CN207714392U - A kind of rock soil anchor monitoring reinforcing rib meter - Google Patents
A kind of rock soil anchor monitoring reinforcing rib meter Download PDFInfo
- Publication number
- CN207714392U CN207714392U CN201721579552.8U CN201721579552U CN207714392U CN 207714392 U CN207714392 U CN 207714392U CN 201721579552 U CN201721579552 U CN 201721579552U CN 207714392 U CN207714392 U CN 207714392U
- Authority
- CN
- China
- Prior art keywords
- reinforcing rib
- rib meter
- cable
- main body
- meter
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Piles And Underground Anchors (AREA)
- Pit Excavations, Shoring, Fill Or Stabilisation Of Slopes (AREA)
Abstract
The utility model discloses a kind of rock soil anchor monitoring reinforcing rib meters; including reinforcing rib meter main body and cable; it is cased with protection pipe outside reinforcing rib meter main body; cable is connect across protection pipe with reinforcing rib meter main body; cable is provided with Acetabula device with reinforcing rib meter main body junction, and bubble glue is filled between protection pipe and reinforcing rib meter main body.The reinforcing rib meter of the utility model; not only it is avoided that injecting cement paste moisture to reinforcing rib meter internal structure potential for adverse effects; also it substantially increases during rockbolt installation to the protection of reinforcing rib meter cable and during rockbolt stress to the potential protection of reinforcing rib meter cable; tunnel, side slope or landslide anchor pole monitoring reinforcing rib meter survival rate can be greatly improved, it is ensured that durability, accuracy and the validity of reinforcing rib meter engineering monitoring.Meanwhile the reinforcing rib meter of the utility model, cheap, simple and practicable, economy is strong.
Description
Technical field
The utility model belongs to geotechnical engineering monitoring technical field, is related to a kind of rock soil anchor monitoring reinforcing rib meter.
Background technology
Reinforcing rib meter is a kind of sensor measuring reinforcing bar and metal bar axially loaded, and can measure prison simultaneously as needed
The temperature value of measuring point is widely used in civil engineering, hydraulic and hydroelectric engineering and other engineering fields all the time.It is answering
When reinforcing the stress of anchor pole reinforcing bar with reinforcing rib meter monitoring works, reinforcing rib meter is first connected on anchor pole reinforcing bar, then again with anchor
Bar reinforcing bar is placed into side slope or landslide drilling, finally injects cement mortar into drilling again.Practice have shown that reinforcing rib meter monitors work
Journey anchor pole reinforcing steel bar bear, survival rate is undesirable, even zero when the collapse hole that drills (such as side slope or landslide rock mass are broken).Study carefully it
Reason, first, reinforcing rib meter with anchor pole reinforcing bar during being placed into drilling, reinforcing rib meter accesses the bending that cable is connect with it
Position is easy and borehole wall friction, leads to cable cuticular breakdown and induces the short circuit of cable inner core or open circuit;Second, anchor pole
The priming charge cement mortar water content that drills is high, is easy to cause moisture to infiltrating inside reinforcing rib meter, is unfavorable for its normal work;Its
Three, with the raising for pouring into strength of cement mortar, the exhibition that do not turn off in tunnel, side slope or Landslide Deformation causes anchor pole reinforcing steel bar bear
And it is axial to be easy to cause reinforcing rib meter cable since cement mortar tightly bonds reinforcing rib meter cable for the growth of cement mortar deformation
Stretching, and then induce the crack of cable epidermis split, be unfavorable for the long-term normal work of cable.But have not yet to see ground work
The journey monitoring device of high-survival rate reinforcing rib meter, this is problem urgently to be resolved hurrily!
Invention content
The shortcomings that the purpose of the utility model is to overcome the prior arts provides a kind of rock soil anchor monitoring reinforcing bar
Meter solves the problems, such as that existing ground monitoring reinforcing rib meter survival rate is low.
The utility model uses following technical scheme:
A kind of rock soil anchor monitoring reinforcing rib meter, including reinforcing rib meter main body and cable, the reinforcing rib meter main body are cased with guarantor outside
Pillar, cable are connect across protection pipe with reinforcing rib meter main body, and cable is provided with Acetabula device with reinforcing rib meter main body junction, is protecting
Bubble glue is filled between pillar and reinforcing rib meter main body.
Especially, reinforcing rib meter main body both ends and protection pipe contact position are provided with AB glue.
Special cable housing has cable protective sleeve.
In addition, being provided with butter layer between cable protective sleeve and cable
Preferably, Acetabula device is filled with AB glue with the contact position of cable and reinforcing rib meter main body.
Preferably, it is provided with band outside cable protective sleeve.
Compared with prior art, the utility model has the following technical effects:
The reinforcing rib meter of the utility model, is not only avoided that injecting cement paste moisture to reinforcing rib meter internal structure potential for adverse effects,
Also it substantially increases during rockbolt installation to the protection of reinforcing rib meter cable and during rockbolt stress to reinforcing rib meter cable
Tunnel, side slope or landslide anchor pole monitoring reinforcing rib meter survival rate can be greatly improved, it is ensured that reinforcing rib meter engineering monitoring in potential protection
Durability, accuracy and validity.Meanwhile the reinforcing rib meter of the utility model, cheap, simple and practicable, economy is strong, mesh
It is preceding side slope, tunnel, foundation pit or landslide anchor pole monitoring etc. geotechnical engineerings field practice principle it is good.
Description of the drawings
Fig. 1 is the utility model reinforcing rib meter diagrammatic cross-section.
Fig. 2 is the utility model Acetabula device and Cable protecting tube schematic diagram.
Fig. 3 is anchor pole and reinforcing rib meter scheme of installation.
Wherein:1 it is reinforcing rib meter main body, 2 be cable, 3 be protection pipe, 4 be Acetabula device, 5 be bubble glue, 6 is AB glue, 7
It is butter layer for cable protective sleeve, 8,9 be band, 10 be reinforcing bar, 11 is Rock And Soil.
The utility model is described in further details below in conjunction with the accompanying drawings.
Specific implementation mode
Embodiment 1:
Such as Fig. 1-3, the present embodiment provides a kind of rock soil anchor monitoring reinforcing rib meter, including reinforcing rib meter main body 1 and cable 2,
Protection pipe 3 is cased with outside reinforcing rib meter main body 1, length is equal to reinforcing rib meter length, and the tubing such as pvc pipe can be used, and cable 2 passes through protection pipe
3 connect with reinforcing rib meter main body 1, and cable 2 is provided with the Acetabula device 4 of tail portion opening, Acetabula device with 1 junction of reinforcing rib meter main body
4 are filled with AB glue 6 with the contact position of cable 2 and reinforcing rib meter main body 1.Bubble is filled between protection pipe 3 and reinforcing rib meter main body 1
Glue 5 is provided with AB glue 6 at 1 both ends of reinforcing rib meter main body and 3 contact position of protection pipe, fills thickness 0.5cm-1.0cm, not only ensure
Being connected and fixed between reinforcing rib meter protection pipe 3 and reinforcing rib meter, also prevents slip casting internal water and enters reinforcing rib meter cable 2 and steel
Potential abrasion of the rockbolt installation in the process to reinforcing rib meter cable 2 has also been reduced or remitted in the in-built joint of muscle meter.
2 housing of cable has cable protective sleeve 7, can be used silicone tube, cable can the fine motion in cable protective sleeve 7, reduce
To the potential tension deformation of reinforcing rib meter cable.
It is provided with butter layer 8 between cable protective sleeve 7 and cable 2, plays lubrication and corrosion-resistant.
It is provided with band 9 outside cable protective sleeve 7, is bound along 7 overall length interval 0.5m-1.0m of cable protective sleeve bands 9
It is solid, avoid contact caused by cable fine motion from loosening.
When work, reinforcing rib meter is connected on the anchor pole reinforcing bar of preprepared certain length, sucker passes through reinforcing rib meter
Cable 2 is contacted to Acetabula device stub end with reinforcing rib meter surface, and butter layer, cable protection is arranged along 2 overall length of reinforcing rib meter cable
It covers 7 overall lengths to be inserted into Acetabula device osculum end across reinforcing rib meter cable 2 to 3 one end of Cable protecting tube, filling is smeared in sucker
AB glue is to bond Cable protecting tube and sucker and sucker and reinforcing rib meter, after AB glue solidification, reinforcing rib meter cable and cable protection
Pipe, which stretches, is close to the placement of anchor pole reinforcing bar, solid with band binding along Cable protecting tube overall length interval 0.5m-1.0m, in reinforcing rib meter
Periphery puts on reinforcing rib meter protection pipe, first the filling thickness 0.5cm- in the gap that reinforcing rib meter protection pipe one end and reinforcing rib meter are formed
The AB glue of 1.0cm, after AB glue solidification, then to filling bubble glue inside reinforcing rib meter protection pipe, then it is another to reinforcing rib meter protection pipe
The AB glue of filling thickness 0.5cm-1.0cm in the gap that one end is formed with reinforcing rib meter, reaches its maximum intensity after AB glue solidification
Value, you can carry out the drilling installment work of subsequent whole device!In the Rock And Soil (tunnel, side slope, foundation pit) drilling (pile foundation and
The inside concretes reinforcing rib meter such as basis or exposed reinforcing rib meter outside can save this process), tripping in is above-mentioned through protecting processing
Be in series with the anchor pole reinforcing bar of reinforcing rib meter, reinforcing rib meter cable and Cable protecting tube (can access corresponding steel in drilling orifice extraction
Muscle meter monitoring data collecting device), slip casting in the borehole waits for that injecting cement paste intensity is met the requirements, and makes branch of the anchor pole at drill mouth
Structure, pedestal, bearing plate and anchorage etc. are kept off, installment work terminates.
Claims (7)
1. a kind of rock soil anchor monitoring reinforcing rib meter, including reinforcing rib meter main body (1) and cable (2), which is characterized in that the reinforcing bar
It is cased with protection pipe (3) outside meter main body (1), cable (2) is connect across protection pipe (3) with reinforcing rib meter main body (1), cable (2) and steel
Muscle meter main body (1) junction is provided with Acetabula device (4).
2. rock soil anchor monitoring reinforcing rib meter as described in claim 1, which is characterized in that in protection pipe (3) and reinforcing rib meter main body
(1) it is filled with bubble glue (5) between, reinforcing rib meter main body (1) both ends and protection pipe (3) contact position are provided with AB glue (6).
3. rock soil anchor monitoring reinforcing rib meter as described in claim 1, which is characterized in that AB glue thickness is 0.5cm-1.0cm.
4. rock soil anchor monitoring reinforcing rib meter as described in claim 1, which is characterized in that cable (2) housing has cable protective sleeve
(7)。
5. rock soil anchor monitoring reinforcing rib meter as described in claim 1, which is characterized in that Acetabula device (4) and cable (2) and steel
The contact position of muscle meter main body (1) is filled with AB glue (6).
6. rock soil anchor monitoring reinforcing rib meter as claimed in claim 4, which is characterized in that cable protective sleeve (7) and cable (2) it
Between be provided with butter layer (8).
7. rock soil anchor monitoring reinforcing rib meter as claimed in claim 4, which is characterized in that be provided with bundle outside cable protective sleeve (7)
Band (9).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721579552.8U CN207714392U (en) | 2017-11-23 | 2017-11-23 | A kind of rock soil anchor monitoring reinforcing rib meter |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721579552.8U CN207714392U (en) | 2017-11-23 | 2017-11-23 | A kind of rock soil anchor monitoring reinforcing rib meter |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207714392U true CN207714392U (en) | 2018-08-10 |
Family
ID=63061986
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721579552.8U Active CN207714392U (en) | 2017-11-23 | 2017-11-23 | A kind of rock soil anchor monitoring reinforcing rib meter |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207714392U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764944A (en) * | 2020-06-12 | 2020-10-13 | 中国水利水电科学研究院 | Three-dimensional reinforcing bar meter suitable for monitoring stress of fracture hard rock support anchor rod (reinforcing bar) |
-
2017
- 2017-11-23 CN CN201721579552.8U patent/CN207714392U/en active Active
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111764944A (en) * | 2020-06-12 | 2020-10-13 | 中国水利水电科学研究院 | Three-dimensional reinforcing bar meter suitable for monitoring stress of fracture hard rock support anchor rod (reinforcing bar) |
CN113931671A (en) * | 2020-06-12 | 2022-01-14 | 中国水利水电科学研究院 | Three-dimensional reinforcing bar meter suitable for monitoring stress of fracture hard rock support anchor rod (reinforcing bar) |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201770981U (en) | Tube-side injection grouting apparatus for simultaneous drilling pipe pile | |
CN103953025A (en) | Equipment for measuring layered settlement of deep soft soil or blanket and setup method thereof | |
CN203479283U (en) | Single point displacement meter used for measuring stope roof strata displacement | |
WO2015103862A1 (en) | Method for supporting by means of full-length pre-stressed anchorage with paste material being first poured and last anchored | |
CN106595548A (en) | Displacement measuring method for the inner part of enclosing rock for tunnel inner face | |
KR100955469B1 (en) | Guid Apparatus for Soil Nail of reinforcing a slope | |
CN204827501U (en) | High precision fiber optic grating cavity of excelling in dynamometry stock | |
CN107178100A (en) | A kind of soft soil foundation basement anti-floating system and its construction technology | |
CN212723393U (en) | Installation and recovery device for microseism sensor in tunnel | |
CN207714392U (en) | A kind of rock soil anchor monitoring reinforcing rib meter | |
CN103115721A (en) | Embedding device and mounting method for shield segment outside osmometer | |
CN107246007A (en) | A kind of construction method CFG | |
CN109056722A (en) | A kind of overall length anti-corrosion has binding type prestress anchorage cable | |
CN201650323U (en) | Grouting anchor rope | |
CN104897321B (en) | Wall shearing stress method of testing in a kind of pre-formed members concrete tubular pile pile body | |
CN106838463A (en) | The fastener inserts and usage of longitudinal integral rigidity after raising rectangular top plumber | |
CN102183230B (en) | An anchoring device of a datum mark in a boring | |
CN101173515B (en) | Steel pipe pile foundation built by planting steel stick and building method thereof | |
CN109029338B (en) | Embedded concrete strain measurement device and construction method thereof | |
CN205246081U (en) | Hidden stainless steel settlement observation point marks piece | |
CN207109805U (en) | Wear the compound isolation pile of bridge pier in a kind of tunnel side | |
CN201148615Y (en) | Steel tube pile foundation built by inseminate steel bar | |
CN108487217A (en) | A kind of vibrating-wire pressure cell fixing device | |
CN214794180U (en) | Simple device for measuring underwater anchor bar bearing capacity | |
CN100565225C (en) | A kind of with a single hole or the long method of contrast resistivity method measurement stake |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |