- CN207738353U CN207738353U CN201721871277.7U CN201721871277U CN207738353U CN 207738353 U CN207738353 U CN 207738353U CN 201721871277 U CN201721871277 U CN 201721871277U CN 207738353 U CN207738353 U CN 207738353U
- Authority
- CN
- China
- Prior art keywords
- sheave
- top sheave
- wheel carrier
- downslide wheel
- lifting hook
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Abstract
The utility model belongs to hoisting machinery technical field, is related to a kind of lifting hook pulley component and includes the crane of the lifting hook pulley component, wherein lifting hook pulley component, including top sheave group and lower sheave group is connected using axis pin therebetween:Top sheave group, including top sheave frame and top sheave, top sheave are set to top sheave frame top, and two outside of top sheave frame lower part is equipped with a pair of upper clump weight;Lower sheave group includes the lower sheave of downslide wheel carrier and the setting of two horizontal symmetricals, and lower sheave is set to downslide wheel carrier top, and two inside of downslide wheel carrier middle and lower part is equipped with two pairs of lower clump weights.The utility model on top sheave frame by being arranged upper clump weight, lower clump weight is set on downslide wheel carrier, the own wt of handling component can be increased, to reduce the tenesmus amount of steel wire rope, the case where generating interference between the steel wire rope of difference derrick crane in the operation of multimachine group is effectively reduced, construction safety risk is reduced.
Description
Technical field
The utility model belongs to hoisting machinery technical field, and in particular, to a kind of lifting hook pulley component and is hung including this
The crane of hook pulley assembly.
Background technology
Derrick crane uses widely in the realm of building construction, and the derrick crane quantity of same construction site is logical
Often more than one, more belong to the operation of multimachine group;And the hoist rope amplitude of derrick crane is up to 70m, even more
It is long, therefore the winding degree that hoist rope is generated due to its own gravity is larger, i.e. tenesmus amount Lc values shown in Fig. 1 are larger, then exist
Interference is also easy to produce when the operation of multimachine group between the steel wire rope of difference derrick crane, increases construction safety risk.
Utility model content
The utility model provides a kind of lifting hook pulley component and includes the crane of the lifting hook pulley component, can effectively solve
Certainly excessive technical problem is measured in wire ropes for tower cranes tenesmus.
The first aspect of the utility model provides a kind of lifting hook pulley component, including top sheave group and lower sheave group, and two
It is connected using axis pin between person:
Top sheave group, including top sheave frame and top sheave, top sheave is outside top sheave frame top, top sheave frame lower part two
Side is equipped with a pair of upper clump weight;
Lower sheave group, includes the lower sheave of downslide wheel carrier and the setting of two horizontal symmetricals, and lower sheave is set on downslide wheel carrier
Portion, two inside of downslide wheel carrier middle and lower part are equipped with two pairs of lower clump weights.
Further, upper clump weight is located at below top sheave, is fixedly connected with downslide wheel carrier by bolt;Lower clump weight is located at
The side-lower of lower sheave, the outer rim along lower sheave are cut into arc, are fixedly connected with downslide wheel carrier by welding.
Further, it is equipped with arcuate guide batten along top sheave outer rim below top sheave, is oriented to batten and passes through bolt and downslide
Wheel carrier is fixedly connected.
Further, downslide wheel carrier lower part is equipped with suspension hook connecting hole, the hook assembly for connecting handling weight.
Another aspect according to the present utility model provides a kind of derrick crane, which includes before
State the lifting hook pulley component described in any one of first aspect.
The utility model has the beneficial effects that:
1, by the way that upper clump weight is arranged on top sheave frame, lower clump weight is set on downslide wheel carrier, handling group can be increased
The own wt of part reduces tenesmus amount Lc values so as to tense this section of steel wire rope between travelling jack and main tower;Also may be used
This section of steel wire rope between travelling jack and crane arm end is tensed, tenesmus amount Lc ' values are reduced;
2, upper clump weight is connect by bolt with top sheave frame, can be convenient for the dismounting of upper clump weight, be replaced, with adjustable pulley
The weight of component effectively increases the versatility and interchangeability of lifting hook pulley component
3, lower clump weight cuts camber along the outer rim of lower sheave, and the guiding batten being arranged below top sheave, can
Guiding role is played to steel wire rope when installing steel wire rope on top sheave and lower sheave.
Description of the drawings
Fig. 1 shows derrick crane overall structure diagram;
Fig. 2 shows the front views of top sheave group;
Fig. 3 shows the sectional view at A-A in Fig. 2;
Fig. 4 shows the left view of lower sheave group;
Fig. 5 shows the sectional view at B-B in Fig. 4;
Fig. 6 shows winding path of the steel wire rope on lifting hook pulley component.
Reference sign:
11- top sheave framves, 12- top sheaves, the upper clump weights of 13-, 14- guiding battens, 21- downslide wheel carriers, 22- lower sheaves,
Clump weight under 23-, 24- suspension hook connecting holes.
Specific implementation mode
The utility model is described in further detail below in conjunction with the accompanying drawings and by specific embodiment, and following embodiment is only retouched
The property stated, it is not restrictive, protection scope of this utility model cannot be limited by this.
The first aspect of the utility model provides a kind of lifting hook pulley component, including top sheave group and lower sheave group, and two
It is connected using axis pin between person:Top sheave group, including top sheave frame 11 and top sheave 12, top sheave 12 are set on top sheave frame 11
Portion, 11 lower part of top sheave frame, two outside are equipped with a pair of upper clump weight 13;Lower sheave group, including downslide wheel carrier 21 and two levels it is right
The lower sheave 22 of setting, lower sheave 22 is claimed to be set to 21 top of downslide wheel carrier, 21 middle and lower part of downslide wheel carrier, two inside is equipped under two pairs
Clump weight 23;21 lower part of downslide wheel carrier is equipped with suspension hook connecting hole 24, the hook assembly for connecting handling weight.
Winding path of the steel wire rope on lifting hook pulley component is as shown in Figure 6, and the steel wire rope of crane arm end point is through hanging
Transport after the directive wheel on trolley is oriented to along No. 1 direction, then bypassed below two lower sheaves, then along No. 2 directions, then around
The fixed pulley crossed on travelling jack then passes around top sheave then along No. 3 directions, then along No. 4 directions, then passes around
Another fixed pulley on travelling jack, then through on travelling jack another directive wheel be oriented to after, further around crossed main tower,
Guider connection on pinnacle of a pagoda is located at the hoist engine on counter-jib.In this way, the retractable cable by hoist engine operates, you can realize
The elevating movement of pulley assembly, and such winding mode can be such that steel wire rope bears to be the 1/4 of handling weight, effectively extend steel wire rope
Service life.
The operation principle of the utility model is as follows:
By the way that upper clump weight is arranged on top sheave frame, lower clump weight is set on downslide wheel carrier, handling component can be increased
Own wt reduce tenesmus amount Lc values so as to tense this section of steel wire rope between travelling jack and main tower;Also it can draw
Tightly this section of steel wire rope between travelling jack and crane arm end reduces tenesmus amount Lc ' values;Existing derrick crane is in lifting
When arm lengths are 70m, using the lifting hook pulley component in the utility model, tenesmus amount can reduce 20% ~ 30%, can effectively reduce
The case where generating interference between the steel wire rope of difference derrick crane in the operation of multimachine group, reduces construction safety risk.
For the technique effect of the utility model is better achieved, it is further preferable that upper clump weight is located at below top sheave, lead to
Bolt is crossed to be fixedly connected with downslide wheel carrier;Lower clump weight is located at the side-lower of lower sheave, and the outer rim along lower sheave is cut into arc,
It is fixedly connected with downslide wheel carrier by welding;It is equipped with arcuate guide batten along top sheave outer rim below top sheave, it is logical to be oriented to batten
Bolt is crossed to be fixedly connected with downslide wheel carrier.Upper clump weight is connect by bolt with top sheave frame in the utility model, can be convenient for upper
The dismounting of clump weight is replaced, and with the weight of adjustable pulley component, effectively increases versatility and the exchange of lifting hook pulley component
Property;Lower clump weight cuts camber along the outer rim of lower sheave, and the guiding batten being arranged below top sheave, can be in top sheave
Guiding role is played to steel wire rope with when installing steel wire rope on lower sheave.
Another aspect according to the present utility model provides a kind of derrick crane, which includes before
State the lifting hook pulley component described in any one of first aspect.
Above-described is only preferred embodiments of the present invention, it is noted that for the ordinary skill of this field
For personnel, under the premise of not departing from utility model design, various modifications and improvements can be made, these belong to this reality
With novel protection domain.
Claims (5)
1. a kind of lifting hook pulley component, including top sheave group and lower sheave group, are connected using axis pin therebetween, feature exists
In:
Top sheave group, including top sheave frame and top sheave, top sheave are set to top sheave frame top, and two outside of top sheave frame lower part is set
There is clump weight in a pair;
Lower sheave group includes the lower sheave of downslide wheel carrier and the setting of two horizontal symmetricals, and lower sheave is set to downslide wheel carrier top, under
Two inside of pulley yoke middle and lower part is equipped with two pairs of lower clump weights.
2. hook assembly according to claim 1, it is characterised in that:Upper clump weight is located at below top sheave, passes through bolt
It is fixedly connected with downslide wheel carrier;Lower clump weight is located at the side-lower of lower sheave, and the outer rim along lower sheave is cut into arc, passes through weldering
It connects and is fixedly connected with downslide wheel carrier.
3. hook assembly according to claim 2, it is characterised in that:It is led equipped with arc along top sheave outer rim below top sheave
To batten, it is oriented to batten and is fixedly connected with downslide wheel carrier by bolt.
4. hook assembly according to claim 1, it is characterised in that:Downslide wheel carrier lower part is equipped with suspension hook connecting hole, is used for
Connect the hook assembly of handling weight.
5. a kind of derrick crane, it is characterised in that:Including the lifting hook pulley group described in any one of Claims 1-4
Part.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721871277.7U CN207738353U (en) | 2017-12-28 | 2017-12-28 | Lifting hook pulley component and the crane for including the lifting hook pulley component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721871277.7U CN207738353U (en) | 2017-12-28 | 2017-12-28 | Lifting hook pulley component and the crane for including the lifting hook pulley component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207738353U true CN207738353U (en) | 2018-08-17 |
Family
ID=63120329
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721871277.7U Expired - Fee Related CN207738353U (en) | 2017-12-28 | 2017-12-28 | Lifting hook pulley component and the crane for including the lifting hook pulley component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207738353U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114719581A (en) * | 2022-04-07 | 2022-07-08 | 陆惠南 | Carbon material baking equipment |
-
2017
- 2017-12-28 CN CN201721871277.7U patent/CN207738353U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114719581A (en) * | 2022-04-07 | 2022-07-08 | 陆惠南 | Carbon material baking equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100567129C (en) | A kind of hoisting device for loop wheel machine | |
WO2022111218A1 (en) | Pile casing hoisting arm | |
CN207738353U (en) | Lifting hook pulley component and the crane for including the lifting hook pulley component | |
CN102351129B (en) | Super-lifting device for improving lifting performance of crane and crane | |
CN103708360B (en) | Movable arm tower crane and standard knot introduction system thereof and standard knot introduction method | |
CN209038874U (en) | A kind of wind-power tower handling apparatus | |
CN202542743U (en) | Auxiliary reeving mechanism for mounting tower crane | |
CN201762053U (en) | Simple automatic derrick | |
CN206538113U (en) | Auxiliary hoisting device for swing arm tower crane | |
CN201099586Y (en) | Crane lifting device | |
CN208916602U (en) | Cement electric pole boom hoisting | |
CN203321336U (en) | Device for adopting drilling line to realize lifting of oil rig self-elevating derrick | |
CN207030780U (en) | A kind of construction site crane | |
CN203865885U (en) | Movable arm tower-type crane | |
CN206088769U (en) | Portal slewing crane's four rope hoists | |
CN203865895U (en) | Jacking lifting device | |
CN204675620U (en) | A kind of swing crane Suspension hook structure | |
CN212315401U (en) | Oil tank inner wall hanging flower basket formula hoisting mechanism that climbs | |
CN210559000U (en) | Tower machine plays to rise wire rope reeving structure | |
CN214935260U (en) | Lifting appliance | |
CN207451470U (en) | A kind of more multiplying power lifting hook pulley systems of arm tower crane | |
CN211712486U (en) | Lifting device based on movable arm tower | |
CN209721421U (en) | Tower crane multiplying power conversion equipment | |
CN213202158U (en) | Indoor outer handling machine of high-rise building | |
CN210366618U (en) | Antiwind hoist device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180817 Termination date: 20181228 |
|
CF01 | Termination of patent right due to non-payment of annual fee |