CN209038874U - A kind of wind-power tower handling apparatus - Google Patents

A kind of wind-power tower handling apparatus Download PDF

Info

Publication number
CN209038874U
CN209038874U CN201821247084.9U CN201821247084U CN209038874U CN 209038874 U CN209038874 U CN 209038874U CN 201821247084 U CN201821247084 U CN 201821247084U CN 209038874 U CN209038874 U CN 209038874U
Authority
CN
China
Prior art keywords
lag
boom
central point
wind
suspension hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821247084.9U
Other languages
Chinese (zh)
Inventor
张洪浩
李毅
张文康
李红亮
仇景田
赵晓龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CRRC Lanzhou Co Ltd
Original Assignee
CRRC Lanzhou Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CRRC Lanzhou Co Ltd filed Critical CRRC Lanzhou Co Ltd
Priority to CN201821247084.9U priority Critical patent/CN209038874U/en
Application granted granted Critical
Publication of CN209038874U publication Critical patent/CN209038874U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model relates to a kind of wind-power tower handling apparatus, including suspension hook and overhead traveling crane lifting rope, suspension hook is made of the U-lag and boom of integration connection, and inside groove face and the bottom surface of the U-lag are mutually perpendicular to, and are equipped with plastic protection pad;Regulation ring is welded on the outside of U-lag on cell wall, in the regulation ring can chain be connected to wirerope;Boom is obliquely installed to inward side, and the central point of endpoint location and U-lag is maintained in same vertical straight line thereon;Boom upper end is located to be equipped with hanging ring between two parties, which connect with overhead traveling crane lifting rope;The central point of hanging ring central point and U-lag keeps vertical.The utility model makes to link up with and unload that hook operation is more convenient, and efficiency is had bad luck in raising, effectively avoids suspension hook from swinging and hits, damage pollution paint, prevents from being squeezed after preventing flange from colliding with.

Description

A kind of wind-power tower handling apparatus
Technical field
The utility model relates to handling technical field, specifically a kind of wind-power tower handling apparatus.
Background technique
It is well known that wind-power tower belongs to large-scale steel structure product, it is straight for tower commonly used at this stage Diameter 90 meters of overall length, can be divided into three-stage, four-part form up to 4.3 meters or so, with the continuous development of wind power technology, diameter, height Bigger tower is also developed constantly.For tower manufacture for, each section of tower length at 12 meters -25 meters not It in having bad luck between each process in factory is substantially all Deng, tower and to pass through suspension steel wire at cylinder section both ends respectively by two overhead traveling cranes Rope is had bad luck.Existing the drawbacks of having bad luck mode are as follows: (1) use wirerope handling, at least two people is needed to toggle and unlock wirerope, grasp It makes comparisons trouble, efficiency is had bad luck in influence;(2) it for having sprayed the tower of paint, is had bad luck using suspender belt and is easy to that pollution, shadow will be painted Ring paint appearance.
Utility model content
The technical problem to be solved by the utility model is to provide a kind of easy to operate, efficiency is had bad luck in raising, prevents flange It squeezes and is painted with pollution, avoid swinging the wind-power tower handling apparatus hit.
To solve the above problems, a kind of wind-power tower handling apparatus described in the utility model, including suspension hook and overhead traveling crane are hung Rope, it is characterised in that: the suspension hook is made of the U-lag and boom of integration connection, is provided with plastic protection in the U-lag Pad, and regulation ring is welded on the cell wall of outside;The boom is obliquely installed to inward side, thereon endpoint location and the U-lag Central point be maintained in same vertical straight line;The boom upper end is located to be equipped with hanging ring between two parties, which hangs with the overhead traveling crane Rope connection.
Side channel face and the bottom surface of the U-lag are mutually perpendicular to.
In the regulation ring can chain be connected to wirerope.
The central point of the hanging ring central point and the U-lag keeps vertical.
Compared with prior art, the utility model has the advantage that
(1) due to being made up of suspension hook U-lag and boom two parts, boom is hung the utility model by hanging ring and overhead traveling crane Rope cooperation movement enables U-lag to be directly clamped among flange inner ring surface and hangs up or directly unload from flange inner ring surface, makes to link up with and unload Hook operation is more convenient, and efficiency is had bad luck in raising.
(2) the utility model passes through steel when being linked up with and unloading hook due to being equipped with regulation ring on U-lag external groove sidevall Cord pulls regulation ring to regulate and control lift hook position, and takes suspension hook slow play slowly, avoids suspension hook from swinging and hits,
(3) the utility model damages contaminated oil after can preventing flange from colliding with since plastic protection pad being arranged in U-lag Paint, while upper extreme point and U-lag central point keep centre of gravity consistent on same vertical line after the tilted setting of boom, Guarantee that flange stress along the direction of vertical gravity, prevents flange to be squeezed.
Detailed description of the invention
Specific embodiment of the present utility model is described in further detail with reference to the accompanying drawing.
Fig. 1 is the structural schematic diagram of the utility model.
In figure: 1. suspension hooks, 101.U shape slot, 102. booms, 2. overhead traveling crane lifting ropes, 3. plastic protection pads, 4. regulation rings, 5. hang Ring, 6. wirerope.
Specific embodiment
With reference to the accompanying drawings shown in 1, a kind of wind-power tower handling apparatus, including suspension hook 1 and overhead traveling crane lifting rope 2, suspension hook 1 is by integration The U-lag 101 and boom 102 of connection form, and inside groove face and the bottom surface of the U-lag 101 are mutually perpendicular to, and are equipped with plastic protection Pad 3;Regulation ring 4 is welded on 101 outside cell wall of U-lag, in the regulation ring 4 can chain be connected to wirerope 6;Boom 102 is inwardly Side is obliquely installed, and the central point of endpoint location and U-lag 101 is maintained in same vertical straight line thereon;102 upper end of boom occupies Middle place is equipped with hanging ring 5, which connect with overhead traveling crane lifting rope 2;The central point of 5 central point of hanging ring and U-lag 101 keeps vertical.
When handling, passes through the mobile suspension hook 1 of overhead traveling crane lifting rope 2 after starting overhead traveling crane, place it in the both ends of institute's tower crane cylinder, movement Meanwhile being drawn surely by manually wirerope 6 is linked in regulation ring 4, prevent suspension hook 1 from swinging shock after tower;When placement position After setting properly, flange inner ring surface is blocked by U-lag 101, then by regulation 4 adjusting position of ring, ensures flange inner ring surface It completely and is caught in U-lag 101 vertically, starts to lift by crane after the completion of being caught in, slowly two overhead traveling cranes of raising, overhead traveling crane are hung simultaneously in lifting Rope pulls hanging ring 5, makes boom 102 and 101 center of U-lag on same vertical line, keeps the center of gravity of suspension hook 1 consistent, reaches When vertical lifting altitude, flange steadily carries out transverse shifting handling along vertical gravity direction stress, band stress afterwards.

Claims (4)

1. a kind of wind-power tower handling apparatus, including suspension hook (1) and overhead traveling crane lifting rope (2), it is characterised in that: the suspension hook (1) by The U-lag (101) and boom (102) composition of integration connection, the U-lag (101) is interior to be provided with plastic protection pad (3), and outer Regulation ring (4) is welded on side channel wall;The boom (102) is obliquely installed to inward side, thereon endpoint location and the U-lag (101) central point is maintained in same vertical straight line;Boom (102) upper end is located to be equipped with hanging ring (5) between two parties, the hanging ring (5) it is connect with the overhead traveling crane lifting rope (2).
2. a kind of wind-power tower handling apparatus according to claim 1, it is characterised in that: the side channel of the U-lag (101) Face is mutually perpendicular to bottom surface.
3. a kind of wind-power tower handling apparatus according to claim 1, it is characterised in that: can chain in the regulation ring (4) It is connected to wirerope (6).
4. a kind of wind-power tower handling apparatus according to claim 1, it is characterised in that: hanging ring (5) central point with The central point of the U-lag (101) keeps vertical.
CN201821247084.9U 2018-08-03 2018-08-03 A kind of wind-power tower handling apparatus Active CN209038874U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821247084.9U CN209038874U (en) 2018-08-03 2018-08-03 A kind of wind-power tower handling apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821247084.9U CN209038874U (en) 2018-08-03 2018-08-03 A kind of wind-power tower handling apparatus

Publications (1)

Publication Number Publication Date
CN209038874U true CN209038874U (en) 2019-06-28

Family

ID=67030429

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821247084.9U Active CN209038874U (en) 2018-08-03 2018-08-03 A kind of wind-power tower handling apparatus

Country Status (1)

Country Link
CN (1) CN209038874U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111232826A (en) * 2020-01-03 2020-06-05 浙江凯达奔克起重设备有限公司 Crane hook
CN112551347A (en) * 2020-11-12 2021-03-26 中船澄西船舶修造有限公司 Lifting hook tool with lifting weight of 100 tons and method for lifting tower drum by using lifting hook tool

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111232826A (en) * 2020-01-03 2020-06-05 浙江凯达奔克起重设备有限公司 Crane hook
CN112551347A (en) * 2020-11-12 2021-03-26 中船澄西船舶修造有限公司 Lifting hook tool with lifting weight of 100 tons and method for lifting tower drum by using lifting hook tool
CN112551347B (en) * 2020-11-12 2022-05-20 中船澄西船舶修造有限公司 Lifting hook tool with lifting weight of 100 tons and method for lifting tower drum by using lifting hook tool

Similar Documents

Publication Publication Date Title
CN209038874U (en) A kind of wind-power tower handling apparatus
CN202296842U (en) Hanger special for universal shaft of vertical rolling mill
CN100567129C (en) A kind of hoisting device for loop wheel machine
CN201334306Y (en) Hoisting machine for upright post member
CN101649684B (en) Installing method of roof mast
CN214326960U (en) Indoor equipment for existing high-rise building hoisting large-scale device
CN205802841U (en) Manual multifunctional ground jack
CN105110205B (en) A kind of reverse method for dismounting of derrick crane
CN205932925U (en) Electric precipitation removes anode plate hoist device
CN207243306U (en) Tower crane two sides jacks stock
CN207645607U (en) A kind of anchor winch experiment loading unit
CN203269355U (en) Hoisting appliance for hoisting concrete pipes
CN202988556U (en) Special lifting appliance for angle-steel type frame body
CN206798972U (en) Steel strip rolling hanger
CN207738353U (en) Lifting hook pulley component and the crane for including the lifting hook pulley component
CN201961951U (en) Internal operation free large cylinder sling
CN108408568A (en) A kind of suspender
CN103470057A (en) Method of hoisting high altitude components
CN208516770U (en) A kind of hanger for hoisting steel plate of anti-rope winding
CN201753210U (en) Telescopic device for material in bulk
CN206901591U (en) Anti-drop device for crown block hook
CN206088730U (en) Automatic system of getting of hanging of electrophoresis coating lifting appliance
CN212127237U (en) Dumbbell type steel pipe encircles closure section lower chord installation hoist
CN217377089U (en) Drill rod hoisting and moving device of raise boring machine
CN218664967U (en) Lifting device for ash bucket of dust remover

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant