A kind of rock soil anchor monitoring reinforcing rib meter Download PDF

Info

Publication number
CN207714392U
CN207714392U CN201721579552.8U CN201721579552U CN207714392U CN 207714392 U CN207714392 U CN 207714392U CN 201721579552 U CN201721579552 U CN 201721579552U CN 207714392 U CN207714392 U CN 207714392U
Authority
CN
China
Prior art keywords
reinforcing rib
rib meter
cable
main body
meter
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721579552.8U
Other languages
Chinese (zh)
Inventor
晏长根
孙巍锋
徐伟
蒋亮亮
杨万里
李澄宇
李永成
高青云
陶悦
万琪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gansu Luqiao Highway Investment Co Ltd
Changan University
Original Assignee
Gansu Luqiao Highway Investment Co Ltd
Changan University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gansu Luqiao Highway Investment Co Ltd, Changan University filed Critical Gansu Luqiao Highway Investment Co Ltd
Priority to CN201721579552.8U priority Critical patent/CN207714392U/en
Application granted granted Critical
Publication of CN207714392U publication Critical patent/CN207714392U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)
  • Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)

Abstract

The utility model discloses a kind of rock soil anchor monitoring reinforcing rib meters; including reinforcing rib meter main body and cable; it is cased with protection pipe outside reinforcing rib meter main body; cable is connect across protection pipe with reinforcing rib meter main body; cable is provided with Acetabula device with reinforcing rib meter main body junction, and bubble glue is filled between protection pipe and reinforcing rib meter main body.The reinforcing rib meter of the utility model; not only it is avoided that injecting cement paste moisture to reinforcing rib meter internal structure potential for adverse effects; also it substantially increases during rockbolt installation to the protection of reinforcing rib meter cable and during rockbolt stress to the potential protection of reinforcing rib meter cable; tunnel, side slope or landslide anchor pole monitoring reinforcing rib meter survival rate can be greatly improved, it is ensured that durability, accuracy and the validity of reinforcing rib meter engineering monitoring.Meanwhile the reinforcing rib meter of the utility model, cheap, simple and practicable, economy is strong.

Description

A kind of rock soil anchor monitoring reinforcing rib meter
Technical field
The utility model belongs to geotechnical engineering monitoring technical field, is related to a kind of rock soil anchor monitoring reinforcing rib meter.
Background technology
Reinforcing rib meter is a kind of sensor measuring reinforcing bar and metal bar axially loaded, and can measure prison simultaneously as needed The temperature value of measuring point is widely used in civil engineering, hydraulic and hydroelectric engineering and other engineering fields all the time.It is answering When reinforcing the stress of anchor pole reinforcing bar with reinforcing rib meter monitoring works, reinforcing rib meter is first connected on anchor pole reinforcing bar, then again with anchor Bar reinforcing bar is placed into side slope or landslide drilling, finally injects cement mortar into drilling again.Practice have shown that reinforcing rib meter monitors work Journey anchor pole reinforcing steel bar bear, survival rate is undesirable, even zero when the collapse hole that drills (such as side slope or landslide rock mass are broken).Study carefully it Reason, first, reinforcing rib meter with anchor pole reinforcing bar during being placed into drilling, reinforcing rib meter accesses the bending that cable is connect with it Position is easy and borehole wall friction, leads to cable cuticular breakdown and induces the short circuit of cable inner core or open circuit;Second, anchor pole The priming charge cement mortar water content that drills is high, is easy to cause moisture to infiltrating inside reinforcing rib meter, is unfavorable for its normal work;Its Three, with the raising for pouring into strength of cement mortar, the exhibition that do not turn off in tunnel, side slope or Landslide Deformation causes anchor pole reinforcing steel bar bear And it is axial to be easy to cause reinforcing rib meter cable since cement mortar tightly bonds reinforcing rib meter cable for the growth of cement mortar deformation Stretching, and then induce the crack of cable epidermis split, be unfavorable for the long-term normal work of cable.But have not yet to see ground work The journey monitoring device of high-survival rate reinforcing rib meter, this is problem urgently to be resolved hurrily!
Invention content
The shortcomings that the purpose of the utility model is to overcome the prior arts provides a kind of rock soil anchor monitoring reinforcing bar Meter solves the problems, such as that existing ground monitoring reinforcing rib meter survival rate is low.
The utility model uses following technical scheme:
A kind of rock soil anchor monitoring reinforcing rib meter, including reinforcing rib meter main body and cable, the reinforcing rib meter main body are cased with guarantor outside Pillar, cable are connect across protection pipe with reinforcing rib meter main body, and cable is provided with Acetabula device with reinforcing rib meter main body junction, is protecting Bubble glue is filled between pillar and reinforcing rib meter main body.
Especially, reinforcing rib meter main body both ends and protection pipe contact position are provided with AB glue.
Special cable housing has cable protective sleeve.
In addition, being provided with butter layer between cable protective sleeve and cable
Preferably, Acetabula device is filled with AB glue with the contact position of cable and reinforcing rib meter main body.
Preferably, it is provided with band outside cable protective sleeve.
Compared with prior art, the utility model has the following technical effects:
The reinforcing rib meter of the utility model, is not only avoided that injecting cement paste moisture to reinforcing rib meter internal structure potential for adverse effects, Also it substantially increases during rockbolt installation to the protection of reinforcing rib meter cable and during rockbolt stress to reinforcing rib meter cable Tunnel, side slope or landslide anchor pole monitoring reinforcing rib meter survival rate can be greatly improved, it is ensured that reinforcing rib meter engineering monitoring in potential protection Durability, accuracy and validity.Meanwhile the reinforcing rib meter of the utility model, cheap, simple and practicable, economy is strong, mesh It is preceding side slope, tunnel, foundation pit or landslide anchor pole monitoring etc. geotechnical engineerings field practice principle it is good.
Description of the drawings
Fig. 1 is the utility model reinforcing rib meter diagrammatic cross-section.
Fig. 2 is the utility model Acetabula device and Cable protecting tube schematic diagram.
Fig. 3 is anchor pole and reinforcing rib meter scheme of installation.
Wherein:1 it is reinforcing rib meter main body, 2 be cable, 3 be protection pipe, 4 be Acetabula device, 5 be bubble glue, 6 is AB glue, 7 It is butter layer for cable protective sleeve, 8,9 be band, 10 be reinforcing bar, 11 is Rock And Soil.
The utility model is described in further details below in conjunction with the accompanying drawings.
Specific implementation mode
Embodiment 1:
Such as Fig. 1-3, the present embodiment provides a kind of rock soil anchor monitoring reinforcing rib meter, including reinforcing rib meter main body 1 and cable 2, Protection pipe 3 is cased with outside reinforcing rib meter main body 1, length is equal to reinforcing rib meter length, and the tubing such as pvc pipe can be used, and cable 2 passes through protection pipe 3 connect with reinforcing rib meter main body 1, and cable 2 is provided with the Acetabula device 4 of tail portion opening, Acetabula device with 1 junction of reinforcing rib meter main body 4 are filled with AB glue 6 with the contact position of cable 2 and reinforcing rib meter main body 1.Bubble is filled between protection pipe 3 and reinforcing rib meter main body 1 Glue 5 is provided with AB glue 6 at 1 both ends of reinforcing rib meter main body and 3 contact position of protection pipe, fills thickness 0.5cm-1.0cm, not only ensure Being connected and fixed between reinforcing rib meter protection pipe 3 and reinforcing rib meter, also prevents slip casting internal water and enters reinforcing rib meter cable 2 and steel Potential abrasion of the rockbolt installation in the process to reinforcing rib meter cable 2 has also been reduced or remitted in the in-built joint of muscle meter.
2 housing of cable has cable protective sleeve 7, can be used silicone tube, cable can the fine motion in cable protective sleeve 7, reduce To the potential tension deformation of reinforcing rib meter cable.
It is provided with butter layer 8 between cable protective sleeve 7 and cable 2, plays lubrication and corrosion-resistant.
It is provided with band 9 outside cable protective sleeve 7, is bound along 7 overall length interval 0.5m-1.0m of cable protective sleeve bands 9 It is solid, avoid contact caused by cable fine motion from loosening.
When work, reinforcing rib meter is connected on the anchor pole reinforcing bar of preprepared certain length, sucker passes through reinforcing rib meter Cable 2 is contacted to Acetabula device stub end with reinforcing rib meter surface, and butter layer, cable protection is arranged along 2 overall length of reinforcing rib meter cable It covers 7 overall lengths to be inserted into Acetabula device osculum end across reinforcing rib meter cable 2 to 3 one end of Cable protecting tube, filling is smeared in sucker AB glue is to bond Cable protecting tube and sucker and sucker and reinforcing rib meter, after AB glue solidification, reinforcing rib meter cable and cable protection Pipe, which stretches, is close to the placement of anchor pole reinforcing bar, solid with band binding along Cable protecting tube overall length interval 0.5m-1.0m, in reinforcing rib meter Periphery puts on reinforcing rib meter protection pipe, first the filling thickness 0.5cm- in the gap that reinforcing rib meter protection pipe one end and reinforcing rib meter are formed The AB glue of 1.0cm, after AB glue solidification, then to filling bubble glue inside reinforcing rib meter protection pipe, then it is another to reinforcing rib meter protection pipe The AB glue of filling thickness 0.5cm-1.0cm in the gap that one end is formed with reinforcing rib meter, reaches its maximum intensity after AB glue solidification Value, you can carry out the drilling installment work of subsequent whole device!In the Rock And Soil (tunnel, side slope, foundation pit) drilling (pile foundation and The inside concretes reinforcing rib meter such as basis or exposed reinforcing rib meter outside can save this process), tripping in is above-mentioned through protecting processing Be in series with the anchor pole reinforcing bar of reinforcing rib meter, reinforcing rib meter cable and Cable protecting tube (can access corresponding steel in drilling orifice extraction Muscle meter monitoring data collecting device), slip casting in the borehole waits for that injecting cement paste intensity is met the requirements, and makes branch of the anchor pole at drill mouth Structure, pedestal, bearing plate and anchorage etc. are kept off, installment work terminates.

Claims (7)

1. a kind of rock soil anchor monitoring reinforcing rib meter, including reinforcing rib meter main body (1) and cable (2), which is characterized in that the reinforcing bar It is cased with protection pipe (3) outside meter main body (1), cable (2) is connect across protection pipe (3) with reinforcing rib meter main body (1), cable (2) and steel Muscle meter main body (1) junction is provided with Acetabula device (4).
2. rock soil anchor monitoring reinforcing rib meter as described in claim 1, which is characterized in that in protection pipe (3) and reinforcing rib meter main body (1) it is filled with bubble glue (5) between, reinforcing rib meter main body (1) both ends and protection pipe (3) contact position are provided with AB glue (6).
3. rock soil anchor monitoring reinforcing rib meter as described in claim 1, which is characterized in that AB glue thickness is 0.5cm-1.0cm.
4. rock soil anchor monitoring reinforcing rib meter as described in claim 1, which is characterized in that cable (2) housing has cable protective sleeve (7)。
5. rock soil anchor monitoring reinforcing rib meter as described in claim 1, which is characterized in that Acetabula device (4) and cable (2) and steel The contact position of muscle meter main body (1) is filled with AB glue (6).
6. rock soil anchor monitoring reinforcing rib meter as claimed in claim 4, which is characterized in that cable protective sleeve (7) and cable (2) it Between be provided with butter layer (8).
7. rock soil anchor monitoring reinforcing rib meter as claimed in claim 4, which is characterized in that be provided with bundle outside cable protective sleeve (7) Band (9).
CN201721579552.8U 2017-11-23 2017-11-23 A kind of rock soil anchor monitoring reinforcing rib meter Active CN207714392U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721579552.8U CN207714392U (en) 2017-11-23 2017-11-23 A kind of rock soil anchor monitoring reinforcing rib meter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721579552.8U CN207714392U (en) 2017-11-23 2017-11-23 A kind of rock soil anchor monitoring reinforcing rib meter

Publications (1)

Publication Number Publication Date
CN207714392U true CN207714392U (en) 2018-08-10

Family

ID=63061986

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721579552.8U Active CN207714392U (en) 2017-11-23 2017-11-23 A kind of rock soil anchor monitoring reinforcing rib meter

Country Status (1)

Country Link
CN (1) CN207714392U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764944A (en) * 2020-06-12 2020-10-13 中国水利水电科学研究院 Three-dimensional reinforcing bar meter suitable for monitoring stress of fracture hard rock support anchor rod (reinforcing bar)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111764944A (en) * 2020-06-12 2020-10-13 中国水利水电科学研究院 Three-dimensional reinforcing bar meter suitable for monitoring stress of fracture hard rock support anchor rod (reinforcing bar)
CN113931671A (en) * 2020-06-12 2022-01-14 中国水利水电科学研究院 Three-dimensional reinforcing bar meter suitable for monitoring stress of fracture hard rock support anchor rod (reinforcing bar)

Similar Documents

Publication Publication Date Title
CN201770981U (en) Tube-side injection grouting apparatus for simultaneous drilling pipe pile
CN103953025A (en) Equipment for measuring layered settlement of deep soft soil or blanket and setup method thereof
CN203479283U (en) Single point displacement meter used for measuring stope roof strata displacement
WO2015103862A1 (en) Method for supporting by means of full-length pre-stressed anchorage with paste material being first poured and last anchored
CN106595548A (en) Displacement measuring method for the inner part of enclosing rock for tunnel inner face
KR100955469B1 (en) Guid Apparatus for Soil Nail of reinforcing a slope
CN204827501U (en) High precision fiber optic grating cavity of excelling in dynamometry stock
CN107178100A (en) A kind of soft soil foundation basement anti-floating system and its construction technology
CN212723393U (en) Installation and recovery device for microseism sensor in tunnel
CN207714392U (en) A kind of rock soil anchor monitoring reinforcing rib meter
CN103115721A (en) Embedding device and mounting method for shield segment outside osmometer
CN107246007A (en) A kind of construction method CFG
CN109056722A (en) A kind of overall length anti-corrosion has binding type prestress anchorage cable
CN201650323U (en) Grouting anchor rope
CN104897321B (en) Wall shearing stress method of testing in a kind of pre-formed members concrete tubular pile pile body
CN106838463A (en) The fastener inserts and usage of longitudinal integral rigidity after raising rectangular top plumber
CN102183230B (en) An anchoring device of a datum mark in a boring
CN101173515B (en) Steel pipe pile foundation built by planting steel stick and building method thereof
CN109029338B (en) Embedded concrete strain measurement device and construction method thereof
CN205246081U (en) Hidden stainless steel settlement observation point marks piece
CN207109805U (en) Wear the compound isolation pile of bridge pier in a kind of tunnel side
CN201148615Y (en) Steel tube pile foundation built by inseminate steel bar
CN108487217A (en) A kind of vibrating-wire pressure cell fixing device
CN214794180U (en) Simple device for measuring underwater anchor bar bearing capacity
CN100565225C (en) A kind of with a single hole or the long method of contrast resistivity method measurement stake

Legal Events

Date Code Title Description
GR01 Patent grant