CN210559000U - Tower machine plays to rise wire rope reeving structure - Google Patents
Tower machine plays to rise wire rope reeving structure Download PDFInfo
- Publication number
- CN210559000U CN210559000U CN201921755373.4U CN201921755373U CN210559000U CN 210559000 U CN210559000 U CN 210559000U CN 201921755373 U CN201921755373 U CN 201921755373U CN 210559000 U CN210559000 U CN 210559000U
- Authority
- CN
- China
- Prior art keywords
- pulley
- trolley
- hook
- wire rope
- fixed
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Landscapes
- Jib Cranes (AREA)
Abstract
The utility model belongs to the technical field of tower machine safety, especially, relate to a tower machine plays to rise wire rope threading structure. The to-be-solved technical problem of the utility model is to provide a tower machine that has promoted the security has risen wire rope threading structure greatly. A rope threading structure of a tower crane hoisting steel wire rope comprises a hoisting drum, a hoisting steel wire rope, a crane boom top fixed pulley, a crane boom root fixed pulley, an amplitude-variable trolley, a first trolley pulley, a second trolley pulley, an auxiliary lifting hook, a first lifting hook pulley, a second lifting hook pulley, a main lifting hook, a third lifting hook pulley and an anti-twisting device; the first trolley pulley and the second trolley pulley are fixed at two ends of the front side of the variable amplitude trolley, and the auxiliary lifting hook is fixed below the variable amplitude trolley. The utility model discloses a rope handling structure has carried out the major improvement, puts all pulley equipartitions on the coplanar, plays to rise after wire rope comes out from rising the reel, all walks the rope on a plane.
Description
Technical Field
The utility model belongs to the technical field of tower machine safety, especially, relate to a tower machine plays to rise wire rope threading structure.
Background
The tower crane, namely the tower crane, is also called as the tower crane for short. Is a hoisting device used in building construction. The industrial classification belongs to machinery- > engineering machinery- > hoisting machinery- > construction hoisting machinery- > tower crane. According to the national standard classification, the model standard of the tower crane is QT, wherein Q represents the crane, and T represents the tower. The standard names in China are the same, and certainly, as our country learns the technology of the tower crane manufactured by the technique of the LiBohai sea and the Botan in France, some manufacturers define the model names according to the foreign coding rule. The tower crane can also be divided into a plurality of varieties according to different design forms, such as a self-elevating tower crane, an inner climbing tower crane, a flat-top tower crane, a jib tower crane, a quick-assembly tower crane and the like. The standard for distinguishing is that many tower cranes, i.e. tower cranes for short, mainly comprise a foundation, a tower body, a jacking part, a rotating part, a lifting part, a balance arm, a crane boom, a crane trolley, a tower top part, a driver cab, a luffing part and the like.
In a traditional tower crane, a traditional rope threading mode of a hoisting steel wire rope of a trolley amplitude-variable tower crane is as follows: the hoisting steel wire rope is wound out from the hoisting drum, passes through the trolley pulley 1, the trolley pulley 2, the hook pulley 1 and the hook pulley 3 in sequence after passing through the top fixed pulley and the root fixed pulley of the crane boom, then passes through the trolley pulley 3, passes through the trolley pulley 2, and finally is fixed on the anti-twist device through the trolley pulley 4. Because the trolley pulleys 1 and 2 and the trolley pulleys 3 and 4 are coaxially and parallelly arranged, and the hook pulleys are on the same plane, the rope threading mode can cause the deflection of the hook due to the fact that the trolley steel wire rope and the hook steel wire rope are not in the same plane, and is not beneficial to actual construction; in addition, the hoisting steel wire ropes are not in the same plane, so the hoisting steel wire ropes can cut the edges of the pulleys after being stressed, and after the edges of the pulleys are cut off after a long time, the steel wire ropes jump out of the pulley grooves and are clamped, so that major safety accidents such as rope breakage are caused.
In summary, there is a need to develop a rope threading structure of a tower crane hoisting steel wire rope with greatly improved safety to overcome the disadvantages in the prior art.
SUMMERY OF THE UTILITY MODEL
The utility model discloses an overcome traditional tower machine wire rope threading structure and lead to the shortcoming of heavy major accident such as disconnected rope easily, the to-be-solved technical problem of the utility model is to provide a tower machine that has promoted the security has risen wire rope threading structure greatly.
The utility model is achieved by the following concrete technical means:
a rope threading structure of a tower crane hoisting steel wire rope comprises a hoisting drum, a hoisting steel wire rope, a crane boom top fixed pulley, a crane boom root fixed pulley, an amplitude-variable trolley, a first trolley pulley, a second trolley pulley, an auxiliary lifting hook, a first lifting hook pulley, a second lifting hook pulley, a main lifting hook, a third lifting hook pulley and an anti-twisting device; first dolly pulley and second dolly pulley are fixed in and become width of cloth dolly front side both ends, vice lifting hook is fixed in and becomes width of cloth dolly below, first lifting hook pulley is fixed in vice lifting hook front side, second lifting hook pulley, third lifting hook pulley are fixed in main lifting hook both sides, play to rise on wire rope one end coiling and play to rise the reel, the other end walks around jib loading boom top fixed pulley, jib loading boom root fixed pulley, first dolly pulley, second lifting hook pulley, first lifting hook pulley, third lifting hook pulley and second dolly pulley in proper order to fix on the anti-twist device, just jib loading boom top fixed pulley, jib loading boom root fixed pulley, first dolly pulley, second lifting hook pulley, first lifting hook pulley, third lifting hook pulley and second dolly pulley all are located the coplanar.
Furthermore, the crane boom top fixed pulley, the crane boom root fixed pulley, the first trolley pulley, the second hook pulley, the first hook pulley, the third hook pulley and the second trolley pulley are all made of ZG270-500 cast steel.
Furthermore, the center positions of the first trolley pulley and the second trolley pulley are positioned on the same horizontal line, and the distance between the center line of the first trolley pulley and the center line of the first hook pulley is equal to the distance between the center line of the second trolley pulley and the center line of the first hook pulley.
Furthermore, the top end of the second trolley pulley and the center position of the anti-twisting device are positioned on the same horizontal line.
Compared with the prior art, the utility model discloses following beneficial effect has:
the utility model discloses a rope handling structure has carried out the major improvement, puts all pulley equipartitions at the coplanar, plays to rise after wire rope comes out from rising the reel, all walks the rope on a plane, and reasonable having avoided to have responded the pulley not at the coplanar and increase extra atress, guarantees that the pulley edge can not cut by wire rope, has effectively avoided playing to rise the condition that wire rope "jumping groove" was stuck, has promoted the security of tower machine greatly.
Drawings
Fig. 1 is a schematic diagram of a traditional tower crane hoisting steel wire rope threading structure.
Fig. 2 is the utility model discloses a tower machine plays to rise wire rope reeving structure schematic diagram.
The labels in the figures are: 1-lifting reel, 2-lifting steel wire rope, 3-fixed pulley at top of cargo boom, 4-fixed pulley at root of cargo boom, 5-amplitude-variable trolley, 6-first trolley pulley, 7-second trolley pulley, 8-auxiliary lifting hook, 9-first lifting hook pulley, 10-second lifting hook pulley, 11-main lifting hook, 12-third lifting hook pulley, 13-anti-twisting device, 14-third trolley pulley and 15-fourth trolley pulley.
Detailed Description
The present invention will be further described with reference to the accompanying drawings.
Examples
A tower crane hoisting steel wire rope threading structure is shown in figure 1-2 and comprises a hoisting drum 1, a hoisting steel wire rope 2, a boom top fixed pulley 3, a boom root fixed pulley 4, a luffing trolley 5, a first trolley pulley 6, a second trolley pulley 7, an auxiliary hook 8, a first hook pulley 9, a second hook pulley 10, a main hook 11, a third hook pulley 12 and an anti-twisting device 13; the first trolley pulley 6 and the second trolley pulley 7 are fixed at the two ends of the front side of the amplitude-variable trolley 5, the auxiliary lifting hook 8 is fixed below the amplitude-variable trolley 5, the first hook pulley 9 is fixed on the front side of the auxiliary hook 8, the second hook pulley 10 and the third hook pulley 12 are fixed on the two sides of the main hook 11, one end of the hoisting steel wire rope 2 is wound on the hoisting drum 1, the other end of the hoisting steel wire rope sequentially rounds a boom top fixed pulley 3, a boom root fixed pulley 4, a first trolley pulley 6, a second hook pulley 10, a first hook pulley 9, a third hook pulley 12 and a second trolley pulley 7, and is fixed on an anti-twist device 13, and the boom top fixed pulley 3, the boom root fixed pulley 4, the first trolley pulley 6, the second hook pulley 10, the first hook pulley 9, the third hook pulley 12 and the second trolley pulley 7 are all positioned on the same plane.
When the hoisting drum 1 rotates, the hoisting steel wire rope 2 is wound up, the main lifting hook 11 can be driven to move up and down, and the anti-twisting device 13 can prevent the hoisting steel wire rope 2 from twisting to cause damage to the device.
For the rope handling structure that fig. 1 shows, the utility model discloses the effectual quantity that becomes width of cloth dolly 5 pulley that has reduced has optimized the structure that becomes width of cloth dolly 5, greatly reduced manufacturing cost to guaranteed to play to rise wire rope 2 and from playing to rise reel 1 and being in the coplanar operation all the time after winding out, can not cut the pulley edge, improve the security, also promoted greatly and played wire rope 2's life.
The crane boom top fixing pulley 3, the crane boom root fixing pulley 4, the first trolley pulley 6, the second hook pulley 10, the first hook pulley 9, the third hook pulley 12 and the second trolley pulley 7 are all made of ZG270-500 cast steel.
The center positions of the first trolley pulley 6 and the second trolley pulley 7 are on the same horizontal line, and the distance between the center lines of the first trolley pulley 6 and the first hook pulley 9 is equal to the distance between the center lines of the second trolley pulley 7 and the first hook pulley 9.
The top end of the second trolley pulley 7 and the center position of the anti-twisting device 13 are positioned on the same horizontal line.
Utilize technical scheme, or technical personnel in the field are in the utility model discloses under technical scheme's the inspiration, design similar technical scheme, and reach above-mentioned technological effect, all fall into the utility model discloses a protection scope.
Claims (4)
1. A rope threading structure of a hoisting steel wire rope of a tower crane is characterized by comprising a hoisting drum (1), a hoisting steel wire rope (2), a fixed pulley (3) at the top of a crane boom, a fixed pulley (4) at the root of the crane boom, an amplitude-variable trolley (5), a first trolley pulley (6), a second trolley pulley (7), an auxiliary hook (8), a first hook pulley (9), a second hook pulley (10), a main hook (11), a third hook pulley (12) and an anti-twisting device (13); first dolly pulley (6) and second dolly pulley (7) are fixed in and become a width of cloth dolly (5) front side both ends, vice lifting hook (8) are fixed in and become a width of cloth dolly (5) below, first lifting hook pulley (9) are fixed in vice lifting hook (8) front side, second lifting hook pulley (10), third lifting hook pulley (12) are fixed in main lifting hook (11) both sides, play to rise wire rope (2) one end and convolute on lifting reel (1), the other end is walked around jib loading boom top fixed pulley (3), jib root fixed pulley (4), first dolly pulley (6), second lifting hook pulley (10), first lifting hook pulley (9), third lifting hook pulley (12) and second dolly pulley (7) in proper order to fix on anti-twist device (13), just jib top fixed pulley (3), jib root fixed pulley (4), The first trolley pulley (6), the second hook pulley (10), the first hook pulley (9), the third hook pulley (12) and the second trolley pulley (7) are all located on the same plane.
2. The stringing structure of a hoisting steel wire rope of a tower crane according to claim 1, wherein the top fixed pulley (3), the root fixed pulley (4), the first trolley pulley (6), the second hook pulley (10), the first hook pulley (9), the third hook pulley (12) and the second trolley pulley (7) are all ZG270-500 cast steel.
3. The stringing structure of a hoisting steel cable of a tower crane according to claim 1, wherein the center positions of the first trolley pulley (6) and the second trolley pulley (7) are on the same horizontal line, and the distance between the center lines of the first trolley pulley (6) and the first hook pulley (9) is equal to the distance between the center lines of the second trolley pulley (7) and the first hook pulley (9).
4. The rope penetrating structure for the hoisting steel wire rope of the tower crane according to claim 1, wherein the top end of the second trolley pulley (7) and the center position of the anti-twisting device (13) are in the same horizontal line.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921755373.4U CN210559000U (en) | 2019-10-18 | 2019-10-18 | Tower machine plays to rise wire rope reeving structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921755373.4U CN210559000U (en) | 2019-10-18 | 2019-10-18 | Tower machine plays to rise wire rope reeving structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN210559000U true CN210559000U (en) | 2020-05-19 |
Family
ID=70671729
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921755373.4U Active CN210559000U (en) | 2019-10-18 | 2019-10-18 | Tower machine plays to rise wire rope reeving structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN210559000U (en) |
-
2019
- 2019-10-18 CN CN201921755373.4U patent/CN210559000U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN204958233U (en) | Tower crane plays to rise wire rope and holds in palm rope device | |
CN102718158B (en) | Superlift device and crane | |
CN206645749U (en) | Electric block type multi-lay winding hoist engine | |
CN110951936A (en) | Double-pulley lifting device provided with balancer and oxygen lance device provided with same | |
CN210559000U (en) | Tower machine plays to rise wire rope reeving structure | |
CN104649120A (en) | Balance hoisting equipment | |
CN109279519B (en) | Method for replacing steel wire rope of tower crane hoisting mechanism | |
CN201722053U (en) | Hoisting mechanism used for upright column hoisting | |
CN203865920U (en) | Steel wire rope winding structure for large-tonnage crane hoisting mechanism | |
CN104627885A (en) | Guiding device for optimizing steel wire rope elevation angle | |
CN201762053U (en) | Simple automatic hoisting rod | |
CN202542743U (en) | Auxiliary reeving mechanism for mounting tower crane | |
CN101613057A (en) | A kind of hoisting mechanism of multi-lifting-point joint crane | |
CN207511735U (en) | A kind of lead type loop wheel machine winch | |
CN210457261U (en) | Variable-amplitude pull rope structure of movable-arm crane | |
CN207738353U (en) | Lifting hook pulley component and the crane for including the lifting hook pulley component | |
CN201433064Y (en) | Lifting mechanism for a multiple-lifting-lug hoisting machine | |
CN210855056U (en) | Novel movable arm crane for hoisting steel wire rope winding system | |
CN210655895U (en) | Large-pitch-angle boom steel wire rope winding device | |
CN210828529U (en) | Steel wire rope rewinding lifting traction system | |
CN202988610U (en) | Mooring rope type mast crane | |
CN202988623U (en) | Compact high-lift hoisting mechanism | |
CN211004313U (en) | Double-lifting device of crane | |
CN205346692U (en) | Swing arm tower machine of supporting multiple mounting means becomes width of cloth pulley yoke | |
CN220376198U (en) | Auxiliary lifting system of tower crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 336000 Yuanzhou economic and Technological Development Zone, Yichun City, Jiangxi Province Patentee after: Jiangxi Zhongtian Intelligent Equipment Co., Ltd Address before: 336000 Yuanzhou economic and Technological Development Zone, Yichun City, Jiangxi Province Patentee before: JIANGXI ZHONGTIAN MACHINERY Co.,Ltd. |
|
CP01 | Change in the name or title of a patent holder |