CN207749484U - A kind of runner formwork structure based on BIM technology - Google Patents

A kind of runner formwork structure based on BIM technology Download PDF

Info

Publication number
CN207749484U
CN207749484U CN201721082648.3U CN201721082648U CN207749484U CN 207749484 U CN207749484 U CN 207749484U CN 201721082648 U CN201721082648 U CN 201721082648U CN 207749484 U CN207749484 U CN 207749484U
Authority
CN
China
Prior art keywords
water inlet
flow channel
inlet flow
outlet passage
outlet
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721082648.3U
Other languages
Chinese (zh)
Inventor
马定球
黄伟勇
卢杰
黄毅义
朱海江
曾俊辉
黄水荣
张力文
李以浪
邓远新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangdong Province's Water Conservancy And Hydropower 3rd Co Ltd Of Engineering Bureau
Guangdong No 3 Water Conservancy and Hydro Electric Engineering Board Co Ltd
Original Assignee
Guangdong Province's Water Conservancy And Hydropower 3rd Co Ltd Of Engineering Bureau
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangdong Province's Water Conservancy And Hydropower 3rd Co Ltd Of Engineering Bureau filed Critical Guangdong Province's Water Conservancy And Hydropower 3rd Co Ltd Of Engineering Bureau
Priority to CN201721082648.3U priority Critical patent/CN207749484U/en
Application granted granted Critical
Publication of CN207749484U publication Critical patent/CN207749484U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model is related to hydraulic engineering technical fields, disclose a kind of runner formwork structure based on BIM technology, including water inlet flow channel, water inlet flow channel includes first segment water inlet flow channel position and the second section water inlet flow channel position, the cross-sectional shape at first segment water inlet flow channel position is rectangle, and the cross-sectional shape at the second section water inlet flow channel position is round for outlet from the gradual transition of import rectangle;Runner formwork structure based on BIM technology further includes outlet passage, outlet passage includes first segment outlet passage position and the second section outlet passage position, the cross-sectional shape at first segment outlet passage position is circle, and from import circle, gradually transition is outlet rectangle to the cross-sectional shape at the second section outlet passage position.It is round for outlet by import rectangular transition by the cross-sectional shape for designing water inlet flow channel, the cross-sectional shape of outlet passage is outlet rectangle by import rounded transitional, so as to improve the flow-shape in runner, reduce the hydraulic loss in runner, and then improve the working efficiency of pumping plant.

Description

A kind of runner formwork structure based on BIM technology
Technical field
The utility model is related to hydraulic engineering technical fields, more particularly to a kind of runner template knot based on BIM technology Structure.
Background technology
In recent years, in order to meet the requirements such as flood control, water drainage, irrigation, the pumping plant that China's Coastal Areas is built is more and more, Medium-and-large-sized inclined pumping plant is with the advantages that its good hydraulic performance, smaller cutting depth, unit uniform force and by widely Using.
Inclined pumping plant machine set system is mainly made of runner, water pump, motor, fuel tank etc., and wherein runner is the important of pumping plant Position plays a crucial role the operation of pumping plant.Runner is divided into water inlet flow channel and outlet passage, will by water inlet flow channel Water in intake pool is smoothly drained to water pump mouth, good Inlet flow pattern is provided for water pump, finally by going out for water pump rear end Water flow passage gently drains away water, and therefore, the design of runner is particularly important to the operation of pumping plant.Since existing runner is general For bend pipe and length it is longer, cause to easy to produce vortex and the separation of flow in runner, to increase the hydraulic loss of runner, Jin Erying Ring the working efficiency of pumping station operation.
Utility model content
The purpose of this utility model is to provide a kind of runner formwork structure based on BIM technology, to solve in existing runner Due to easy to produce vortex and the separation of flow and cause runner hydraulic loss increase the technical issues of, with improve pumping plant work imitate Rate.
In order to solve the above-mentioned technical problem, the utility model provides a kind of runner formwork structure based on BIM technology, including Water inlet flow channel, the cross section of the water inlet flow channel along the water inlet flow channel direction from import to the outlet of the water inlet flow channel by Taper contracting;The water inlet flow channel includes that first segment water inlet flow channel position and second save water inlet flow channel position, the water inlet flow channel Import is set in the import at first segment water inlet flow channel position, and the outlet of the water inlet flow channel is set to described second and saves feed water flow In the outlet at road position, the import that the outlet at first segment water inlet flow channel position saves water inlet flow channel position with described second connects It connects;The cross-sectional shape at first segment water inlet flow channel position is rectangle, the cross section shape at second section water inlet flow channel position Shape is that outlet is round from the gradual transition of import rectangle;
The runner formwork structure based on BIM technology further includes outlet passage, and the outlet passage includes that first segment goes out Water flow passage position and the second section outlet passage position, the import of the outlet passage are set to first segment outlet passage position In import, the outlet of the outlet passage is set in the outlet that described second saves outlet passage position, and the first segment goes out flow The outlet at road position is connect with the import at second section outlet passage position;The cross section at first segment outlet passage position Shape is circle, and from import circle, gradually transition is outlet rectangle to the cross-sectional shape at second section outlet passage position, and Import of the cross section at second section outlet passage position along second section outlet passage position is discharged to second section The direction of the outlet at runner position is gradually expanded.
Preferably, the water inlet flow channel further includes multiple first skeletons, first skeleton be connected to it is described into On the madial wall of water flow passage.
Preferably, first skeleton includes the first outline border and multiple the first keel to interweave in length and breadth, and described The both ends of one keel are both connected on first outline border;First skeleton is connected to the water inlet by first outline border On the madial wall of runner.
Preferably, the water inlet flow channel further includes multiple first stiffeners, and first stiffener is connected to more On a first keel.
Preferably, the outlet passage further includes multiple second skeletons, second skeleton be connected to it is described go out On the madial wall of water flow passage.
Preferably, second skeleton includes the second outline border and multiple the second keel to interweave in length and breadth, and described Bicarinate both ends are both connected on second outline border;Second skeleton is connected to the water outlet by second outline border On the madial wall of runner.
Preferably, the outlet passage further includes multiple second stiffeners, and second stiffener is connected to more On a second keel.
Preferably, the material of the water inlet flow channel is timber.
Preferably, the material of the outlet passage is timber.
Preferably, the runner formwork structure based on BIM technology further includes for showing the water inlet flow channel With the outlet passage shape and the BIM software modules of data.
The utility model provides a kind of runner formwork structure based on BIM technology, including water inlet flow channel, water inlet flow channel include First segment water inlet flow channel position and the second section water inlet flow channel position, the cross-sectional shape at first segment water inlet flow channel position is rectangle, The cross-sectional shape at the second section water inlet flow channel position is that outlet is round from the gradual transition of import rectangle;Runner based on BIM technology Formwork structure further includes outlet passage, and outlet passage includes first segment outlet passage position and second saves outlet passage position, the The cross-sectional shape at one section outlet passage position is circle, the cross-sectional shape at the second section outlet passage position from import circle by Gradual transition is outlet rectangle.It is round for outlet by import rectangular transition by the cross-sectional shape for designing water inlet flow channel, go out flow The cross-sectional shape in road is outlet rectangle by import rounded transitional so that water can be smoothly drained to water pump by water inlet flow channel Import and outlet passage can gently drain away water from the outlet of water pump, so as to improve the flow-shape in runner, Reduce hydraulic loss of the flow in runner, and then improves the working efficiency of pumping station operation.
Description of the drawings
Fig. 1 is the structural schematic diagram of water inlet flow channel in the utility model embodiment;
Fig. 2 is the structural schematic diagram of outlet passage in the utility model embodiment;
Fig. 3 is the structural schematic diagram of the first skeleton in the utility model embodiment;
Fig. 4 is the structural schematic diagram of the second skeleton in the utility model embodiment.
Wherein, 1, water inlet flow channel;11, first segment water inlet flow channel position;12, the second section water inlet flow channel position;13, the first bone Frame;131, the first outline border;132, the first keel;2, outlet passage;21, first segment outlet passage position;22, second flow is saved out Road position;23, the second skeleton;231, the second outline border;232, the second keel.
Specific implementation mode
With reference to the accompanying drawings and examples, specific embodiment of the present utility model is described in further detail.Below Embodiment is not intended to limit the scope of the present invention for illustrating the utility model.
In conjunction with shown in Fig. 1 and Fig. 2, a kind of runner formwork structure based on BIM technology of the preferred embodiment in the utility model, Including water inlet flow channel 1, the cross section of the water inlet flow channel 1 is along outlet of the import to the water inlet flow channel 1 of the water inlet flow channel 1 Direction gradually taper up;The water inlet flow channel 1 includes that water inlet flow channel position 12, institute are saved in first segment water inlet flow channel position 11 and second The import for stating water inlet flow channel 1 is set in the import at first segment water inlet flow channel position 11, and the outlet of the water inlet flow channel 1 is set to In the outlet at second section water inlet flow channel position 12, the outlet at first segment water inlet flow channel position 11 with described second save into The import at water flow passage position 12 connects;The cross-sectional shape at first segment water inlet flow channel position 11 is rectangle, second section The cross-sectional shape at water inlet flow channel position 12 is that outlet is round from the gradual transition of import rectangle;
The runner formwork structure based on BIM technology further includes outlet passage 2, and the outlet passage 2 includes first segment Outlet passage position 22 is saved at outlet passage position 21 and second, and the import of the outlet passage 2 goes out flow set on the first segment In the import at road position 21, the outlet of the outlet passage 2 is set in the outlet that described second saves outlet passage position 22, described The outlet at first segment outlet passage position 21 is connect with the import at second section outlet passage position 22;The first segment water outlet The cross-sectional shape at runner position 21 is circle, the cross-sectional shape at second section outlet passage position 22 from import circle by Gradual transition is outlet rectangle, and the cross section at second section outlet passage position 22 is along second section outlet passage position 22 Import be gradually expanded to the direction of the outlet at second section outlet passage position 22.
In the utility model embodiment, the cross-sectional shape by designing water inlet flow channel 1 by import rectangular transition is Mouthful round, the cross-sectional shape of outlet passage 2 is outlet rectangle by import rounded transitional so that water inlet flow channel 1 can will be horizontal It is drained to the import of water pump suitablely and outlet passage 2 can gently drain away water from the outlet of water pump, so as to improve Flow-shape in runner reduces hydraulic loss of the flow in runner, and then improves the working efficiency of pumping station operation.
As shown in figure 3, in order to prevent during the water inlet flow channel 1 shapes, the shape of the water inlet flow channel 1 occurs Deformation, to ensure that the stability of the water inlet flow channel 1 after forming, water inlet flow channel 1 described in the present embodiment further include multiple the One skeleton 13, first skeleton 13 are connected on the madial wall of the water inlet flow channel 1.By in the water inlet flow channel 1 Multiple first skeletons 13 are connected on side wall, to provide support force for the water inlet flow channel 1, are effectively prevented in institute During stating the forming of water inlet flow channel 1, gross distortion occurs for the shape of the water inlet flow channel 1, and then ensures the feed water flow Water can be smoothly drained to the import of water pump by road 1.
In the utility model embodiment, in order to further ensure that the stability of the water inlet flow channel 1 after forming, preferably Ground, the first skeleton 13 described in the present embodiment include the first outline border 131 and multiple the first keel 132 to interweave in length and breadth, and described the The both ends of one keel 132 are both connected on first outline border 131;First skeleton 13 is connected by first outline border 131 It is connected on the madial wall of the water inlet flow channel 1.By the way that the both ends of multiple first keel 132 to interweave in length and breadth are connected to institute It states on the first outline border 131, and first skeleton 13 is connected in the water inlet flow channel 1 by first outline border 131 On side wall, so that first skeleton 13, which can be the water inlet flow channel 1, provides effective support force, and then further really The stability of the water inlet flow channel 1 after forming is protected.
In the utility model embodiment, it should be noted that the multiple the first keel 132 to interweave in length and breadth include the One longitudinal keel, the first lateral keel and the first oblique keel;Described in first segment water inlet flow channel position 11 One skeleton 13 is interweaved in length and breadth by several first longitudinal direction keel and several first lateral keels and is connected outside described first Frame 131 is constituted, and the multiple first keel are in netted, and the first longitudinal direction keel are connected with first lateral keel;If In first skeleton 13 in the outlet at second section water inlet flow channel position 12 by the first longitudinal direction keel, described first Lateral keel and several first oblique keel interweave and connect first outline border 131 in length and breadth to be constituted, and the multiple first Keel 132 are in M shape, and the first longitudinal direction keel, first lateral keel are connected with the described first oblique keel.When So, in the utility model embodiment, first skeleton 13 can also be formed by other processing technologys, need to only be met described The shape that first skeleton 13 can be effectively prevented the water inlet flow channel 1 deforms, and does not do more repeating herein.
It is excellent in order to further ensure that the stability of the water inlet flow channel 1 after forming in the utility model embodiment Selection of land, water inlet flow channel 1 described in the present embodiment further include multiple first stiffeners, and first stiffener is connected to multiple described On first keel 132.It is described to improve by the way that first stiffener to be connected on multiple first keel 132 The tension of water inlet flow channel 1 and measuring body ability, and then ensure the stability of the water inlet flow channel 1 after forming.
As shown in figure 4, in order to prevent during the outlet passage 2 shapes, the shape of the outlet passage 2 occurs Deformation, to ensure that the stability of the outlet passage 2 after forming, outlet passage 2 described in the present embodiment further include multiple the Two skeletons 23, second skeleton 23 are connected on the madial wall of the outlet passage 2.By in the outlet passage 2 Multiple second skeletons 23 are connected on side wall, to provide support force for the outlet passage 2, are effectively prevented in institute During stating the forming of outlet passage 2, the shape of the outlet passage 2 deforms, and then ensures 2 energy of the outlet passage It is enough gently to drain away water from the outlet of water pump.
In the utility model embodiment, in order to further ensure that the stability of the outlet passage 2 after forming, preferably Ground, the second skeleton 23 described in the present embodiment include the second outline border 231 and multiple the second keel 232 to interweave in length and breadth, and described the The both ends of two keel 232 are both connected on second outline border 231;Second skeleton 23 is connected by second outline border 231 It is connected on the madial wall of the outlet passage 2.By the way that the both ends of multiple second keel 232 to interweave in length and breadth are connected to institute It states on the second outline border 231, and second skeleton 23 is connected in the outlet passage 2 by second outline border 231 On side wall, so that second skeleton 23, which can be the outlet passage 2, provides effective support force, and then further really The stability of the outlet passage 2 after forming is protected.
In the utility model embodiment, it should be noted that the multiple the second keel 232 to interweave in length and breadth include the Two longitudinal keels, the second lateral keel and the second oblique keel;Described in first segment outlet passage position 21 Two skeletons 23 are interweaved by the second longitudinal direction keel, second lateral keel and the second oblique keel and connect institute in length and breadth The second outline border 231 composition is stated, the multiple second keel 232 are in M shape, and the second longitudinal direction keel, described second are laterally Keel are connected with the described second oblique keel;Second skeleton in the outlet at second section outlet passage position 22 23 are interweaved by several second longitudinal direction keel and several second lateral keels and connect 231 structure of the second outline border in length and breadth At the multiple second keel are in netted, and the second longitudinal direction keel are connected with second lateral keel.Certainly, at this In utility model embodiment, second skeleton 23 can also be formed by other processing technologys, only need to meet second bone The shape that frame 23 can be effectively prevented the template of the outlet passage 2 deforms, and does not do more repeating herein.
It is excellent in order to further ensure that the stability of the outlet passage 2 after forming in the utility model embodiment Selection of land, outlet passage 2 described in the present embodiment further include multiple second stiffeners, and second stiffener is connected to multiple described On second keel 232.It is described to improve by the way that second stiffener to be connected on multiple second keel 232 The tension of outlet passage 2 and measuring body ability, and then ensure the stability of the outlet passage 2 after forming.
In the utility model embodiment, the material of the water inlet flow channel 1 can be selected according to actual operation requirements, such as steel Material, timber, aluminium alloy etc. only need to meet the import that water can be smoothly drained to water pump by the water inlet flow channel 1, be carried for water pump For good Inlet flow pattern.In order to make design and simplify the structure, to reduce cost, it is preferable that described in the present embodiment The material of water inlet flow channel 1 is timber.
In the utility model embodiment, the material of the outlet passage 2 can be selected according to actual operation requirements, such as steel Material, timber, aluminium alloy etc., only need to meet the outlet passage 2 can gently drain away water from the outlet of the water pump .In order to make design and simplify the structure, to reduce cost, it is preferable that the material of outlet passage 2 described in the present embodiment is Timber.
In the utility model embodiment, in order to overall structure that is intuitive, clearly displaying the runner, in order to The manufacture of the runner, the runner formwork structure based on BIM technology described in the present embodiment further includes for showing the water inlet The BIM software modules of runner 1 and 2 shape of the outlet passage and data.Pass through the BIM software modules, enabling according to The shape and data of the water inlet flow channel 1 and the outlet passage 2 that the BIM software modules are shown manufacture the water inlet respectively Runner 1 and the outlet passage 2, consequently facilitating the manufacture of the runner.
In the utility model embodiment, the BIM software modules realize the shape and data for showing the water inlet flow channel 1 Concrete mode:According to the actual size of the water inlet flow channel 1 water inlet flow channel 1 is established using the BIM software modules Threedimensional model;13 support system of the first skeleton of 1 threedimensional model of the water inlet flow channel is designed, and to the three of the water inlet flow channel 1 Dimension module carries out force analysis, according to answering on the threedimensional model for the water inlet flow channel 1 that the BIM software modules are shown at this time The distribution situation of stress-strain optimizes 13 support system of the first skeleton;The manufacture material of the water inlet flow channel 1 is determined again Material, creates corresponding mould material and imports 1 threedimensional model of the water inlet flow channel, described in the final BIM software modules are shown The shape and related data of water inlet flow channel 1.In addition, the shape of the water inlet flow channel 1 finally shown according to the BIM software modules Shape and related data manufacture to form the water inlet flow channel 1.Certainly, in the utility model embodiment, it should be noted that described Water inlet flow channel 1 can also be formed by other manufacturing process, and only need to meet the water inlet flow channel 1 can smoothly be drained to water The import of water pump provides good Inlet flow pattern for water pump.
In addition, in the utility model embodiment, the BIM software modules realize the shape for showing the outlet passage 2 And the concrete mode of data:Go out flow using described in BIM software modules foundation according to the actual size of the outlet passage 2 The threedimensional model in road 2;23 support system of the second skeleton of 2 threedimensional model of the outlet passage is designed, and to the outlet passage 2 Threedimensional model carry out force analysis, according on the threedimensional model for the outlet passage 2 that the BIM software modules are shown at this time The distribution situation of ess-strain 23 support system of the second skeleton is optimized;The outlet passage 2 is determined again Manufacture material, create corresponding mould material and import the threedimensional model of the outlet passage 2, the final BIM softwares mould Block shows the shape and related data of the outlet passage 2.In addition, according to the BIM software modules finally show described in go out The shape and related data of water flow passage 2 manufacture to form the outlet passage 2.Certainly, it in the utility model embodiment, needs Bright, the outlet passage 2 can also be formed by other manufacturing process, and only need to meet the outlet passage 2 can be by water Gently drained away from the outlet of the water pump.
To sum up, the utility model provides a kind of runner formwork structure based on BIM technology, including water inlet flow channel 1, feed water flow Road 1 includes that water inlet flow channel position 12 is saved at first segment water inlet flow channel position 11 and second, first segment water inlet flow channel position 11 it is transversal Face shape is rectangle, and the cross-sectional shape at the second section water inlet flow channel position 12 is round for outlet from the gradual transition of import rectangle;Base Further include outlet passage 2 in the runner formwork structure of BIM technology, outlet passage 2 includes first segment outlet passage position 21 and the The cross-sectional shape at two section outlet passage positions 22, first segment outlet passage position 21 is circle, the second section outlet passage position 22 cross-sectional shape exports rectangle from the round gradually transition of import.By design water inlet flow channel 1 cross-sectional shape by into Mouth rectangular transition is that outlet is round, and the cross-sectional shape of outlet passage 2 exports rectangle by import rounded transitional so that feed water flow Water can be smoothly drained to the import of water pump by road 1 and outlet passage 2 can gently drain water from the outlet of water pump It goes, so as to improve the flow-shape in runner, reduces hydraulic loss of the flow in runner, and then improve pumping station operation Working efficiency.
The above is only the preferred embodiment of the utility model, it is noted that for the common skill of the art For art personnel, without deviating from the technical principle of the utility model, several improvement and replacement can also be made, these change The scope of protection of the utility model is also should be regarded as into replacement.

Claims (8)

1. a kind of runner formwork structure based on BIM technology, which is characterized in that including water inlet flow channel, the cross of the water inlet flow channel Section is gradually tapered up along the import of the water inlet flow channel to the direction of the outlet of the water inlet flow channel;The water inlet flow channel includes the One section water inlet flow channel position and the second section water inlet flow channel position, the import of the water inlet flow channel are set to the first segment water inlet flow channel In the import at position, the outlet of the water inlet flow channel is set in the outlet that described second saves water inlet flow channel position, the first segment The outlet at water inlet flow channel position is connect with the import at second section water inlet flow channel position;First segment water inlet flow channel position Cross-sectional shape is rectangle, and the cross-sectional shape at second section water inlet flow channel position is justified from the gradual transition of import rectangle for outlet Shape;
The runner formwork structure based on BIM technology further includes outlet passage, and the outlet passage includes that first segment goes out flow Road position and the second section outlet passage position, the import of the outlet passage are set to the import at first segment outlet passage position On, the outlet of the outlet passage is set in the outlet that described second saves outlet passage position, first segment outlet passage portion The outlet of position is connect with the import at second section outlet passage position;The cross-sectional shape at first segment outlet passage position For circle, from import circle, gradually transition is outlet rectangle to the cross-sectional shape at second section outlet passage position, and described Import of the cross section at the second section outlet passage position along second section outlet passage position saves outlet passage to described second The direction of the outlet at position is gradually expanded;
The water inlet flow channel further includes multiple first skeletons, and first skeleton is connected on the madial wall of the water inlet flow channel;
First skeleton includes the first outline border and multiple the first keel to interweave in length and breadth, and the both ends of first keel are all connected with On first outline border;First skeleton is connected to by first outline border on the madial wall of the water inlet flow channel.
2. the runner formwork structure based on BIM technology as described in claim 1, which is characterized in that the water inlet flow channel also wraps Multiple first stiffeners are included, first stiffener is connected on multiple first keel.
3. the runner formwork structure based on BIM technology as claimed in claim 1 or 2, which is characterized in that the outlet passage is also Including multiple second skeletons, second skeleton is connected on the madial wall of the outlet passage.
4. the runner formwork structure based on BIM technology as claimed in claim 3, which is characterized in that second skeleton includes Second outline border and multiple the second keel to interweave in length and breadth, the bicarinate both ends are both connected on second outline border;Institute The second skeleton is stated to be connected on the madial wall of the outlet passage by second outline border.
5. the runner formwork structure based on BIM technology as claimed in claim 4, which is characterized in that the outlet passage also wraps Multiple second stiffeners are included, second stiffener is connected on multiple second keel.
6. the runner formwork structure based on BIM technology as described in claim 1, which is characterized in that the material of the water inlet flow channel Material is timber.
7. the runner formwork structure based on BIM technology as described in claim 1, which is characterized in that the material of the outlet passage Material is timber.
8. the runner formwork structure based on BIM technology as described in claim 1, which is characterized in that described based on BIM technology Runner formwork structure further includes the BIM software modules for showing the water inlet flow channel and the outlet passage shape and data.
CN201721082648.3U 2017-08-25 2017-08-25 A kind of runner formwork structure based on BIM technology Active CN207749484U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721082648.3U CN207749484U (en) 2017-08-25 2017-08-25 A kind of runner formwork structure based on BIM technology

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721082648.3U CN207749484U (en) 2017-08-25 2017-08-25 A kind of runner formwork structure based on BIM technology

Publications (1)

Publication Number Publication Date
CN207749484U true CN207749484U (en) 2018-08-21

Family

ID=63145653

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721082648.3U Active CN207749484U (en) 2017-08-25 2017-08-25 A kind of runner formwork structure based on BIM technology

Country Status (1)

Country Link
CN (1) CN207749484U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062325A (en) * 2021-03-25 2021-07-02 李阳 Concrete pouring method for water inlet runner

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113062325A (en) * 2021-03-25 2021-07-02 李阳 Concrete pouring method for water inlet runner
CN113062325B (en) * 2021-03-25 2022-08-19 李阳 Concrete pouring method for water inlet runner

Similar Documents

Publication Publication Date Title
CN109267549A (en) A kind of diversion tunnel structure
CN207749484U (en) A kind of runner formwork structure based on BIM technology
CN206658711U (en) One kind is irrigated with supercharging elbow
CN205475065U (en) Tower import crowd combined layout structure of steep narrow many holes of river valley of side slope bank
CN205875194U (en) Pouring jacket cofferdam bearing platform structure
CN200999341Y (en) Side-wise inflow pumping station composite bottom ridge
CN203321859U (en) Low-lift bidirectional vertical shaft tubular pump device
CN207331836U (en) A kind of runner template decomposition splicing structure of pumping plant
CN110396978A (en) Improve the method that river ecological structure promotes urban rives water ecological environment
CN203113359U (en) Earth rock cofferdam structure
CN108149769A (en) A kind of method for improving Urban Waterlogging pumping plant side unit Inlet flow pattern
CN214245623U (en) Aeration facility combining dovetail ridge and wedge-shaped groove
CN207130701U (en) Compound water flowing out structure for Hydraulic and Hydro-Power Engineering
CN201025228Y (en) A device for power generation based on recycling water
CN207525718U (en) A kind of flood discharging tunnel gentle slope and abrupt slope connection structure
CN210262945U (en) Cemented sand gravel buttress dam structure
CN210459271U (en) Fan jacket structure for offshore wind power
CN205188910U (en) Harmony high water level increases device of diversion flow
CN207160129U (en) A kind of pipeline for hydraulic engineering
CN219992339U (en) Water conservancy ecological slope protection structure
CN206337544U (en) A kind of landscape dam of stabilized structure
CN207109722U (en) A kind of pumping plant water outlet is confluxed cell structure
CN207419407U (en) A kind of energy dissipating preform structure
CN106836154B (en) Novel deep hole with function of reducing outlet water flow lateral diffusion
CN105485053A (en) Outlet passage with excellent hydraulic performance for prepositioned horizontal pump device and application method of outlet passage

Legal Events

Date Code Title Description
GR01 Patent grant