CN207717541U - Consider the Rock And Soil cutting creep instrument of drying and watering cycle - Google Patents

Consider the Rock And Soil cutting creep instrument of drying and watering cycle Download PDF

Info

Publication number
CN207717541U
CN207717541U CN201820006540.4U CN201820006540U CN207717541U CN 207717541 U CN207717541 U CN 207717541U CN 201820006540 U CN201820006540 U CN 201820006540U CN 207717541 U CN207717541 U CN 207717541U
Authority
CN
China
Prior art keywords
shear box
drying
watering cycle
rock
shear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201820006540.4U
Other languages
Chinese (zh)
Inventor
倪卫达
王敬勇
孙淼军
徐文刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Huadong Engineering Corp Ltd
Original Assignee
PowerChina Huadong Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by PowerChina Huadong Engineering Corp Ltd filed Critical PowerChina Huadong Engineering Corp Ltd
Priority to CN201820006540.4U priority Critical patent/CN207717541U/en
Application granted granted Critical
Publication of CN207717541U publication Critical patent/CN207717541U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Sampling And Sample Adjustment (AREA)
  • Investigating Strength Of Materials By Application Of Mechanical Stress (AREA)

Abstract

The utility model is related to a kind of Rock And Soil cutting creep instruments considering drying and watering cycle.The purpose of this utility model is to provide a kind of Rock And Soil cutting creep instrument of consideration drying and watering cycle simple in structure, easy to operate, both it can carry out the shear creep test of soft rock or pan soil during drying and watering cycle, and can also carry out the direct shear test of the lower soft rock of drying and watering cycle effect or pan soil.The technical solution of the utility model is:A kind of Rock And Soil cutting creep instrument considering drying and watering cycle, it is characterised in that:With bottom plate, bottom plate is equipped with opening up passive shear box, and ground sample is placed in passive shear box, the active shear box that Open Side Down is arranged above passive shear box, active shear box covers on ground sample.The utility model is in the mechanics parameter of soft rock or pan soil drying and watering cycle environment suitable for testing.

Description

Consider the Rock And Soil cutting creep instrument of drying and watering cycle
Technical field
The utility model is related to a kind of Rock And Soil cutting creep instruments considering drying and watering cycle.It is followed in dry and wet suitable for testing The mechanics parameter of soft rock or pan soil in ring environment.
Background technology
Drying and watering cycle is a kind of common natural operating mode, such as:Natural slope Rock And Soil is subjected to periodic rainfall and wind Dry effect, reservoir stability Rock And Soil is subjected to periodic Reservoir Operation effect, so as to cause side slope inside Rock And Soil by the period Property drying and watering cycle effect, drying and watering cycle effect promotes water and Rock And Soil and complicated physical-chemical reaction occurs, and finally leads Cause gradually changing for rock mechanical characteristic.
The variation of the lower rock mechanical characteristic of drying and watering cycle effect is mainly shown as two aspects:1, Rock And Soil intensive parameter (especially shear strength parameter) is continuously decreased with the increase of drying moistening cycle;2, Rock And Soil under stress conditions, with dry Wet cyclic process gradually generates the deformation of creep.Under above-mentioned both sides collective effect, what the stability of side slope can be at any time pushes away It moves and continuously decreases, therefore drying and watering cycle is a key factor for causing slope instability to destroy.
Existing scholar has carried out research for the mechanical characteristic of the lower Rock And Soil of drying and watering cycle effect at present, is concentrated mainly on room Interior drying and watering cycle process simulation experiment and mechanics parameter measuring technology etc., deformation failure of these researchs for announcement side slope Mechanism has important theoretical and practical significance.However current research still remains following deficiency:1, indoor dry and wet is circulated throughout Journey simulates the ambient stress departing from Rock And Soil.Drying and watering cycle and mechanical test are mostly divided into two individual mistakes by current experiment Journey can not simulate the true stress occurrence condition of Rock And Soil during drying and watering cycle, lead to the variation of rock mechanical parameter Rule deviates practical;2, heating dehumidification method has certain damage to the internal structure of ground sample.Interior dry and wet is followed at present The method that the drying of ring process simulation mostly uses baking oven drying or hot blast drying, such method are especially native to Rock And Soil The structure in internal portion has certain damaging action, does not conform to the actual conditions so as to cause the test result of mechanics parameter;3, Indoor Dry Wet cyclic process is simulated less efficient.Since Rock And Soil is the non-conductor of heat, and ground sample, especially sticky great soil group are tried The infiltration coefficient of sample is relatively low, therefore the moisture inside ground sample is difficult to be discharged by way of heating dehumidification so that dry and wet is followed Ring process simulation it is less efficient, and the size for limiting ground sample cannot be excessive, so as to cause Mechanical test results by To the influence of certain size effect.
Invention content
The technical problems to be solved in the utility model is:In view of the above problems, a kind of simple in structure, operation is provided The Rock And Soil cutting creep instrument of convenient consideration drying and watering cycle, the shearing that can have both carried out soft rock or pan soil during drying and watering cycle are compacted Become experiment, can also carry out the direct shear test of the lower soft rock of drying and watering cycle effect or pan soil.
Technical solution used by the utility model is:A kind of Rock And Soil cutting creep instrument considering drying and watering cycle, it is special Sign is:With bottom plate, bottom plate is equipped with opening up passive shear box, places ground sample in passive shear box, passively The setting active shear box that Open Side Down, active shear box cover on ground sample above shear box;
The normal direction load maintainer for applying normal stress to it is equipped at the top of active shear box, normal direction load maintainer is cut with active It cuts and is equipped with rigid backing plate between box, rigid pad plate end face is uniformly provided with several rolling steel balls;Active shear box side is equipped with to it Apply the shearing load maintainer of shear stress;
Corresponding active shear box is equipped with the Normal Displacement for measuring active shear box Normal Displacement and clipped position respectively Sensor and shear displacemant sensor;
It is equipped in passive shear box and active shear box and realizes that ground sample dry and wet is followed by immersion moistening and microwave dehumidification The drying and watering cycle system of ring.
Drying and watering cycle system includes infiltration mechanism and dehumidification mechanism;
Wherein infiltration mechanism includes be respectively arranged in bottom in active shear box inner top and passive shear box upper permeable Plate and lower porous disc, wherein offering connection active shear box in upper porous disc and extending to the upper steam outside active shear box Hole offers the passive shear box of connection in lower porous disc and extends to the lower water vapor hole outside passive shear box;
Dehumidification mechanism includes the microwave generator being installed in active shear box and passive shear box;
When drying and watering cycle mechanism carries out immersion moistening to ground sample, the distilled water of upper water vapor hole connection constant pressure, Lower water vapor hole communicated drainage sink;
When drying and watering cycle mechanism carries out microwave dehumidification to ground sample, upper and lower water vapor hole is connected to negative pressure sucking pump.
The temperature sensor for measuring ground specimen temperature is equipped in passive shear box and active shear box, microwave occurs The ground specimen temperature that device is measured according to temperature sensor works.
Upper and lower porous disc is all made of the permeable slabstone of clay.
There is normal direction load maintainer numerical control normal direction jack, shearing load maintainer there is numerical control to shear jack.
Normal direction load maintainer and shearing load maintainer are fixed on through holder on bottom plate.
Ground sample uses rectangular large dimension specimen, the cavity shape that the passive shear box is cooperatively formed with active shear box Shape is adapted with the ground sample.
Using the method for considering that the Rock And Soil cutting creep instrument of drying and watering cycle is tested, it is characterised in that:
1, sample is installed:Ground sample is positioned between active shear box and passive shear box, ground sample bottom is set In on lower porous disc, porous disc on apical grafting at the top of ground sample;
2, apply primary stress:According to the practically stress condition residing for ground sample sampling point, ground sample is determined Initial stress values apply primary stress using normal direction load maintainer;
3, drying and watering cycle:
The access of upper water vapor hole there are the distilled water of constant pressure, lower water vapor hole are connected to draining sink, waits for distillation water infiltration Entire ground sample, and be discharged from lower water vapor hole, maintain state certain time to realize the full water process of ground sample;
Upper and lower water vapor hole is respectively connected to negative pressure sucking pump, opens the microwave hair in active shear box and passive shear box Raw device, maintains state certain time to realize the drying of ground sample;
It repeats full water and dehumidification realizes the drying and watering cycle process of the certain number of ground sample;
4, apply normal stress:Normal stress is applied using normal direction load maintainer, keeps normal direction to answer after reaching specified value Power is constant;
5, apply shear stress:Shear stress is applied using shearing load maintainer, loads per after level-one shear stress, maintains Shear stress is constant and continuous observation record shear creep deforms, and after shear creep stabilization, deflection is small in one day It is considered as stabilization in 0.01mm, then applies next stage shear stress, while recording the action time of upper level shear stress, until examination Sample shear creep destroys;
6, it repeats to test:Different brackets normal stress is adjusted, step 1~5 are repeated;
7, shearing strain is calculated:
Wherein, ε is shearing strain;κ deforms for shear creep;L is length of the ground sample along shear direction.
8, result treatment:It draws under the effect of different brackets normal stress, undergoes Rock And Soil after certain number drying and watering cycle The relation curve of shearing strain and time.
Using the method for considering that the Rock And Soil cutting creep instrument of drying and watering cycle is tested, it is characterised in that:
1, sample is installed:Ground sample is positioned between active shear box and passive shear box, ground sample bottom is set In on lower porous disc, porous disc on apical grafting at the top of ground sample;
2, apply primary stress:According to the practically stress condition residing for ground sample sampling point, ground sample is determined Initial stress values apply primary stress using normal direction load maintainer;
3, drying and watering cycle:
The access of upper water vapor hole there are the distilled water of constant pressure, lower water vapor hole are connected to draining sink, waits for distillation water infiltration Entire ground sample, and be discharged from lower water vapor hole, maintain state certain time to realize the full water process of ground sample;
Upper and lower water vapor hole is respectively connected to negative pressure sucking pump, opens the microwave hair in active shear box and passive shear box Raw device, maintains state certain time to realize the drying of ground sample;
It repeats full water and dehumidification realizes the drying and watering cycle process of the certain number of ground sample;
4, apply normal stress:Normal stress is applied using normal direction load maintainer, keeps normal direction to answer after reaching specified value Power is constant;
5, apply shear stress:Shear stress is applied using shearing load maintainer step by step, adds level-one at regular intervals, directly To ground sample failure by shear;
6, it repeats to test:Different brackets normal stress is adjusted, step 1~5 are repeated;
7, normal stress σ and shear stress τ is calculated:
Wherein, σ is normal stress;τ is shear stress;G is the total weight of active shear box and rigid backing plate;PvFor normal direction The output of load maintainer;PhTo shear the output of load maintainer;A is the section of shear of ground sample.
8, result treatment:The normal stress of each sample and shear stress point are painted in coordinate diagram, fitting normal stress and Shear stress relation curve determines the shear strength parameter of Rock And Soil after undergoing certain number drying and watering cycle.
In drying, after the ground specimen temperature that temperature sensor measures is more than setting high level, stop microwave hair Raw device work starts microwave generator work when temperature falls back to setting low value.
The utility model has the beneficial effects that:
1, the utility model by the drying and watering cycle process of ground sample and mechanical test process concentrate on Rock And Soil shearing it is compacted Become in instrument, carries out drying and watering cycle and mechanical test without transfer ground sample repeatedly, it is more largely to reduce ground sample Disturbance in secondary transfer process;
2, the utility model can restore the primitive stress of ground sample during drying and watering cycle, it is ensured that ground sample is in Drying and watering cycle is carried out in ambient stress similar in practical geological conditions, and the accuracy of test result is greatly improved;
3, the utility model realizes the drying of ground sample using microwave generator, since metal material has microwave There are good reflex, rock-soil material to there is fabulous penetration, water to have good absorption to microwave microwave, Therefore microwave can penetrate rock-soil material, carry out oscillation heating to the moisture of its inside, both improved the dehumidification efficiency of ground sample, The damage in ground sample drying is reduced again, and the shear box of metal material can effectively prevent microwave from leakage;
4, the utility model carries out experiment using rectangular large-sized ground sample, due to the optimization of rectangular ground sample by Power mode and succinct geometry, are effectively simplified the computational methods of ground sample mechanics parameter;Simultaneously as rectangular big ruler The section of shear of very little ground sample bigger more specific than cutting ring direct shear test and triaxial compression test, effectively reduces the size of experiment Effect.
Description of the drawings
Fig. 1 is the front view of embodiment.
Fig. 2 is the side view of embodiment.
Fig. 3 is the vertical view of embodiment.
Fig. 4 is the A-A sectional views of Fig. 3.
Fig. 5 is the B-B sectional views of Fig. 3.
Fig. 6 is the stereogram of embodiment.
Specific implementation mode
As shown in Fig. 1~Fig. 6, the present embodiment is a kind of Rock And Soil cutting creep instrument considering drying and watering cycle, has bottom plate 4 And holder, holder include 4 support columns 3 for being located at the top plate 1 of 4 top of bottom plate and being fixed on top plate 1 on bottom plate 4, support column 3 It is uniformly distributed at top and four angles of bottom plate, the quadrangle of top plate 1 is fixed at 3 top of support column through bolt I2.
The present embodiment is equipped with opening up passive shear box 15,15 top setting opening of passive shear box on bottom plate 4 Downward active shear box 14.
14 top of active shear box is equipped with the normal direction load maintainer for applying normal stress to it, normal direction load maintainer and active Rigid backing plate 9 is equipped between shear box 14.Wherein 9 upper surface of rigid backing plate is uniformly provided with several rolling steel balls, for uniformly distributed method To stress and enable active shear box 14 that shear displacemant occurs along shear direction.Normal direction load maintainer has number in the present embodiment Normal direction jack 8 is controlled, numerical control normal direction jack 8 is fixed on by normal direction jack chassis 7 and bolt II5 on the top plate 1 of holder, The normal direction jack inlet nozzle 6 of numerical control normal direction jack 8 is set to 7 outside of normal direction jack chassis.
14 side of active shear box is equipped with the shearing load maintainer that can apply shear stress to it in this example, shears load machine There is structure numerical control to shear jack 13, and numerical control is sheared jack 13 and is fixed on by shearing jack chassis 12 and bolt III10 Between two support columns 3 of holder side, numerical control shearing jack 13 shearing jack inlet nozzle 11 be set to shearing it is very heavy Push up 12 outside of chassis.
Active shear box 14 is corresponded in the present embodiment to be equipped with for measuring active shear box Normal Displacement and shearing position respectively The Normal Displacement sensor 23 and shear displacemant sensor 22 set.Wherein Normal Displacement sensor 23 is installed on active shear box 14 On, by measuring relative displacement of the active shear box 14 relative to top plate 1, obtain active shear box Normal Displacement;Shear displacemant Sensor 22 is mounted between two support columns 3,12 top of shearing jack chassis, passes through and measures active shear box 14 Relative displacement obtains active shear box shear displacemant.
It is formed when active shear box 14 is matched with passive shear box 15 in this example for loading the rectangular of ground sample Body hollow cavity.Ground specimen shape is adapted with the cavity geometry that active shear box 14 and passive shear box 15 cooperatively form, Using rectangular large dimension specimen.The force way of rectangular large dimension specimen optimization and succinct geometry, are effectively simplified rock The computational methods of soil sample mechanics parameter.
It is equipped in the passive shear box 15 and active shear box 14 of the present embodiment and is realized by immersion moistening and microwave dehumidification The drying and watering cycle system of ground sample drying and watering cycle, drying and watering cycle system include infiltration mechanism and dehumidification mechanism.
Infiltration mechanism includes be respectively arranged in bottom in 14 inner top of active shear box and passive shear box 15 upper permeable Plate 18 and lower porous disc 19 offer connection active shear box 14 in upper porous disc 18 and extend to upper outside active shear box 14 Water vapor hole 1801 offers the lower water vapor hole for being connected to passive shear box 15 and extending to passive shear box outer 15 in lower porous disc 19 1901。
Dehumidification mechanism includes being installed on the microwave generator 16 at 14 top and 15 bottom of passive shear box of active shear box, micro- Wave producer 16 is for emitting microwave oscillation Rock And Soil internal water molecule to realize drying.Microwave generator 16 passes through electricity Source data line connector 17 is connect with external power supply.The present embodiment installation in active shear box 14 and the passive shear box 15 Temperature sensor 21, the temperature for measuring ground sample in real time.
Normal direction jack inlet nozzle 6 and numerical control shearing jack inlet nozzle 11 are connect with oil pump respectively in the present embodiment;Number Control normal direction jack, numerical control shearing jack, shear displacemant sensor, Normal Displacement sensor, temperature sensor and microwave hair Raw device is connect with microcomputer.It is micro- after the temperature of the ground sample wherein obtained by temperature sensor when microcomputer is more than setting high level Machine control microwave generator 16 is stopped, and when temperature falls back to setting low value, restarts the work of microwave generator 16.
In the present embodiment when drying and watering cycle system carries out immersion moistening to ground sample, upper water vapor hole 1801 is connected to constant The distilled water of pressure, 1901 communicated drainage sink of lower water vapor hole.When drying and watering cycle system carries out microwave dehumidification to ground sample, Upper and lower water vapor hole 1801,1901 is connected to negative pressure sucking pump.Upper and lower porous disc 18,19 is all made of clay permeable stone in this example Plate, microwave have completely penetrating through property to it.
The present embodiment application considers that the Rock And Soil cutting creep instrument of drying and watering cycle carries out the specific method of shear creep test It is as follows:
1, sample is installed:Ground sample is positioned between active shear box 14 and passive shear box 15, ground sample bottom Portion is placed on lower porous disc 19, porous disc 18 on apical grafting at the top of ground sample;
2, apply primary stress:According to the practically stress condition residing for ground sample sampling point, ground sample is determined Initial stress values apply primary stress using normal direction load maintainer;
3, drying and watering cycle:
Upper water vapor hole 1801, which is accessed, the distilled water of constant pressure, and lower water vapor hole 1901 is connected to draining sink, waits for and steaming Distilled water infiltrates entire ground sample, and is discharged from lower water vapor hole 1901, and state certain time is maintained to realize the full of ground sample Water process;
Upper and lower water vapor hole 1801,1901 is respectively connected to negative pressure sucking pump, opens active shear box 14 and passive shear box Microwave generator 16 in 15 maintains state certain time to realize the drying of ground sample;
It repeats full water and dehumidification realizes the drying and watering cycle process of the certain number of ground sample;
4, apply normal stress:Normal stress is applied using normal direction load maintainer, keeps normal direction to answer after reaching specified value Power is constant;
5, apply shear stress:Shear stress is applied using shearing load maintainer, loads per after level-one shear stress, maintains Shear stress is constant and continuous observation record shear creep deforms, and after shear creep stabilization, deflection is small in one day It is considered as stabilization in 0.01mm, then applies next stage shear stress, while recording the action time of upper level shear stress, until examination Sample shear creep destroys;
6, it repeats to test:Different brackets normal stress is adjusted, step 1~5 are repeated;
7, shearing strain is calculated:
Wherein, ε is shearing strain;κ deforms for shear creep;L is length of the ground sample along shear direction.
8, result treatment:It draws under the effect of different brackets normal stress, undergoes Rock And Soil after certain number drying and watering cycle The relation curve of shearing strain and time.
The Rock And Soil cutting creep instrument of the present embodiment application consideration drying and watering cycle carries out direct shear test, and the specific method is as follows:
1, sample is installed:Ground sample is positioned between active shear box 14 and passive shear box 15, ground sample bottom Portion is placed on lower porous disc 19, porous disc 18 on apical grafting at the top of ground sample;
2, apply primary stress:According to the practically stress condition residing for ground sample sampling point, ground sample is determined Initial stress values apply primary stress using normal direction load maintainer;
3, drying and watering cycle:
Upper water vapor hole 1801, which is accessed, the distilled water of constant pressure, and lower water vapor hole 1901 is connected to draining sink, waits for and steaming Distilled water infiltrates entire ground sample, and is discharged from lower water vapor hole 1901, and state certain time is maintained to realize the full of ground sample Water process;
Upper and lower water vapor hole 1801,1901 is respectively connected to negative pressure sucking pump, opens active shear box 14 and passive shear box Microwave generator 16 in 15 maintains state certain time to realize the drying of ground sample;
It repeats full water and dehumidification realizes the drying and watering cycle process of the certain number of ground sample;
4, apply normal stress:Normal stress is applied using normal direction load maintainer, keeps normal direction to answer after reaching specified value Power is constant;
5, apply shear stress:Shear stress is applied using shearing load maintainer step by step, adds level-one at regular intervals, directly To ground sample failure by shear;
6, it repeats to test:Different brackets normal stress is adjusted, step 1~5 are repeated;
7, normal stress σ and shear stress τ is calculated:
Wherein, σ is normal stress;τ is shear stress;G is the total weight of active shear box and rigid backing plate;PvFor normal direction The output of load maintainer;PhTo shear the output of load maintainer;A is the section of shear of ground sample.
8, result treatment:The normal stress of each sample and shear stress point are painted in coordinate diagram, fitting normal stress and Shear stress relation curve determines the shear strength parameter of Rock And Soil after undergoing certain number drying and watering cycle.

Claims (7)

1. a kind of Rock And Soil cutting creep instrument considering drying and watering cycle, it is characterised in that:With bottom plate (4), bottom plate (4) is equipped with Opening up passive shear box (15), passive shear box (15) is interior to place ground sample, is arranged above passive shear box (15) The active shear box (14) that Open Side Down, active shear box (14) cover on the ground sample;
The normal direction load maintainer for applying normal stress to it, normal direction load maintainer and master are equipped at the top of the active shear box (14) Rigid backing plate (9) is equipped between dynamic shear box (14), rigid backing plate (9) end face is uniformly provided with several rolling steel balls;Actively shear Box (14) side is equipped with the shearing load maintainer for applying shear stress to it;
Corresponding active shear box (14) is equipped with the normal direction for measuring active shear box (14) Normal Displacement and clipped position respectively Displacement sensor (23) and shear displacemant sensor (22);
It is equipped in the passive shear box (15) and active shear box (14) and ground examination is realized by immersion moistening and microwave dehumidification The drying and watering cycle system of sample drying and watering cycle.
2. the Rock And Soil cutting creep instrument according to claim 1 for considering drying and watering cycle, it is characterised in that:The dry and wet is followed Loop system includes infiltration mechanism and dehumidification mechanism;
Wherein infiltration mechanism includes be respectively arranged in active shear box (14) inner top and passive shear box (15) interior bottom upper Porous disc (18) and lower porous disc (19), wherein offering connection active shear box (14) in upper porous disc (18) and extending to master The dynamic upper water vapor hole (1801) of shear box (14) outside, lower porous disc (19) is interior to be offered the passive shear box (15) of connection and extends to The passive lower water vapor hole (1901) of shear box (15) outside;
The dehumidification mechanism includes the microwave generator being installed in the active shear box (14) and passive shear box (15) (16);
When drying and watering cycle system carries out immersion moistening to ground sample, the distillation of upper water vapor hole (1801) connection constant pressure Water, lower water vapor hole (1901) communicated drainage sink;
When drying and watering cycle system carries out microwave dehumidification to ground sample, upper and lower water vapor hole (1801,1901) is connected to negative pressure pumping Air pump.
3. the Rock And Soil cutting creep instrument according to claim 2 for considering drying and watering cycle, it is characterised in that:It is described passively to cut Cut the temperature sensor (21) being equipped in box (15) and active shear box (14) for measuring ground specimen temperature, the microwave hair Raw device (16) works according to the ground specimen temperature that temperature sensor (21) measures.
4. the Rock And Soil cutting creep instrument according to claim 2 or 3 for considering drying and watering cycle, it is characterised in that:On described, Lower porous disc (18,19) is all made of the permeable slabstone of clay.
5. the Rock And Soil cutting creep instrument according to claim 1 for considering drying and watering cycle, it is characterised in that:The normal direction adds There is mounted mechanism numerical control normal direction jack (8), the shearing load maintainer to have numerical control shearing jack (13).
6. considering the Rock And Soil cutting creep instrument of drying and watering cycle according to claim 1 or 5, it is characterised in that:The method It is fixed on the bottom plate (4) through holder to load maintainer and shearing load maintainer.
7. the Rock And Soil cutting creep instrument according to claim 1 for considering drying and watering cycle, it is characterised in that:The ground examination Sample uses rectangular large dimension specimen, the cavity geometry and institute that the passive shear box (15) cooperatively forms with active shear box (14) Ground sample is stated to be adapted.
CN201820006540.4U 2018-01-03 2018-01-03 Consider the Rock And Soil cutting creep instrument of drying and watering cycle Active CN207717541U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201820006540.4U CN207717541U (en) 2018-01-03 2018-01-03 Consider the Rock And Soil cutting creep instrument of drying and watering cycle

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201820006540.4U CN207717541U (en) 2018-01-03 2018-01-03 Consider the Rock And Soil cutting creep instrument of drying and watering cycle

Publications (1)

Publication Number Publication Date
CN207717541U true CN207717541U (en) 2018-08-10

Family

ID=63054217

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201820006540.4U Active CN207717541U (en) 2018-01-03 2018-01-03 Consider the Rock And Soil cutting creep instrument of drying and watering cycle

Country Status (1)

Country Link
CN (1) CN207717541U (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108020473A (en) * 2018-01-03 2018-05-11 中国电建集团华东勘测设计研究院有限公司 Consider the Rock And Soil cutting creep instrument and its test method of drying and watering cycle
CN111060411A (en) * 2019-12-27 2020-04-24 中国矿业大学 Intelligent rock mass creep shear testing machine and testing method
CN112504872A (en) * 2020-11-19 2021-03-16 贵州省水利水电勘测设计研究院有限公司 Rock structural surface shearing creep device capable of realizing dry-wet circulation
CN113970493A (en) * 2021-09-23 2022-01-25 中国电建集团华东勘测设计研究院有限公司 Testing device and testing method for shear stress-strain curve test sample under large-scale direct shearing of on-site coarse-grained soil

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108020473A (en) * 2018-01-03 2018-05-11 中国电建集团华东勘测设计研究院有限公司 Consider the Rock And Soil cutting creep instrument and its test method of drying and watering cycle
CN111060411A (en) * 2019-12-27 2020-04-24 中国矿业大学 Intelligent rock mass creep shear testing machine and testing method
CN111060411B (en) * 2019-12-27 2022-04-15 中国矿业大学 Intelligent rock mass creep shear testing machine and testing method
CN112504872A (en) * 2020-11-19 2021-03-16 贵州省水利水电勘测设计研究院有限公司 Rock structural surface shearing creep device capable of realizing dry-wet circulation
CN113970493A (en) * 2021-09-23 2022-01-25 中国电建集团华东勘测设计研究院有限公司 Testing device and testing method for shear stress-strain curve test sample under large-scale direct shearing of on-site coarse-grained soil

Similar Documents

Publication Publication Date Title
CN108020473A (en) Consider the Rock And Soil cutting creep instrument and its test method of drying and watering cycle
CN207717541U (en) Consider the Rock And Soil cutting creep instrument of drying and watering cycle
CN105203410B (en) A kind of experimental rig for being used to measure rock shearing creep properties
CN108614090B (en) Test device for simulating instability of natural gas hydrate induced seabed slope
Meshkat et al. Evaporation reduction potential in an undisturbed soil irrigated with surface drip and sand tube irrigation
CN103675238A (en) Multifunctional rainfall landslide indoor testing device
CN106370816B (en) It is a kind of can dynamic testing soil dehumidification/frozen water content variation characteristic pilot system
CN109459368B (en) Osmotic instrument for realizing multi-field coupling and in-situ dry-wet circulation
CA3090105C (en) Multi-load-mode frost heave tester for unsaturated soil and method for_testing amount of frost heave
CN105891014B (en) A kind of Rock And Soil shear rheology instrument considering drying and watering cycle damage effect
CN209372647U (en) A kind of permeameter for realizing multi- scenarios method and drying and watering cycle in situ
CN109187918B (en) Direct shear sample device for dry-wet cycle test and use method thereof
CN109459367A (en) A kind of permeating method for realizing multi- scenarios method and drying and watering cycle in situ
CN109668923B (en) Method for testing upper limit change rule of frozen soil
CN112964563A (en) Simulation box for simulating long-term tunnel settlement under subway operation load and test method
CN105004850A (en) Testing device and method for quantitatively simulating drying-humidifying cycle of soil triaxial sample
CN205138907U (en) Test device is cut to pressure of dry -wet cycle in -process rock
CN110849792A (en) Test device and method for water conductivity coefficient and water and soil parameters of saline soil in aeration zone
CN109702876A (en) A kind of road engineering material is cared the car
CN205808897U (en) A kind of adhesion tester that can eliminate pull of vacuum impact
CN109883837B (en) Model pile tester capable of controlling soil body temperature and testing method thereof
CN209069941U (en) A kind of one-dimensional soil-column test device of temperature control
CN211877707U (en) Test device for water guide coefficient and water and soil parameters of saline soil in aeration zone
CN212844912U (en) Automatic dry-wet cycle test device for rock-like pile
CN113295534A (en) Large-scale lateral limit compression test and shear test all-in-one machine based on dry-wet cycle condition

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant