CN207686272U - Cylindrical concrete, which pours, uses aluminum alloy pattern plate - Google Patents

Cylindrical concrete, which pours, uses aluminum alloy pattern plate Download PDF

Info

Publication number
CN207686272U
CN207686272U CN201721764651.3U CN201721764651U CN207686272U CN 207686272 U CN207686272 U CN 207686272U CN 201721764651 U CN201721764651 U CN 201721764651U CN 207686272 U CN207686272 U CN 207686272U
Authority
CN
China
Prior art keywords
aluminium alloy
alloy panel
connection board
connecting tubes
panel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721764651.3U
Other languages
Chinese (zh)
Inventor
周明军
周成军
杨振伟
李建华
邵文通
李杨
张龙龙
陈永利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan Xiangzhong Technology Co ltd
Original Assignee
Henan Ding Aluminum Environmental Protection Building Materials Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan Ding Aluminum Environmental Protection Building Materials Co Ltd filed Critical Henan Ding Aluminum Environmental Protection Building Materials Co Ltd
Priority to CN201721764651.3U priority Critical patent/CN207686272U/en
Application granted granted Critical
Publication of CN207686272U publication Critical patent/CN207686272U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
  • On-Site Construction Work That Accompanies The Preparation And Application Of Concrete (AREA)

Abstract

Cylindrical concrete is poured with aluminum alloy pattern plate, including aluminium alloy panel, the cross section of aluminium alloy panel is semicircle, semicircular bulge loop is fixed on the top surface of aluminium alloy panel, the thickness of bulge loop is less than the thickness of aluminium alloy panel, the inner wall of bulge loop is flushed with the inner wall of aluminium alloy panel, and semi-circular recesses compatible with bulge loop size are offered on the bottom surface of aluminium alloy panel;The top surface periphery of aluminium alloy panel is equipped with semicircular upper ring plate, and the upper surface of upper ring plate is flushed with the top surface of aluminium alloy panel, and the bottom surface periphery of aluminium alloy panel is equipped with semicircular lower ring plate;In conclusion the utility model is simple in structure, when pour cylinder concrete, used parts are few, and installation is convenient, reduces the labor intensity of worker.

Description

Cylindrical concrete, which pours, uses aluminum alloy pattern plate
Technical field
The utility model belongs to technical field of building construction, and in particular to a kind of cylindrical concrete, which pours, uses aluminum alloy pattern plate.
Background technology
With the increase of population, housing is also continuously increased therewith, and building trade is caused to flourish.In construction Use plank sheathing substantially in the process, plank sheathing is composite made of the timber and glue bond intersected in length and breadth with multilayer, and the whole nation is every The timber of about 4600 ten thousand steres or so need to be consumed year, plank sheathing not only contains a large amount of harmful substance but also using several times After become building waste, become a prodigious environmental issue.
The use of aluminum alloy pattern plate significantly reduces the use cost of template, and environmentally protective aluminum alloy mould plate is because with weight The features such as amount is light, rigidity is high, stability is strong, service life is long, construction efficiency is high and advantage, have become template market new lover, Aluminum alloy pattern plate use ratio is just in cumulative year after year;But existing aluminum alloy pattern plate can use during installation and arrive a large amount of zero Accessory(Such as bolt), a large amount of spare and accessory parts can often be lost in use, and the work of the construction and installation of spare and accessory parts Measure bigger, hand labor intensity is big.
Utility model content
The utility model in order to solve shortcoming in the prior art, provide it is a kind of it is simple in structure, few using spare and accessory parts, Cylindrical concrete easy to assembly, which pours, uses aluminum alloy pattern plate.
In order to solve the above technical problems, the utility model adopts the following technical solution:Cylindrical concrete, which pours, uses aluminum dipping form The cross section of plate, including aluminium alloy panel, aluminium alloy panel is semicircle, is fixed on the top surface of aluminium alloy panel semicircular Bulge loop, the thickness of bulge loop are less than the thickness of aluminium alloy panel, and the inner wall of bulge loop is flushed with the inner wall of aluminium alloy panel, aluminium alloy face Semi-circular recesses compatible with bulge loop size are offered on the bottom surface of plate;The top surface periphery of aluminium alloy panel is equipped with semicircular Upper ring plate, the upper surface of upper ring plate are flushed with the top surface of aluminium alloy panel, and the bottom surface periphery of aluminium alloy panel is equipped with semicircular Lower ring plate, the lower surface of lower ring plate are flushed with the bottom surface of aluminium alloy panel;
Several left connecting tubes, axial direction of several left connecting tubes along aluminium alloy panel are fixed on the left of aluminium alloy panel Spacing side by side is arranged, and the center line of all left connecting tubes overlaps, and left installation is formed between neighbouring two left connecting tubes Space, is fixed with several right connecting tubes on the right side of aluminium alloy panel, several right connecting tubes along aluminium alloy panel axial direction simultaneously The center line of the setting of row interval, all right connecting tubes overlaps, and it is empty that right installation is formed between neighbouring two right connecting tubes Between, left installation space is arranged in a one-to-one correspondence with right connecting tube, and right installation space is arranged in a one-to-one correspondence with left connecting tube.
The left side edge of aluminium alloy panel is fixed with left connection board, and the right side of left connection board and aluminium alloy panel inner wall are neat Flat, the right edge of aluminium alloy panel is fixed with right connection board, and right connection board right side is flushed with aluminium alloy panel outer wall, right company The distance that the inner wall of aluminium alloy panel is radially arrived on the left of fishplate bar is equal to the thickness of left connection board radially, right connection Length is equal to left connection board length in the circumferential direction to plate in the circumferential direction.
The outer surface of aluminium alloy panel is equipped with the cross reinforcing of longitudinally arranged vertical strengthening ribs and lateral arrangement.
Using above-mentioned technical proposal, the utility model has the advantages that:When progress cylindrical concrete pours, It is spliced into cylindrical shape with the utility model construction first, specifically in construction, two devices are linked together, two of which Device is opposite to be connected, i.e., the left side of the aluminium alloy panel of first device is connected with the right side of the aluminium alloy panel of second device It connects, in connection, the right connection of the left connection board of the aluminium alloy panel of first device and the aluminium alloy panel of second device Plate fits, the left connecting tube of the aluminium alloy panel of first device and the right connecting tube of the aluminium alloy panel of second device Center line overlaps, and then sequentially passes through left connecting tube and right connecting tube from top to bottom using steel pole, you can connects two devices Together, remaining device then is installed in the top of two devices, wherein the lower ring plate for the device being located above with below The upper ring plate of device be bolted.
In conclusion the utility model is simple in structure, when pour cylinder concrete, used parts are few, peace It fills easy for construction, reduces the labor intensity of worker.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the vertical view of Fig. 1;
Fig. 3 is the usage state diagram of the utility model;
Fig. 4 is the vertical view of Fig. 3.
Specific implementation mode
As shown in Figs 1-4, the cylindrical concrete of the utility model is poured with aluminum alloy pattern plate, including aluminium alloy panel 1, aluminium conjunction The cross section of golden panel 1 is semicircle, is fixed with semicircular bulge loop 2 on the top surface of aluminium alloy panel 1, the thickness of bulge loop 2 is small It flushes with the inner wall of aluminium alloy panel 1 in the inner wall of the thickness of aluminium alloy panel 1, bulge loop 2, is opened on the bottom surface of aluminium alloy panel 1 Equipped with semi-circular recesses compatible with 2 size of bulge loop 3;The top surface periphery of aluminium alloy panel 1 is equipped with semicircular upper ring plate 4, The upper surface of upper ring plate 4 is flushed with the top surface of aluminium alloy panel 1, and the bottom surface periphery of aluminium alloy panel 1 is equipped with semicircular lower ring The lower surface of plate 5, lower ring plate 5 is flushed with the bottom surface of aluminium alloy panel 1;
The left side of aluminium alloy panel 1 is fixed with several left connecting tubes 6, axial direction of several left connecting tubes 6 along aluminium alloy panel 1 Direction spacing side by side setting, the center line of all left connecting tubes 6 are overlapped, are formed between neighbouring two left connecting tubes 6 The right side of left installation space, aluminium alloy panel 1 is fixed with several right connecting tubes 12, and several right connecting tubes 12 are along aluminium alloy panel 1 The setting of axial direction spacing side by side, the center lines of all right connecting tubes 12 overlaps, neighbouring two right connecting tubes 12 Between form right installation space, left installation space is arranged in a one-to-one correspondence with right connecting tube 12, right installation space and left connecting tube 6 one One is correspondingly arranged.
The left side edge of aluminium alloy panel 1 is fixed with left connection board 7, the right side of left connection board 7 in aluminium alloy panel 1 Wall flushes, and the right edge of aluminium alloy panel 1 is fixed with right connection board 8,8 left side of right connection board and 1 outer wall of aluminium alloy panel It flushes, the distance of the inner wall on the left of right connection board 8 along the radial direction of aluminium alloy panel 1 to aluminium alloy panel 1 is equal to left connection Plate 7 is along the thickness of the radial direction of aluminium alloy panel 1, and length is equal to left connection board 7 circumferentially to right connection board 8 in the circumferential direction The length in direction.
The outer surface of aluminium alloy panel 1 is equipped with the cross reinforcing 10 of longitudinally arranged vertical strengthening ribs 9 and lateral arrangement.
As shown in Figure 3 and Figure 4 when progress cylindrical concrete pours, cylinder is spliced into the utility model construction first Shape links together two devices specifically in construction, and two of which device is opposite to be connected, i.e., the aluminium of first device The left side of alloy panel 1 is connected with the right side of the aluminium alloy panel 1 of second device, in connection, the aluminium of first device The left connection board 7 of alloy panel 1 and the right connection board 8 of the aluminium alloy panel 1 of second device fit, the aluminium of first device The left connecting tube 6 of alloy panel 1 is overlapped with the center line of the right connecting tube 12 of the aluminium alloy panel 1 of second device, is then adopted Sequentially pass through left connecting tube 6 and right connecting tube 12 from top to bottom with steel pole, you can two devices link together, then two Remaining device is installed in the top of a device, wherein the upper ring plate 4 of the lower ring plate 5 for the device being located above and device below It is connected by bolt 11.
The present embodiment not makes any form of restriction the shape of the utility model, material, structure etc., every foundation The technical essence of the utility model belongs to this reality to any simple modification, equivalent change and modification made by above example With the protection domain of new technique scheme.

Claims (3)

1. cylindrical concrete is poured with aluminum alloy pattern plate, it is characterised in that:Including aluminium alloy panel, the cross section of aluminium alloy panel is Semicircle is fixed with semicircular bulge loop on the top surface of aluminium alloy panel, and the thickness of bulge loop is less than the thickness of aluminium alloy panel, convex The inner wall of ring is flushed with the inner wall of aluminium alloy panel, and semicircle compatible with bulge loop size is offered on the bottom surface of aluminium alloy panel Connected in star;The top surface periphery of aluminium alloy panel is equipped with semicircular upper ring plate, the upper surface of upper ring plate and the top of aluminium alloy panel Face flushes, and the bottom surface periphery of aluminium alloy panel is equipped with semicircular lower ring plate, the lower surface of lower ring plate and the bottom of aluminium alloy panel Face flushes;
Be fixed with several left connecting tubes on the left of aluminium alloy panel, several left connecting tubes along aluminium alloy panel axial direction side by side The center line of interval setting, all left connecting tubes overlaps, and left installation space is formed between neighbouring two left connecting tubes, Several right connecting tubes, axial direction spacing side by side of several right connecting tubes along aluminium alloy panel are fixed on the right side of aluminium alloy panel The center line of setting, all right connecting tubes overlaps, and right installation space, Zuo An are formed between neighbouring two right connecting tubes Dress space is arranged in a one-to-one correspondence with right connecting tube, and right installation space is arranged in a one-to-one correspondence with left connecting tube.
2. cylindrical concrete according to claim 1 is poured with aluminum alloy pattern plate, it is characterised in that:The left side of aluminium alloy panel Edge is fixed with left connection board, and the right side of left connection board is flushed with aluminium alloy panel inner wall, the right edge of aluminium alloy panel It is fixed with right connection board, right connection board right side is flushed with aluminium alloy panel outer wall, and aluminium is radially arrived on the left of right connection board The distance of the inner wall of alloy panel is equal to the thickness of left connection board radially, and length is equal to right connection board in the circumferential direction Left connection board length in the circumferential direction.
3. cylindrical concrete according to claim 1 is poured with aluminum alloy pattern plate, it is characterised in that:The appearance of aluminium alloy panel Face is equipped with the cross reinforcing of longitudinally arranged vertical strengthening ribs and lateral arrangement.
CN201721764651.3U 2017-12-18 2017-12-18 Cylindrical concrete, which pours, uses aluminum alloy pattern plate Expired - Fee Related CN207686272U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721764651.3U CN207686272U (en) 2017-12-18 2017-12-18 Cylindrical concrete, which pours, uses aluminum alloy pattern plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721764651.3U CN207686272U (en) 2017-12-18 2017-12-18 Cylindrical concrete, which pours, uses aluminum alloy pattern plate

Publications (1)

Publication Number Publication Date
CN207686272U true CN207686272U (en) 2018-08-03

Family

ID=62997661

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721764651.3U Expired - Fee Related CN207686272U (en) 2017-12-18 2017-12-18 Cylindrical concrete, which pours, uses aluminum alloy pattern plate

Country Status (1)

Country Link
CN (1) CN207686272U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585720A (en) * 2021-08-20 2021-11-02 佛山旭达建材科技有限公司 Aluminum alloy building templates that can assemble fast

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113585720A (en) * 2021-08-20 2021-11-02 佛山旭达建材科技有限公司 Aluminum alloy building templates that can assemble fast

Similar Documents

Publication Publication Date Title
CN104746422B (en) A kind of hollow pier stud delay-pour joint structure of bridge prefabrication and construction method
CN103243817B (en) A kind of assembled beam-column attachment means
CN202831233U (en) Connected node of protracting inner diaphragm steel girder and concrete-filled steel-tubular columns inscribed a pipe coat
CN203613792U (en) Parapet wall formwork pouring structure
CN106438212A (en) Bent and spliced type bucket-shaped tower barrel
CN205777482U (en) A kind of back cord formula aluminum alloy mould plate
CN104405165B (en) The assembled mixing station storage bin partition wall of a kind of repeatable utilization and construction method thereof
CN105155836B (en) Aluminum alloy mould plate for building and its using method
CN207686272U (en) Cylindrical concrete, which pours, uses aluminum alloy pattern plate
CN208934422U (en) A kind of pump concrete pump line support device with bumper and absorbing shock function
CN211229458U (en) A operation platform for cylinder mound concrete placement construction
CN206616765U (en) Large span is without depending on huge bandy truss pull bar
CN104405042A (en) Steel stand column beam
CN206070875U (en) SC component steel structure concrete prefabricated columns
CN203393721U (en) Inner support main purlin component
CN106149682A (en) A kind of double reinforcement cage structure of poured pile base
CN206308705U (en) A kind of concrete assembled basis
CN202090847U (en) Strengthening riser combination structure
CN201574608U (en) Novel prestress pole connecting disk
CN207004150U (en) A kind of environmentally friendly flag platform easy to assemble that can be reused
CN205369906U (en) Cast -in -place slab band formwork support device
CN205530400U (en) Batter pile test model steel reinforcement cage cushion inclines
CN205476444U (en) Light -duty support post based on low level jacking die carrier system
CN104453045A (en) Separate prefabricated truss frame floor bearing plate and construction method thereof
CN203113817U (en) Stair protective structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP03 Change of name, title or address

Address after: 461300 Industrial Agglomeration Zone, Fugou County, Zhoukou City, Henan Province

Patentee after: Henan Xiangzhong Technology Co.,Ltd.

Address before: 461300 Fugou County Industrial Park, Zhoukou City, Henan Province, No. 6 Factory Building of Fugou County Machinery Industry Park on the West Side of Line S102

Patentee before: HENAN DING ALUMINUM ENVIRONMENTAL PROTECTION BUILDING MATERIAL CO.,LTD.

CP03 Change of name, title or address
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180803

CF01 Termination of patent right due to non-payment of annual fee