CN207680825U - Asphalt smoke gas purifying equipment in green anode workshop in a kind of production of charcoal element - Google Patents
Asphalt smoke gas purifying equipment in green anode workshop in a kind of production of charcoal element Download PDFInfo
- Publication number
- CN207680825U CN207680825U CN201721670893.6U CN201721670893U CN207680825U CN 207680825 U CN207680825 U CN 207680825U CN 201721670893 U CN201721670893 U CN 201721670893U CN 207680825 U CN207680825 U CN 207680825U
- Authority
- CN
- China
- Prior art keywords
- coke powder
- flue gas
- smoke
- batcher
- threeway
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Coke Industry (AREA)
Abstract
Asphalt smoke gas purifying equipment in green anode workshop in a kind of production of charcoal element, including:Coke powder feed bin, batcher, feed inlet guide cone, drainage conduit, threeway and Whirlwind cyclone for dust remover.Bitumen flue gas enters threeway by smoke-intake pipe, and the coke powder in coke powder feed bin is entered by feed inlet in batcher, it uniformly spreads around along the conical surface of guide cone under the effect of gravity, prevents coke powder from accumulating.Negative pressure is generated in threeway during flowing to smoke exhaust pipe from smoke-intake pipe due to bitumen flue gas, to coke powder monarch's such as drainage conduit from horn mouth, and enters in threeway and mixed with bitumen flue gas, mixed bitumen flue gas, which enters in each Whirlwind cyclone for dust remover, generates eddy flow, coke powder carries out black method absorption with the particulate matter in bitumen flue gas, dust after absorption into material bin, and is discharged by ash discharging hole eventually by ash releasing tube.The flue gas of purification is discharged by exhaust outlet.Coke powder after absorption can participate in workshop dispensing production again, reduce manufacturing cost.
Description
Technical field
The utility model is related to charcoal elements to produce green anode technical field, and in particular to green anode workshop in a kind of production of charcoal element
Asphalt smoke gas purifying is equipped.
Background technology
Traditional green anode workshop bitumen flue gas, which is administered, mostly uses electrically trapped tar oil dedusting technology or sack cleaner to carry out
Processing.But this two technologies are after system puts into operation 1 to 2 year, occur that regulation effect is poor, and the solid waste generated can not be located
Reason is unable to reach existing national environmental protection to company standard requirement.
Newly occur carrying out adsorption treatment green anode workshop bitumen flue gas scheme using alumina powder a few years ago, also there is part
Prebaked anode manufacturing enterprise carries out trial throw money operation, and the more traditional electric fishing treatment effect of adsorption effect improved, but finally due to
Alumina powder input is larger, and the alumina powder after adsorptive pitch flue gas is reluctant recycling due to aluminium electrolysis enterprise, causes to provide
Source wastes and solid waste can not be handled.
Invention content
The utility model provides a kind of coke powder using green anode workshop to pitch to overcome the shortcomings of the above technology
The equipment that flue gas is purified.
Technical solution is used by the utility model overcomes its technical problem:
Asphalt smoke gas purifying equipment in green anode workshop in a kind of production of charcoal element, including:Coke powder feed bin, setting equipped with coke powder
In coke powder feed bin lower end batcher, be set on batcher and be connected with coke powder bin outlet feed inlet, be set to dispensing
The guide cone of cone, the drainage conduit for being set to batcher lower end, threeway in case and immediately below feed inlet and several
The Whirlwind cyclone for dust remover being arranged in parallel, the drainage conduit upper end are provided with horn mouth, and the bottom of guide cone is located in horn mouth, and three
Logical one end is connected with drainage conduit, and one end is connected with smoke-intake pipe, and one end is connected with smoke exhaust pipe, the smoke exhaust pipe and each deduster
The air inlet of Whirlwind cyclone is connected, and Whirlwind cyclone for dust remover upper end is provided with exhaust outlet, and lower end is provided with ash discharging hole, each deduster
The ash discharging hole lower end of Whirlwind cyclone is provided with hopper, and ash releasing tube is provided with below the hopper.
Along the circumferential direction uniform intervals are provided with guide plate on the conical surface of above-mentioned guide cone.
Further include being turned in coke powder feed bin lower end by the rotational installation of bearing I to realize the adjustable of coke powder feeding coal
Son is rotatablely installed by bearing II in the input of feed pipe, the speed reducer and speed reducer that are installed on coke powder feed bin in rotor
Hold the motor being sequentially connected and the belt pulley that is installed on speed reducer output shaft, it is eccentrically mounted in the rotor to be vertically arranged
Discharging channel I, it is eccentrically mounted in the feed pipe to have eccentricity discharging channel II identical with discharging channel I, the belt
It is connected by belt transmission between wheel and rotor, the lower end of the feed pipe is connected with feed inlet.
The utility model has the beneficial effects that:Bitumen flue gas enters threeway by smoke-intake pipe, and the coke powder in coke powder feed bin is logical
It crosses feed inlet to enter in batcher, it uniformly spreads around along the conical surface of guide cone under the effect of gravity, prevents coke powder from accumulating.
Negative pressure is generated in threeway during flowing to smoke exhaust pipe from smoke-intake pipe due to bitumen flue gas, to which monarch is such as from horn mouth for coke powder
Drainage conduit, and enter in threeway and mixed with bitumen flue gas, mixed bitumen flue gas enters in each Whirlwind cyclone for dust remover
Eddy flow is generated, the particulate matter in coke powder and bitumen flue gas carries out black method absorption, and the dust after absorption is by ash discharging hole into material bin
In, and be discharged eventually by ash releasing tube.The flue gas of purification is discharged by exhaust outlet.Using the coke powder in green anode workshop to glance coal
Gas is purified to be generated without any solid waste, and the coke powder after absorption can participate in workshop dispensing production again, reduce manufacture
Cost.
Description of the drawings
Fig. 1 is the structural schematic diagram of the utility model;
Fig. 2 is the cross-sectional view at the rotor position of the utility model;
In figure, 1. coke powder feed bin, 2. motor, 3. speed reducer, 4. feed pipe, 5. batcher, 6. feed inlet, 7. guide cone
8. 14. Whirlwind cyclone for dust remover of guide plate 9. drainage conduit, 10. horn mouth, 11. threeway, 12. smoke-intake pipe, 13. smoke exhaust pipe, 15. row
22. bearing of gas port 16. ash discharging hole, 17. hopper, 18. ash releasing tube, 19. belt pulley, 20. rotor, 21. belt, I 23. bearing II
24. I 25. discharging channel II of discharging channel.
Specific implementation mode
Below in conjunction with the accompanying drawings 1, attached drawing 2 is described further the utility model.
Asphalt smoke gas purifying equipment in green anode workshop in a kind of production of charcoal element, including:Coke powder feed bin 1 equipped with coke powder is set
It is placed in the batcher 5 of 1 lower end of coke powder feed bin, is set on batcher 5 and exports the feed inlet 6 being connected, setting with coke powder feed bin 1
The guide cone 7 of cone in batcher 5 and immediately below feed inlet 6, the drainage conduit 9, three for being set to 5 lower end of batcher
Logical 11 and several Whirlwind cyclone for dust remover 14 being arranged in parallel, 9 upper end of drainage conduit be provided with horn mouth 10, the bottom of guide cone 7
In horn mouth 10, one end of threeway 11 is connected with drainage conduit 9, and one end is connected with smoke-intake pipe 12, and one end is connected with smoke exhaust pipe
13, smoke exhaust pipe 13 is connected with the air inlet of each Whirlwind cyclone for dust remover 14, and 14 upper end of Whirlwind cyclone for dust remover is provided with exhaust outlet,
Lower end is provided with ash discharging hole 16, and 16 lower end of ash discharging hole of each Whirlwind cyclone for dust remover 14 is provided with hopper 17, and 17 lower section of hopper is set
It is equipped with ash releasing tube 18.Bitumen flue gas enters threeway 11 by smoke-intake pipe 12, and the coke powder in coke powder feed bin 1 is entered by feed inlet 6
In batcher 4, it uniformly spreads around along the conical surface of guide cone 7 under the effect of gravity, prevents coke powder from accumulating.Due to glance coal
Gas generates negative pressure during flowing to smoke exhaust pipe 13 from smoke-intake pipe 12 in threeway 11, to which monarch such as arranges coke powder from horn mouth 10
Expects pipe 9, and enter in threeway 11 and mixed with bitumen flue gas, mixed bitumen flue gas enters each Whirlwind cyclone for dust remover 14
Middle generation eddy flow, coke powder carry out black method absorption with the particulate matter in bitumen flue gas, and the dust after absorption is entered by ash discharging hole 16
In hopper 17, and it is discharged eventually by ash releasing tube 18.The flue gas of purification is discharged by exhaust outlet 15.Utilize the coke in green anode workshop
Powder purifies bitumen flue gas and is generated without any solid waste, and the coke powder after absorption can participate in workshop dispensing production again,
Reduce manufacturing cost.
Further, along the circumferential direction uniform intervals are provided with guide plate 8 on the conical surface of guide cone 7.Pass through leading for setting
It may insure that coke powder is snapped down to along the conical surface of guide cone 7 in drainage conduit 9 to plate 8, further improve steady when coke powder feeds
It is qualitative.
Preferably, further include being rotatablely installed in the rotor 20 of 1 lower end of coke powder feed bin, by bearing II by bearing I 22
23 rotational installations are passed in the input terminal of feed pipe 4, the speed reducer 3 and speed reducer 3 that are installed on coke powder feed bin 1 in rotor 20
The motor 2 of dynamic connection and the belt pulley 19 being installed on 3 output shaft of speed reducer, in rotor 20 it is eccentrically mounted have be vertically arranged
Discharging channel I 24, it is eccentrically mounted in feed pipe 4 to have eccentricity discharging channel II 25 identical with discharging channel I 24, belt
It is sequentially connected by belt 21 between wheel 19 and rotor 20, the lower end of feed pipe 4 is connected with feed inlet 6.Motor 2, which rotates through, to be subtracted
Driving belt pulley 19 rotates after the deceleration amplification torque of fast machine 3, and belt pulley 19 drives rotor 20 to rotate by belt 21, the rotation of rotor 20
During turning so that the identical discharging channel I 24 of eccentricity coincides with discharging channel II 25, discharging channel I 24 and discharge
When channel II 25 coincides, coke powder in coke powder feed bin 1 is coincided entrance by discharging channel I 24 and discharging channel II 25
In batcher 5.Motor 2 rotary speed is different, secondary to make in the unit interval discharging channel I 24 overlap with discharging channel II 25
Number is different so that the amount for entering the coke powder in batcher 5 in the unit interval is also different, and then reaches the flow velocity according to bitumen flue gas
The purpose of proportioning is changed to coke powder feeding coal.
Claims (3)
1. green anode workshop asphalt smoke gas purifying equipment in a kind of charcoal element production, which is characterized in that including:Coke powder equipped with coke powder
Feed bin(1), be set to coke powder feed bin(1)The batcher of lower end(5), be set to batcher(5)It is upper and with coke powder feed bin(1)Outlet
Connected feed inlet(6), be set to batcher(5)It is interior and be located at feed inlet(6)The guide cone of the cone of underface(7), set
It is placed in batcher(5)The drainage conduit of lower end(9), threeway(11)And several Whirlwind cyclone for dust remover being arranged in parallel(14), described
Drainage conduit(9)Upper end is provided with horn mouth(10), guide cone(7)Bottom be located at horn mouth(10)It is interior, threeway(11)One end
With drainage conduit(9)It is connected, one end and smoke-intake pipe(12)It is connected, one end is connected with smoke exhaust pipe(13), the smoke exhaust pipe(13)With it is each
A Whirlwind cyclone for dust remover(14)Air inlet be connected, Whirlwind cyclone for dust remover(14)Upper end is provided with exhaust outlet(15), lower end is set
It is equipped with ash discharging hole(16), each Whirlwind cyclone for dust remover(14)Ash discharging hole(16)Lower end is provided with hopper(17), the hopper
(17)Lower section is provided with ash releasing tube(18).
2. green anode workshop asphalt smoke gas purifying equipment in charcoal element production according to claim 1, it is characterised in that:It is described
Guide cone(7)The conical surface on along the circumferential direction uniform intervals be provided with guide plate(8).
3. green anode workshop asphalt smoke gas purifying equipment in charcoal element production according to claim 1, it is characterised in that:Also wrap
It includes through bearing I(22)It is rotatablely installed in coke powder feed bin(1)The rotor of lower end(20), pass through bearing II(23)Be rotatablely installed in turn
Son(20)Interior feed pipe(4), be installed on coke powder feed bin(1)On speed reducer(3)With speed reducer(3)Input terminal transmission connect
The motor connect(2)And it is installed on speed reducer(3)Belt pulley on output shaft(19), the rotor(20)It is interior it is eccentrically mounted have it is perpendicular
The discharging channel I being directly arranged(24), the feed pipe(4)Interior eccentrically mounted have eccentricity and discharging channel I(24)Identical row
Expect channel II(25), the belt pulley(19)With rotor(20)Between pass through belt(21)It is sequentially connected, the feed pipe(4)'s
Lower end and feed inlet(6)It is connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721670893.6U CN207680825U (en) | 2017-12-05 | 2017-12-05 | Asphalt smoke gas purifying equipment in green anode workshop in a kind of production of charcoal element |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721670893.6U CN207680825U (en) | 2017-12-05 | 2017-12-05 | Asphalt smoke gas purifying equipment in green anode workshop in a kind of production of charcoal element |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207680825U true CN207680825U (en) | 2018-08-03 |
Family
ID=62996416
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721670893.6U Expired - Fee Related CN207680825U (en) | 2017-12-05 | 2017-12-05 | Asphalt smoke gas purifying equipment in green anode workshop in a kind of production of charcoal element |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207680825U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115121085A (en) * | 2021-03-29 | 2022-09-30 | 宝山钢铁股份有限公司 | VOC treatment system and treatment method in coking production process |
-
2017
- 2017-12-05 CN CN201721670893.6U patent/CN207680825U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN115121085A (en) * | 2021-03-29 | 2022-09-30 | 宝山钢铁股份有限公司 | VOC treatment system and treatment method in coking production process |
CN115121085B (en) * | 2021-03-29 | 2023-06-13 | 宝山钢铁股份有限公司 | VOC (volatile organic compound) treatment system and method in coking production process |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104587731B (en) | Rotating disc type automatic deslagging apparatus and deslagging method thereof | |
CN106440838A (en) | Calcium carbide furnace purification ash gas conveying and incineration device | |
CN202238681U (en) | Winnowing device for organic fertilizer made of domestic garbage | |
CN207680825U (en) | Asphalt smoke gas purifying equipment in green anode workshop in a kind of production of charcoal element | |
CN213387827U (en) | Raw material diversified active coke internal heating type rotary furnace | |
CN212223526U (en) | Continuous asphalt mixture stirring equipment | |
CN203264516U (en) | Novel asphalt fume treating equipment | |
CN219111258U (en) | Multistage rotational flow type dynamic waste gas adsorption purification device and system | |
CN208182083U (en) | A kind of waste incineration slag integrated treatment conveyer tripper | |
CN207734780U (en) | The device of adsorption cleaning processing is carried out to viscosity or flue gas containing wet dust | |
CN209204937U (en) | A kind of sticky dust adsorption cleaning and filter device | |
CN102798126A (en) | Feed device used in garbage burning reaction furnace | |
CN201596626U (en) | Automatic separator for raw coal sundries | |
CN107930324A (en) | The device and method of adsorption cleaning processing is carried out to viscosity or flue gas containing wet dust | |
CN206444988U (en) | A kind of house refuse recycling system | |
CN211562098U (en) | Sludge discharge device for sewage treatment | |
CN108284004A (en) | A kind of cyclone of multicyclone | |
CN211226871U (en) | Sludge blending combustion system of thermal power plant | |
CN209500981U (en) | A kind of drilling mud waste receiving and processing device | |
CN202590618U (en) | Multifunctional flue gas desulfurization and dust removing device | |
CN111097252A (en) | Device for removing volatile organic compounds in coal-charging flue gas of coke oven | |
CN110918465A (en) | Variable-diameter pulse airflow sorting system and sorting method thereof | |
CN106906720B (en) | Dust recovery system of asphalt mixing tank | |
CN210675454U (en) | Pulverized coal preparation device for rotary kiln | |
CN205599652U (en) | Garbage treatment device |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180803 Termination date: 20191205 |