CN207809457U - A kind of building pipe transport device - Google Patents

A kind of building pipe transport device Download PDF

Info

Publication number
CN207809457U
CN207809457U CN201721910741.9U CN201721910741U CN207809457U CN 207809457 U CN207809457 U CN 207809457U CN 201721910741 U CN201721910741 U CN 201721910741U CN 207809457 U CN207809457 U CN 207809457U
Authority
CN
China
Prior art keywords
platform
holds
lift lever
pedestal
fixed link
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721910741.9U
Other languages
Chinese (zh)
Inventor
李其瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhangpu Kerui Building Materials Trade Co Ltd
Original Assignee
Zhangpu Kerui Building Materials Trade Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhangpu Kerui Building Materials Trade Co Ltd filed Critical Zhangpu Kerui Building Materials Trade Co Ltd
Priority to CN201721910741.9U priority Critical patent/CN207809457U/en
Application granted granted Critical
Publication of CN207809457U publication Critical patent/CN207809457U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a kind of building pipe transport devices,Including pedestal,It is installed with shearing lift lever above the pedestal,It is installed with push handle on the left of the shearing lift lever,It is installed with first above the shearing lift lever and holds platform,Described first, which holds platform top, is installed with lift lever,It is installed with promotion pawl above the lift lever,Described first holds and is movably installed with second above platform and holds platform,Described second, which holds platform dextral, is installed with third and holds platform,The third holds and is installed with the second fixed link above platform,It is installed with the first telescopic rod above second fixed link,It is installed with supporting rod above the idler wheel,It is installed with support plate below the supporting rod,It is installed with hydraulic regulation bar on the right side of the hydraulic cylinder,It is installed with connecting rod inside the shearing lift lever.The utility model is simple in structure, convenient and practical, stable structure, and transport capacity is strong.

Description

A kind of building pipe transport device
Technical field
The utility model is related to building pipe transport field, specially a kind of building pipe transport device.
Background technology
The common pipeline of skyscraper includes:Waste pipe, flue, ventilating duct, air-conditioning duct, water supply and drainage pipeline, coal gas Pipeline, cable channel, article conveying hoistway etc., are the component parts of building, it can be seen that the importance of pipeline under construction, And the transport of pipeline is very important link in house building course.And existing building pipe transport device structure is multiple It is miscellaneous, it is not convenient to use and transport capacity is not strong.
Utility model content
The purpose of this utility model is to provide a kind of building pipe transport devices, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the utility model provides the following technical solutions:A kind of building pipe transport device, including bottom Seat, the pedestal top is installed with shearing lift lever, push handle is installed on the left of the shearing lift lever, described It is installed with first above shearing lift lever and holds platform, described first, which holds platform top, is installed with lift lever, It is installed with promotion pawl above the lift lever, described first holds and be movably installed with second above platform and hold platform, institute It states second and holds platform dextral and be installed with third and hold platform, the third holds that be installed with second above platform solid Fixed pole, the second fixed link top are installed with the first telescopic rod, first are installed with above first telescopic rod Fixed link, the first fixed link top is installed with the second telescopic rod, idler wheel is installed with below the pedestal, described It is installed with supporting rod above idler wheel, support plate is installed with below the supporting rod, is fixedly mounted below the pedestal There is a hydraulic cylinder, is installed with hydraulic regulation bar on the right side of the hydraulic cylinder, the company of being installed with inside the shearing lift lever Extension bar.
Preferably, the supporting rod is fixedly connected with pedestal.
Preferably, the third, which holds platform and holds platform activity with first, connect.
Preferably, second telescopic rod is fixedly connected with the second fixed link.
Preferably, the pedestal is fixedly connected with push handle.
Compared with prior art, the utility model has the beneficial effects that:The utility model is simple in structure, convenient and practical, knot Structure is stablized, and transport capacity is strong, by being provided with supporting rod and support plate, realizes device and keeps stability in transportational process, By realizing moving up and down for building pipe provided with shearing lift lever, by being provided with idler wheel, building pipe is realized Movement all around, by be provided with first hold platform, second hold platform, third holds platform, ensure that pipeline is contained The area put so that conevying efficiency higher ensure that pipeline can easily be put into the by being provided with lift lever and promoting pawl One hold platform, second hold platform, third holds platform.
Description of the drawings
Fig. 1 is the utility model agent structure schematic diagram;
Fig. 2 is the utility model placing table structural schematic diagram.
In figure:1 first fixed link, 2 first telescopic rods, 3 push handles, 4 lift levers, 5 promote pawl, 6 supporting rods, 7 support plates, 8 Idler wheel, 9 pedestals, 10 shearing lift levers, 11 hydraulic cylinders, 12 hydraulic regulation bars, 13 connecting rods, 14 first hold platform, 15 Two fixed links, 16 second hold platform, 17 thirds hold platform, 18 second telescopic rods.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that the instructions such as term "vertical", "upper", "lower", "horizontal" Orientation or positional relationship is to be based on the orientation or positional relationship shown in the drawings, and is merely for convenience of description the utility model and simplification Description, does not indicate or imply the indicated device or element must have a particular orientation, with specific azimuth configuration and behaviour Make, therefore should not be understood as limiting the present invention.
In the description of the present invention, it should also be noted that, unless otherwise clearly defined and limited, term " is set Set ", " installation ", " connected ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, Or it is integrally connected;It can be mechanical connection, can also be electrical connection;It can be directly connected, intermediary can also be passed through It is indirectly connected, can be the connection inside two elements.It for the ordinary skill in the art, can be according to specific feelings Condition understands the concrete meaning of above-mentioned term in the present invention.
- 2 are please referred to Fig.1, the utility model provides a kind of technical solution:A kind of building pipe transport device, including pedestal 9,9 top of the pedestal is installed with shearing lift lever 10 so that pipeline can transport up and down, the shearing lift lever 10 left sides are installed with push handle 3, and 10 top of the shearing lift lever is installed with first and holds platform 14, and described first It holds 14 top of platform and is installed with lift lever 4,4 top of the lift lever, which is installed with, promotes pawl 5, can make pipeline Be promoted to placing position, described first, which holds 14 top of platform, is movably installed with second and holds platform 16, described second hold it is flat 16 right side of platform is installed with third and holds platform 17, and the third holds 17 top of platform and is installed with the second fixed link 15, the top of second fixed link 15 is installed with the first telescopic rod 2, and first telescopic rod, 2 top is installed with the One fixed link 1, first fixed link, 1 top are installed with the second telescopic rod 18, and 9 lower section of the pedestal is installed with rolling Wheel 8 ensure that the transport in pipeline plane, 8 top of the idler wheel are installed with supporting rod 6, and 6 lower section of the supporting rod is fixed Support plate 7 is installed, 9 lower section of the pedestal is installed with hydraulic cylinder 11, and 11 right side of the hydraulic cylinder is installed with hydraulic pressure Adjusting rod 12 is installed with connecting rod 13 inside the shearing lift lever 10, and the supporting rod 6 is fixedly connected with pedestal 9, The third, which holds platform 17 and holds platform 14 with first, to be flexibly connected, and second telescopic rod, 18 and second fixed link 15 is fixed Connection, the pedestal 9 are fixedly connected with push handle 3.
Operation principle:First, staff is moved to device at pipe storage by push handle 3, then by lift lever 4 with Promoted pawl 5 by the pipeline of storeroom move to first hold platform 14, second hold platform 16, third is held on platform 17, first The length for solving pipeline, then decide whether again by first hold platform 14, second hold platform 16, that third holds platform 17 is complete Expansion is realized by the first telescopic rod 2 and the second telescopic rod 18 and is unfolded, then again transported pipeline by idler wheel 8 if needing to be unfolded It is defeated, it is if desired promoted, is then realized by shearing lift lever 10, hydraulic cylinder 11, hydraulic regulation bar 12, in this process up and down In, supporting rod 6 ensure that the stability of device with support plate 7, prevent from causing to turn on one's side because the pipeline of transport is overweight, when entire work When completing, then device moved into storeroom by idler wheel 8.
While there has been shown and described that the embodiments of the present invention, for the ordinary skill in the art, It is appreciated that can these embodiments be carried out with a variety of variations in the case where not departing from the principles of the present invention and spirit, repaiied Change, replace and modification, the scope of the utility model are defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of building pipe transport device, including pedestal (9), it is characterised in that:It is installed with and cuts above the pedestal (9) Cut type lift lever (10), shearing lift lever (10) left side are installed with push handle (3), the shearing lift lever (10) Top is installed with first and holds platform (14), and described first, which holds platform (14) top, is installed with lift lever (4), institute It states to be installed with above lift lever (4) and promotes pawl (5), described first holds and be movably installed with second above platform (14) and hold Platform (16), described second holds and is installed with third on the right side of platform (16) and holds platform (17), and the third holds platform (17) top is installed with the second fixed link (15), and the first telescopic rod is installed with above second fixed link (15) (2), it is installed with the first fixed link (1) above first telescopic rod (2), peace is fixed above first fixed link (1) Equipped with the second telescopic rod (18), it is installed with idler wheel (8) below the pedestal (9), is installed with above the idler wheel (8) Supporting rod (6), supporting rod (6) lower section are installed with support plate (7), hydraulic pressure are installed with below the pedestal (9) Cylinder (11), hydraulic cylinder (11) right side are installed with hydraulic regulation bar (12), and the shearing lift lever (10) is internal solid Dingan County is equipped with connecting rod (13).
2. a kind of building pipe transport device according to claim 1, it is characterised in that:The supporting rod (6) and pedestal (9) it is fixedly connected.
3. a kind of building pipe transport device according to claim 1, it is characterised in that:The third holds platform (17) Platform (14) is held with first to be flexibly connected.
4. a kind of building pipe transport device according to claim 1, it is characterised in that:Second telescopic rod (18) with Second fixed link (15) is fixedly connected.
5. a kind of building pipe transport device according to claim 1, it is characterised in that:The pedestal (9) and push handle (3) It is fixedly connected.
CN201721910741.9U 2017-12-30 2017-12-30 A kind of building pipe transport device Expired - Fee Related CN207809457U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721910741.9U CN207809457U (en) 2017-12-30 2017-12-30 A kind of building pipe transport device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721910741.9U CN207809457U (en) 2017-12-30 2017-12-30 A kind of building pipe transport device

Publications (1)

Publication Number Publication Date
CN207809457U true CN207809457U (en) 2018-09-04

Family

ID=63328901

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721910741.9U Expired - Fee Related CN207809457U (en) 2017-12-30 2017-12-30 A kind of building pipe transport device

Country Status (1)

Country Link
CN (1) CN207809457U (en)

Similar Documents

Publication Publication Date Title
CN203361592U (en) Sliding platform used for installing arch-shaped roof truss of steel structure
CN207809457U (en) A kind of building pipe transport device
CN204001416U (en) For the assemble type truss of the factory building of constructing
CN203372985U (en) Hanging basket for hollow mold shell
CN209536110U (en) A kind of shelf horizontal pulling device
CN203922511U (en) A kind of branched some cableway movement system
CN202431008U (en) Auxiliary binding tool for grid beam steel bars
CN203528519U (en) Steel bar conveying pushing frame
CN203770852U (en) Multi-deck integrated pipe frame structure
CN203742047U (en) Storage room with detachable roof
CN203666706U (en) Simple two-wheel lever transportation tool
CN206801046U (en) Support meanss for Steel Structure Installation
CN201588414U (en) Supporting structure for framework scaffolds
CN202840638U (en) Supporting frame for water-cooled storage battery charging frame
CN203372857U (en) Steel section bar loading and unloading auxiliary frame
CN203212208U (en) Assembling and lifting molding bed suitable for modular pipeline construction
CN204998996U (en) Braced frame
CN203402796U (en) Building hoist cross beam type chassis
CN201198654Y (en) Movable scaffold for mounting wide span dry coal shed curved surface steel network frame
CN204826682U (en) Steel construction uninstallation device
CN207258511U (en) A kind of heavy roller formula shelf
CN203654706U (en) Movable operation platform for pot top
CN208731629U (en) A kind of PCF wallboard transport shelf
CN203113340U (en) Dam body lifting pouring construction safety platform capable of being assembled
CN202862201U (en) Steel wire rope hanger device beneficial for sort management

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant