CN207749515U - A kind of semicircle pile driving construction device - Google Patents

A kind of semicircle pile driving construction device Download PDF

Info

Publication number
CN207749515U
CN207749515U CN201721809503.9U CN201721809503U CN207749515U CN 207749515 U CN207749515 U CN 207749515U CN 201721809503 U CN201721809503 U CN 201721809503U CN 207749515 U CN207749515 U CN 207749515U
Authority
CN
China
Prior art keywords
semicircle
reinforcement cage
steel reinforcement
isolation board
construction device
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721809503.9U
Other languages
Chinese (zh)
Inventor
陈德国
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Original Assignee
Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd filed Critical Rail Transit Engineering Co Ltd of China Railway 21St Bureau Group Co Ltd
Priority to CN201721809503.9U priority Critical patent/CN207749515U/en
Application granted granted Critical
Publication of CN207749515U publication Critical patent/CN207749515U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

A kind of semicircle pile driving construction device, steel reinforcement cage is provided in drilled pile, steel reinforcement cage is integrally machined and is made by lower part circle steel reinforcement cage and top semicircle steel reinforcement cage, and separation layer is provided on the semi circular surface of top semicircle steel reinforcement cage, isolated tube has been horizontally spaced about on separation layer;The utility model has the following advantages compared with the prior art:Abolishing the time, improving lower step process construction effect, constructing operation simplicity, be easy to control, save labour, is smaller to armored concrete semicircle Influence of Pile Foundation for concrete parts semicircle pile foundation is shortened, pile foundation engineering constructing device or equipment technical field can be promoted the use of.

Description

A kind of semicircle pile driving construction device
Technical field
The utility model belongs to pile foundation engineering constructing device or equipment technical field, and in particular to arrives a kind of city underground vehicle It stands foundation pit enclosure structure semicircle pile driving construction device.
Background technology
City Subway Station erect-position is normally at below urban transportation major trunk roads, and structure construction is required to early period AT STATION Progress pipeline moves to change to be needed with station construction.Since part arterial traffic is relatively narrow, station erect-position all occupies boundary lines of roads, leads Causing more underground utilities, structure both sides do not move and change position AT STATION, it is contemplated that implementing only above station structure.Work as pipe When line buried depth absolute altitude is well below station top elevation, need station partial panels structure being designed to sink structures in construction, And after sink structures are implemented in advance, moving for pipeline could be carried out and changed, touched mouth, restore road construction.Led in conjunction with traffic change demand with And construction period, cost factor, the part station top board structure for being related to sinking mostly use fender post, interim stand column pile as structure Support system.It is connected as one with station top plate at the top of interim stand column pile, and is carried out after the completion of whole station agent structures It abolishes.Fender post, which then needs to abolish half and under the top plate sink structure or less position, to be implemented after longitudinal Guan Liang as sinking top plate knot The part support system of structure.
Generally conventional fender post is one-piece casting, and half is carried out in foundation pit when abolishing, tedious process, and basal plane is smooth Degree is difficult to control, and construction effect is low, and overall construction cost is higher.
Invention content
The technical problem to be solved by the utility model is to a gram above-mentioned the deficiencies in the prior art, provide a kind of design conjunction Reason, simple in structure, low engineering cost, the semicircle pile driving construction device that can quickly abolish construction.
Solve above-mentioned technical problem the technical solution adopted is that:Steel reinforcement cage is provided in drilled pile, steel reinforcement cage is by lower part Round steel reinforcement cage and top semicircle steel reinforcement cage are integrally machined and are made, and isolation is provided on the semi circular surface of top semicircle steel reinforcement cage Layer, it has been horizontally spaced about isolated tube on separation layer.
The separation layer of the utility model is the double-deck isolation board, and first layer isolation board is weldingly fixed on the half of semicircle steel reinforcement cage On disc, second layer isolation board is fixed on first layer isolation board, and isolated tube is fixed on second layer isolation board.
The first layer isolation board of the utility model is steel plate, and second layer isolation board is wood based panel.
Mounting hole is machined on the second layer isolation board of the utility model, isolated tube passes through the cassette tape in mounting hole It is fixed on second layer isolation board.
The isolated tube of the utility model is hard straight pvc pipe, and caliber is 30~50mm.
The closely knit closure of both ends adhesive tape or cotton-wool of the isolated tube of the utility model.
The distance of the adjacent isolated tube of the utility model is 50~80cm.
Due to the utility model use semicircle steel reinforcement cage semi circular surface be provided with separation layer, separation layer be steel plate and Wood based panel, steel plate are weldingly fixed on the semi circular surface of semicircle steel reinforcement cage, and wood based panel is fixed on the steel plate, is reserved on wood based panel Mounting hole, isolated tube are mounted on by cassette tape in reserving installation hole, and isolated tube both ends use adhesive tape or the closely knit envelope of cotton-wool It is stifled, prevent concrete from pouring into, the utility model has the following advantages compared with the prior art:Shorten concrete parts semicircle stake Base is abolished the time, and lower step process construction effect is improved;Constructing operation is easy, is easy to control, and saves labour;To reinforced concrete Native semicircle Influence of Pile Foundation is smaller, can promote the use of pile foundation engineering constructing device or equipment technical field.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model one embodiment.
Fig. 2 is the vertical view of Fig. 1.
Fig. 3 is the fixed structural schematic diagram on wood based panel 2-2 of isolated tube 3 in Fig. 1.
Fig. 4 is the right view of Fig. 3.
In figure:1, semicircle steel reinforcement cage;2, separation layer;3, isolated tube;4, round steel reinforcement cage;5, cassette tape;6, adhesive tape; 2-1, first layer isolation board;2-2, second layer isolation board;A, drilled pile;B, mounting hole.
Specific implementation mode
The utility model is described in further details with reference to the accompanying drawings and examples, but the utility model is not limited to this A little embodiments.
Embodiment 1
In Fig. 1,2,3,4, a kind of semicircle pile driving construction device of the utility model is provided with steel reinforcement cage, steel in drilled pile a Muscle cage is integrally machined and is made by lower part circle steel reinforcement cage 4 and top semicircle steel reinforcement cage 1, the semicircle of top semicircle steel reinforcement cage 4 Separation layer 2 is installed on face, the separation layer 2 of the utility model is the double-deck isolation board, and first layer isolation board 2-1 is steel plate, First layer isolation board 2-1 is weldingly fixed on the semi circular surface of semicircle steel reinforcement cage, second layer isolation board 2-2 be wood based panel, second Layer isolation board 2-2 is fixed on first layer isolation board 2-1, mounting hole b is machined on second layer isolation board 2-2, isolated tube 3 passes through Cassette tape 5 in mounting hole b is fixed on second layer isolation board 2-2, and 3 horizontal interval of isolated tube is isolated mounted on the second layer On plate 2-2, the distance of adjacent isolated tube is 65cm, and the isolated tube 3 of the present embodiment is hard straight pvc pipe, caliber 45mm;In order to anti- Only concrete pours into, the closely knit closure of both ends adhesive tape or cotton-wool of isolated tube 3, and the separation layer 2 of the utility model is segmented On semicircle steel reinforcement cage 4, seam is tight when segmentation is installed, the diameter of the width of separation layer 2 and semicircle steel reinforcement cage 4 It is consistent, the fitting depth of separation layer 2 is to lower end Guan Liang bottom, convenient for cutting for follow-up concrete.
Embodiment 2
In above-described embodiment 1,3 horizontal interval of isolated tube of the present embodiment is mounted on second layer isolation board 2-2, it is adjacent every It is 50cm with a distance from pipe, isolated tube 3 is hard straight pvc pipe, and the connection of caliber 30mm, remaining each parts and parts are closed System is identical with embodiment 1.
Embodiment 3
In above-described embodiment 1,3 horizontal interval of isolated tube of the present embodiment is mounted on second layer isolation board 2-2, it is adjacent every It is 80cm with a distance from pipe, isolated tube 3 is hard straight pvc pipe, and the connection of caliber 50mm, remaining each parts and parts are closed System is identical with embodiment 1.

Claims (7)

1. a kind of semicircle pile driving construction device, it is characterised in that:Steel reinforcement cage is provided in drilled pile, steel reinforcement cage is by lower part circular steel Muscle cage and top semicircle steel reinforcement cage are integrally machined and are made, and separation layer is provided on the semi circular surface of top semicircle steel reinforcement cage, every Isolated tube has been horizontally spaced about on absciss layer.
2. a kind of semicircle pile driving construction device according to claim 1, it is characterised in that:The separation layer is double-deck is isolated Plate, first layer isolation board are weldingly fixed on the semi circular surface of semicircle steel reinforcement cage, and second layer isolation board is fixed on first layer isolation On plate, isolated tube is fixed on second layer isolation board.
3. a kind of semicircle pile driving construction device according to claim 2, it is characterised in that:The first layer isolation board is steel Plate, second layer isolation board are wood based panel.
4. a kind of semicircle pile driving construction device according to claim 3, it is characterised in that:Add on the second layer isolation board Work has mounting hole, isolated tube to be fixed on second layer isolation board by the cassette tape in mounting hole.
5. a kind of semicircle pile driving construction device according to claim 1, it is characterised in that:The isolated tube is hard straight PVC Pipe, caliber are 30~50mm.
6. a kind of semicircle pile driving construction device according to claim 4, it is characterised in that:The both ends of the isolated tube are with thoroughly Gelatin band or the closely knit closure of cotton-wool.
7. a kind of semicircle pile driving construction device according to claim 1, it is characterised in that:The distance of the adjacent isolated tube For 50~80cm.
CN201721809503.9U 2017-12-21 2017-12-21 A kind of semicircle pile driving construction device Active CN207749515U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721809503.9U CN207749515U (en) 2017-12-21 2017-12-21 A kind of semicircle pile driving construction device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721809503.9U CN207749515U (en) 2017-12-21 2017-12-21 A kind of semicircle pile driving construction device

Publications (1)

Publication Number Publication Date
CN207749515U true CN207749515U (en) 2018-08-21

Family

ID=63150187

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721809503.9U Active CN207749515U (en) 2017-12-21 2017-12-21 A kind of semicircle pile driving construction device

Country Status (1)

Country Link
CN (1) CN207749515U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119172A (en) * 2020-01-07 2020-05-08 广州地铁设计研究院股份有限公司 Modular arc-shaped steel die for half-pile construction of cast-in-place pile and construction method
CN114703833A (en) * 2022-04-27 2022-07-05 中铁三局集团有限公司 Construction method for semi-circular piles for covering and digging station

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111119172A (en) * 2020-01-07 2020-05-08 广州地铁设计研究院股份有限公司 Modular arc-shaped steel die for half-pile construction of cast-in-place pile and construction method
CN114703833A (en) * 2022-04-27 2022-07-05 中铁三局集团有限公司 Construction method for semi-circular piles for covering and digging station

Similar Documents

Publication Publication Date Title
CN102644466B (en) Joist arching method for constructing ultra-shallow buried large-span underground excavated subway station in rocky stratum
CN105240024B (en) A kind of method of parallel shield method enlarging construction subway station
CN206942764U (en) The supplementary structure of assembly and disassembly shield machine or TBM development machines in a kind of hole
CN201412163Y (en) Circular tunnel lining structure for construction of open-type tunnel boring machine
CN202544925U (en) One-hole dual-purpose tunnel drain hole structure
CN105201516B (en) A kind of main structure of subway station and its tetrad arch PBA excavating construction methods
CN205024717U (en) Construction equipment of city utility tunnel immersed tube section
CN207749515U (en) A kind of semicircle pile driving construction device
CN106193117B (en) A kind of assembling and construction method of the prefabricated pipe gallery in underground
CN108868814A (en) Collapsible loess combination land pebble stratum tunneling air duct connects the ventilating shaft of shield tunnel
CN102587933A (en) Gob-side entry retaining method using prefabricated walls
CN204715366U (en) A kind of large-area deep foundation pit subregion is along the support system under inverse operating mode
CN104481555A (en) Method of grouting and drilling construction by passing through weak surrounding rock
CN103089298B (en) Structure and method for building side direction multicolumn gob-side entry retaining filling wall body
CN205036380U (en) Block of four encircles PBA and secretly digs subway station major structure
CN204492847U (en) A kind of supporting and protection structure of underground space reverse construction
CN103090107B (en) Construction method for rectangular large section steel structure assembled temporary support pipe joint jack-in mechanism
CN105041348A (en) Underground space subsurface excavation construction method adopting combined roof
CN105065040A (en) Top-plate-prefabricated underground space underground excavation building method
Song et al. The overall design of Qingdao Jiaozhou Bay subsea tunnel
CN205036388U (en) Block of four encircles knot hunch construction structures that PBA secretly dug subway station
CN204941551U (en) A kind of subway station of Curve Pipe Jacking supporting and protection structure enlarging shield-tunneling construction
CN203834809U (en) Steel pipe column structure for steel pipe column concrete side pouring method
CN104793262A (en) Stratum hierarchical displacement monitoring method
CN103032099A (en) Prefabricated partition wall structure of lateral smoke discharge passage of shield tunnel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant