CN207672766U - Newly-increased floor and original beam connection structure - Google Patents

Newly-increased floor and original beam connection structure Download PDF

Info

Publication number
CN207672766U
CN207672766U CN201721638278.7U CN201721638278U CN207672766U CN 207672766 U CN207672766 U CN 207672766U CN 201721638278 U CN201721638278 U CN 201721638278U CN 207672766 U CN207672766 U CN 207672766U
Authority
CN
China
Prior art keywords
floor
newly
increased
original beam
shear reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721638278.7U
Other languages
Chinese (zh)
Inventor
陈林炜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhuhai Huafa Architectural Design Consulting Co Ltd
Original Assignee
Zhuhai Huafa Architectural Design Consulting Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhuhai Huafa Architectural Design Consulting Co Ltd filed Critical Zhuhai Huafa Architectural Design Consulting Co Ltd
Priority to CN201721638278.7U priority Critical patent/CN207672766U/en
Application granted granted Critical
Publication of CN207672766U publication Critical patent/CN207672766U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model is related to building interior reinforcement structure, specially a kind of newly-increased floor and original beam connection structure, including newly-increased floor and original beam;Newly-increased floor includes concrete layer and extends transversely through and be fixed on the floor bar in concrete layer, original beam offers floor bar hole, floor bar is inserted into floor bar hole, and structure glue is filled between floor bar and floor bar hole, and the contact surface of original beam and newly-increased floor is painted with interfacial agents;Shear reinforcement is additionally provided in newly-increased floor, shear reinforcement is shorter than floor bar, and original beam offers shear reinforcement hole, and shear reinforcement is inserted into shear reinforcement hole and is filled with structure glue.The utility model is insufficient in order to solve the problems, such as newly-increased shear resistance between floor and original beam column, provides a kind of stronger connection structure of shear resistance.

Description

Newly-increased floor and original beam connection structure
Technical field
The utility model is related to building interior reinforcement structure, specially a kind of newly-increased floor and original beam connection structure.
Background technology
When traditional newly-increased floor is with original beam consolidation process, the combination problem of new-old concrete can be all encountered.It is new and old mixed The combination for coagulating soil, mainly by snap-in force, bond and frictional force.Wherein mechanical snap power is maximum, account for about the half of binding force with On;Bond is mainly generated by the gelling property of cement;Frictional force is related with the stress of component, when bearing pulling force, no Frictional force can be generated.Due to improper measures, attention is inadequate, performs a task perfunctorily, and secured strict purpose is often not achieved in junction, There is crack, leakage, intensity deficiency and other issues.
Utility model content
The utility model is insufficient in order to solve the problems, such as newly-increased intensity between floor and original beam column, provides a kind of intensity more Good connection structure.
The utility model provides base case:Newly-increased floor and original beam connection structure, including newly-increased floor with it is original Beam;Newly-increased floor includes concrete layer and extends transversely through and be fixed on the floor bar in concrete layer, and original beam offers building Plate reinforced hole, floor bar are inserted into floor bar hole, are filled with structure glue between floor bar and floor bar hole, original beam with The contact surface of newly-increased floor is painted with interfacial agents;It is additionally provided with shear reinforcement in newly-increased floor, shear reinforcement is shorter than floor bar, former There is beam to offer shear reinforcement hole, shear reinforcement is inserted into shear reinforcement hole and is filled with structure glue.
The concrete layer of newly-increased floor makes newly-increased floor itself have stronger globality and structural strength with floor bar. Floor bar is fixed with floor bar hole, increases the bonding strength of the two horizontal direction by structure glue, by the knot of floor bar Structure carrys out the shearing force of load vertical direction.Brushing interfacial agents reduce the gap of the two junction.Shear reinforcement, shear reinforcement are set The structural stress of newly-increased floor is not needed to undertake, one end of which is fixed in concrete layer, the other end is implanted by structure glue In shear reinforcement hole, major function is to assist the newly-increased shearing force between floor and original beam of floor bar load.
Compared with prior art, it is the advantages of this programme:According to the connection structure between newly-increased floor and original beam by The larger feature of vertical shearing power is provided with shear reinforcement, and shear reinforcement is not necessarily to such as what kind of length of floor bar, therefore saves Cost, while effectively enhancing the shear resistance of newly-increased floor and original beam junction.
Scheme two:Outer wall for the preferred of basic scheme, the shear reinforcement is equipped with thread segment.Advantageous effect:Thread segment Shear reinforcement is more effectively fixed in shear reinforcement hole by the friction coefficient that can effectively increase shear reinforcement.
Scheme three:Further include shearing resistance angle steel for the preferred of scheme two, the shearing resistance angle steel be equipped with integrally formed left plate with Right panel, the left plate are posted and fixed in the lower face of newly-increased floor, and the right panel is posted and fixed in the side of original beam.Have Beneficial effect:Left plate withstands newly-increased floor, and right panel is fixed on original beam, is increased by right panel and the vertical load force of left plate new Increase the shear resistance of floor and original beam junction.
Scheme four:For the preferred of scheme three, anchor bolt is all made of between the left plate and newly-increased floor and right panel and original beam It is fixed.Advantageous effect:Anchor bolt can increase the bonding strength between shearing resistance angle steel and newly-increased floor and original beam, avoid increasing newly Floor stress is detached from.
Scheme five:For the preferred of scheme four, the right panel is located under newly-increased floor.Advantageous effect:Right panel stretches into newly-increased The area that the leakage of shearing resistance angle steel can be reduced between floor and original beam improves beauty, but enhances difficulty of construction, while may apply Increase the destruction to original beam during work.
Description of the drawings
Fig. 1 is the structural schematic diagram that the utility model increases floor and original beam connection structure embodiment 1 newly.
Fig. 2 is the structural schematic diagram of embodiment 2.
Specific implementation mode
The utility model is described in further detail below by specific implementation mode:
1. the reference numeral in Figure of description includes:Newly-increased floor 100, original beam 200, concrete layer 110, floor steel Muscle 120, floor bar hole 210, shear reinforcement 220, shear reinforcement hole 230, shearing resistance angle steel 300, left plate 310, right panel 320, anchor Bolt 330.
2. embodiment 1 as shown in Figure 1:Including newly-increased floor 100 and original beam 200;Newly-increased floor 100 includes concrete Layer 110 and extends transversely through and is fixed on the floor bar 120 in concrete layer 110, and original beam 200 offers floor bar 120 Hole, floor bar 120 are inserted into 120 hole of floor bar, and structure glue is filled between 120 hole of floor bar 120 and floor bar, former There are beam 200 and the contact surface of newly-increased floor 100 to be painted with structure glue;It is additionally provided with shear reinforcement 220, shearing resistance in newly-increased floor 100 Reinforcing bar 220 is shorter than floor bar 120, and original beam 200 offers 220 hole of shear reinforcement, and shear reinforcement 220 is inserted into shear reinforcement In 220 holes and it is filled with structure glue.The outer wall of shear reinforcement 220 is equipped with thread segment.
3. embodiment 2, implementing 2 as shown in Figure 2, difference lies in replace shearing resistance steel using shearing resistance angle steel 300 with embodiment 1 Muscle 220, shearing resistance angle steel 300 are equipped with integrally formed left plate 310 and right panel 320, and left plate 310 is posted and fixed in newly-increased floor 100 lower face, right panel 320 are posted and fixed in the side of original beam 200.Left plate 310 and newly-increased floor 100 and right panel The fixation of anchor bolt 330 is all made of between 320 and original beam 200.Right panel 320 is located under newly-increased floor 100.
4. build, in implementing 1, shear reinforcement 220 is inserted with floor bar 120 before newly-increased floor 100 is cast respectively Enter in 220 hole of 120 hole of floor bar and shear reinforcement, and into hole, injecting structure glue makes the two stablize, and is then poured, is made A part for shear reinforcement 220 is stably fixed in newly-increased floor 100.
In embodiment 2, a part for the anchor bolt 330 of left plate 310 is poured together using when pouring, enhances the anchor bolt Bonding strength between 330 and newly-increased floor 100.The trepanning on original beam 200 simultaneously, original beam 200 is also secured at by right panel 320 On.

Claims (5)

1. newly-increased floor and original beam connection structure, including newly-increased floor and original beam;The newly-increased floor includes concrete layer With extend transversely through and be fixed on the floor bar in concrete layer, original beam offers floor bar hole, the floor steel Muscle is inserted into floor bar hole, and structure glue, original beam and newly-increased building are filled between the floor bar and floor bar hole The contact surface of plate is painted with interfacial agents;It is characterized in that, being additionally provided with shear reinforcement in the newly-increased floor, the shear reinforcement is short In floor bar, original beam offers shear reinforcement hole, and the shear reinforcement is inserted into shear reinforcement hole and filled with knot Structure glue.
2. newly-increased floor according to claim 1 and original beam connection structure, which is characterized in that outside the shear reinforcement Wall is equipped with thread segment.
3. newly-increased floor according to claim 2 and original beam connection structure, which is characterized in that further include shearing resistance angle steel, The shearing resistance angle steel is equipped with integrally formed left plate and right panel, and the left plate is posted and fixed in the lower face of newly-increased floor, institute Right panel is stated to post and fix in the side of original beam.
4. newly-increased floor according to claim 3 and original beam connection structure, which is characterized in that the left plate and newly-increased building Anchor bolt is all made of between plate and right panel and original beam to fix.
5. newly-increased floor according to claim 4 and original beam connection structure, which is characterized in that the right panel is located at newly-increased Under floor.
CN201721638278.7U 2017-11-29 2017-11-29 Newly-increased floor and original beam connection structure Active CN207672766U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721638278.7U CN207672766U (en) 2017-11-29 2017-11-29 Newly-increased floor and original beam connection structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721638278.7U CN207672766U (en) 2017-11-29 2017-11-29 Newly-increased floor and original beam connection structure

Publications (1)

Publication Number Publication Date
CN207672766U true CN207672766U (en) 2018-07-31

Family

ID=62966499

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721638278.7U Active CN207672766U (en) 2017-11-29 2017-11-29 Newly-increased floor and original beam connection structure

Country Status (1)

Country Link
CN (1) CN207672766U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797772A (en) * 2019-01-31 2019-05-24 深圳市建筑设计研究总院有限公司 A kind of shearing resistance column foot connecting structure and its construction method
CN109812045A (en) * 2019-03-19 2019-05-28 中建四局第一建筑工程有限公司 After a kind of tool-type plus structural slab fast joint structure and method

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109797772A (en) * 2019-01-31 2019-05-24 深圳市建筑设计研究总院有限公司 A kind of shearing resistance column foot connecting structure and its construction method
CN109797772B (en) * 2019-01-31 2024-03-15 深圳市建筑设计研究总院有限公司 Shear column base connection structure and construction method thereof
CN109812045A (en) * 2019-03-19 2019-05-28 中建四局第一建筑工程有限公司 After a kind of tool-type plus structural slab fast joint structure and method

Similar Documents

Publication Publication Date Title
CN204435564U (en) Prefabricated assembled frame construction New Types of Beam column Connections
CN106381925A (en) Prefabricated reinforced concrete column and column splice joint with sleeves
CN207194146U (en) Prestressing force assembly concrete frame joint attachment structure
CN206174146U (en) Assembly type structure's assembly node
CN107044177A (en) A kind of assembly concrete shear wall fractionation, assembled attachment structure and connection method
CN207672766U (en) Newly-increased floor and original beam connection structure
CN107354862A (en) Prefabricated interlayer steel tube concrete and hollow steel bar concrete assembly bridge pier
CN108661202A (en) A kind of large area hollow out lattice brick curtain wall construction modelled after an antique and construction method
CN106917470A (en) The steel tube confinement concrete-filled rectangular steel tube component and its processing method of a kind of sandwich
CN208633136U (en) Novel fabricated Screw Anchor composite foundation
CN203821625U (en) Fiber cloth-reinforced mortar-free reinforced masonry shear wall
CN102864944B (en) A kind of steel angle bracket masonry structure and reinforcement means thereof
CN209723690U (en) A kind of node connecting newly-increased concrete column and original concrete column
CN206844316U (en) A kind of assembled steel reinforced concrete column with well and post splicing node
CN108240037A (en) Transverse joint connecting node between a kind of prefabricated board wall layers
CN207211366U (en) The attachment structure of prefabricated beam column
CN205934722U (en) Seam bolted connection precast concrete decking
CN208762895U (en) Hinge seam bracing means
CN207619818U (en) A kind of shearing resistance composite structure of the concrete of bridge
CN206693469U (en) A kind of precast floor slab connecting node
CN207048064U (en) A kind of attachment structure of prefabricated assembled shear wall and stair
CN206070731U (en) Connecting structure with dry shaped connecting piece precast shear wall plate
CN105369986A (en) Steel bar eccentric connection half grouting sleeve and using method thereof
CN108316530A (en) The assembled steel reinforced concrete composite floor and installation method connected using self-locking
CN105735338B (en) Prestressing force assembly type blower foundation

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant