CN207775885U - 前插式钢管柱固定平台 - Google Patents

前插式钢管柱固定平台 Download PDF

Info

Publication number
CN207775885U
CN207775885U CN201721784543.2U CN201721784543U CN207775885U CN 207775885 U CN207775885 U CN 207775885U CN 201721784543 U CN201721784543 U CN 201721784543U CN 207775885 U CN207775885 U CN 207775885U
Authority
CN
China
Prior art keywords
clamping platform
steel pipe
pipe column
platform
front inserting
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721784543.2U
Other languages
English (en)
Inventor
曹超
王磊
张策
李志坚
钱万磊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Engineering Machinery Co Ltd
Original Assignee
XUZHOU DUN AN HEAVY INDUSTRY MACHINERY MANUFACTURING Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by XUZHOU DUN AN HEAVY INDUSTRY MACHINERY MANUFACTURING Co Ltd filed Critical XUZHOU DUN AN HEAVY INDUSTRY MACHINERY MANUFACTURING Co Ltd
Priority to CN201721784543.2U priority Critical patent/CN207775885U/zh
Application granted granted Critical
Publication of CN207775885U publication Critical patent/CN207775885U/zh
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

一种前插式钢管柱固定平台,包括置于地面的基板、设置在基板上的支腿油缸、设置在支腿油缸上的下层夹紧平台、与下夹紧平台间隔且平行设置的上层夹紧平台、固定连接下夹紧平台和上夹紧平台的导向柱、动力系统和液压阀组,该动力系统通过液压阀组为下夹紧平台和上夹紧平台提供动力。本实用新型的前插式钢管柱固定平台可以利用上层夹紧平台与下层夹紧平台共同夹紧钢管柱,进行前插工法施工,精度高且工作效率高。

Description

前插式钢管柱固定平台
技术领域
本实用新型涉及一种固定平台,尤其涉及一种固定钢管柱的前插式钢管柱固定平台。
背景技术
随着社会的发展,近几年国内逆作法桩工工程日益增多,特殊工况工程也在不断出现。现阶段逆作法桩工工程项目多采用后插式工法施工,其工作原理为先于桩洞内灌入混凝土,随后在混凝土未凝固前将钢立柱插入指定深度并保证施工要求垂直度,该施工方法存在钢立柱插入时间段要求苛刻、施工效率低,施工精度差等问题。
实用新型内容
本实用新型要解决的技术问题是:提供一种施工更容易的前插式钢管柱固定平台。
一种前插式钢管柱固定平台,包括置于地面的基板、设置在基板上的支腿油缸、设置在支腿油缸上的下层夹紧平台、与下夹紧平台间隔且平行设置的上层夹紧平台、固定连接下夹紧平台和上夹紧平台的导向柱、动力系统和液压阀组,该动力系统通过液压阀组为下夹紧平台和上夹紧平台提供动力。
本实用新型的前插式钢管柱固定平台可以利用上层夹紧平台与下层夹紧平台共同夹紧钢管柱,进行前插工法施工,精度高且工作效率高。
附图说明
图1为本实用新型前插式钢管柱固定平台的结构图。
具体实施方式
下面结合图示对本实用新型的前插式钢管柱固定平台进行详细说明。
请参见图1,本实用新型的前插式钢管柱固定平台包括基板1、支腿油缸2、下层夹紧平台3、导向柱4、上层夹紧平台5、护栏6、动力系统7和液压阀组8。
其中,基板1为平板,置于地面上,用于支撑其他元件。
支腿油缸2数量为多个,均匀分布,用于调平。
下层夹紧平台3置于支腿油缸2上,上层夹紧平台5与下层夹紧平台3平行且间隔设置,上层夹紧平台5与下层夹紧平台3共同夹紧钢管柱。导向柱4设置在上层夹紧平台5与下层夹紧平台3之间,位于上层夹紧平台5与下层夹紧平台3的四角处,将上层夹紧平台5与下层夹紧平台3固定连接。护栏安装在上层夹紧平台5上。动力系统7为液压动力站,通过管道连接液压阀组8,液压阀组8设置在下夹紧平台3上,通过液压阀组8驱动上层夹紧平台5与下层夹紧平台3的运动,夹紧或者松开钢管柱。
使用时,首先采用全套管全回转钻机(或者旋挖钻机)等方式开挖钢管柱固定基坑,基坑完成挖掘深度后清除槽底沉渣,孔底沉渣厚度≦200mm。将基板1吊至基坑上方,通过经纬仪和十字定位法不断调整保证基板1中心与基坑中心一致,起吊钢筋笼缓慢放入基坑中,当钢筋笼吊放到设计位置时,检测其水平位置和高程是否满足设计要求,检测合格后立即固定钢筋笼完成前期准备工作。起吊前插式钢管柱平台至基板1上,通过经纬仪和十字定位法不断调整保证平台中心、基板中心及基坑中心在一条直线上,由动力系统7提供动力,通过支腿油缸2调节平台水平。接着用履带吊将钢管柱吊装至基坑中,满足钢管柱深度要求,下层夹紧平台3开始工作,120°水平方向三个油缸采用导轨方式同步进行推进,将钢管柱初步扶正夹紧,如在夹紧过程中发现钢管柱偏向一方,可通过液压阀组8对单一油缸进行调节,通过经纬仪来确保钢管柱基本满足施工要求垂直度及中心定位时,上层夹紧平台5采用楔形夹紧结构下压夹紧钢管柱,保证钢管柱与前插式钢管柱固定平台同心及其垂直度。此时可将履带吊撤离,依靠平台将钢管柱固定,之后进行钢管柱(基坑)混凝土灌注工作。如在施工过程中,因地层沉降而导致钢管柱垂直度发生偏离后,此时可通过液压阀组8对单一支腿油缸2进行调节,始终保持钢管柱垂直精度要求。混凝土完成灌注及凝结后,基坑内进行沙土回填,完成钢管柱前插工法施工,移走前插式钢管柱固定平台至下一桩位施工。
本实用新型的前插式钢管柱固定平台可以利用上层夹紧平台5与下层夹紧平台3共同夹紧钢管柱,进行前插工法施工,精度高且工作效率高。
综上所述,以上仅为本实用新型的较佳实施例而已,不应以此限制本实用新型的范围。即凡是依本实用新型权利要求书及说明书内容所作的简单的等效变化与修饰,皆应仍属本实用新型专利涵盖的范围内。

Claims (3)

1.一种前插式钢管柱固定平台,包括置于地面的基板、设置在基板上的支腿油缸、设置在支腿油缸上的下层夹紧平台、与下夹紧平台间隔且平行设置的上层夹紧平台、固定连接下夹紧平台和上夹紧平台的导向柱、动力系统和液压阀组,该动力系统通过液压阀组为下夹紧平台和上夹紧平台提供动力。
2.如权利要求1所述的前插式钢管柱固定平台,其特征在于,还包括设置在上夹紧平台上的护栏。
3.如权利要求1所述的前插式钢管柱固定平台,其特征在于,支腿油缸数量为多个,均匀分布。
CN201721784543.2U 2017-12-18 2017-12-18 前插式钢管柱固定平台 Active CN207775885U (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721784543.2U CN207775885U (zh) 2017-12-18 2017-12-18 前插式钢管柱固定平台

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721784543.2U CN207775885U (zh) 2017-12-18 2017-12-18 前插式钢管柱固定平台

Publications (1)

Publication Number Publication Date
CN207775885U true CN207775885U (zh) 2018-08-28

Family

ID=63227033

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721784543.2U Active CN207775885U (zh) 2017-12-18 2017-12-18 前插式钢管柱固定平台

Country Status (1)

Country Link
CN (1) CN207775885U (zh)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043047A (zh) * 2019-03-27 2019-07-23 徐州盾安重工机械制造有限公司 一种新型钢立柱植入装置及施工方法

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110043047A (zh) * 2019-03-27 2019-07-23 徐州盾安重工机械制造有限公司 一种新型钢立柱植入装置及施工方法

Similar Documents

Publication Publication Date Title
CN105569064B (zh) 一种适用于深水裸岩的设置式沉井基础施工方法
CN109371974A (zh) 一种适用于坚硬地质的phc管桩植入施工方法
CN102635120A (zh) 圆形深基坑无支撑施工结构和施工方法
CN112900450A (zh) 逆作法钢管结构桩旋挖钻进与全回转组合后插法定位方法
CN108103939A (zh) 斜截面钢栈桥施工组合加固方式及施工工艺
CN112267472A (zh) 一种超前搅拌桩斜桩基坑支护施工工艺
CN104234082A (zh) 深基坑跃层逆作施工方法
CN103967058A (zh) 基于一柱一桩后插法的孔内导向纠偏和钢管柱调直的方法
CN102619206A (zh) 一种深水裸岩、岩溶桩的基础平台结构
CN103321212A (zh) 一柱一桩后插法施工工艺
CN105064381A (zh) 一种高低刃脚双壁钢围堰钢筋混凝土一次封底施工方法
CN207775885U (zh) 前插式钢管柱固定平台
CN202492854U (zh) 深水裸岩、岩溶桩的基础平台结构
CN109610473A (zh) 一种市政大型池体构筑物基坑支护体系的施工方法
CN105133641A (zh) 一种薄壁型连续墙式地基基础加固结构及方法
CN104074209B (zh) 深层平板载荷试验装置
CN202595747U (zh) 用于u形混凝土板桩沉桩的型钢导向架
CN206267159U (zh) 一种顶管工作井基坑支护结构
CN110847047B (zh) 一种外海裸岩栈桥施工方法
CN108316314A (zh) 一种可解决深浅基坑中坑偏压问题的内支撑结构
CN205804365U (zh) 一种盖挖法顶板节点结构
CN204849759U (zh) 一种作为主体结构立柱的捆绑式锚索复合桩结构
CN209323529U (zh) 一种框架式双排桩水泥土墙基坑围护结构
CN202247830U (zh) 新型水中钢平台
CN208088306U (zh) 一种可解决深浅基坑中坑偏压问题的内支撑结构

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20200610

Address after: 221140 No. 8 Tongfa Road, Quanshan Economic Development Zone, Xuzhou City, Jiangsu Province

Patentee after: Xuzhou Dun'an Construction Machinery Manufacturing Co.,Ltd.

Address before: 1-6 No. 221140 Jiangsu city of Xuzhou Province era North Development Zone Quanshan District Road

Patentee before: XUZHOU DUN'AN HEAVY INDUSTRY MACHINERY MANUFACTURING Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210805

Address after: 201901 5 / F, 6 / F, building 5, No. 258, Yangnan Road, Baoshan District, Shanghai

Patentee after: SHANGHAI ENGINEERING MACHINERY Co.,Ltd.

Address before: 221140 No.8 Tongfa Road, Quanzhou Economic Development Zone, Quanzhou District, Xuzhou City, Jiangsu Province

Patentee before: Xuzhou Dun'an Construction Machinery Manufacturing Co.,Ltd.

TR01 Transfer of patent right