CN207130701U - Compound water flowing out structure for Hydraulic and Hydro-Power Engineering - Google Patents

Compound water flowing out structure for Hydraulic and Hydro-Power Engineering Download PDF

Info

Publication number
CN207130701U
CN207130701U CN201721106842.0U CN201721106842U CN207130701U CN 207130701 U CN207130701 U CN 207130701U CN 201721106842 U CN201721106842 U CN 201721106842U CN 207130701 U CN207130701 U CN 207130701U
Authority
CN
China
Prior art keywords
flowing out
out structure
water flowing
hydraulic
hydro
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721106842.0U
Other languages
Chinese (zh)
Inventor
易文明
付峥
刘亚洲
李万军
张顺利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Chengdu Engineering Co Ltd
Original Assignee
PowerChina Chengdu Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Chengdu Engineering Co Ltd filed Critical PowerChina Chengdu Engineering Co Ltd
Priority to CN201721106842.0U priority Critical patent/CN207130701U/en
Application granted granted Critical
Publication of CN207130701U publication Critical patent/CN207130701U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Lining And Supports For Tunnels (AREA)

Abstract

The utility model discloses a kind of compound water flowing out structure, especially discloses a kind of compound water flowing out structure for Hydraulic and Hydro-Power Engineering, belongs to Hydraulic and Hydro-Power Engineering Building Design building technology field.A kind of excavation project that can effectively reduce construction of hydropower plant is provided, reduces the compound water flowing out structure for Hydraulic and Hydro-Power Engineering of up-front investment cost.Described compound water flowing out structure includes drain measure tunnel, and described compound water flowing out structure also includes Tail water reuse system, and the water side of the Tail water reuse system connects with the drain measure tunnel described in that part after power plant building.

Description

Compound water flowing out structure for Hydraulic and Hydro-Power Engineering
Technical field
The utility model is related to a kind of compound water flowing out structure, more particularly, to it is a kind of for Hydraulic and Hydro-Power Engineering it is compound go out Water-bound, belong to Hydraulic and Hydro-Power Engineering Building Design building technology field.
Background technology
To meet the construction diversion requirement during construction of hydropower plant, plant area's Tail water reuse of generating stone factory building during operation Deng needs, the hydraulic structures such as diversion tunnel, tailwater channel need to be arranged.Influenceed by service life, functional requirement, structure type etc., one As in the case of both the above hydraulic structure be individually to arrange so that need work-yard it is big, excavation, supporting, lining cutting Quantities dramatically increase, its result is that engineering cost at initial stage significantly raises, and does not consider the combination of diversion tunnel and tailwater channel Arrange, be used in combination.
Utility model content
Technical problem to be solved in the utility model is:A kind of excavation that can effectively reduce construction of hydropower plant is provided Engineering, reduce the compound water flowing out structure for Hydraulic and Hydro-Power Engineering of up-front investment cost.
Technical scheme is used by solve above-mentioned technical problem:A kind of compound water outlet knot for Hydraulic and Hydro-Power Engineering Structure, including drain measure tunnel, described compound water flowing out structure also include Tail water reuse system, and the Tail water reuse system goes out Water end (W.E.) connects with the drain measure tunnel described in that part after power plant building.
The beneficial effects of the utility model are:After the application is by the water side and power plant building by Tail water reuse system That a part of drain measure tunnel connection.So as to realize that after the water side of Tail water reuse system and power plant building The common function of split flow water discharge tunnel, reach avoid the water side for Tail water reuse system from individually excavating, supporting and lining cutting base The purpose of plinth, and then the foundation excavation amount of construction of hydropower plant can be largely reduced, the up-front investment of engineering construction is reduced, it is real Purpose is arranged and is used in combination in the combination of existing diversion tunnel and tailwater channel.At the same time it can also make, whole engineering layout is compacter, accounts for It is less with land resource in short supply.
It is further that described compound water flowing out structure also includes transition passage, the water side of the Tail water reuse system Connected by described transition passage with that part after the power plant building of the drain measure tunnel.
Such scheme it is preferable that, described Tail water reuse system includes more suitable with generating set quantity of quantity Bar Tail water reuse canal, the quantity of the transition passage is suitable with the quantity of the Tail water reuse canal, each Tail water reuse The water side of canal is connected by that part after the power plant building of corresponding transition passage and the drain measure tunnel respectively It is logical.
It is further, described in the longitudinal center line of Tail water reuse canal described in each bar and that part after power plant building The angle of the longitudinal center line of drain measure tunnel is between 85 °~95 °.
It is further that the elevation of the bottom plate of the drain measure tunnel described in that part after power plant building is less than institute State the elevation of the baseplane of the water side of transition passage.
It is further that described Tail water reuse system includes the quantity a plurality of Tail water reuse suitable with generating set quantity Canal, the baseplane of the posterior segment of each Tail water reuse canal gradually rise along water (flow) direction elevation.
It is further that described compound water flowing out structure also includes later stage occluding body, that part before power plant building Described drain measure tunnel is blocked by described later stage occluding body after water conservancy diversion terminates.
Brief description of the drawings
Fig. 1 is the horizontal layout schematic diagram for the compound water flowing out structure that the utility model is used for Hydraulic and Hydro-Power Engineering;
Fig. 2 is Fig. 1 A-A schematic cross-sectional views.
In figure mark for:Drain measure tunnel 1, Tail water reuse system 2, water side 3, transition passage 4, Tail water reuse canal 5, Bottom plate 6, baseplane 7, later stage occluding body 8.
Embodiment
It is a kind of excavation work that can effectively reduce construction of hydropower plant provided by the utility model as shown in Figure 1 and Figure 2 Journey, reduce the compound water flowing out structure for Hydraulic and Hydro-Power Engineering of up-front investment cost.Described compound water flowing out structure includes leading Water discharge tunnel 1 is flowed, described compound water flowing out structure also includes Tail water reuse system 2, the water side 3 of the Tail water reuse system 2 Connected with the drain measure tunnel 1 described in that part after power plant building.The application passes through going out Tail water reuse system 2 Water end (W.E.) connects with that a part of drain measure tunnel 1 after power plant building.So as to realize the water side 3 of Tail water reuse system 2 Common function, reaches the water outlet avoided as Tail water reuse system 2 with that a part of drain measure tunnel 1 after power plant building The purpose that end 3 is individually excavated, supporting and lining cutting are basic, and then the foundation excavation amount of construction of hydropower plant can be largely reduced, The up-front investment of engineering construction is reduced, the combination arrangement of diversion tunnel and tailwater channel is realized and purpose is used in combination.At the same time it can also Make the land resource that whole engineering layout is compacter, occupancy is in short supply less.
In above-mentioned embodiment, for the ease of that a part of institute after described Tail water reuse system 2 and power plant building Connection between the drain measure tunnel 1 stated, compound water flowing out structure described herein also include transition passage 4, the tail water The water side 3 of exhaust system 2 passes through that after the power plant building of described transition passage and the 4 drain measure tunnels 1 Part connects.Generally all include the quantity a plurality of tail water suitable with generating set quantity in conjunction with described Tail water reuse system 2 The characteristics of discharging canal 5, the quantity for the transition passage 4 that the application is set is suitable with the quantity of the Tail water reuse canal 5, this Sample, can be so that the water side of each Tail water reuse canal 5 passes through corresponding transition passage 4 and the drain measure respectively That point of portion connection after the power plant building of tunnel 1.Meanwhile pouring in down a chimney in order to avoid tail water, generally by after power plant building That part described in drain measure tunnel 1 bottom plate 6 elevation be positioned below the transition passage 4 water side bottom The elevation of plane 7, and the baseplane 7 of the posterior segment of each Tail water reuse canal 5 is gradually risen along water (flow) direction elevation It is high.
The characteristics of in conjunction with drain measure tunnel 1 and the entirely different service life of Tail water reuse system 2, i.e. drain measure Tunnel 1 is typically used to the water above cofferdam exporting to downstream in the process of construction of engineering, and Tail water reuse system 2 is in work When being generated electricity after the completion of Cheng Jianshe, for discharging the tail water of generating set.Therefore, compound water flowing out structure described herein also includes Later stage occluding body 8, the drain measure tunnel 1 described in that part before power plant building are existed by described later stage occluding body 8 Water conservancy diversion blocks after terminating.So, by the closure of later stage occluding body 8, can make described in that part after power plant building Drain measure tunnel 1 forms one with transition passage 4 and Tail water reuse canal 5 and completely applies structure, ensures the unobstructed of draining.Enter One step, according to the layout feature of the various buildings of engineering site, the longitudinal center line of Tail water reuse canal 5 and generating described in each bar The angle of the longitudinal center line of that a part of drain measure tunnel 1 after factory building is between 85 °~95 °.Certainly, if It can also be any other number of degrees between 0~180 ° to need described angle, and it arranges that quantities is most according to so that scene is convenient It is defined less.
In summary, after using the compound water flowing out structure of the application offer, when building, the diversion tunnel can be faced When building, tailwater channel is permanent building, to adapt to the needs of engineering construction;And when setting, the diversion tunnel tract When being combined with tailwater channel, the structure design of bound fraction uses permanent building design standard;When in use, described diversion tunnel In construction time excessively stream, the passage between factory building tailwater channel and diversion tunnel retains, and factory building tailwater channel is got through after diversion tunnel closure Passage between diversion tunnel;Finally, after whole engineering construction completion, after the closure of described diversion tunnel, factory building tail water is direct Diversion tunnel tract is discharged into, directly using letting out factory building generating water under existing diversion tunnel;Described factory building tailwater channel outlet compared with Diversion tunnel tract is high so that tailwater channel outlet is less prone to Yong Shui phenomenons;And tailwater channel has certain distance, water away from underwater bed Stream is smaller by downstream stage backwater effect, and flow-shape is more smooth;Described factory building tailwater channel exit flow rate of water flow is larger, The diversion tunnel tract being mutually connected therewith is not easy shoal materials.
Above-mentioned compound water flowing out structure of the present utility model also has following beneficial effect to be:I.e. with generally meeting to lead respectively Flow use the function of hole and tailwater channel, above hydraulic structure is provided separately, and quantities is larger, invest it is also big, the machinery that uses, Place, artificial etc. also increase.Diversion tunnel and tailwater channel are combined arrangement, not only meet more than building in construction time, runtime Different service requirements, the advantages of characteristics of compact layout, quantities are small, the duration is saved is also equipped with, is worth similar projects to be used for reference.

Claims (7)

1. a kind of compound water flowing out structure for Hydraulic and Hydro-Power Engineering, including drain measure tunnel (1), it is characterised in that:It is described Compound water flowing out structure also include Tail water reuse system (2), the water side (3) and power plant building of the Tail water reuse system (2) Drain measure tunnel (1) connection described in that part afterwards.
2. the compound water flowing out structure according to claim 1 for Hydraulic and Hydro-Power Engineering, it is characterised in that:Described is compound Water flowing out structure also includes transition passage (4), and the water side (3) of the Tail water reuse system (2) passes through described transition passage (4) Connected with that part after the power plant building of the drain measure tunnel (1).
3. the compound water flowing out structure according to claim 2 for Hydraulic and Hydro-Power Engineering, it is characterised in that:Described tail water Exhaust system (2) includes the quantity a plurality of Tail water reuse canal (5) suitable with generating set quantity, the number of the transition passage (4) Amount is suitable with the quantity of the Tail water reuse canal (5), and the water side of each Tail water reuse canal (5) is respectively by corresponding Transition passage (4) connects with that part after the power plant building of the drain measure tunnel (1).
4. the compound water flowing out structure according to claim 3 for Hydraulic and Hydro-Power Engineering, it is characterised in that:Tail described in each bar The axial centre of that a part of drain measure tunnel (1) after the longitudinal center line of water discharge canal (5) and power plant building The angle of line is between 85 °~95 °.
5. the compound water flowing out structure for Hydraulic and Hydro-Power Engineering according to any one of claim 2~4, its feature exist In:The elevation of the bottom plate (6) of drain measure tunnel (1) described in that part after power plant building is less than the transition passage (4) elevation of the baseplane (7) of water side.
6. the compound water flowing out structure according to claim 1 or 2 for Hydraulic and Hydro-Power Engineering, it is characterised in that:Described Tail water reuse system (2) includes the quantity a plurality of Tail water reuse canal (5) suitable with generating set quantity, each tail water row The baseplane (7) for putting the posterior segment of canal (5) gradually rises along water (flow) direction elevation.
7. the compound water flowing out structure according to claim 1 for Hydraulic and Hydro-Power Engineering, it is characterised in that:Described is compound Water flowing out structure also includes later stage occluding body (8), and the drain measure tunnel (1) described in that part before power plant building passes through institute The later stage occluding body (8) stated blocks after water conservancy diversion terminates.
CN201721106842.0U 2017-08-30 2017-08-30 Compound water flowing out structure for Hydraulic and Hydro-Power Engineering Active CN207130701U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721106842.0U CN207130701U (en) 2017-08-30 2017-08-30 Compound water flowing out structure for Hydraulic and Hydro-Power Engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721106842.0U CN207130701U (en) 2017-08-30 2017-08-30 Compound water flowing out structure for Hydraulic and Hydro-Power Engineering

Publications (1)

Publication Number Publication Date
CN207130701U true CN207130701U (en) 2018-03-23

Family

ID=61637094

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721106842.0U Active CN207130701U (en) 2017-08-30 2017-08-30 Compound water flowing out structure for Hydraulic and Hydro-Power Engineering

Country Status (1)

Country Link
CN (1) CN207130701U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107338773A (en) * 2017-08-30 2017-11-10 中国电建集团成都勘测设计研究院有限公司 Compound water flowing out structure for Hydraulic and Hydro-Power Engineering

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107338773A (en) * 2017-08-30 2017-11-10 中国电建集团成都勘测设计研究院有限公司 Compound water flowing out structure for Hydraulic and Hydro-Power Engineering

Similar Documents

Publication Publication Date Title
CN201874614U (en) Drainage structure for emptying overhaul of derivation tunnel
CN109267549A (en) A kind of diversion tunnel structure
CN212077859U (en) Tunnel structure capable of being used for diversion, flood discharge and emptying
CN105155484A (en) Method for reconstructing temporary diversion tunnel into permanent flood discharge facility
CN103410130A (en) Multi-purpose tunnel arrangement structure
CN203429606U (en) Sediment retaining bank reconstructed from temporary cofferdam
CN207130701U (en) Compound water flowing out structure for Hydraulic and Hydro-Power Engineering
CN110195597A (en) A kind of water-storage chamber and construction method suitable for TBM construction
CN208251035U (en) Flood discharging tunnel joint air-supplement system
CN206752427U (en) A kind of power station ground power house tailrace outlet structure and its power station
CN209194485U (en) A kind of diversion tunnel structure
CN107338773A (en) Compound water flowing out structure for Hydraulic and Hydro-Power Engineering
CN209873741U (en) Multifunctional reservoir
CN207376584U (en) For the tunnel flow passage structure of hydraulic and hydroelectric engineering
CN105386426B (en) The ecological drainage tunnel and method that diversion tunnel reconstruction controls for gates of segmental shape
CN207919510U (en) Diversion tunnel blocks arrangement using lock under permanent plug first section joint gate
CN210216332U (en) Retaining dam structure for overhauling whole tunnel section of hydroelectric engineering diversion tunnel in canyon region
CN109469025B (en) Overflow gallery system for step-by-step water retaining and emptying system of high dam
CN209178952U (en) A kind of block-resistant type technical water supply water intaking mouth structure suitable for slding form operation
CN203546683U (en) Tailrace configuration device of hydropower station
CN208219579U (en) The structure that a kind of diversion tunnel and ecological drainage tunnel combine
CN207749484U (en) A kind of runner formwork structure based on BIM technology
CN108330932A (en) Flood discharging tunnel joint air-supplement system
CN221052538U (en) Diversion tunnel, flood discharge cavity and vertical shaft type spillway combined structure
CN110468810B (en) Multi-water-inlet diversion tunnel device and construction method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant