CN207685614U - A kind of city illumination system - Google Patents

A kind of city illumination system Download PDF

Info

Publication number
CN207685614U
CN207685614U CN201721737810.0U CN201721737810U CN207685614U CN 207685614 U CN207685614 U CN 207685614U CN 201721737810 U CN201721737810 U CN 201721737810U CN 207685614 U CN207685614 U CN 207685614U
Authority
CN
China
Prior art keywords
wall
pipes
well
bottom end
backfill
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201721737810.0U
Other languages
Chinese (zh)
Inventor
李峰
王建磊
郭传凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zibo City Planning Design & Research Institute
Original Assignee
Zibo City Planning Design & Research Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zibo City Planning Design & Research Institute filed Critical Zibo City Planning Design & Research Institute
Priority to CN201721737810.0U priority Critical patent/CN207685614U/en
Application granted granted Critical
Publication of CN207685614U publication Critical patent/CN207685614U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kind of city illumination systems, including pavement, greenbelt and hand hole well, warning tape is equipped in the pavement and greenbelt bottom end groove, the warning tape bottom end is equipped with fine sand layer, PE is equipped in the fine sand layer to manage, it is equipped with illuminalive power-supply cable in the PE pipes, the greenbelt is made of backfill planting soil layer and plain earthen backfill layering, the backfill planting soil layer bottom end is equipped with plain earthen backfill and is layered, the hand hole well includes well lid, well seat, inner wall and ground, the inner wall upper end is equipped with well seat, the well seat is equipped with well lid, the inner wall bottom end is equipped with ground, cobblestone shop fixtures block is equipped in the ground, the PE pipes are arranged across inner wall in hand hole well.The utility model can effectively solve the contradiction between sidewalk planting and urban road pipeline width of corridor, and enough planting spaces are reserved for shade tree;Amount of demolition and the fund input for reducing road construction, promote the economic benefit of road construction, are conducive to shade tree and grow.

Description

A kind of city illumination system
Technical field
The utility model is related to a kind of lighting system, specifically a kind of city illumination system.
Background technology
Illumination pipelining mode is that light conduits covers PVC-U pipe buried-pipe layings at present, and buried depth is 0.7 meter.Pipeline applies If position is generally in two kinds of situation, the first situation is that shade tree is not afforested in road driveway both sides, illuminates pipeline at this time and buries If position is away from the inside of carriageway kerb 0.5 meter.The second situation, which is road driveway both sides, greening shade tree, in order to The required space of evacuation plantation shade tree, it is away from the inside of carriageway kerb 1.3 meters to illuminate pipeline burial place at this time.When When to illuminate pipelining position be the second situation, at this time road piping width of corridor compared with the first situation when increase 0.8 meter. This also means that the red line range of road will increase by 0.8 meter, when boundary lines of roads space is limited, illuminates the laying position of pipeline It is more apparent with the plantation contradiction of shade tree.Ensure that the plantation of shade tree, illumination pipeline just need to concede enough plantation skies Between.
Utility model content
The purpose of this utility model is to provide a kind of city illumination systems, to solve to propose in above-mentioned background technology The problem of.
To achieve the above object, the utility model provides the following technical solutions:
A kind of city illumination system, including pavement, greenbelt and hand hole well, the pavement and greenbelt bottom end Warning tape is equipped in groove, the pavement bottom end is equipped with 3:7 plaster backfill layer, and the warning tape bottom end is equipped with fine sand layer, institute It states and is equipped with PE pipes in fine sand layer, illuminalive power-supply cable is equipped in the PE pipes, the greenbelt is by backfill planting soil layer and element soil Backfill layering composition, the backfill planting soil layer bottom end are equipped with plain earthen backfill layering, and the hand hole well includes well lid, well seat, interior Wall and ground, the inner wall upper end are equipped with well seat, and the well seat is equipped with well lid, and the inner wall bottom end is equipped with ground, describedly Cobblestone shop fixtures block is equipped in base, the PE pipes are arranged across inner wall in hand hole well, and the PE pipes pass through C20 cement with inner wall Concrete is fixed.
As further program of the utility model:The trench slope coefficient is 1:0.33.
As the utility model further scheme:The PE pipe diameters use 75mm, when crossing driveway, the PE pipes Outer sheath is managed equipped with N-HAP, and the N-HAP pipe diameters are 100mm.
As the utility model further scheme:The backfill planting soil layer thickness is 500mm, the element earthen backfill Compaction in layers compactness >=85%.
As the utility model further scheme:The warning tape depth is 1100mm, and the PE pipes depth is 1200mm。
As the utility model further scheme:The inner wall is by M10 cement mortar and Mu15 gangue solid bricks Composition, the inner wall thickness are 240mm.
As the utility model further scheme:The ground uses C15 cement concretes.
As the utility model further scheme:The hand hole well uses rectangle structure, the hand hole well length It is respectively 800mm and 600mm, depth 1400mm with width.
As the utility model further scheme:The PE pipes tail end is 40mm away from inner wall distance.
Compared with prior art, the utility model has the beneficial effects that:The utility model can effectively solve sidewalk planting With the contradiction between urban road pipeline width of corridor, the laying position on the inside of lighting tube line-spacing carriageway kerb at 0.5 meter, 0.8 meter of road piping width of corridor can be saved;1.2 meters of laying depths of pipeline are illuminated, can be that shade tree reserves enough kinds Plant space;In the project implementing process of part, compression pipeline width of corridor can reduce boundary lines of roads width, and then reduce road The amount of demolition brought and fund input are built, the economic benefit of road construction is promoted, is laid at 0.5 meter on position and increases lighting tube Wire routing depth, it is ensured that the integrality of root tree ball when sidewalk planting is conducive to the late growth of shade tree, limited Equally can be that city increases one brush green in space.
Description of the drawings
Fig. 1 is the structural schematic diagram of city illumination system.
Fig. 2 is the structural schematic diagram of hand hole well in city illumination system.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are without making creative work The every other embodiment obtained, shall fall within the protection scope of the present invention.
Please refer to Fig.1~2, in the utility model embodiment, a kind of city illumination system, including pavement 1, greening Warning tape 3 is equipped in band and hand hole well, the pavement 1 and greenbelt bottom end groove, the trench slope coefficient is 1:0.33, Groove take supporting or meet stone when can reduce slope, also can not slope, 1 bottom end of the pavement be equipped with 3:7 plaster backfill layer 2,3 bottom end of the warning tape is equipped with fine sand layer 6, and PE pipes 4 are equipped in the fine sand layer 6, illuminalive power-supply electricity is equipped in the PE pipes 4 Cable 5,4 diameter of PE pipes use 75mm, and when crossing driveway, 4 outer sheath of PE pipes is managed equipped with N-HAP, and the N-HAP pipes are straight Diameter is 100mm, if hand hole well is arranged in casing both ends, a diameter of 80mmN-HAP pipes of the direct housing of cable, the greenbelt is by backfilling Planting soil layer 7 and plain earthen backfill are layered 8 compositions, and 7 bottom end of backfill planting soil layer is equipped with plain earthen backfill and is layered 8, the backfill 7 thickness of planting soil layer is 500mm, 8 compacting compactness >=85% of element earthen backfill layering, and 3 depth of the warning tape is 1100mm, 4 depth of PE pipes are 1200mm, and the hand hole well includes well lid 9, well seat 10, inner wall 11 and ground 13, it is described in 11 upper end of wall is equipped with well seat 10, and the well seat 10 is equipped with well lid 9, and the inner wall 11 is by M10 cement mortar and Mu15 gangues Solid brick forms, and 11 bottom end of the inner wall is equipped with ground 13, and cobblestone shop fixtures block 12, the PE pipes 4 are equipped in the ground 13 It is arranged in hand hole well across inner wall 11, the hand hole well uses rectangle structure, and 11 thickness of the inner wall is 240mm, described Hand hole well length and width is respectively 800mm and 600mm, depth 1400mm, 4 tail end of PE pipes away from inner wall 11 apart from for 40mm, the PE pipes 4 are fixed with inner wall 11 by C20 cement concretes 14, and the ground 13 uses C15 cement concretes, institute It states 11 inside of inner wall and is all made of 1:2 waterproof mortar finish 1.5cm are thick.
When the utility model is used, when there are greening shade tree in road driveway both sides, illumination pipeline burial place be still away from On the inside of carriageway kerb at 0.5 meter, this laying position can be that the laying of other pipelines saves segment space, more conducively not With the reasonable Arrangement between pipeline, but pipeline buried depth is adjusted to 1.2 meters, this buried depth can avoid the tree of plantation shade tree substantially Ball range neither influences sidewalk planting and is adjusted at 1.2 meters without pipeline gallery, illumination pipeline buried depth is widened, is in this way Illumination casing tubing is changed to PE flezxible couplings, can utilize tubing sheet in this way by the flexibility for further strengthening illumination pipelining The amount of deflection of body suitably avoids the tree ball of shade tree, and the more traditional PVC-U pipes of PE pipes 4 have stronger impact resistance and pipe Body surface face smooth pieces, notch are bright and clean uniformly, preferably as light conduits casing is in the case where there is shade tree and buried depth is 1.2 being used when rice;Illumination pipelining is carried out using this technology, respectively backfills 10cm thickness fine sands up and down in casing, and thin Warning tape 3 is covered on sand, 3 width of warning tape requires more than casing width 10cm, and 3 top of warning tape backfills structure in two kinds of situation, It is normal structure of sidewalk way under the road surface of pavement, under structure of sidewalk first, when illumination pipeline is located under pavement It is 3:7 plaster backfill, second is that when illumination pipeline is located in greenbelt, 60cm is 8 layers of compacting of plain earthen backfill point, compacting on warning tape Degree >=85%, topmost 50cm are plantation earthen backfill, and planting soil is more conducive to the growth of shade tree;It constructs for the ease of road lighting cable Threading and later maintenance, need street lamp hand hole well inside dimension being adjusted to 600mm × 800mm, depth 1400mm, every three roads Lamp does at one in illumination hand hole well and is grounded, earthing pole exposed 0.5 meter of hand hole shaft bottom layer, earthing pole inside hand hole well(Angle Steel)It is reliably connected through PE lines and street lamp earth stud, earthing pole protective cap is 100mm × 100mm × 10mm galvanized steel plain sheets, works as hand When Kong Jing is set in pavement:It is backfilled under the concrete structure of pavement and is put down using 10% plaster in wide 30cm around hand hole well; When hand hole well is set in dividing strip:The element soil layering of hand hole well periphery, which is rammed, fills out, compactness 85%, and hand hole well well lid should be higher by Ground 10cm.
It is obvious to a person skilled in the art that the present invention is not limited to the details of the above exemplary embodiments, and And without departing substantially from the spirit or essential attributes of the utility model, it can realize that this practicality is new in other specific forms Type.Therefore, in all respects, the present embodiments are to be considered as illustrative and not restrictive, this practicality is new The range of type is indicated by the appended claims rather than the foregoing description, it is intended that containing in the equivalent requirements of the claims will be fallen All changes in justice and range are embraced therein.Any reference numeral in claim should not be considered as limitation Involved claim.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiment being appreciated that.

Claims (9)

1. a kind of city illumination system, including pavement(1), greenbelt and hand hole well, which is characterized in that the pavement (1)With in the groove of greenbelt bottom end be equipped with warning tape(3), the pavement(1)Bottom end is equipped with 3:7 plaster backfill layer(2), described Warning tape(3)Bottom end is equipped with fine sand layer(6), the fine sand layer(6)The interior PE that is equipped with is managed(4), the PE pipes(4)It is interior to be equipped with illumination confession Electrical cables(5), the greenbelt is by backfill planting soil layer(7)It is layered with plain earthen backfill(8)Composition, the backfill planting soil layer (7)Bottom end is equipped with plain earthen backfill and is layered(8), the hand hole well includes well lid(9), well seat(10), inner wall(11)And ground(13), The inner wall(11)Upper end is equipped with well seat(10), the well seat(10)It is equipped with well lid(9), the inner wall(11)Bottom end is equipped with ground Base(13), the ground(13)It is interior to be equipped with cobblestone shop fixtures block(12), the PE pipes(4)Across inner wall(11)It is arranged in hand hole well It is interior, the PE pipes(4)With inner wall(11)Pass through C20 cement concretes(14)It is fixed.
2. city illumination system according to claim 1, which is characterized in that the trench slope coefficient is 1: 0.33。
3. city illumination system according to claim 1, which is characterized in that the PE pipes(4)Diameter uses 75mm, When crossing driveway, the PE pipes(4)Outer sheath is managed equipped with N-HAP, and the N-HAP pipe diameters are 100mm.
4. city illumination system according to claim 1, which is characterized in that the backfill planting soil layer(7)Thickness For 500mm, the element earthen backfill layering(8)Tamp compactness >=85%.
5. city illumination system according to claim 1, which is characterized in that the warning tape(3)Depth is 1100mm, the PE pipes(4)Depth is 1200mm.
6. city illumination system according to claim 1, which is characterized in that the inner wall(11)By M10 cement bonded sands Slurry and Mu15 gangue solid bricks composition, the inner wall(11)Thickness is 240mm.
7. city illumination system according to claim 1, which is characterized in that the ground(13)Using C15 cement Concrete.
8. city illumination system according to claim 1, which is characterized in that the hand hole well is tied using square Structure, the hand hole well length and width are respectively 800mm and 600mm, depth 1400mm.
9. city illumination system according to claim 1, which is characterized in that the PE pipes(4)Tail end is away from inner wall (11)Distance is 40mm.
CN201721737810.0U 2017-12-13 2017-12-13 A kind of city illumination system Expired - Fee Related CN207685614U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721737810.0U CN207685614U (en) 2017-12-13 2017-12-13 A kind of city illumination system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721737810.0U CN207685614U (en) 2017-12-13 2017-12-13 A kind of city illumination system

Publications (1)

Publication Number Publication Date
CN207685614U true CN207685614U (en) 2018-08-03

Family

ID=62997003

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721737810.0U Expired - Fee Related CN207685614U (en) 2017-12-13 2017-12-13 A kind of city illumination system

Country Status (1)

Country Link
CN (1) CN207685614U (en)

Similar Documents

Publication Publication Date Title
CN107587557A (en) Outdoor water engineering construction method
CN106436596A (en) Construction method for fiberglass reinforced plastic mortar pipe culvert of roads
CN203701255U (en) Device for collecting rainwater on road to supplement underground water
CN202247950U (en) Quadrate culvert member
CN106759476A (en) A kind of assembled municipal administration comprehensive pipeline passage and its construction method
CN208651807U (en) One kind being suitable for mountain area complicated landform slurry delivery pipe line paving system
CN204940040U (en) A kind of ecological permeable road structure
CN207685614U (en) A kind of city illumination system
CN206529795U (en) A kind of municipal comprehensive pipeline passage of assembled
CN203904857U (en) Precast-concrete three-arch culvert pipe
CN106498981A (en) A kind of brick type municipal administration comprehensive pipeline passage and its construction method
CN204174496U (en) A kind of novel town road structure
CN207672616U (en) A kind of outdoor cable penetration pipe is passed by one's way laying structure
CN107269930B (en) Bellows substitutes the construction of sealing-tape machine concrete corridor in sandstone system
CN209619870U (en) Box culvert is used in a kind of transformation of underground piping
CN104088352A (en) Ground rainwater comprehensive utilization structure
CN209958395U (en) Hidden inspection shaft
CN208023610U (en) Steel corrugated plating pipe gallery
CN209723194U (en) Drainage system of freeway
CN103982707B (en) The most now spread concrete and surround soft pipe flow guide system
CN203498866U (en) Integrated-type plastic common pipe for cities
CN111749073A (en) Water permeable reconstruction technology based on existing road base layer
CN206308583U (en) A kind of mountain area side drainage structure
CN209001496U (en) A kind of electric power tunnel push pipe with electro-magnetic screen function
CN205677022U (en) The dirty same groove structure of drainpipe of a kind of rain

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20180803

Termination date: 20211213