CN210559000U CN201921755373.4U CN201921755373U CN210559000U CN 210559000 U CN210559000 U CN 210559000U CN 201921755373 U CN201921755373 U CN 201921755373U CN 210559000 U CN210559000 U CN 210559000U
Authority
CN
China
Prior art keywords
pulley
trolley
hook
wire rope
fixed
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201921755373.4U
Other languages
Chinese (zh)
Inventor
邓建林
叶南祥
陈东标
罗斌飞
晏勇斌
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Zhongtian Intelligent Equipment Co Ltd
Original Assignee
Jiangxi Zhongtian Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Zhongtian Machinery Co ltd filed Critical Jiangxi Zhongtian Machinery Co ltd
Priority to CN201921755373.4U priority Critical patent/CN210559000U/en
Application granted granted Critical
Publication of CN210559000U publication Critical patent/CN210559000U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Jib Cranes (AREA)

Abstract

The utility model belongs to the technical field of tower machine safety, especially, relate to a tower machine plays to rise wire rope threading structure. The to-be-solved technical problem of the utility model is to provide a tower machine that has promoted the security has risen wire rope threading structure greatly. A rope threading structure of a tower crane hoisting steel wire rope comprises a hoisting drum, a hoisting steel wire rope, a crane boom top fixed pulley, a crane boom root fixed pulley, an amplitude-variable trolley, a first trolley pulley, a second trolley pulley, an auxiliary lifting hook, a first lifting hook pulley, a second lifting hook pulley, a main lifting hook, a third lifting hook pulley and an anti-twisting device; the first trolley pulley and the second trolley pulley are fixed at two ends of the front side of the variable amplitude trolley, and the auxiliary lifting hook is fixed below the variable amplitude trolley. The utility model discloses a rope handling structure has carried out the major improvement, puts all pulley equipartitions on the coplanar, plays to rise after wire rope comes out from rising the reel, all walks the rope on a plane.

Description

Tower machine plays to rise wire rope reeving structure
Technical Field
The utility model belongs to the technical field of tower machine safety, especially, relate to a tower machine plays to rise wire rope threading structure.
Background
The tower crane, namely the tower crane, is also called as the tower crane for short. Is a hoisting device used in building construction. The industrial classification belongs to machinery- > engineering machinery- > hoisting machinery- > construction hoisting machinery- > tower crane. According to the national standard classification, the model standard of the tower crane is QT, wherein Q represents the crane, and T represents the tower. The standard names in China are the same, and certainly, as our country learns the technology of the tower crane manufactured by the technique of the LiBohai sea and the Botan in France, some manufacturers define the model names according to the foreign coding rule. The tower crane can also be divided into a plurality of varieties according to different design forms, such as a self-elevating tower crane, an inner climbing tower crane, a flat-top tower crane, a jib tower crane, a quick-assembly tower crane and the like. The standard for distinguishing is that many tower cranes, i.e. tower cranes for short, mainly comprise a foundation, a tower body, a jacking part, a rotating part, a lifting part, a balance arm, a crane boom, a crane trolley, a tower top part, a driver cab, a luffing part and the like.
In a traditional tower crane, a traditional rope threading mode of a hoisting steel wire rope of a trolley amplitude-variable tower crane is as follows: the hoisting steel wire rope is wound out from the hoisting drum, passes through the trolley pulley 1, the trolley pulley 2, the hook pulley 1 and the hook pulley 3 in sequence after passing through the top fixed pulley and the root fixed pulley of the crane boom, then passes through the trolley pulley 3, passes through the trolley pulley 2, and finally is fixed on the anti-twist device through the trolley pulley 4. Because the trolley pulleys 1 and 2 and the trolley pulleys 3 and 4 are coaxially and parallelly arranged, and the hook pulleys are on the same plane, the rope threading mode can cause the deflection of the hook due to the fact that the trolley steel wire rope and the hook steel wire rope are not in the same plane, and is not beneficial to actual construction; in addition, the hoisting steel wire ropes are not in the same plane, so the hoisting steel wire ropes can cut the edges of the pulleys after being stressed, and after the edges of the pulleys are cut off after a long time, the steel wire ropes jump out of the pulley grooves and are clamped, so that major safety accidents such as rope breakage are caused.
In summary, there is a need to develop a rope threading structure of a tower crane hoisting steel wire rope with greatly improved safety to overcome the disadvantages in the prior art.
SUMMERY OF THE UTILITY MODEL
The utility model discloses an overcome traditional tower machine wire rope threading structure and lead to the shortcoming of heavy major accident such as disconnected rope easily, the to-be-solved technical problem of the utility model is to provide a tower machine that has promoted the security has risen wire rope threading structure greatly.
The utility model is achieved by the following concrete technical means:
a rope threading structure of a tower crane hoisting steel wire rope comprises a hoisting drum, a hoisting steel wire rope, a crane boom top fixed pulley, a crane boom root fixed pulley, an amplitude-variable trolley, a first trolley pulley, a second trolley pulley, an auxiliary lifting hook, a first lifting hook pulley, a second lifting hook pulley, a main lifting hook, a third lifting hook pulley and an anti-twisting device; first dolly pulley and second dolly pulley are fixed in and become width of cloth dolly front side both ends, vice lifting hook is fixed in and becomes width of cloth dolly below, first lifting hook pulley is fixed in vice lifting hook front side, second lifting hook pulley, third lifting hook pulley are fixed in main lifting hook both sides, play to rise on wire rope one end coiling and play to rise the reel, the other end walks around jib loading boom top fixed pulley, jib loading boom root fixed pulley, first dolly pulley, second lifting hook pulley, first lifting hook pulley, third lifting hook pulley and second dolly pulley in proper order to fix on the anti-twist device, just jib loading boom top fixed pulley, jib loading boom root fixed pulley, first dolly pulley, second lifting hook pulley, first lifting hook pulley, third lifting hook pulley and second dolly pulley all are located the coplanar.
Furthermore, the crane boom top fixed pulley, the crane boom root fixed pulley, the first trolley pulley, the second hook pulley, the first hook pulley, the third hook pulley and the second trolley pulley are all made of ZG270-500 cast steel.
Furthermore, the center positions of the first trolley pulley and the second trolley pulley are positioned on the same horizontal line, and the distance between the center line of the first trolley pulley and the center line of the first hook pulley is equal to the distance between the center line of the second trolley pulley and the center line of the first hook pulley.
Furthermore, the top end of the second trolley pulley and the center position of the anti-twisting device are positioned on the same horizontal line.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses a rope handling structure has carried out the major improvement, puts all pulley equipartitions at the coplanar, plays to rise after wire rope comes out from rising the reel, all walks the rope on a plane, and reasonable having avoided to have responded the pulley not at the coplanar and increase extra atress, guarantees that the pulley edge can not cut by wire rope, has effectively avoided playing to rise the condition that wire rope "jumping groove" was stuck, has promoted the security of tower machine greatly.
Drawings
Fig. 1 is a schematic diagram of a traditional tower crane hoisting steel wire rope threading structure.
Fig. 2 is the utility model discloses a tower machine plays to rise wire rope reeving structure schematic diagram.
The labels in the figures are: 1-lifting reel, 2-lifting steel wire rope, 3-fixed pulley at top of cargo boom, 4-fixed pulley at root of cargo boom, 5-amplitude-variable trolley, 6-first trolley pulley, 7-second trolley pulley, 8-auxiliary lifting hook, 9-first lifting hook pulley, 10-second lifting hook pulley, 11-main lifting hook, 12-third lifting hook pulley, 13-anti-twisting device, 14-third trolley pulley and 15-fourth trolley pulley.
Detailed Description
The present invention will be further described with reference to the accompanying drawings.
Examples
A tower crane hoisting steel wire rope threading structure is shown in figure 1-2 and comprises a hoisting drum 1, a hoisting steel wire rope 2, a boom top fixed pulley 3, a boom root fixed pulley 4, a luffing trolley 5, a first trolley pulley 6, a second trolley pulley 7, an auxiliary hook 8, a first hook pulley 9, a second hook pulley 10, a main hook 11, a third hook pulley 12 and an anti-twisting device 13; the first trolley pulley 6 and the second trolley pulley 7 are fixed at the two ends of the front side of the amplitude-variable trolley 5, the auxiliary lifting hook 8 is fixed below the amplitude-variable trolley 5, the first hook pulley 9 is fixed on the front side of the auxiliary hook 8, the second hook pulley 10 and the third hook pulley 12 are fixed on the two sides of the main hook 11, one end of the hoisting steel wire rope 2 is wound on the hoisting drum 1, the other end of the hoisting steel wire rope sequentially rounds a boom top fixed pulley 3, a boom root fixed pulley 4, a first trolley pulley 6, a second hook pulley 10, a first hook pulley 9, a third hook pulley 12 and a second trolley pulley 7, and is fixed on an anti-twist device 13, and the boom top fixed pulley 3, the boom root fixed pulley 4, the first trolley pulley 6, the second hook pulley 10, the first hook pulley 9, the third hook pulley 12 and the second trolley pulley 7 are all positioned on the same plane.
When the hoisting drum 1 rotates, the hoisting steel wire rope 2 is wound up, the main lifting hook 11 can be driven to move up and down, and the anti-twisting device 13 can prevent the hoisting steel wire rope 2 from twisting to cause damage to the device.
For the rope handling structure that fig. 1 shows, the utility model discloses the effectual quantity that becomes width of cloth dolly 5 pulley that has reduced has optimized the structure that becomes width of cloth dolly 5, greatly reduced manufacturing cost to guaranteed to play to rise wire rope 2 and from playing to rise reel 1 and being in the coplanar operation all the time after winding out, can not cut the pulley edge, improve the security, also promoted greatly and played wire rope 2's life.
The crane boom top fixing pulley 3, the crane boom root fixing pulley 4, the first trolley pulley 6, the second hook pulley 10, the first hook pulley 9, the third hook pulley 12 and the second trolley pulley 7 are all made of ZG270-500 cast steel.
The center positions of the first trolley pulley 6 and the second trolley pulley 7 are on the same horizontal line, and the distance between the center lines of the first trolley pulley 6 and the first hook pulley 9 is equal to the distance between the center lines of the second trolley pulley 7 and the first hook pulley 9.
The top end of the second trolley pulley 7 and the center position of the anti-twisting device 13 are positioned on the same horizontal line.
Utilize technical scheme, or technical personnel in the field are in the utility model discloses under technical scheme's the inspiration, design similar technical scheme, and reach above-mentioned technological effect, all fall into the utility model discloses a protection scope.

Claims (4)

1. A rope threading structure of a hoisting steel wire rope of a tower crane is characterized by comprising a hoisting drum (1), a hoisting steel wire rope (2), a fixed pulley (3) at the top of a crane boom, a fixed pulley (4) at the root of the crane boom, an amplitude-variable trolley (5), a first trolley pulley (6), a second trolley pulley (7), an auxiliary hook (8), a first hook pulley (9), a second hook pulley (10), a main hook (11), a third hook pulley (12) and an anti-twisting device (13); first dolly pulley (6) and second dolly pulley (7) are fixed in and become a width of cloth dolly (5) front side both ends, vice lifting hook (8) are fixed in and become a width of cloth dolly (5) below, first lifting hook pulley (9) are fixed in vice lifting hook (8) front side, second lifting hook pulley (10), third lifting hook pulley (12) are fixed in main lifting hook (11) both sides, play to rise wire rope (2) one end and convolute on lifting reel (1), the other end is walked around jib loading boom top fixed pulley (3), jib root fixed pulley (4), first dolly pulley (6), second lifting hook pulley (10), first lifting hook pulley (9), third lifting hook pulley (12) and second dolly pulley (7) in proper order to fix on anti-twist device (13), just jib top fixed pulley (3), jib root fixed pulley (4), The first trolley pulley (6), the second hook pulley (10), the first hook pulley (9), the third hook pulley (12) and the second trolley pulley (7) are all located on the same plane.
2. The stringing structure of a hoisting steel wire rope of a tower crane according to claim 1, wherein the top fixed pulley (3), the root fixed pulley (4), the first trolley pulley (6), the second hook pulley (10), the first hook pulley (9), the third hook pulley (12) and the second trolley pulley (7) are all ZG270-500 cast steel.
3. The stringing structure of a hoisting steel cable of a tower crane according to claim 1, wherein the center positions of the first trolley pulley (6) and the second trolley pulley (7) are on the same horizontal line, and the distance between the center lines of the first trolley pulley (6) and the first hook pulley (9) is equal to the distance between the center lines of the second trolley pulley (7) and the first hook pulley (9).
4. The rope penetrating structure for the hoisting steel wire rope of the tower crane according to claim 1, wherein the top end of the second trolley pulley (7) and the center position of the anti-twisting device (13) are in the same horizontal line.
CN201921755373.4U 2019-10-18 2019-10-18 Tower machine plays to rise wire rope reeving structure Active CN210559000U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921755373.4U CN210559000U (en) 2019-10-18 2019-10-18 Tower machine plays to rise wire rope reeving structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921755373.4U CN210559000U (en) 2019-10-18 2019-10-18 Tower machine plays to rise wire rope reeving structure

Publications (1)

Publication Number Publication Date
CN210559000U true CN210559000U (en) 2020-05-19

Family

ID=70671729

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921755373.4U Active CN210559000U (en) 2019-10-18 2019-10-18 Tower machine plays to rise wire rope reeving structure

Country Status (1)

Country Link
CN (1) CN210559000U (en)

Similar Documents

Publication Publication Date Title
CN204958233U (en) Tower crane plays to rise wire rope and holds in palm rope device
CN102718158B (en) Superlift device and crane
CN206645749U (en) Electric block type multi-lay winding hoist engine
CN110951936A (en) Double-pulley lifting device provided with balancer and oxygen lance device provided with same
CN210559000U (en) Tower machine plays to rise wire rope reeving structure
CN104649120A (en) Balance hoisting equipment
CN109279519B (en) Method for replacing steel wire rope of tower crane hoisting mechanism
CN201722053U (en) Hoisting mechanism used for upright column hoisting
CN203865920U (en) Steel wire rope winding structure for large-tonnage crane hoisting mechanism
CN104627885A (en) Guiding device for optimizing steel wire rope elevation angle
CN201762053U (en) Simple automatic hoisting rod
CN202542743U (en) Auxiliary reeving mechanism for mounting tower crane
CN101613057A (en) A kind of hoisting mechanism of multi-lifting-point joint crane
CN207511735U (en) A kind of lead type loop wheel machine winch
CN210457261U (en) Variable-amplitude pull rope structure of movable-arm crane
CN207738353U (en) Lifting hook pulley component and the crane for including the lifting hook pulley component
CN201433064Y (en) Lifting mechanism for a multiple-lifting-lug hoisting machine
CN210855056U (en) Novel movable arm crane for hoisting steel wire rope winding system
CN210655895U (en) Large-pitch-angle boom steel wire rope winding device
CN210828529U (en) Steel wire rope rewinding lifting traction system
CN202988610U (en) Mooring rope type mast crane
CN202988623U (en) Compact high-lift hoisting mechanism
CN211004313U (en) Double-lifting device of crane
CN205346692U (en) Swing arm tower machine of supporting multiple mounting means becomes width of cloth pulley yoke
CN220376198U (en) Auxiliary lifting system of tower crane

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 336000 Yuanzhou economic and Technological Development Zone, Yichun City, Jiangxi Province

Patentee after: Jiangxi Zhongtian Intelligent Equipment Co., Ltd

Address before: 336000 Yuanzhou economic and Technological Development Zone, Yichun City, Jiangxi Province

Patentee before: JIANGXI ZHONGTIAN MACHINERY Co.,Ltd.

CP01 Change in the name or title of a patent holder