition, artificial feeding be difficult to ensure after cardboard pile discharging still in Under neat specification condition;Cause cardboard pile not neat after artificial feeding, will cardboard pile can not be successfully via processing district Printing machine import enters production line, can also influence actual production, these are all to compel technical problem to be solved.
Invention content
The purpose of the utility model is to overcome above-mentioned the deficiencies in the prior art, provide a kind of reasonable for structure and practical be used for The full-automatic intelligent logistics system of carton production, has that automation and production continuity degree are high, functional reliability is strong, structure Compact and simple and efficient to handle advantage is made, efficient can realize that cardboard pile detaches and be pre-stored operation with the online of pallet.
To achieve the above object, the utility model uses following technical scheme:
A kind of full-automatic intelligent logistics system for carton production, it is characterised in that:This system includes for online It detaches the disk pile separation assembly of pallet and cardboard pile and is pre-stored so as in due course to production line feeding for realizing cardboard pile Memory block;The disk pile separation assembly include the charging band to band transfer module being sequentially connected along cardboard pile travel path, lifting platform and Discharge band to band transfer module;Lifting platform has high-order and two kinds of location status of low level, and when lifting platform is in a high position, lifting platform is used to put The conveyor surface for setting the table top and charging band to band transfer module of cardboard pile and pallet is in the same plane, when lifting platform is in low level, rises The table top of platform is dropped less than the lead between the conveyor surface of discharging band to band transfer module and the table top of lifting platform and the conveyor surface for the band to band transfer module that discharges Vertical distance is equal to pallet height;Have between lifting platform and charging band to band transfer module for pushing away paper baffle along vertical between being put into Gap, disk pile separation assembly further include for drive push away paper baffle along vertical to the vertical driving portion of action and driving push away paper baffle Along the horizontal drive portion of lifting table table top action, it is horizontally disposed and push away paper baffle plate length direction and vertically go out to push away paper baffle plate body Expect the haul direction of Transport Desk;When lifting platform is in a high position, the either flush of paper baffle is pushed away or less than charging Transport Desk conveying Face;When lifting platform is in low level, the bottom surface for pushing away paper baffle is concordant or higher than the pallet upper disk surface being now placed on lifting platform, with It leaves pallet upper disk surface so that pushing away paper baffle and can push cardboard pile and is moved at the conveyor surface of discharging band to band transfer module;The memory block Including storage the bands more than twice that are arranged in juxtaposition, the material of the material direction of travel parallel discs pile separation assembly of the storage band Direction of travel;The guide direction vertical disk of setting cross track and cross track between disk pile separation assembly and memory block The material direction of travel of pile separation assembly;Cross slide way extends to production line inlet along itself guide direction;On cross track It is mounted with for realizing material conveying between discharging band to band transfer module and storage band and stores what material between band and production line conveyed It is fed ferry bus;This system further includes for realizing the burden charging carriage that material conveys between each storage band;The burden charging carriage is set up in On dispensing track;The guide direction of the dispensing track and cross track is parallel to each other, and dispensing track is distinguished with cross track It is arranged at the both ends of storage band.
Preferably, the disk pile separation assembly is arrangement more than two and alongside one another;Disk pile separation assembly and production line It is arranged at the homonymy of cross track;Storage band is located at the other side of cross track.
Preferably, the storage band is parallel by axis each other and more rollers of coplanar arrangement are constituted, same storage band Each roller by stepper motor drive to constitute one of rollgang;The cardboard pile isolated by disk pile separation assembly is according to confession Expect the transport sequence of ferry bus, and the conveying direction by each cardboard pile along storage band is held on one by one on each road rollgang;Together Photoelectric sensor is set between adjacent two rollers of one storage band, the photoelectric sensor induction end radiation exposure direction is hung down Directly upward.
Preferably, table top when the charging conveyor surface of band to band transfer module, the lifting platform at each disk pile separation assembly are in high-order with And discharging band to band transfer module conveyor surface, feed ferry bus set charge level, storage with conveyor surface, burden charging carriage set charge level be in it is same On horizontal plane;The charging conveyor surface of band to band transfer module, lifting platform table top, the conveyor surface for the band to band transfer module that discharges, feed ferry bus are set The charge level of setting of charge level and burden charging carriage is that can make the conveyer belt of material transferring action along set direction, and the material of each conveyer belt Conveying direction is parallel to each other.
Preferably, the horizontal drive portion includes the guide rail pushed away at lifting platform at paper baffle travel path both sides that is placed in, The forward surface of twice guide rail constitutes the guide surface for making the action of sliding rail guiding for guide runner, and each sliding block is with corresponding power source It is driven;Arrange that vertical driving portion, the vertical driving portion are vertical cylinder at the forward surface of two sliding blocks, the vertical driving The casing wall in portion is fixed on sliding block, and the tailpiece of the piston rod vertical of vertical driving portion extends downwardly and is fixed in the respective plate for pushing away paper baffle At end.
Preferably, described to push away paper baffle shape in rectangular plate and push away paper baffle plate face plumbing arrangement.
Preferably, platform support is set at the lifting platform below conveyer belt;Lifting platform further includes for driving conveyer belt And platform support make vertical to lifting action jacking cylinder, the tailpiece of the piston rod vertical of jacking cylinder upwardly extends and is fixed on On platform support.
The beneficial effects of the utility model are:
1), the utility model with disk pile separation assembly come realize cardboard pile and pallet online quick separating operate, then with Memory block detaches the interim storage function of back cardboard pile to realize, is fed at any time so as to the needs according to production line.Simultaneously, It is fed the setting of ferry bus, then is realized between discharging band to band transfer module and storage band between material conveying and storage band and production line Material conveying function.For burden charging carriage, then play after interim refining or a certain the storage band between storage band are fully loaded with another It is pre-stored function at outer storage band;It when needed, can be by the running of burden charging carriage, without being fast implemented by feed ferry bus Quick feeding demand between each storage band.When specific operation, for disk pile separation assembly, the utility model is passed with feeding Defeated, as the feed end for accepting pallet and cardboard pile, the discharge end of transported sheet straight sheet pile is used as using the band to band transfer module that discharges, and to lift Cardboard pile and autonomous separating effect of the pallet at lifting platform are realized in platform and the collocation for pushing away paper baffle, it is final realize it is few manually very Cardboard pile under to no manual intervention detaches purpose with the automatic on-line of pallet.And for storing band, simultaneously by multiple tracks The arrangement of row and form memory block, and transversely orbit transports direction in block form be laid out.On the one hand feed ferry bus connects The cardboard pile closed at pile separation assembly, and by the transversely displacement function of track and by the in due course transport of cardboard pile to specified Storage band in, to realize the pre-stored function of cardboard pile;On the other hand, when production line needs, feed ferry bus again from Certain stores splicing at band together, and by transport to the production line inlet being similarly positioned at cross track side.When feed is put Cross vehicle it is in running order and can not dual-purpose when, can realize in memory block the in due course dispensing between respectively storage band by burden charging carriage Function, to ensure the continuity of production.The utility model efficient can realize that cardboard pile detaches and prestores with the online of pallet Significant increase can be obtained in storage operation, the real work efficiency of subsequent handling.
2), further to promote the working efficiency of whole system, disk pile separation assembly can arrange it is multigroup, to adapt to store The quick feed demand of band.It certainly, when specific operation, can be depending on the item number of production line.Disk pile separation assembly and production line cloth It is placed at the homonymy of cross track, and stores band and be located at the other side of cross track, this is because disk pile separation assembly and life The usual item number of producing line is less, thus can integral arrangement in the side of cross track, and store band and usually require a large amount of to accommodate cardboards Pile, therefore usually arrangement is compared with multiple tracks, by the other side for storing band and being arranged in cross track obviously help storage band placement and Planning, the place space availability ratio of workshop can be also effectively ensured.
3), for storing band, it is essentially all to form rollgang by more rollers that per pass, which stores band,.It is storing When band pan feeding, rollgang is inverted such that at feed ferry bus that cardboard pile can smoothly immerse storage band.In storage band discharging, Rollgang rotates forward in order to the setting on charge level into feed ferry bus of cardboard pile sequentially at rollgang, and then is put by feed The production line inlet that these cardboard piles are sent into cross track other end by vehicle is crossed, each section division of labor is clear and clear.And Photoelectric sensor can be set between the adjacent rollers of per pass rollgang, photoelectric sensor can arrange one also arrange it is several A, function is to monitor right over the photoelectric sensor whether have cardboard pile, how many thus judges on the rollgang Cardboard pile and whether need to feed, then conventional central production control unit of arranging in pairs or groups, it is clear that can be achieved it is efficient and automation into Discharging monitoring and operating function.
4), when practical operation, band to band transfer module and discharging band to band transfer module is fed or conveyer belt can be used to realize actively conveying, even Manual power assisting can be used to push or realize that the traveling of cardboard pile or even pallet acts using individual pushing mechanism.When cardboard pile And after pallet is acted to lifting platform table top, lifting platform can sink a lattice automatically at this time, and originally buried in lifting platform and charging The paper baffle that pushes away of gap location starts to be lifted and make horizontal balance between band to band transfer module, is realized only to paper to be bonded pallet upper disk surface The scraping effect of straight sheet pile, and then push to cardboard pile is entire at discharging band to band transfer module;Meanwhile pallet can be lost because of difference in height It stays on lifting platform, you can realize the quick separating effect of pallet and cardboard pile, simple operation and functional reliability and efficiency It can be effectively ensured.
5), as the further preferred scheme of said program, the conveyor surface of band to band transfer module is fed, when lifting platform is in high-order Table top and discharge band to band transfer module conveyor surface, feed ferry bus set charge level, storage the charge level of setting with conveyor surface, burden charging carriage should all When in same level.In other words, it is along same level when cardboard pile is advanced along the transport path of above each equipment What face and straight line were advanced.Above-mentioned horizontal traveling mode, helps to ensure that the traveling stationarity of cardboard pile, and conducive to side pan feeding and The other side discharges to memory block or production line entrance, to increase the efficiency of production procedure.
6), as one of the utility model core component, the traveling action of paper baffle is pushed away, directly determines cardboard The separation reliability and efficiency of pile and pallet.The utility model using guide rail as the guide part along cardboard pile direction of travel, and Make the guide end that vertical acts using vertical cylinder as paper baffle is pushed away, and then realizes the aforementioned pusher function of pushing away paper baffle.Specifically For, when being run to lifting platform cardboard pile and pallet edge charging band to band transfer module, paper baffle is pushed away at this time by vertical cylinder action And gap between charging band to band transfer module and lifting platform is sunk to, to avoid the travel path of material.And when cardboard pile is risen with pallet When drop platform acts on and comes downwards to specified altitude assignment, pushing away paper baffle is then first risen by vertical cylinder action, then preceding by railway effect Row, and then realize the push function to cardboard pile, the final conveying for enabling cardboard pile reliably to be pushed to discharging band to band transfer module At face.
7), further, charging band to band transfer module, lifting platform, discharging band to band transfer module or even feed ferry bus and burden charging carriage are with can Along set direction make material transferring action conveyer belt as table top or conveyor surface, to realize the full-automatic traveling mesh of material 's.For lifting platform, after pallet is detached with cardboard pile and lifting platform replys high-order, lifting platform table top can be made anti- Turn, so that the pallet at lifting platform is reversed at the conveyor surface for being delivered to charging band to band transfer module, at this time or charging is transmitted Platform continues reversion or pallet of manually taking, to realize the self-emptying function of pallet, in order to which next group carries the paper of pallet Separator can be added in straight sheet pile as early as possible.And conveyer belt then relies on platform support as support at lifting platform, and made by jacking cylinder It is just repeated no more herein for driving source with realizing the autonomous lifting effect of lifting platform.
Description of the drawings
Fig. 1 is each component layout area schematic diagram of the utility model;
When Fig. 2 is that lifting platform is in high-order and feeds band to band transfer module feeding, the action schematic diagram of disk pile separation assembly;
The schematic top plan view of disk pile separation assembly when Fig. 3 is state shown in Fig. 2;
When Fig. 4 is that lifting platform is in low level and pushes away paper baffle uplink, the action schematic diagram of disk pile separation assembly;
The schematic top plan view of disk pile separation assembly when Fig. 5 is state shown in Fig. 4;
When Fig. 6 is that lifting platform is in low level and pushes away paper baffle horizontal pusher, the action schematic diagram of disk pile separation assembly;
The schematic top plan view of disk pile separation assembly when Fig. 7 is state shown in Fig. 6;
Fig. 8 is the structural schematic diagram for storing band.
The practical correspondence of each label of the utility model and component names is as follows:
A- cardboard pile b- pallet c- production lines
10- disk pile separation assemblies
11- feeds band to band transfer module
12- lifting platform 12a- platform support 12b- jacking cylinders
13- discharging band to band transfer module
14a- pushes away paper baffle 14b- guide rail 14c- sliding block 14d- vertical cylinders
21- storage band 21a- roller 21b- photoelectric sensors
22- is fed ferry bus 23- cross track 24- burden charging carriage 25- dispensing tracks
Specific implementation mode
For ease of understanding, here in connection with attached drawing, concrete structure and working method to the utility model are made further below Description:
ERP system is the abbreviation of Enterprise Resources Plan (Enterprise Resource Planning), refers to establishing On Information Technology Foundation, integrate information technology and advanced management thought, with the management thought of systematization, be enterprise staff and Decision-making level provides the management platform of decision making approach.ERP system has integration, advance, uniformity, integrality, opening.It should ERP system is applied in logistics system provided by the utility model, to play country variant, different brands, different works The machinery equipment of sequence is together in series and forms automatic assembly line, and then reduces live manpower, reduces the damage in process handshaking Consumption, and the synchronous linking reduced between different processes takes etc., realizes greatly saving for resource.And the logistics of the utility model System is then mainly used as paper process on the front end of corrugated case factory, and purpose mainly automatically detaches cardboard pile a and pallet b, Then automatic pre- material stock, and in response to production line c and before transporting cardboard pile a by the cooperation of feed ferry bus 22 and burden charging carriage 24 Toward printing process namely production line entrance.The utility model concrete structure is shown referring to Fig.1, and agent structure includes Pan Duo separation Component 10 stores band 21 and positioned at the feed ferry bus 22 for playing linking between the two, is fed ferry bus 22 by laterally Track 23 and make reciprocating action.In addition, as shown in Figure 1, the utility model is also in 23 cloth of relatively transverse track of storage band 21 It sets and arranges dispensing track 25 at the other end at end, 23 guide direction of guide direction parallel transverse track of dispensing track 25, to It is run for burden charging carriage 24, to realize the proportioning materials operation respectively stored in memory block 20 between band 21.
For disk pile separation assembly 10:Feed band to band transfer module 11 and head and the tail of the band to band transfer module 13 as entire defiber that discharge End, undertakes the pan feeding of the cardboard pile a with pallet b and the discharging functions of simple cardboard pile a respectively.Feed band to band transfer module 11 with Band to band transfer module 13 discharge using conveyer belt as conveyor surface, to realize the traveling function along set direction of above-mentioned material.And it is right For lifting platform 12, it is arranged between charging band to band transfer module 11 and discharging band to band transfer module 13, to play linking fade function.Often When the cardboard pile a with pallet b advances along the conveyor surface of charging band to band transfer module 11, initially enters lifting platform 12 and realize cardboard pile The online lock out operation of a and pallet b, hereafter individual cardboard pile a enter discharging band to band transfer module 13 and discharge, pallet b is then being lifted While platform 12 replys a high position, by lifting platform 12 and feeds the reversion action of 11 conveyer belt of band to band transfer module and take out of.
On the basis of above structure, to realize the online separation function of cardboard pile a and pallet b, one side of the utility model Face is by jacking cylinder 12b collocation platform support 12a, to realize the controllable sedimentation of conveyer belt and lifting work(at lifting platform 12 Energy;And on the other hand, by as illustrated in figs. 2-7 push away paper baffle 14a, to realize the push purpose of cardboard pile a.Push away paper baffle The vertical of 14a is realized to lifting action by vertical cylinder 14d, and horizontal direction displacement then comes by guide rail 14b and sliding block 14c Ensure.When on the shelf or charging band to band transfer module 11 is in feed state, pushing away paper baffle 14a can be in the work of vertical cylinder 14d Lifting platform 12 is sunk to lower and is fed in the gap between band to band transfer module 11, as Figure 2-3, to ensure to push away paper baffle 14a The feed operation of cardboard pile a will not be hampered.
For ease of further understanding the utility model, illustrate that the real work flow of disk pile separation assembly 10 is as follows herein:
1), cardboard pile a of the neat pile on pallet b, by forklift to charging band to band transfer module 11.At this point, charging transmission Photoelectric sensor scanning at platform 11 is to having on material, and charging band to band transfer module 11 advances automatically, as Figure 2-3.Later, cardboard Pile a proceeds to lifting platform 12, and the photoelectric sensor Scanning Detction at lifting platform 12 enters to entire pallet b, feeds band to band transfer module 11 Stop transmission.
2), lifting platform 12 starts to act, and jacking cylinder 12b starts to bounce back, and then drives platform support 12a and lifting platform 12 Place's conveyer belt drops to low-end trim automatically.At this point, the table top falling head of lifting platform 12 is just pallet b height, such as Fig. 4-7 It is shown.Wait for that lifting platform 12 drops to after low level, gap location pushes away paper baffle between charging band to band transfer module 11 and lifting platform 12 14a starts to make uplink action as shown in Figure 4.
3) after, pushing away the 14a rises of paper baffle, the bottom surfaces paper baffle 14a is pushed away and preferably just touch the surfaces pallet b, then push away paper gear The beginnings of plate 14a as shown in fig. 6-7 move forward automatically close to pallet b upper disk surfaces so that cardboard pile a is pushed into out from pallet b On the conveyor surface for expecting band to band transfer module 13.
4), when cardboard pile a has just touched the conveyor surface of discharging band to band transfer module 13, the photoelectric sensor at the band to band transfer module 13 that discharges Incuded and drive the automatic rolls forward of conveyor surface at discharging band to band transfer module 13, so as to coordinate push away paper baffle 14a drive cardboard pile a from Open pallet b.Later, paper baffle 14a self-returns are pushed away to gap between charging band to band transfer module 11 and lifting platform 12 as Figure 2-3 Place.Meanwhile lifting platform 12 can reply a high position, then conveyer belt counter motion at lifting platform 12 sends pallet b back to charging band to band transfer module 11 conveyor surface;After again, the conveyor surface also counter motion of band to band transfer module 11 is fed, to send pallet b back to starting points, entire at this time point It is fully completed from movement.
After disk pile separation assembly 10 isolates cardboard pile a, cardboard pile a can be transported to feed along discharging band to band transfer module 13 At ferry bus 22.Backstage is differentiated and is needed in that production line c productions and production sequence according to the order information in ERP system, To judge cardboard pile a placement regions.It is as shown in Figure 1, feed ferry bus 22 according to the judging result on backstage, and it is in due course general Cardboard pile a is delivered at corresponding storage band 21 as shown in Figure 1, to realize the pre-stored function of cardboard pile a.Cardboard pile After a is sent to storage band 21, the light eye of the photoelectric sensor 21b between the corresponding correspondence roller 21a to storage band 21 is blocked, can Obtain actual cardboard pile a storage conditions in each storage band 21;The position of photoelectric sensor 21b is with reference to shown in Fig. 8.And When feeding similarly, the automatic of production line cries material system according to the order information in ERP system, to judge to need to store from which road Feeding in band 21, being fed ferry bus 22 at this time, transversely track 23 marches to splicing at this, and material transportation to production line c is entered At mouthful.When necessary, using burden charging carriage 24 material allocation between different storage bands 21 is realized along the operation of dispensing track 25, Also the operation burden of feed ferry bus 21 can be reduced to a certain extent.

Claims (7)

1. a kind of full-automatic intelligent logistics system for carton production, it is characterised in that:This system includes for dividing online It is pre-stored so as in due course to production line feeding with the disk pile separation assembly (10) of cardboard pile and for realizing cardboard pile from pallet Memory block;The disk pile separation assembly (10) include the charging band to band transfer module (11) being sequentially connected along cardboard pile travel path, Lifting platform (12) and discharging band to band transfer module (13);Lifting platform (12) has high-order and two kinds of location status of low level, works as lifting platform (12) when being in high-order, the conveyor surface of the table top and charging band to band transfer module (11) for shelving cardboard pile and pallet of lifting platform (12) In the same plane, when lifting platform (12) is in low level, the table top of lifting platform (12) is defeated less than discharging band to band transfer module (13) The vertical between the table top in face and lifting platform (12) and the conveyor surface of discharging band to band transfer module (13) is sent to be equal to pallet height to distance;It rises Have between drop platform (12) and charging band to band transfer module (11) for pushing away paper baffle (14a) along vertical to the gap being put into, Pan Duo is detached Component (10) further include for drive push away paper baffle (14a) along vertical to the vertical driving portion of action and drive push away paper baffle (14a) it is horizontally disposed and push away paper baffle to push away paper baffle (14a) plate body along the horizontal drive portion that lifting table (12) table top acts (14a) plate length direction vertically discharges the haul direction of Transport Desk;When lifting platform (12) is in a high position, paper baffle (14a) is pushed away Either flush is less than charging Transport Desk conveyor surface;When lifting platform (12) is in low level, the bottom surface for pushing away paper baffle (14a) is concordant Or higher than the pallet upper disk surface being now placed on lifting platform (12), support is left so that pushing away paper baffle (14a) and cardboard pile can be pushed Disk upper disk surface and be moved to discharging band to band transfer module (13) conveyor surface at;The memory block includes the storage of the twice being arranged in juxtaposition or more Deposit band (21), the material direction of travel of the material direction of travel parallel discs pile separation assembly (10) of the storage band (21);In disk Pile separation assembly (10) and the guide direction vertical disk of setting cross track (23) and the cross track (23) between memory block The material direction of travel of pile separation assembly (10);Cross slide way (14b) extends to production line inlet along itself guide direction;It is horizontal It is mounted on track (23) for realizing material conveying between discharging band to band transfer module (13) and storage band (21) and storage band (21) the feed ferry bus (22) that material conveys between production line;This system further includes for realizing between each storage band (21) The burden charging carriage (24) of material conveying;The burden charging carriage (24) is set up on dispensing track (25);The dispensing track (25) and cross Guide direction to track (23) is parallel to each other, and dispensing track (25) is respectively arranged with cross track (23) in storage band (21) Both ends at.
2. a kind of full-automatic intelligent logistics system for carton production according to claim 1, it is characterised in that:Institute It is arrangement more than two and alongside one another to state disk pile separation assembly (10);Disk pile separation assembly (10) is with production-line arrangement in transverse direction At the homonymy of track (23);Storage band (21) is located at the other side of cross track (23).
3. a kind of full-automatic intelligent logistics system for carton production according to claim 2, it is characterised in that:Institute State that storage band (21) is parallel by axis each other and more rollers (21a) of coplanar arrangement are constituted, same storage is each with (21) Roller (21a) is driven by stepper motor to constitute one of rollgang;The cardboard pile isolated by disk pile separation assembly (10) According to the transport sequence of feed ferry bus (22), and the conveying direction by each cardboard pile along storage band (21) is held on each road one by one On rollgang;Setting photoelectric sensor (21b) between adjacent two rollers (21a) of same storage band (21), the light Electric inductor (21b) induction end radiation exposure direction is vertically upward.
4. a kind of full-automatic intelligent logistics system for carton production according to claim 1 or 2 or 3, feature It is:The conveyor surface of charging band to band transfer module (11) at each disk pile separation assembly (10), table top when lifting platform (12) is in high-order And discharging band to band transfer module (13) conveyor surface, feed ferry bus (22) set charge level, storage band (21) conveyor surface, burden charging carriage (24) Charge level of setting be all in the same horizontal plane;The conveyor surface of the charging band to band transfer module (11), lifting platform (12) table top, discharging transmission The conveyor surface of platform (13), the set charge level and the charge level of setting of burden charging carriage (24) of feed ferry bus (22) are that can make along set direction The conveyer belt of material transferring action, and the material conveying direction of each conveyer belt is parallel to each other.
5. a kind of full-automatic intelligent logistics system for carton production according to claim 4, it is characterised in that:Institute Horizontal drive portion is stated including pushing away the guide rail (14b) at paper baffle (14a) travel path both sides, twice at the lifting platform (12) that is placed in The forward surface of guide rail (14b) constitutes the guide surface for making the action of sliding rail guiding for guide runner (14c), each sliding block (14c) with Corresponding power source is driven;Arrange that vertical driving portion, the vertical driving portion are vertical at the forward surface of two sliding blocks (14c) The casing wall of cylinder (14d), the vertical driving portion is fixed on sliding block (14c), and the tailpiece of the piston rod vertical of vertical driving portion is downward Extend and is fixed at the respective plate end for pushing away paper baffle (14a).
6. a kind of full-automatic intelligent logistics system for carton production according to claim 4, it is characterised in that:Institute It states and pushes away paper baffle (14a) shape in rectangular plate and push away paper baffle (14a) plate face plumbing arrangement.
7. a kind of full-automatic intelligent logistics system for carton production according to claim 4, it is characterised in that:Institute It states and platform support (12a) is set at lifting platform (12) below conveyer belt;Lifting platform (12) further includes for driving conveyer belt and putting down Platform holder (12a) make vertical to lifting action jacking cylinder (12b), the tailpiece of the piston rod vertical of jacking cylinder (12b) is upward Extend and is fixed on platform support (12a).
CN201820086646.XU 2018-01-17 2018-01-17 A kind of full-automatic intelligent logistics system for carton production Withdrawn - After Issue CN207844097U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820086646.XU CN207844097U (en) 2018-01-17 2018-01-17 A kind of full-automatic intelligent logistics system for carton production

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820086646.XU CN207844097U (en) 2018-01-17 2018-01-17 A kind of full-automatic intelligent logistics system for carton production

Publications (1)

Publication Number Publication Date
CN207844097U true CN207844097U (en) 2018-09-11

Family

ID=63415222

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820086646.XU Withdrawn - After Issue CN207844097U (en) 2018-01-17 2018-01-17 A kind of full-automatic intelligent logistics system for carton production

Country Status (1)

Country Link
CN (1) CN207844097U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108263800A (en) * 2018-01-17 2018-07-10 龙利得包装印刷股份有限公司 For the full-automatic intelligent logistics system and method for carton production
CN113152906A (en) * 2021-03-02 2021-07-23 江苏吴中建设集团有限公司 Efficient sliding equipment in PC component field and PC component installation method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108263800A (en) * 2018-01-17 2018-07-10 龙利得包装印刷股份有限公司 For the full-automatic intelligent logistics system and method for carton production
CN113152906A (en) * 2021-03-02 2021-07-23 江苏吴中建设集团有限公司 Efficient sliding equipment in PC component field and PC component installation method

Similar Documents

Publication Publication Date Title
CN108263800B (en) Full-automatic intelligent logistics system and method for carton production
CN106586355B (en) A kind of disc material double computer cooperation automatic access system
CN107336962A (en) A kind of automation delivery system of material
CN201694418U (en) Paperboard automatic conveying device of beverage paper box forming machine
CN207844097U (en) A kind of full-automatic intelligent logistics system for carton production
CN107973041B (en) All-round goods arrive people letter sorting commodity circulation device
CN107055070A (en) A kind of photovoltaic module Transmission system
CN103922136B (en) The intensive picking method of small lot cigarette and the order-picking trucks that shuttles back and forth
CN203484906U (en) Automatic production system of container bottom beam
CN209403339U (en) A kind of full-automatic unstacking and stacking machine
CN106348029A (en) Empty tray recovery method and device
CN104960869A (en) Multi-station material collection stacking device
CN110877405A (en) Prefabricated component production line
CN207827129U (en) A kind of goods of Almightiness type sorts logistics device to people
CN105795511A (en) Material demanding method for auxiliary material object disc of ultra-high-speed cigarette making machine
CN110512471A (en) A kind of moulded paper pulp product automatic production line
CN210339806U (en) Collecting device used after paperboard cutting
CN112224725A (en) Intelligent logistics system for printing and dyeing industry
CN207844260U (en) A kind of intelligence Production Scheduling System
CN108058972A (en) A kind of intelligence production material separator
CN105712023A (en) Wall and floor brick warehousing system convenient for realizing automatic storage and taking
CN111290394A (en) Automatic sheet material storage and management system
CN207844287U (en) A kind of intelligence production material separator
CN109526880A (en) A kind of full-automatic unstacking and stacking machine
CN218557499U (en) Full-automatic preparation maintenance circulation system of environmental protection brick

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder
CP01 Change in the name or title of a patent holder

Address after: 239400 No. 150 Sports Road, Mingguang Industrial Park, Chuzhou, Anhui

Co-patentee after: Bin printing technology (Shanghai) Co., Ltd.

Patentee after: Dragon Lede intelligent Polytron Technologies Inc

Address before: 239400 No. 150 Sports Road, Mingguang Industrial Park, Chuzhou, Anhui

Co-patentee before: Bin printing technology (Shanghai) Co., Ltd.

Patentee before: LONG LI DE PACKAGING AND PRINTING CO., LTD.

AV01 Patent right actively abandoned
AV01 Patent right actively abandoned

Granted publication date: 20180911

Effective date of abandoning: 20190830