CN203212208U - Assembling and lifting molding bed suitable for modular pipeline construction - Google Patents

Assembling and lifting molding bed suitable for modular pipeline construction Download PDF

Info

Publication number
CN203212208U
CN203212208U CN 201320241287 CN201320241287U CN203212208U CN 203212208 U CN203212208 U CN 203212208U CN 201320241287 CN201320241287 CN 201320241287 CN 201320241287 U CN201320241287 U CN 201320241287U CN 203212208 U CN203212208 U CN 203212208U
Authority
CN
China
Prior art keywords
assembling
frame body
lifting
longeron
fetal membrane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320241287
Other languages
Chinese (zh)
Inventor
周英杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Metallurgical Construction Engineering Group Co Ltd
Original Assignee
China Metallurgical Construction Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Metallurgical Construction Engineering Group Co Ltd filed Critical China Metallurgical Construction Engineering Group Co Ltd
Priority to CN 201320241287 priority Critical patent/CN203212208U/en
Application granted granted Critical
Publication of CN203212208U publication Critical patent/CN203212208U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Invalid Beds And Related Equipment (AREA)

Abstract

The utility model discloses an assembling and lifting molding bed suitable for modular pipeline construction. The assembling and lifting molding bed comprises a main frame body composed of a plurality of transverse beams and a plurality of longitudinal beams, the main frame body is shaped in a grid, a plurality of suspension arms are arranged on opposite sides of the main frame body, and a plurality of positioning blocks for fixing spraying pipelines and supports are arranged on the main frame body. The assembling and lifting molding bed suitable for modular pipeline construction is firm, reliable, good in stability, high in support and pipeline assembling speed, good in quality and high in mounting efficiency; weight is controlled within a small range; a large amount of aloft work is changed to ground work, so that security risk is reduced; modular construction of the spraying pipelines in an electronic vault is realized.

Description

Be applicable to assembling, the lifting fetal membrane frame of pipeline modular construction
Technical field
The utility model relates to civil construction electromechanical installation field, relates in particular to a kind of assembling, lifting fetal membrane frame that is applicable to the pipeline modular construction.
Background technology
The electronic warehouse constructional feature is individual layer, superelevation, large space.At present, when setting up electronic warehouse, setting up of its roofing adopts H shape roof girders and H shape purlin intersection welding laying to form more.Simultaneously, owing to be placed with a lot of article in the warehouse, be an easy place on fire, so in order to prevent fire, electronic warehouse generally can arrange drenching system.
Drenching system of the prior art mainly is made up of some interlaced showers, and shower is installed on the support that is connected on the roof.Because roof area is bigger, in order to realize comprehensive flameproof purpose, described shower is covered with in the roof.At present, when drenching system is installed, be that the spray piping support is installed earlier, spray piping is installed again, adopt the U-shaped pipe clamp to connect between spray piping and the support.Adopt that the aforesaid way efficiency of assembling is low, assembly difficulty big, the workman is had relatively high expectations, and workman's aloft work, comparatively dangerous, cause safety misadventure easily.
The utility model content
The purpose of this utility model be provide in order to solve above-mentioned the deficiencies in the prior art a kind of sound construction, can be safely and fast the assembling that is applicable to the pipeline modular construction, the lifting fetal membrane frame of subsidiary conduit construction.
To achieve these goals, the utility model has adopted following technical scheme:
Be applicable to assembling, the lifting fetal membrane frame of pipeline modular construction, comprise the body frame body that is welded by some crossbeams and longeron, described body frame body is grid-like, in the relative side of body frame body several suspension arms are set, are provided with several at the crossbeam of body frame body and/or longeron and are used for the fixedly locating piece of spray piping and support.
As a kind of preferred version of the present utility model, be provided with platform at described body frame body, described platform is near locating piece.
As another kind of preferred version of the present utility model, supporting leg all vertically is set below each intersection area of crossbeam and longeron, be provided with diagonal brace between adjacent two supporting legs, one end of diagonal brace is fixed on the bottom of supporting leg, and the other end is fixed on the intersection area of the crossbeam of adjacent support legs correspondence and longeron.
As a kind of improvement project of the present utility model, described locating piece is I shape structure, and forms a fixedly screens between adjacent two locating pieces.
Compared with prior art, the utlity model has following advantage:
1, this fetal membrane frame adopts the body frame body that is gridiron, and is solid and reliable, good stability; Support and pipeline assembly unit speed are fast, and quality is good, the operating efficiency height.
2, shower entoilage face operation by this fetal membrane frame integral hoisting, has reduced security risk.
3, adopt this assembling fetal membrane frame, realized the modular construction of electronic warehouse spray piping.
4, the assembling lifting loose tool frame that is applicable to the pipeline modular construction can be widely used in similar electronic warehouse engineering construction.
Description of drawings
Fig. 1 is the assembling that is applicable to the pipeline modular construction, the front view of lifting fetal membrane frame;
Fig. 2 is the assembling that is applicable to the pipeline modular construction, the birds-eye view of lifting fetal membrane frame.
Among the figure: 1-crossbeam; 2-longeron; 3-supporting leg; 4-suspension arm; 5-platform; 6 locating pieces; 7-diagonal brace.
The specific embodiment
Below in conjunction with the drawings and specific embodiments the utility model is further specified.
As shown in Figure 1, 2, be applicable to assembling, the lifting fetal membrane frame of pipeline modular construction, comprise that the body frame body is grid-like by five crossbeams 1 and five body frame bodies that longeron 2 is welded.In order to increase the connection rigidity of body frame body, be convenient to the transhipment of fetal membrane frame level, supporting leg 3 all vertically is set below each intersection area of crossbeam 1 and longeron 2, namely below the body frame body, be provided with 25 supporting legs 3.Wherein be provided with six suspension arms 4 in two relative sides at the body frame body, hang for convenience, be equipped with hole for hoist at each suspension arm 4.Be provided with three platforms 5 of standing for the aloft work personnel at the body frame body, be provided with 16 at the longeron 2 of body frame body and be used for the fixedly locating piece 6 of spray piping and support.
In order to improve the rigidity of body frame body, be provided with diagonal brace 7 between adjacent two supporting legs 3, an end of diagonal brace 7 is fixed on the bottom of supporting leg 3, and the other end of diagonal brace 7 is fixed on the intersection area of the crossbeam 1 of adjacent support legs 3 correspondences and longeron 2.
For the ease of fixedly shower and mounting bracket, locating piece 6 is I shape structure, and forms a fixedly screens between adjacent two locating pieces 6.Before the lifting, only need shower or be placed on this fixedly to get final product between the screens.
Be explained as follows with regard to the fitting process of fetal membrane frame in the present embodiment and the concrete occupation mode of fetal membrane frame below:
At first, assembling fetal membrane frame.When assembling fetal membrane frame, select the crossbeam 1 and the longeron 2 that are of convenient length earlier for use, and crossbeam 1 and longeron 2 are welded into grid-like (length of crossbeam 1 or longeron 2 preferably and the purlin equal in length on roof).Welding a plurality of supporting legs 3 and diagonal brace 7 below crossbeam 1 and longeron 2 formed body frame bodies then is at body frame body two opposed side edges welding suspension arms 4 wherein.After aforesaid operations is finished, according to the installation site of installation frame body, at crossbeam 1 or longeron 2 corresponding sections welding locating piece 6, after locating piece 6 assemblings are finished, at body frame body binding platform 5.
After the assembling of fetal membrane frame is finished, assembled conduit support and spray piping above the fetal membrane frame.At first, with locating piece 6 support of pipelines is fixed, connected spray piping at support of pipelines then.
After above-mentioned assembling is finished, the hook of lifting appliance is enclosed within the hole for hoist of suspension arm 4, and starts lifting appliance.At this moment, the pipeline of drenching system and support rise with the fetal membrane frame.After rising to proper height, the workman just can install and fix installation frame body and spray piping at platform 5.After the above-mentioned installation, the fetal membrane frame can be dropped on the ground, thereby play a part the auxiliary spray piping of installing.
Need to prove at last, above embodiment is only in order to the technical solution of the utility model to be described but not the restriction technologies scheme, although the applicant has been described in detail the utility model with reference to preferred embodiment, those of ordinary skill in the art is to be understood that, those are made amendment to the technical solution of the utility model or are equal to replacement, and do not break away from aim and the scope of the technical program, all should be encompassed in the middle of the claim scope of the present utility model.

Claims (4)

1. be applicable to assembling, the lifting fetal membrane frame of pipeline modular construction, it is characterized in that: comprise the body frame body that is welded by some crossbeams (1) and longeron (2), described body frame body is grid-like, in the relative side of body frame body several suspension arms (4) are set, are provided with several at the crossbeam (1) of body frame body and/or longeron (2) and are used for the fixedly locating piece (6) of spray piping and support.
2. assembling, the lifting fetal membrane frame that is applicable to the pipeline modular construction according to claim 1 is characterized in that: be provided with platform (5) at described body frame body, the close locating piece (6) of described platform (5).
3. the assembling that is applicable to the pipeline modular construction according to claim 1 and 2, lifting fetal membrane frame, it is characterized in that: each below, intersection area at crossbeam (1) and longeron (2) all vertically arranges supporting leg (3), be provided with diagonal brace (7) between adjacent two supporting legs (3), one end of diagonal brace (7) is fixed on the bottom of supporting leg (3), and the other end is fixed on the intersection area of the corresponding crossbeam (1) of adjacent support legs (3) and longeron (2).
4. the assembling that is applicable to the pipeline modular construction according to claim 3, lifting fetal membrane frame, it is characterized in that: described locating piece (6) is I shape structure, and forms a fixedly screens between adjacent two locating pieces (6).
CN 201320241287 2013-05-07 2013-05-07 Assembling and lifting molding bed suitable for modular pipeline construction Expired - Fee Related CN203212208U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320241287 CN203212208U (en) 2013-05-07 2013-05-07 Assembling and lifting molding bed suitable for modular pipeline construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320241287 CN203212208U (en) 2013-05-07 2013-05-07 Assembling and lifting molding bed suitable for modular pipeline construction

Publications (1)

Publication Number Publication Date
CN203212208U true CN203212208U (en) 2013-09-25

Family

ID=49201760

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320241287 Expired - Fee Related CN203212208U (en) 2013-05-07 2013-05-07 Assembling and lifting molding bed suitable for modular pipeline construction

Country Status (1)

Country Link
CN (1) CN203212208U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110722204A (en) * 2019-10-18 2020-01-24 中国电建集团山东电力建设第一工程有限公司 Reinforcing device and reinforcing method for pipeline below replaced cylinder body of steam turbine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110722204A (en) * 2019-10-18 2020-01-24 中国电建集团山东电力建设第一工程有限公司 Reinforcing device and reinforcing method for pipeline below replaced cylinder body of steam turbine

Similar Documents

Publication Publication Date Title
CN213329955U (en) Flower basket diagonal rod type overhanging scaffold
CN203499229U (en) Operating platform for construction of elevator shaft
CN204299145U (en) For the operating platform that external climbing tower crane support frame is installed
CN101215928B (en) Attached lifting scaffold trolley type inclining-proof device and method of use thereof
CN105480002B (en) A kind of single-layer steel structure decoration tree and its installation method
CN202483154U (en) High bearing capacity suspending scaffold
CN201794286U (en) Hanging combined external scaffold and triangular supporting device thereof
CN204385629U (en) A kind of support for the construction of suspension bridge king-tower top rail
CN203212208U (en) Assembling and lifting molding bed suitable for modular pipeline construction
CN204282803U (en) To encorbelment formwork structure for mounting platform
CN105625732B (en) Superelevation overhanging steel structure truss support free construction method
CN209523198U (en) A kind of underpinning structure supporting lattice column
CN202969897U (en) Ringlock type scaffold joist system
CN106698242B (en) Support frame for pipeline installation
CN206753087U (en) A kind of lighting roof operating platform structure
CN202031308U (en) Inverted-hanging type scaffold
CN205509388U (en) Three cascades climbing crane span structure
CN204282788U (en) Assembled fixed scaffold
CN203769341U (en) Anti-falling grating plate of steel platform
CN202214976U (en) Steel wire rope support device
CN203257080U (en) Adjustable overhang supporting device for building construction
CN206800965U (en) A kind of high-rise balcony tailgate construction operating platform
CN207794238U (en) A kind of toilet urinal integrative installation technology steelframe
CN206110799U (en) Novel graphite alkene combined material single -pipe tower
CN205292077U (en) Tree is decorated to individual layer steel construction

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130925

Termination date: 20160507

CF01 Termination of patent right due to non-payment of annual fee