CN207772066U - Zirconia-corundum refractory brick production casting equipment - Google Patents
Zirconia-corundum refractory brick production casting equipment Download PDFInfo
- Publication number
- CN207772066U CN207772066U CN201820024152.9U CN201820024152U CN207772066U CN 207772066 U CN207772066 U CN 207772066U CN 201820024152 U CN201820024152 U CN 201820024152U CN 207772066 U CN207772066 U CN 207772066U
- Authority
- CN
- China
- Prior art keywords
- casting
- casting equipment
- zirconia
- refractory brick
- room
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Compositions Of Oxide Ceramics (AREA)
Abstract
The utility model discloses zirconia-corundum refractory brick production casting equipments,Including cast tubes,Casting room,Flap and casting equipment,Top both sides inside the casting equipment are equipped with sprinkler head by nut,One end of the casting equipment is by being welded with cast tubes,The lower end of the cast tubes assigns into the inside of casting room,The inside of the casting room offers casting model slot,Bottom end inside the casting equipment is placed with conveyer belt,The side of the conveyer belt is placed with slide plate,The bottom end side of the casting equipment offers side port,The utility model is by being arranged flap,Conveyer belt etc.,Conveniently casting is directly overturn to fall on conveyer belt after having cast and be sent out,Avoid situations such as being scalded caused by staff may directly touch,It is simple in structure,It is easy to operate,Teeming pipe is set,Teeming is carried out to shrinkage cavity that may be present in time,Improve the quality of casting.
Description
Technical field
The utility model is related to casting equipment technical field more particularly to zirconia-corundum refractory brick production casting equipments.
Background technology
It, will be by molten liquid by electric furnace after batch reaches casting standard in electric arc furnaces after fusing and refining stage
The operating process for directly pouring into casting mold is known as casting.This process is although of short duration, but each step is all related to the quality of final product,
It is a complicated operation stage.But temperature is very high in casting process, and a high temperature shape is still in after cooling
State, it is easy to which the danger such as scald are generated to the staff directly touched.
Utility model content
Purpose of the utility model is to solve disadvantages existing in the prior art, and the zirconia-corundum refractory brick life proposed
Production casting equipment.
To achieve the goals above, the utility model uses following technical solution:
Zirconia-corundum refractory brick production casting equipment, including cast tubes, casting room, flap and casting equipment, the casting
Top both sides inside equipment are equipped with sprinkler head by nut, and one end of the casting equipment is by being welded with casting
Pipe, the lower end of the cast tubes assign into the inside of casting room, and the inside of the casting room offers casting model slot, described to pour
Casting is placed with inside mold type groove, the bottom end both sides of the casting room are respectively equipped with left fixed link and right fixed link, the left side
Fixed link is both placed in the upper end of flap with right fixed link, and the bottom end inside the casting equipment is placed with conveyer belt, the biography
The side of band is sent to be placed with slide plate, the bottom end side of the casting equipment offers side port.
Preferably, the inside of the cast tubes is placed with filter plate, and the filter plate is in mesh.
Preferably, the both sides inner wall of the casting room offers resettlement groove, and teeming pipe is placed with inside the resettlement groove.
Preferably, the side of the left fixed link is assigned by being welded with inserting column, the inserting column inside slot, institute
Slot is stated to be opened in inside the side of right fixed link.
Preferably, the both sides of the casting room are equipped with clamping plate, and the side of the clamping plate is by being welded with compression bullet
Spring, the other side of the clamping plate is by being welded with protective pad.
Preferably, the flap is internally provided with shaft, and the side of the shaft is equipped with bull stick by nut.
The utility model has the beneficial effects that:
1, the utility model falls into biography by the way that flap, conveyer belt etc., convenient directly overturn casting after having cast is arranged
It send to take and send out, avoid situations such as being scalded caused by staff may directly touch, it is simple in structure, it is easy to operate.
2, the utility model carries out teeming to shrinkage cavity that may be present in time, improves the matter of casting by the way that teeming pipe is arranged
Amount.
Description of the drawings
Fig. 1 be the utility model proposes zirconia-corundum refractory brick production casting equipment structural schematic diagram;
Fig. 2 be the utility model proposes zirconia-corundum refractory brick production casting equipment teeming pipe place schematic diagram.
In figure:1 cast tubes, 2 casting rooms, 21 resettlement grooves, 3 casting model slots, 4 flaps, 41 shafts, 411 bull sticks, 5 casting,
51 shrinkage cavities, 6 conveyer belts, 7 left fixed links, 71 inserting columns, 8 right fixed links, 81 slots, 9 clamping plates, 91 protective pads, 92 compressed springs, 10
Teeming pipe, 11 filter plates, 12 side ports, 13 slide plates, 14 sprinkler heads, 15 casting equipments.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.
Referring to Fig.1-2, zirconia-corundum refractory brick production casting equipment, including cast tubes 1, casting room 2, flap 4 and casting
Equipment 15, the top both sides inside casting equipment 15 are equipped with sprinkler head 14 by nut, and sprinkler head 14 is used for carrying out casting 5
One end of cooling, casting equipment 15 is used for pouring into molten liquid casting, cast tubes 1 by being welded with cast tubes 1, cast tubes 1
Lower end assign into the inside of casting room 2, the inside of casting room 2 offers casting model slot 3, and casting model slot 3 is used for making casting
Part 5 is molded, and is placed with casting 5 inside casting model slot 3, the bottom end both sides of casting room 2 are respectively equipped with left fixed link 7 and right fixation
Bar 8, left fixed link 7 and right fixed link 8, which are used for fixing, to be prevented from leaking when casting, and is facilitated after having poured and overturn casting 5, left
Fixed link 7 is both placed in the upper end of flap 4 with right fixed link 8, and flap 4 is used for making the overturning of casting 5 to fall on conveyer belt 6, casts
Bottom end inside equipment 15 is placed with conveyer belt 6, and conveyer belt 6 is used for transmitting casting 5, and the side of conveyer belt 6 is placed with slide plate 13,
Slide plate 13 is used for that casting 5 is made to skid off outside casting equipment 5, and the bottom end side of casting equipment 15 offers side port 12.
In the present embodiment, left fixed link 7 and right fixed link 8 are fixed to each other are placed in 2 lower end of casting room first, confirmed tight
It is close it is seamless after, at the uniform velocity pour into molten liquid above cast tubes 1, its fair current made to enter in casting model slot 3, make its molding, simultaneously
Start sprinkler head 14 to cool down to 2 outside of casting room, is closed after a period of time, check whether casting 5 has shrinkage cavity generation, if
There are shrinkage cavity, teeming pipe 10 is taken out out of resettlement groove 21, and move to and pour into suitable melt at shrinkage cavity in teeming pipe 10
Melt liquid to enter in shrinkage cavity, so that shrinkage cavity is repaired complete, after confirming without any shrinkage cavity, start transmission belt 6, while by 7 He of left fixed link
Right fixed link 8 is extracted out respectively, and casting 5 is made to fall on flap 4, then rotates bull stick 411, and shaft 41 is made to rotate, and drives flap 4
Overturning so that the overturning of casting 5 is fallen on conveyer belt 6, under the operating of conveyer belt 6 will the transport of casting 5 to make on slide plate 13 its from
Side port 12 slides to outside, after close conveyer belt 6.
The preferable specific implementation mode of the above, only the utility model, but the scope of protection of the utility model is not
Be confined to this, any one skilled in the art within the technical scope disclosed by the utility model, according to this practicality
Novel technical solution and its utility model design are subject to equivalent substitution or change, should all cover the protection model in the utility model
Within enclosing.
Claims (6)
1. zirconia-corundum refractory brick production casting equipment, including cast tubes (1), casting room (2), flap (4) and casting equipment
(15), which is characterized in that the internal top both sides of the casting equipment (15) are equipped with sprinkler head (14) by nut, described to pour
One end of casting machine (15) assigns into casting room (2) by being welded with cast tubes (1), the lower end of the cast tubes (1)
The inside of inside, the casting room (2) offers casting model slot (3), and casting is placed with inside the casting model slot (3)
(5), the bottom end both sides of the casting room (2) are respectively equipped with left fixed link (7) and right fixed link (8), the left fixed link (7) with
Right fixed link (8) is both placed in the upper end of flap (4), and the internal bottom end of the casting equipment (15) is placed with conveyer belt (6), institute
The side for stating conveyer belt (6) is placed with slide plate (13), and the bottom end side of the casting equipment (15) offers side port (12).
2. zirconia-corundum refractory brick production casting equipment according to claim 1, which is characterized in that the cast tubes (1)
Inside be placed with filter plate (11), the filter plate (11) is in mesh.
3. zirconia-corundum refractory brick production casting equipment according to claim 1, which is characterized in that the casting room (2)
Both sides inner wall offer resettlement groove (21), is placed with teeming pipe (10) inside the resettlement groove (21).
4. zirconia-corundum refractory brick production casting equipment according to claim 1, which is characterized in that the left fixed link
(7) side assigns into slot (81) inside by being welded with inserting column (71), the inserting column (71), and the slot (81) is opened
It is located inside the side of right fixed link (8).
5. zirconia-corundum refractory brick production casting equipment according to claim 1, which is characterized in that the casting room (2)
Both sides be equipped with clamping plate (9), the side of the clamping plate (9) by being welded with compressed spring (92), the clamping plate (9)
The other side is by being welded with protective pad (91).
6. zirconia-corundum refractory brick production casting equipment according to claim 1, which is characterized in that the flap (4)
It is internally provided with shaft (41), the side of the shaft (41) is equipped with bull stick (411) by nut.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820024152.9U CN207772066U (en) | 2018-01-08 | 2018-01-08 | Zirconia-corundum refractory brick production casting equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820024152.9U CN207772066U (en) | 2018-01-08 | 2018-01-08 | Zirconia-corundum refractory brick production casting equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207772066U true CN207772066U (en) | 2018-08-28 |
Family
ID=63224025
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820024152.9U Active CN207772066U (en) | 2018-01-08 | 2018-01-08 | Zirconia-corundum refractory brick production casting equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207772066U (en) |
-
2018
- 2018-01-08 CN CN201820024152.9U patent/CN207772066U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN203380346U (en) | Vacuum centrifugal casting device provided with heating and thermal insulation devices | |
CN211101532U (en) | Low-pressure casting equipment for casting flywheel | |
CN104325107B (en) | The efficient fine vacuum former of a kind of conventional die-cast metal (aluminum, zinc, copper) alloy and method | |
JPS6161899B2 (en) | ||
CN104315845A (en) | Enclosed self-feeding lead smelting furnace | |
CN102151790B (en) | Investment casting method of heavy castings | |
CN204276853U (en) | A kind of efficient high vacuum former of conventional die-cast metal alloy | |
CN207772066U (en) | Zirconia-corundum refractory brick production casting equipment | |
CN204747444U (en) | Resistance preheats formula vacuum furnace | |
CN210939838U (en) | Be used for evaporating fashioned heat preservation device of pressure aerated concrete block | |
KR101425572B1 (en) | Furnace for melting Aluminum Puck by Precipitation | |
CN103394674A (en) | Vacuum induction furnace for casting thin-wall castings and method of casting thin-wall titanium alloy castings | |
CN103159575B (en) | Technological cover and application method thereof | |
CN207414301U (en) | A kind of apparatus for cast-aluminium rotor of electric machine centrifugal aluminum casting machine | |
CN206046999U (en) | A kind of dewaxing device in cast shaping process | |
CN205008554U (en) | High -efficient portable stalk | |
CN210952342U (en) | Thermal cycle formula smelting pot device | |
CN210498347U (en) | Casting device | |
CN208879679U (en) | The filling lead device of radioactive material container | |
CN203076576U (en) | Single-ladle multi-box pouring system | |
CN207914571U (en) | A kind of differential pressure furnaceman dress | |
RU2007118032A (en) | METHOD FOR PRODUCING CASTINGS AND DEVICE FOR ITS IMPLEMENTATION | |
KR101848432B1 (en) | Aluminum continuous melting furnace | |
CN218903616U (en) | Automatic smelting system of precision casting tunnel roasting furnace robot | |
CN106735081A (en) | A kind of counter-pressure casting machine and casting method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |