CN207795213U - A kind of well cementation fracturing technology tubing string - Google Patents
A kind of well cementation fracturing technology tubing string Download PDFInfo
- Publication number
- CN207795213U CN207795213U CN201721861980.XU CN201721861980U CN207795213U CN 207795213 U CN207795213 U CN 207795213U CN 201721861980 U CN201721861980 U CN 201721861980U CN 207795213 U CN207795213 U CN 207795213U
- Authority
- CN
- China
- Prior art keywords
- pressure
- pressure break
- tube body
- break mechanism
- well cementation
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Earth Drilling (AREA)
Abstract
The utility model discloses a kind of well cementation fracturing technology tubing strings, tube body, safety joint, permanent packer, pressure break mechanism, throttling ball seat, pressure sensor, the tube body is respectively equipped with safety joint, permanent packer, pressure break mechanism from top to bottom, the pressure break is in-house to be equipped with pressure sensor, and the lowermost end of the tube body is equipped with throttling ball seat.The utility model can realize multiple fracturing mechanism concurrent fracturing, effectively improve oil reservoir aerial drainage rate, promote oil recovery efficiency, and can monitor the in-house pressure of each pressure break, convenient for grasping bottom pressure variation in real time, be conducive to control construction speed.
Description
Technical field
The utility model is related to oil reservoir production technique field more particularly to a kind of well cementation fracturing technology tubing strings.
Background technology
Fracturing technique can greatly increase the recoverable reserves of oil gas, make the Low Permeability Oil/gas being worth originally without commercial mining
It hides, becomes the major oil and gas field with suitable commercial reserves and exploitation scale.Hydraulic fracturing, which is increasingly becoming, determines that low permeability oil field is opened
The leading factor of originating party case is in advantageous orientation by hydraulic fracture and determines well when studying and defining LOW PERMEABILITY OILFIELD DEVELOPMENT scheme
Orientation is arranged, by researching and analysing the influence of different well patterns, cloth well density and crack matching to every development index, to improve oil field
Whole development effect and economic benefit are target, determine well pattern type, cloth well density and pressing crack construction scale, make hydraulic fracturing with
Reservoir engineering combines even closer, makes it possible the Efficient Development of low permeability oil field.Traditional fracturing string is using step by step
The pressure break that stifled mode realizes multi-section multi-layer is thrown, it is less efficient, and down-hole pressure can not be monitored in real time, it uses more not
Just.
Utility model content
The purpose of this utility model is to provide a kind of well cementation fracturing technology tubing strings, to solve the above technical problems.
The utility model uses following technical scheme to achieve the above object:
A kind of well cementation fracturing technology tubing string, including:Tube body, safety joint, permanent packer, pressure break mechanism, throttling ball seat,
Pressure sensor, the tube body are respectively equipped with safety joint, permanent packer, pressure break mechanism, the pressure break mechanism from top to bottom
It is internally provided with pressure sensor, the lowermost end of the tube body is equipped with throttling ball seat.
On the basis of above-mentioned technical proposal, the pressure break mechanism have it is multiple, and can be according to geologic structure and oil reservoir position
And set number and interval.
On the basis of above-mentioned technical proposal, the pressure sensor uses DATA-52 Series Hydraulic sensors.
On the basis of above-mentioned technical proposal, the pressure break mechanism includes:Water anchor, packer, sanding machine, the sanding machine
Upper/lower terminal is equipped with packer and water anchor successively respectively, and the sanding machine, water anchor, packer are connect with tube body.
Compared with prior art, the utility model has the following advantages:The utility model can realize that multiple fracturing mechanism is same
When pressure break, effectively improve oil reservoir aerial drainage rate, promote oil recovery efficiency, and the in-house pressure of each pressure break can be monitored, be convenient for
Bottom pressure variation is grasped in real time, is conducive to control construction speed.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the pressure break mechanism structure schematic diagram of the utility model.
In figure:1, tube body, 2, safety joint, 3, permanent packer, 4, pressure break mechanism, 5, throttling ball seat, 6, pressure sensing
Device, 7, water anchor, 8, packer, 9, sanding machine.
Specific implementation mode
The utility model is further elaborated in the following with reference to the drawings and specific embodiments.
As shown in Figure 1, a kind of well cementation fracturing technology tubing string, including:Tube body 1, safety joint 2, permanent packer 3, pressure break
Mechanism 4, throttling ball seat 5, pressure sensor 6, the tube body 1 are respectively equipped with safety joint 2, permanent packer 3, pressure from top to bottom
Mechanism 4 is split, the pressure break mechanism 4 is internally provided with pressure sensor 6, and the lowermost end of the tube body 1 is equipped with throttling ball seat, described
Pressure break mechanism 4 has multiple, and can set number and interval according to geologic structure and oil reservoir position, the pressure sensor 6
Using DATA-52 Series Hydraulic sensors.
As shown in Fig. 2, the pressure break mechanism 4 includes:Water anchor 7, packer 8, sanding machine 9, the sanding machine 9 it is upper and lower
Both ends are equipped with packer 8 and water anchor 7 successively respectively, and the sanding machine 9, water anchor 7, packer 8 are connect with tube body 1.
The utility model can carry out multilayer pressure by the number of geology structural adjustment pressure break mechanism 4 and interval where oil reservoir
Mechanism concurrent fracturing is split, oil reservoir aerial drainage rate is effectively improved, promotes oil recovery efficiency, water anchor 7 is fixed on the borehole wall, to improve stabilization
Property, confined space is formed after upper and lower two packers 8 unlatching, sanding machine 9 is opened, and makes to be full of highly pressurised liquid in confined space, with
Realize the pressure break both sides borehole wall;Pressure sensor 6 inside pressure break mechanism 4 monitors liquid pressure data in real time, and passes on well
Staff is conducive to control construction speed in order to grasp bottom pressure variation in real time.
The above is the utility model preferred embodiment, for the ordinary skill in the art, according to this reality
With novel introduction, in the case where not departing from the principles of the present invention with spirit, the change that is carried out to embodiment is repaiied
Change, replace and modification is still fallen within the scope of protection of the utility model.
Claims (3)
1. a kind of well cementation fracturing technology tubing string, including:Tube body (1), safety joint (2), permanent packer (3), pressure break mechanism
(4), throttling ball seat (5), pressure sensor (6), it is characterised in that:The tube body (1) is respectively equipped with safety joint from top to bottom
(2), permanent packer (3), pressure break mechanism (4), the pressure break mechanism (4) are internally provided with pressure sensor (6), the tube body
(1) lowermost end is equipped with throttling ball seat, and the pressure break mechanism (4) includes:Water anchor (7), packer (8), sanding machine (9), institute
The upper/lower terminal for stating sanding machine (9) is equipped with packer (8) and water anchor (7), the sanding machine (9), water anchor (7), envelope successively respectively
It is connect with tube body (1) every device (8).
2. a kind of well cementation fracturing technology tubing string according to claim 1, it is characterised in that:The pressure break mechanism (4) has more
It is a, and number and interval can be set according to geologic structure and oil reservoir position.
3. a kind of well cementation fracturing technology tubing string according to claim 1, it is characterised in that:The pressure sensor (6) is adopted
With DATA-52 Series Hydraulic sensors.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721861980.XU CN207795213U (en) | 2017-12-27 | 2017-12-27 | A kind of well cementation fracturing technology tubing string |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721861980.XU CN207795213U (en) | 2017-12-27 | 2017-12-27 | A kind of well cementation fracturing technology tubing string |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207795213U true CN207795213U (en) | 2018-08-31 |
Family
ID=63279467
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721861980.XU Active CN207795213U (en) | 2017-12-27 | 2017-12-27 | A kind of well cementation fracturing technology tubing string |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207795213U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112343577A (en) * | 2021-01-07 | 2021-02-09 | 中国石油大学胜利学院 | Fracturing well oil reservoir testing device |
-
2017
- 2017-12-27 CN CN201721861980.XU patent/CN207795213U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112343577A (en) * | 2021-01-07 | 2021-02-09 | 中国石油大学胜利学院 | Fracturing well oil reservoir testing device |
CN112343577B (en) * | 2021-01-07 | 2021-03-23 | 中国石油大学胜利学院 | Fracturing well oil reservoir testing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102733789B (en) | Staged fracturing construction yield increment method for waterpower in deep thickened oil deposit thick-bedded sandstone storage layer | |
CN106194131B (en) | It is spaced CO between multistage fracturing horizontal well seam2Oil flooding method | |
CN201474673U (en) | Oil-producing pipe column for sectional water control of horizontal well | |
CN206617151U (en) | Side tracked slim hole well barefoot completion fracturing strings | |
CN104963671B (en) | A kind of fracturing reform method of High angle from formula well reservoir | |
CN113738317A (en) | Method for combined exploitation of deep coal bed gas and dry hot rock type geothermal | |
CN102606124A (en) | Sectioned multi-cluster synchronous volume fracturing technology for double horizontal wells | |
CN104213846B (en) | Cased hole completion multistage frac water horizontal well selectivity mining tubular column and method of work thereof | |
RU2561420C1 (en) | Hydraulic fracturing technique in two parallel horizontal boreholes | |
CN103184859A (en) | Device and method for exploitation for single-well injection-production | |
CN106761612B (en) | The asynchronous water injection oil extraction method of double different wells of pressure break horizontal well of zip mode cloth seam | |
CN104818978A (en) | One-well multi-control method for offshore low-permeability reservoir thick oil layer exploitation | |
CN107246254A (en) | Coal-based gas U-shaped well drilling and development method | |
CN105587300B (en) | Oil production method for horizontal well | |
CN111305891A (en) | Three-dimensional comprehensive efficient and accurate treatment technical method for coal-oil-gas coexisting mine | |
WO2022193655A1 (en) | Crustal stress magnitude evaluation method based on well wall mechanical instability collapse | |
CN202152643U (en) | Layering production pressure measuring tubular column for exploiting oil wells in multilayer mode | |
CN110306965A (en) | A kind of method for increasing for coal bed gas low yield wellblock | |
CN106837290A (en) | The asynchronous note CO of the different well of packet of symmetrical expression cloth seam2Oil production method | |
CN105422057A (en) | Oil extraction method for ultra-low permeable reservoir or dense reservoir | |
CN207795213U (en) | A kind of well cementation fracturing technology tubing string | |
CN106761611A (en) | Double pressure break horizontal well cyclic water stimulation oil production methods of zip mode cloth seam | |
CN203239303U (en) | Extraction device used for injection and extraction of same well | |
CN107387020A (en) | A kind of common device for picking of two gas | |
CN207296957U (en) | A kind of two gas are total to device for picking |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |