CN207829516U - A kind of construction gib frame - Google Patents

A kind of construction gib frame Download PDF

Info

Publication number
CN207829516U
CN207829516U CN201820065254.5U CN201820065254U CN207829516U CN 207829516 U CN207829516 U CN 207829516U CN 201820065254 U CN201820065254 U CN 201820065254U CN 207829516 U CN207829516 U CN 207829516U
Authority
CN
China
Prior art keywords
sleeve
hole
montant
fixed
support
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201820065254.5U
Other languages
Chinese (zh)
Inventor
陈炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201820065254.5U priority Critical patent/CN207829516U/en
Application granted granted Critical
Publication of CN207829516U publication Critical patent/CN207829516U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of construction gib framves,Including bottom plate and the sleeve being fixed in the middle part of bottom plate upper surface,Montant is plugged in sleeve,It is locked by retaining mechanism between montant and sleeve,Retaining mechanism includes two screw rods,It is provided with first through hole on the side wall of sleeve,Axial directional distribution of the first through hole along sleeve,The second through-hole being arranged in a one-to-one correspondence with first through hole is provided in montant,Every screw rod is threaded through respectively in one of first through hole and the second through-hole,The both ends of every screw rod stretch out in outside sleeve and are threaded with hand nutting,The upper end of montant stretches out in outside sleeve and is fixed with support plate,The upper surface of support plate is fixedly arranged in the middle of jack,The upper end of the piston rod of jack is fixed with support base,Arc groove is provided in the middle part of support base,It is fitted with non-slip mat on the support base of arc groove both sides;The utility model can realize the secure support to pipeline and prefabricated board, and can achieve the purpose that reuse.

Description

A kind of construction gib frame
Technical field
The utility model belongs to suspension device technical field, is related to a kind of construction gib frame.
Background technology
In building construction process, it is often necessary to be supported to objects such as pipeline, prefabricated boards, at present to pipeline, prefabricated The support of plate is generally all supported by timber, however it is steady in the presence of support to come supporting pipeline and prefabricated board by using timber The disadvantage of qualitative difference and structural strength difference, and timber will appear damaged phenomenon after a single use, to be unable to reach repetition The purpose used.
Utility model content
To solve the above-mentioned problems, the utility model devises a kind of construction gib frame, can realize pair The secure support of pipeline and prefabricated board, and can achieve the purpose that reuse.
What the purpose of this utility model was realized in:
The construction gib frame of the utility model, including bottom plate and the sleeve that is fixed in the middle part of bottom plate upper surface, It is plugged with montant in sleeve, is locked by retaining mechanism between montant and sleeve, retaining mechanism includes two screw rods, the side of sleeve It is provided on wall respectively for several first through hole that wherein a screw rod passes through, axial direction point of the first through hole along sleeve Cloth is provided with the second through-hole passed through for screw rod being arranged in a one-to-one correspondence with first through hole in montant, and every screw rod is worn respectively It is located in one of first through hole and the second through-hole, the both ends of every screw rod, which stretch out in outside sleeve and are threadedly coupled, to be useful for The upper end of the hand nutting of tie down screw, montant stretches out in outside sleeve and is fixed with support plate, and the upper surface middle part of support plate is solid There are jack, the upper end of the piston rod of jack to be fixed with support base, be provided in the middle part of support base and be used to support pipeline surely Arc groove is fitted with the non-slip mat for being used to support plane on the support base of arc groove both sides.
The construction gib frame of the utility model, wherein several are fixed on the lower face of support base in week To the guide post of distribution, the lower end of guide post, which can slide up and down to, to be threaded through in support plate;By the setting of guide post, pushed in jack During support base moves up and down, it can be ensured that support base it is steady.
The construction gib frame of the utility model, wherein it is in array that several are provided on the lower face of bottom plate The anti-slop serrations of shape distribution;By the setting of anti-slop serrations, the frictional force between bottom plate and supporting surface can be increased, play anti-skidding work With.
The construction gib frame of the utility model, wherein be fixed between the lateral wall and bottom plate of sleeve lower end Several are in circumferentially distributed reinforcement block;By the setting of reinforcement block, the structural strength between sleeve and bottom plate can be improved.
The construction gib frame of the utility model, wherein the lower end of montant is individual dome-like structures;By using this Kind structure, montant can be more easily inserted into sleeve.
When the utility model is used, adjustment montant first is inserted into the depth in sleeve, i.e., is adjusted to close by support base Suitable height, and being locked montant and sleeve by retaining mechanism, then passes through and operates jack so that support base to pipeline or Prefabricated board is held out against;After above structure, the utility model can realize the secure support to pipeline and prefabricated board, And it can achieve the purpose that reuse.
Description of the drawings
Fig. 1 is the partial cross-sectional structural diagram of the utility model;
Fig. 2 is amplified structural schematic diagram at A in Fig. 1.
Specific implementation mode
Specific embodiment of the present invention is described in further detail below in conjunction with the accompanying drawings.
In the description of the present invention, unless otherwise indicated, term "upper", "lower", "left", "right", "front", "rear", The orientation or state relation of the instructions such as " top ", " bottom " are orientation based on ... shown in the drawings or state relation, merely to just It is described in description the utility model and simplifying, does not indicate or imply the indicated mechanism or certain party that component must have Position, with specific azimuth configuration and operation, therefore should not be understood as limiting the present invention.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " connection " It shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can be direct phase It even, can also be indirectly connected through an intermediary.For the ordinary skill in the art, on being understood with concrete condition State the concrete meaning of term in the present invention.
A kind of construction gib frame, including bottom plate 1 and the sleeve 11 being fixed in the middle part of 1 upper surface of bottom plate, sleeve It is plugged with montant 2 in 11, is locked by retaining mechanism between montant 2 and sleeve 11, retaining mechanism includes two screw rods 3, sleeve Several first through hole 12 passed through respectively for a wherein screw rod 3 are provided on 11 side wall, first through hole 12 is along sleeve 11 axial directional distribution is provided in montant 2 second logical with being passed through for screw rod 3 of being arranged in a one-to-one correspondence of first through hole 12 Hole 21, every screw rod 3 are threaded through respectively in one of first through hole 12 and the second through-hole 21, and the both ends of every screw rod 3 are stretched Outer and be threadedly coupled and be useful for the hand nutting 31 of tie down screw 3 for sleeve 11, the upper end of montant 2 stretches out in outside sleeve 11 simultaneously It is fixed with support plate 4, the upper surface of support plate 4 is fixedly arranged in the middle of jack 5, and the upper end of the piston rod of jack 5 is fixed with branch Seat 6 is supportted, the middle part of support base 6 is provided with the arc groove 61 for being used to support pipeline, is pasted on the support base 6 of 61 both sides of arc groove Close the non-slip mat 7 for being useful for supporting plane;It is in circumferentially distributed guide post 62 that several are fixed on the lower face of support base 6, is led The lower end of column 62, which can slide up and down to, to be threaded through in support plate 4;By the setting of guide post, pushes in jack and moved down on support base In dynamic process, it can be ensured that support base it is steady;Several are provided on the lower face of bottom plate 1 in the anti-skidding of array-like distribution Tooth 13;By the setting of anti-slop serrations, the frictional force between bottom plate and supporting surface can be increased, play anti-skidding effect;Sleeve 11 It is in circumferentially distributed reinforcement block 14 that several are fixed between the lateral wall and bottom plate 1 of lower end;It, can by the setting of reinforcement block Improve the structural strength between sleeve and bottom plate;The lower end of montant 2 is individual dome-like structures;By using this structure, montant energy It is enough to be more easily inserted into sleeve;When the utility model is used, adjustment montant first is inserted into the depth in sleeve, i.e., will Support base is adjusted to suitable height, and is locked montant and sleeve by retaining mechanism, then by operating jack so that Support base holds out against pipeline or prefabricated board;After above structure, the utility model can be realized to pipeline and pre- The secure support of making sheet, and can achieve the purpose that reuse.
It should be noted that in the embodiment above, as long as reconcilable technical solution can carry out permutation and combination, this Field technology personnel can be possible to according to the mathematical knowledge limit of permutation and combination, and therefore, the utility model is no longer to arrangement Technical solution after combination illustrated one by one, but it is understood that being the technical solution after permutation and combination by the utility model It is disclosed.
It should be noted that listed above is only a kind of specific embodiment of the utility model.Obviously, the utility model It is not limited to above example, acceptable there are many deformations.
In short, the institute that those skilled in the art directly can export or associate from content disclosed by the utility model There is deformation, is considered as the scope of protection of the utility model.

Claims (5)

1. a kind of construction gib frame, it is characterised in that:Including bottom plate (1) and it is fixed in the middle part of bottom plate (1) upper surface Sleeve (11), be plugged with montant (2) in the sleeve (11), pass through retaining mechanism between the montant (2) and sleeve (11) Locking, the retaining mechanism include two screw rods (3), are provided with respectively for a wherein spiral shell on the side wall of the sleeve (11) Several first through hole (12) that bar (3) passes through, the first through hole (12) along sleeve (11) axial directional distribution, it is described perpendicular The second through-hole (21) passed through for screw rod (3) being arranged in a one-to-one correspondence with first through hole (12), every spiral shell are provided in bar (2) Bar (3) is threaded through respectively in one of first through hole (12) and the second through-hole (21), and the both ends of every screw rod (3) stretch out in Sleeve (11) outside and is threadedly coupled and is useful for the hand nutting (31) of tie down screw (3), and the upper end of the montant (2) stretches out in set Cylinder (11) outside and is fixed with support plate (4), and the upper surface of the support plate (4) is fixedly arranged in the middle of jack (5), the jack (5) upper end of piston rod is fixed with support base (6), and the arc for being used to support pipeline is provided in the middle part of the support base (6) Slot (61) is located on the support base (6) of arc groove (61) both sides and is fitted with the non-slip mat (7) for being used to support plane.
2. construction gib frame according to claim 1, which is characterized in that the lower face of the support base (6) On be fixed with several be in circumferentially distributed guide post (62), the lower end of the guide post (62), which can slide up and down to, is threaded through support plate (4) in.
3. construction gib frame according to claim 2, which is characterized in that on the lower face of the bottom plate (1) It is provided with the anti-slop serrations (13) that several are in array-like distribution.
4. construction gib frame according to claim 3, which is characterized in that the outside of sleeve (11) lower end It is in circumferentially distributed reinforcement block (14) that several are fixed between wall and bottom plate (1).
5. construction gib frame according to claim 4, which is characterized in that the lower end of the montant (2) is circle Dome-shaped structure.
CN201820065254.5U 2018-01-16 2018-01-16 A kind of construction gib frame Expired - Fee Related CN207829516U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820065254.5U CN207829516U (en) 2018-01-16 2018-01-16 A kind of construction gib frame

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820065254.5U CN207829516U (en) 2018-01-16 2018-01-16 A kind of construction gib frame

Publications (1)

Publication Number Publication Date
CN207829516U true CN207829516U (en) 2018-09-07

Family

ID=63392946

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820065254.5U Expired - Fee Related CN207829516U (en) 2018-01-16 2018-01-16 A kind of construction gib frame

Country Status (1)

Country Link
CN (1) CN207829516U (en)

Similar Documents

Publication Publication Date Title
CN109736566A (en) Form beam bottom secondary joist, beam forms constructing structure and beam die plate reinforcing method
CN206917265U (en) A kind of adjustable small bore beam side reinforcement tools
CN207829516U (en) A kind of construction gib frame
CN205531283U (en) Scaffold puts up I -steel bracing of encorbelmenting power of getting and pole setting positioner
CN106149744A (en) Pile foundation steel bar cage skeletal support device and construction method
CN206844715U (en) A kind of novel building ergonomic support device
CN212031158U (en) Tension detection device for building engineering
CN210562223U (en) Slope protection template with arch framework
CN207727978U (en) Girderless floor bolumn cap template reinforcing device
CN201439641U (en) Scaffold supporting device
CN204510624U (en) Carbon beaverboard anchorage tensioning system
CN208437580U (en) A kind of device for molding reinforcement cage
CN201031502Y (en) Forwork assembled stand bridging beam with adjustable length
CN109914795A (en) A kind of building template assembly
CN205046843U (en) Reinforcing apparatus's stair template of marking time in middle of installation
CN213710269U (en) Prefabricated T roof beam construction operation platform
CN203769307U (en) Early-removal adjustable ejection rod device for building formwork
CN204691216U (en) Pylon is set up with scale rule and pylon
CN207794583U (en) A kind of construction operation platform
CN207144429U (en) A kind of engineering building construction scaffold
CN202728873U (en) An adjustable support for conveying cylinders
CN107989402B (en) Supporting device and supporting method for column body during building displacement
CN109025263A (en) A kind of construction form and shoring early-dismantling device
CN206205457U (en) A kind of steel reinforcement cage aids in colligation frame
CN204623800U (en) A kind of horizontal angle fixture

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180907

Termination date: 20200116