CN204691216U - Pylon is set up with scale rule and pylon - Google Patents
Pylon is set up with scale rule and pylon Download PDFInfo
- Publication number
- CN204691216U CN204691216U CN201520333359.0U CN201520333359U CN204691216U CN 204691216 U CN204691216 U CN 204691216U CN 201520333359 U CN201520333359 U CN 201520333359U CN 204691216 U CN204691216 U CN 204691216U
- Authority
- CN
- China
- Prior art keywords
- scale
- pylon
- voussoir
- steel pipe
- shaped
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn - After Issue
Links
Landscapes
- Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
Abstract
The utility model discloses a kind of pylon to set up with scale rule and pylon, scale rule are made up of the round steel pipe fastener at scale main body and two ends; Fastener comprises two hinged semicircle clips and a voussoir, the free end of the first semicircle clip be extended with one in the middle part of the slotted engaging lug of tool; The free end of the second semicircle clip is formed with a T-shaped dop, and the vertical edge width of T-shaped dop is less than the groove width of described engaging lug; Voussoir is provided with an elongated slot be slidably matched with the vertical edge of T-shaped dop, the first semicircle clip and the second semicircle clip by engaging lug and T-shaped dop by voussoir wedging.Pylon to be advised by scale by multiple standpipe and is connected and fixed and is formed.The beneficial effects of the utility model are, when scale rule are set up for pylon, and easy disassembly, reliable lock; Pylon shape specification, dimensional uniformity are good, be specially adapted to set pattern grid template support system, it is set up simply, take that to tear efficiency open high.
Description
Technical field
The utility model relates to the pylon set-up technology of a kind of building operations scaffold or form bracing system, and particularly a kind of pylon is set up with scale rule and pylon.
Background technology
In building construction process, need to set up scaffold and form bracing system.For meeting modern construction requirement, scaffold or support system not only need to have enough safety guarantee, meanwhile, more and more higher to the requirement of setting up efficiency.The main support section of existing scaffold or form bracing system all sets up into pylon form usually.Comparatively conventional mode of setting up has two kinds, and one is set up by rack, and two is that the mode adding transverse tube or down tube by standpipe is set up.It is need rational height adjustable bowl of seats under rack that rack is set up, and rack volume is large, and rack transport is extremely inconvenient, and cost of transportation is high, it is high to set up cost, but comparatively firm, also meets the sizing demand of pylon by the rack of sizing.The hand cradle that steel pipe is set up or support system comprise multiple steel pipe post of laying in array and for being connected to horizontal steel tube between column and diagonal brace steel pipe, horizontal steel tube and being fixedly connected with by fastener between diagonal brace steel pipe with column steel pipe, a part of crossbeam also forms operation platform for setting up springboard.Although its cost of transportation is low, take the speed of tearing open slow, take that the time of tearing open is long, production efficiency is low, modern construction speed needs can not be met; Meanwhile, the distance between each column is difficult to control, and the extremely difficult sizing requirement met between column, is not suitable for being used in setting up of sizing specification form bracing system.For this reason, need improve.
Summary of the invention
First object of the present utility model is exactly for deficiency of the prior art, there is provided a kind of pylon to set up to advise with scale, this scale rule two ends are welded with voussoir locking type fastener, to realize the quick and scale requirement that pylon is set up and removed, be specially adapted to the form bracing system adopting standard form.Another object of the present utility model is to provide a kind of pylon with this scale rule, to be applicable to the form bracing system adopting standard form.
For realizing above-mentioned first object, the utility model adopts following technical scheme:
A kind of pylon is set up with scale rule, and comprise and to be made up of steel pipe or scale main body that steel pipe welding is connected into, scale main body two ends are respectively equipped with at least one round steel pipe fastener; Round steel pipe fastener comprises by a hinge and two semicircle clips of being locked by a voussoir, and the free end of the first semicircle clip in two semicircle clips extends an engaging lug along cylindrical tangent plane direction, forms a fluting in the middle part of this engaging lug; The free end of the second semicircle clip in two semicircle clips is formed with a T-shaped dop along cylindrical tangent plane direction, the free end of the first semicircle clip is mutually vertical with two tangent planes of the second semicircle clip, and the vertical edge width of T-shaped dop is less than the groove width of described engaging lug; Described voussoir is provided with an elongated slot be slidably matched with the vertical edge of T-shaped dop, and the first semicircle clip and the second semicircle clip are by the wedging face wedging by voussoir of engaging lug and T-shaped dop.
Adopt the utility model of preceding solution, the scale main body of scale rule is made up of steel pipe or steel-pipe welding is formed, and scale main body two ends are provided with at least one round steel pipe fastener, and fastener is made up of a bearing pin, two semicircle clips and a voussoir, and its structure is simple; Two semicircle clips can adopt casting, its easy to process, low cost of manufacture.During for setting up scaffold or form bracing system, first by two semicircle clips in the periphery of column steel pipe, and the vertical edge of T-shaped dop is snapped in the fluting of lug, voussoir inserts T-shaped dop by small end, firmly knock the large end of voussoir, voussoir bottom surface is made to be connected on the first semicircle clip, inclined-plane is connected on the horizontal plane medial surface of T-shaped dop, then make two semicircular clip realize clasping of column steel pipe to step up, thus the locking of fastener and standpipe can be realized easily, during dismounting, only need suitably firmly to knock voussoir small end, the convenient locking state removing fastener.Simultaneously, because scale rule have the size of preseting length, therefore, distance between the pylon column set up can meet and presets requirement, effectively can meet standard form and setting the setting up of specification form bracing system, not by the restriction of the technical level of the personnel of setting up, ability and sense of responsibility, and effectively can avoid on-the-spot size specification and adjustment work, improve and set up efficiency, be specially adapted to setting up of quick detach and early removing system.
Preferred technical scheme, described scale main body is the frame construction of rod-like structure or triangle commander's flag-shaped or rectangle.The scale rule of various structures can meet different pylon and set up rigidity requirement, the scale rule bonding strength of rectangular frame structure and rigidity best, but cost is higher, the connection between two columns being suitable for the initial stage of setting up; Bonding strength and the rigidity of the scale rule of rod-like structure are minimum, and cost is also minimum, be suitable for the connection between follow-up two columns that square shape pylon set up two sides, or the expansion of other other shapes expanded on square shape basis are set up; The structural strength of the scale rule of triangle commander flag-shaped, rigidity and cost, between aforementioned two kinds of shapes, are usually suitable for being formed with one of both and orthogonally set up relation.The site specific that three sets up according to pylon, pylon rigidity, firm supporting degree etc. require choice for use.Arbitrary limit of pylon also may be combined with use wherein two or three.
Preferred technical scheme further, described rod-like structure scale main body is made up of a steel pipe, and round steel pipe fastener described in is welded at steel pipe two ends respectively; Described rectangle scale main body comprises two scales and isometric transverse tube and two isometric longitudinal tubule (L tubule)s, two transverse tubes are welded into rectangle frame by two longitudinal tubule (L tubule)s, be welded with down tube between two transverse tubes, down tube is between two longitudinal tubule (L tubule)s, and the two ends of two transverse tubes are respectively welded with round steel pipe fastener described in; Described triangle commander flag-shaped scale main body comprises a scale supervisor, a vertical tube, an inclined tube and an auxiliary pipe in flag angle, the auxiliary pipe in flag angle is responsible for parallel with scale, the auxiliary pipe in flag angle is responsible for scale and is welded by vertical tube and inclined tube, and the two ends of the outer end of the auxiliary pipe in flag angle and scale supervisor are all welded with round steel pipe fastener described in.Scale main body is made up of steel pipe, and it is lightweight, good rigidity, can save material, handled easily.
Further preferred technical scheme again; The free end sidewall of described second semicircle clip outwardly there is bulge loop.To be welded by the coffin of bulge loop with scale main body, also can add round steel at bulge loop during welding and assist, to improve the intensity and reliability that are welded to connect.
Preferred technical scheme, in face of the wedging of described voussoir, end is formed with guiding surface.Guiding surface, for the non-cutting time shortening voussoir locking or unlock, improves to take further and tears efficiency open.
Preferred technical scheme further, described voussoir is frame-shaped construction, and the elongated slot front end of voussoir is formed with hollow-out parts, and this hollow-out parts is greater than the cross section profile of described T-shaped dop horizontal sides.When locking to prevent voussoir, elongated slot two side arms free end is opened outward, affects locking effect or cause to open outside voussoir side arm to split, and increases the service life.Meanwhile, hollow-out parts is used for through T-shaped dop, effectively can shorten voussoir locking or unlock stroke, the locking of shortening voussoir or the non-cutting time unlocked, improve to take further and tear efficiency open, and when unblock is knocked, voussoir small end has and larger knocks bearing surface, extends voussoir application life.
Further preferred technical scheme, described hollow-out parts is in hatch frame on voussoir body, and voussoir body is welded with strut rail, and it is closed that strut rail is used for that hollow-out parts is formed.To make voussoir be not limited only to the restriction of casting material therefor performance, be convenient to select intensity and the better material of toughness to make, be convenient to processing, improve working (machining) efficiency, reduce manufacturing cost.
Further preferred technical scheme again, described first semicircle clip is formed with T-shaped fixture block, T-shaped fixture block is formed in the fluting rear of described engaging lug, T-shaped fixture block and described T-shaped dop are that front and back are set up in parallel, the vertical edge width of T-shaped fixture block is less than the elongated slot width of described voussoir, and the horizontal sides cross section profile of T-shaped fixture block is less than the hollow out contoured surface of described hollow-out parts.So that voussoir in advance or be sleeved on the first semicircle clip by T-shaped fixture block after unlocking, the non-cutting time further shortening voussoir locking or unlock, further improves to take and tears efficiency open.
When adopting fastener of the present utility model to set up scaffold or support system, its firmness can match in excellence or beauty with space truss structure, and it is taken and tears efficiency open no less than space truss structure, and take split into this far below rack.
For realizing the second object, the utility model adopts following technical scheme.
A kind of pylon, the square shape be fixedly connected into by multiple standpipe and horizontal connector, day font, order font, matrix pattern or groined type; Horizontal connector by realize the utility model first object pylon set up with scale advise form.
Adopt the utility model of preceding solution, the horizontal connector set up of pylon is set up to advise with scale form by being realized the utility model first object pylon, the size certainty of advising to utilize aforementioned scale, property easy to connect and reliability etc., realize size block plasticity that pylon sets up and the requirement such as uniformity, high efficiency, eliminate or stopped pylon size by the impact of operating personnel's randomness, being specially adapted to setting up of standard form or set pattern grid template support system; In addition, because pylon column is connected with horizontal connector by means of only voussoir locking mode, the height and position that horizontal connector is connected on standpipe can regulate easily according to field condition, therefore, rational height adjustment structure is not needed at lower riser end, be specially adapted to the pylon that riser top is provided with the early-dismantling formwork system of Height Adjustable Zao Chai mechanism set up, with scene rugged on ground, adopt the standpipe of basic equal length, realize the conforming requirement of early stripping formwork system apical side height by the height adjusting Zao Chai mechanism.
The beneficial effects of the utility model are, when scale rule are set up for pylon, and easy disassembly, reliable lock, and dismounting efficiency is high; Pylon shape specification, dimensional uniformity are good, are specially adapted to set pattern grid template support system and set up, and erection method simple, take that to tear efficiency open high.
Accompanying drawing explanation
Fig. 1 is the structural representation axonometric drawing of rectangular frame structure scale rule in the utility model.
Fig. 2 is the structural representation front view of rectangular frame structure scale rule in the utility model.
Fig. 3 is that the fastener of scale rule end in the utility model is in locking state structural representation axonometric drawing.
Fig. 4 is that the fastener of scale rule end in the utility model is in open mode structural representation axonometric drawing.
Fig. 5 is the first semicircle yoke configurations signal axonometric drawing in the utility model in scale rule end fastener.
Fig. 6 is the second semicircle yoke configurations signal axonometric drawing in the utility model in scale rule end fastener.
Fig. 7 is the wedge structure diagrammatic bottom view in the utility model in scale rule end fastener.
Fig. 8 is the structural representation axonometric drawing of rod-like structure scale rule in the utility model.
Fig. 9 is the structural representation axonometric drawing of the utility model intermediate cam commander flag-shaped frame construction scale rule.
Figure 10 is the structural representation front view of the utility model intermediate cam commander flag-shaped frame construction scale rule.
Figure 11 is a kind of structural representation axonometric drawing of early stripping formwork system support system, and pylon wherein adopts scale rule and standpipe in the utility model to set up and forms.
Detailed description of the invention
Below in conjunction with accompanying drawing, the utility model is further described, but therefore the utility model is not limited among described scope of embodiments.
Embodiment 1, see Fig. 1 ~ 7, a kind of pylon is set up and is advised with scale, comprise scale main body, the rectangular frame construction of scale main body, rectangle scale main body comprises two scales and isometric transverse tube 51 and two isometric longitudinal tubule (L tubule)s 52, two transverse tubes 51 are welded into rectangle frame by two longitudinal tubule (L tubule)s 52, be welded with down tube 53 between two transverse tubes 51, down tube 53 is between two longitudinal tubule (L tubule)s 52, and the two ends of two transverse tubes 51 are respectively welded with round steel pipe fastener 100 described in.
Wherein, round steel pipe fastener comprises two semicircle clips that are hinged by a bearing pin 1 and that locked by a voussoir 2, and the free end of the first semicircle clip 3 in two semicircle clips extends an engaging lug 3a along cylindrical tangent plane direction, forms a fluting in the middle part of this engaging lug 3a; The free end of the second semicircle clip 4 in two semicircle clips is formed with a T-shaped dop 4a along cylindrical tangent plane direction, the free end of the first semicircle clip 3 is mutually vertical with two tangent planes of the second semicircle clip 4, and the vertical edge width of T-shaped dop 4a is less than the groove width of described engaging lug 3a; The free end sidewall of the second semicircle clip 4 outwardly there is bulge loop 4b; Voussoir 2 is provided with an elongated slot 2a be slidably matched with the vertical edge of T-shaped dop 4a, and the first semicircle clip 3 and the second semicircle clip 4 are by the wedging face 2b wedging of engaging lug 3a and T-shaped dop 4a by voussoir 2; The 2b front end, wedging face of voussoir 2 is formed with guiding surface 2c; Voussoir 2 is in frame-shaped construction, and the elongated slot 2a front end of voussoir 2 is formed with hollow-out parts 2d, and this hollow-out parts 2d is greater than the cross section profile of described T-shaped dop 4a horizontal sides; Hollow-out parts 2d is in hatch frame on voussoir 2 body, and voussoir 2 body is welded with strut rail 2e, and it is closed that strut rail 2e is used for that hollow-out parts 2d is formed.First semicircle clip 3 is formed with T-shaped fixture block 3b, T-shaped fixture block 3b is formed in the fluting rear of described engaging lug 3a, T-shaped fixture block 3b and described T-shaped dop 4a is that front and back are set up in parallel, the vertical edge width of T-shaped fixture block 3b is less than the elongated slot 2a width of described voussoir 2, and the horizontal sides cross section profile of T-shaped fixture block 3b is less than the hollow out contoured surface of described hollow-out parts 2d.
Embodiment 2, see Fig. 8, a kind of pylon is set up with scale rule, and comprise scale main body, scale main body is made up of a steel pipe 5a, and steel pipe 5a welds at two ends a round steel pipe fastener 100 respectively.
All the other structures of the present embodiment are identical with embodiment 1, do not repeat them here.
Embodiment 3, see Fig. 9, Figure 10, a kind of pylon is set up with scale rule, comprises scale main body, and scale main body is connected into by steel pipe welding the frame construction that triangle commands flag-shaped; Scale main body comprises the auxiliary pipe 57 of scale supervisor's 54, one vertical tube 55, inclined tube 56 and a flag angle, the auxiliary pipe in flag angle 57 and scale are responsible for 54 parallel, the auxiliary pipe 57 in flag angle and scale are responsible for 54 and are welded by vertical tube 55 and inclined tube 56, and the two ends of the outer end of the auxiliary pipe 57 in flag angle and scale supervisor 54 are all welded with a round steel pipe fastener 100.
All the other structures of the present embodiment are identical with embodiment 1, do not repeat them here.
Embodiment 4, see Fig. 1 ~ 11, a kind of pylon for the formation of early stripping formwork system support system, standpipe 6 upper end of pylon is provided with the Zao Chai mechanism 7 of height-adjustable, and by early tearing the early stripping formwork system 8 that structure is formed open, early stripping formwork system 8 comprises standard size or set pattern grid template, the square shape that pylon is fixedly connected into by four standpipes 6 and horizontal connector; Wherein, horizontal connector comprises the scale rule of the scale rule of the rectangular frame structure described in an embodiment 1, the shaft-like scale rule described in two embodiments 2 and the commander of the triangle described in an embodiment 3 flag-shaped frame construction, and three kinds of scales rule are connected between corresponding two standpipes 6 on demand.
In the present embodiment, pylon is also expanded into a day font, order font, matrix pattern or groined type by standpipe 6 and scale rule and illustrates without accompanying drawing; Wherein, scale rule can adopt that one or more in three kinds of forms are mixed takes use.
Standpipe 6 lower end in the present embodiment also can arrange base, to expand the Area of bearing of standpipe 6, fully can improve the stability of pylon.
When pylon is specifically set up, can first adopt scale to advise two standpipes are connected keeping flat on ground, and then by another two scales rule, two composite membeies are combined into square shape by after composite member erect, based on square shape, be finally expanded into a day font, order font, matrix pattern or groined type pylon.
Under the irregular situation in ground, by removing the locking state of round steel pipe fastener 100, standpipe 6 being supported on the ground reliably, then carries out the locking of round steel pipe fastener 100.
Need when setting up into early stripping formwork system support system, in the adjustable Zao Chai mechanism of the riser top rational height of pylon and standard size or the template of determining specification.
Embodiment of the present utility model is drawings described although combine above, but those of ordinary skill in the art also can recognize in the scope to claims and makes various change or amendment, these modifications and variations are interpreted as within scope of the present utility model and intention.
Claims (9)
1. a pylon is set up with scale rule, and comprise and to be made up of steel pipe or scale main body that steel pipe welding is connected into, scale main body two ends are respectively equipped with at least one round steel pipe fastener (100); It is characterized in that, described round steel pipe fastener (100) comprises two semicircle clips that are hinged by a bearing pin (1) and that locked by a voussoir (2), the free end of the first semicircle clip (3) in two semicircle clips extends an engaging lug (3a) along cylindrical tangent plane direction, and this engaging lug (3a) middle part forms a fluting; The free end of the second semicircle clip (4) in two semicircle clips is formed with a T-shaped dop (4a) along cylindrical tangent plane direction, the free end of the first semicircle clip (3) is mutually vertical with two tangent planes of the second semicircle clip (4), and the vertical edge width of T-shaped dop (4a) is less than the groove width of described engaging lug (3a); Described voussoir (2) is provided with an elongated slot (2a) be slidably matched with the vertical edge of T-shaped dop (4a), and the first semicircle clip (3) and the second semicircle clip (4) are by wedging face (2b) wedging by voussoir (2) of engaging lug (3a) and T-shaped dop (4a).
2. pylon according to claim 1 is set up with scale rule, it is characterized in that: described scale main body is the frame construction of rod-like structure or triangle commander's flag-shaped or rectangle.
3. pylon according to claim 2 is set up with scale rule, it is characterized in that: described rod-like structure scale main body is made up of a steel pipe (5a), and round steel pipe fastener described in is welded at steel pipe (5a) two ends respectively; Described rectangle scale main body comprises two scales and isometric transverse tube (51) and two isometric longitudinal tubule (L tubule)s (52), two transverse tubes (51) are welded into rectangle frame by two longitudinal tubule (L tubule)s (52), down tube (53) is welded with between two transverse tubes (51), down tube (53) is positioned between two longitudinal tubule (L tubule)s (52), and the two ends of two transverse tubes (51) are respectively welded with round steel pipe fastener described in; Described triangle commander flag-shaped scale main body comprises scale supervisor (54), a vertical tube (55), an inclined tube (56) and the auxiliary pipe in a flag angle (57), (54) are responsible at the auxiliary pipe in flag angle (57) with scale parallel, the auxiliary pipe in flag angle (57) is responsible for (54) and is welded by vertical tube (55) and inclined tube (56) with scale, the two ends of the outer end at the auxiliary pipe in flag angle (57) and scale supervisor (54) are all welded with round steel pipe fastener described in.
4. set up with scale rule according to the pylon described in claim 3, it is characterized in that: the free end sidewall of described second semicircle clip (4) outwardly has bulge loop (4b).
5. set up with scale rule according to the pylon in Claims 1 to 4 described in any one claim, it is characterized in that: wedging face (2b) front end of described voussoir (2) is formed with guiding surface (2c).
6. set up according to the pylon in Claims 1 to 4 described in any one claim and advise with scale, it is characterized in that: the front end of described voussoir (2) is formed with hollow-out parts (2d), this hollow-out parts (2d) is greater than the cross section profile of described T-shaped dop (4a) horizontal sides.
7. pylon according to claim 6 is set up and is advised with scale, it is characterized in that: described hollow-out parts (2d) is hatch frame on voussoir (2) body, voussoir (2) body is welded with strut rail (2e), strut rail (2e) is closed for making hollow-out parts (2d) be formed.
8. pylon according to claim 7 is set up and is advised with scale, it is characterized in that: described first semicircle clip (3) is formed with T-shaped fixture block (3b), T-shaped fixture block (3b) is formed in the fluting rear of described engaging lug (3a), T-shaped fixture block (3b) and described T-shaped dop (4a) are set up in parallel in front and back, the vertical edge width of T-shaped fixture block (3b) is less than elongated slot (2a) width of described voussoir (2), and the horizontal sides cross section profile of T-shaped fixture block (3b) is less than the hollow out contoured surface of described hollow-out parts (2d).
9. a pylon, the square shape be fixedly connected into by multiple standpipe (6) and horizontal connector, day font, order font, matrix pattern or groined type; It is characterized in that, described horizontal connector is set up by any one pylon in claim 1 ~ 8 and is formed with scale rule.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520333359.0U CN204691216U (en) | 2015-05-21 | 2015-05-21 | Pylon is set up with scale rule and pylon |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201520333359.0U CN204691216U (en) | 2015-05-21 | 2015-05-21 | Pylon is set up with scale rule and pylon |
Publications (1)
Publication Number | Publication Date |
---|---|
CN204691216U true CN204691216U (en) | 2015-10-07 |
Family
ID=54231525
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201520333359.0U Withdrawn - After Issue CN204691216U (en) | 2015-05-21 | 2015-05-21 | Pylon is set up with scale rule and pylon |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN204691216U (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104806003A (en) * | 2015-05-21 | 2015-07-29 | 泰博混凝土模板与支撑(陕西)有限公司 | Sizing gauge for framework erection, framework and rapid framework erection method |
CN107640281A (en) * | 2017-08-30 | 2018-01-30 | 沪东中华造船(集团)有限公司 | A kind of Multifunctional mobile platform |
-
2015
- 2015-05-21 CN CN201520333359.0U patent/CN204691216U/en not_active Withdrawn - After Issue
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104806003A (en) * | 2015-05-21 | 2015-07-29 | 泰博混凝土模板与支撑(陕西)有限公司 | Sizing gauge for framework erection, framework and rapid framework erection method |
CN107640281A (en) * | 2017-08-30 | 2018-01-30 | 沪东中华造船(集团)有限公司 | A kind of Multifunctional mobile platform |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103104092B (en) | Support composite structure of beam and slab | |
CN204691216U (en) | Pylon is set up with scale rule and pylon | |
CN105696806A (en) | Supporting device | |
CN110005059B (en) | Steel construction for building connection that can install fast | |
CN104806003B (en) | A kind of pylon is set up with scale rule, pylon and the quick erection method of pylon | |
CN104358405A (en) | Heavy load full formwork support system | |
CN202767483U (en) | Multifunctional bailey piece | |
CN102312563A (en) | Method for connecting external scaffold with wall for large-span and ultra-story-height structures | |
CN203626252U (en) | Diagonal bracing reinforcing device applied to formwork system | |
CN103758342A (en) | Tool-type top form for buildings | |
CN206971724U (en) | A kind of construction engineering top board template support component | |
CN206646817U (en) | The form bracing system of the cast-in-place decorative panel of staged Arc Stand | |
CN102022001A (en) | Integrated binding and locating device of single-box double-chamber full span box girder reinforcing steel bar | |
CN204343666U (en) | Roof plate template bearer combined structure | |
CN201850762U (en) | Beam bottom supporting frame for crossbeam formwork support | |
CN203257080U (en) | Adjustable overhang supporting device for building construction | |
CN102127962A (en) | Improved bidirectionally stressed foundation knot attached to lifting scaffold | |
CN201915616U (en) | Improved bidirectional stressed foundation joint attached to lifting scaffold | |
CN113931450B (en) | Construction method of building high-altitude suspension landscape platform | |
CN104481127A (en) | Rigidly-connected and high-strength die plate supporting system | |
CN204403567U (en) | One can have enough to meet the need concrete pump pipe fixing device | |
CN204738430U (en) | Concrete precast slab grade beam fetal membrane supports and positioning tool | |
CN209585591U (en) | A kind of novel climbing frame scaffold board | |
CN204781885U (en) | Novel crown cornice shaped steel operation platform that encorbelments | |
CN204081474U (en) | A kind of construction formwork false beam template supporting pillar |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
AV01 | Patent right actively abandoned |
Granted publication date: 20151007 Effective date of abandoning: 20160907 |
|
C25 | Abandonment of patent right or utility model to avoid double patenting |