CN105735338B - Prestressing force assembly type blower foundation - Google Patents

Prestressing force assembly type blower foundation Download PDF

Info

Publication number
CN105735338B
CN105735338B CN201410744039.4A CN201410744039A CN105735338B CN 105735338 B CN105735338 B CN 105735338B CN 201410744039 A CN201410744039 A CN 201410744039A CN 105735338 B CN105735338 B CN 105735338B
Authority
CN
China
Prior art keywords
central part
attached
prestressing force
assembly type
prefabricated component
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201410744039.4A
Other languages
Chinese (zh)
Other versions
CN105735338A (en
Inventor
谌磊
彭奕亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
PowerChina Henan Electric Power Survey and Design Institute Co Ltd
Original Assignee
Hennan Electric Power Survey and Design Institute
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hennan Electric Power Survey and Design Institute filed Critical Hennan Electric Power Survey and Design Institute
Priority to CN201410744039.4A priority Critical patent/CN105735338B/en
Publication of CN105735338A publication Critical patent/CN105735338A/en
Application granted granted Critical
Publication of CN105735338B publication Critical patent/CN105735338B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

A kind of prestressing force assembly type blower foundation disclosed by the invention, including sole plate, the base is made up of prefabricated component, prefabricated component includes central part and extremity piece, there is the deformed bar hole of insertion on the joint face of central part and extremity piece, it is attached by deformed bar, each face of central part surrounding is provided with groove, and extremity piece junction side is provided with tongue;Base is attached with top blower fan tower barrel structure by prestressed reinforced concrete circular rod, and central part top is provided with concrete secondary grout hole, is attached with circular rod by concrete secondary grouting.The prestressing force assembly type blower foundation provided is provided, precast block is carried out to concrete first, prefabricated component different during blower foundation is installed and carries out prestressed stretch-draw connection, base is attached with blower fan tower barrel structure by transition structure.Compared with cast in place reinforced bar concrete foundation, the present invention have the advantages that bending resistance is strong, the set-up time is short, resource without waste, will not be formed dismounting rubbish.

Description

Prestressing force assembly type blower foundation
Technical field
The present invention relates to blower fan field, more particularly to a kind of prestressing force assembly type blower foundation.
Background technology
Wind turbines basis is the concrete structure for fixing unit, and it will not only bear the weight of unit and tower, And to resist the maximum tipping load of unit, it is ensured that safe operation of the unit under various load.The conduct of Wind turbines basis The safe and reliable operation of the important component of Construction of Wind Power, not only relation wind field, have an effect on the investment of wind field.Traditional Wind turbines basis generally use bearing platform type basis, it is one section of tower of embedment in bearing platform type basis(Foundation ring), units' installation When, tower drum flange is connected with basic ring flange.Scene is needed to carry out one-piece casting during foundation construction, quantities is big, construction quality It is not easy to ensure.
The content of the invention
A kind of prestressing force assembly type blower foundation is provided it is an object of the invention to overcome the deficiencies in the prior art.
The purpose of the present invention is achieved through the following technical solutions:
A kind of prestressing force assembly type blower foundation, including sole plate, the base are made up of prefabricated component, and prefabricated component includes There is the deformed bar hole of insertion on the joint face of central part and extremity piece, central part and extremity piece, connected by deformed bar Connect, each face of central part surrounding is provided with groove, and extremity piece junction side is provided with tongue;Base passes through with top blower fan tower barrel structure Prestressed reinforced concrete circular rod is attached, and central part top is provided with concrete secondary grout hole, is passed through with circular rod mixed Native back-grouting is coagulated to be attached.
The prefabricated component also includes balancing weight, and balancing weight joint face is provided with tongue.
The circular rod is attached with upper column barrel structure by flange.
Prestressing force assembly type blower foundation provided by the invention, precast block is carried out to concrete first, blower fan base is installed Different prefabricated components carries out prestressed stretch-draw connection during plinth, and base is attached with blower fan tower barrel structure by transition structure.With Cast in place reinforced bar concrete foundation is compared, the present invention have bending resistance is strong, the set-up time is short, resource without waste, dismounting rubbish will not be formed The advantages that rubbish, the present invention are applied in blower foundation, still belonged to the first time both at home and abroad.
Brief description of the drawings
Fig. 1 is blower foundation floor plan of the present invention;
Fig. 2 is central part floor map;
Fig. 3 is central part front view;
Fig. 4 is extremity piece front view;
Fig. 5 is circular rod front view;
Wherein, 1 is central part;2 be extremity piece;3 be balancing weight;4 be circular rod;5 be groove;6 be tongue;7 be prestressing force Reinforcing bar;8 be reserved deformed bar hole;9 be reserved back-grouting hole.
Embodiment
A kind of prestressing force assembly type blower foundation provided by the invention, as shown in Figure 1, including sole plate, the bottom Seat is made up of prefabricated component, and prefabricated component includes central part 1, extremity piece 2 and balancing weight 3, as shown in Figure 3 and Figure 4, central part 1 and extremity piece 2 Joint face on have the reserved deformed bar hole 8 of insertion, use high-strength prestressed flexible connection by inserting deformed bar 7 Technology carries out prestressed stretch-draw connection, as shown in Fig. 2 each face of the surrounding of central part 1 is provided with groove 5, as shown in figure 3, extremity piece 2 connects Junction is provided with tongue 6;The joint face of balancing weight 3 is provided with tongue 6, and groove 5 and tongue 6 mutually agree with the shearing resistance caused between each prefabricated component Ability greatly increases.Base is attached with top blower fan tower barrel structure by the concrete circular rod 4 of deformed bar 7, annular Deformed bar 7 is set in bar 4 can strengthen the anti-shear ability of circular rod 4, and circular rod 4 is as shown in figure 5, the top of central part 1 is set There is concrete secondary grout hole 9, be attached with circular rod 4 by concrete secondary grouting;Circular rod 4 and upper column barrel structure It is attached by flange.
Balancing weight 3 plays a part of to increase quality, can selectively use according to the actual requirements;Prestressing force blower foundation of the present invention Suitable for land and shallow water area.
Above-described is only the preferred embodiment of the present invention, it is noted that for those skilled in the art, Under the premise of general idea of the present invention is not departed from, some changes and improvements can also be made, these should also be considered as the present invention's Protection domain.

Claims (3)

1. a kind of prestressing force assembly type blower foundation, including sole plate, it is characterised in that:The base is made up of prefabricated component, Prefabricated component includes central part and extremity piece, has the deformed bar hole of insertion on the joint face of central part and extremity piece, passes through prestressing force Reinforcing bar is attached, and each face of central part surrounding is provided with groove, and extremity piece junction side is provided with tongue;Base and top blower fan tower Barrel structure is attached by prestressed reinforced concrete circular rod, and central part top is provided with concrete secondary grout hole, with ring Shape bar is attached by concrete secondary grouting.
2. prestressing force assembly type blower foundation as claimed in claim 1, it is characterised in that:The prefabricated component also includes counterweight Block, balancing weight connection side are provided with tongue.
3. prestressing force assembly type blower foundation as claimed in claim 1, it is characterised in that:The circular rod and top tower knot Structure is attached by flange.
CN201410744039.4A 2014-12-09 2014-12-09 Prestressing force assembly type blower foundation Expired - Fee Related CN105735338B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201410744039.4A CN105735338B (en) 2014-12-09 2014-12-09 Prestressing force assembly type blower foundation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201410744039.4A CN105735338B (en) 2014-12-09 2014-12-09 Prestressing force assembly type blower foundation

Publications (2)

Publication Number Publication Date
CN105735338A CN105735338A (en) 2016-07-06
CN105735338B true CN105735338B (en) 2017-12-29

Family

ID=56237836

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201410744039.4A Expired - Fee Related CN105735338B (en) 2014-12-09 2014-12-09 Prestressing force assembly type blower foundation

Country Status (1)

Country Link
CN (1) CN105735338B (en)

Families Citing this family (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106741689A (en) * 2016-12-06 2017-05-31 哈尔滨工业大学深圳研究生院 A kind of Spar types prefabricated PC armored concrete floating offshore blower foundation
CN113007031B (en) * 2019-12-19 2023-07-07 北京天杉高科风电科技有限责任公司 Tower and wind generating set

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2813712Y (en) * 2005-08-23 2006-09-06 陈文姝 Low foundation ground carrying force concrete precast assembling tower machine basic structural component
CN201649117U (en) * 2010-03-12 2010-11-24 安徽三建工程有限公司 Detachable concrete prefabricated assembled tower crane foundation
CN202047421U (en) * 2011-04-22 2011-11-23 辽宁大金重工股份有限公司 Foundation transition section for offshore wind power tower
CN103114604A (en) * 2012-03-09 2013-05-22 中国水电顾问集团西北勘测设计研究院 Prestressed concrete tubular type wind generating set foundation
US20140237923A1 (en) * 2012-03-30 2014-08-28 Allan Henderson Cementitious foundation cap with post-tensioned helical anchors and method of making the same

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2813712Y (en) * 2005-08-23 2006-09-06 陈文姝 Low foundation ground carrying force concrete precast assembling tower machine basic structural component
CN201649117U (en) * 2010-03-12 2010-11-24 安徽三建工程有限公司 Detachable concrete prefabricated assembled tower crane foundation
CN202047421U (en) * 2011-04-22 2011-11-23 辽宁大金重工股份有限公司 Foundation transition section for offshore wind power tower
CN103114604A (en) * 2012-03-09 2013-05-22 中国水电顾问集团西北勘测设计研究院 Prestressed concrete tubular type wind generating set foundation
US20140237923A1 (en) * 2012-03-30 2014-08-28 Allan Henderson Cementitious foundation cap with post-tensioned helical anchors and method of making the same

Also Published As

Publication number Publication date
CN105735338A (en) 2016-07-06

Similar Documents

Publication Publication Date Title
CN106321367B (en) Oblique pull prestress steel and the box-like blower fan pylon of coagulation local soil type
CN206971259U (en) Blower foundation concrete pouring structure
CN108331334A (en) Shear wall, cylinder concrete structure large form hoisting type construction method
CN206190456U (en) Draw prestressing force steel concrete combination formula tower frame of draught fan to one side
CN105735338B (en) Prestressing force assembly type blower foundation
CN206784392U (en) The horizontal inner supporting body system of deep basal pit assembled combination steel construction
CN208701698U (en) A kind of foundation pit recoverable concrete support
CN207749409U (en) Detachable assembling type reinforced concrete bridge pier cushion cap connection structure
CN207297239U (en) A kind of foundation ring of wind generating set
CN205501843U (en) Consolidate rigid framed arch bridge
CN102653991B (en) Raised type turnable concrete bearing part with template function and construction method thereof
CN207228347U (en) A kind of connector, prefabricated component and prefabricated component and the connecting node on basis
CN103225313A (en) Connection flange for prestressed reinforced concrete composite foundation
CN207672766U (en) Newly-increased floor and original beam connection structure
CN207193967U (en) A kind of prestressed concrete pipe pile end plate
CN207004535U (en) A kind of shield tunnel liner glass fiber-reinforced polymer concrete pipe sheet
CN105909477A (en) Transition section structure connecting steel tower drum with prestressed concrete tower drum
CN206359882U (en) A kind of assembled solid steel tube constrains reinforced column squat pier
CN109184741A (en) A kind of high-bearing capacity shield tunnel segment joint structure
CN204356793U (en) A kind of assembling hollow reinforced concrete independent foundation
CN206903060U (en) The concrete composite beam of strap end portion shaped steel
CN106836324A (en) A kind of blower foundation reinforcement means for setting up oblique tension reinforcement
CN207419508U (en) Direct burial body of rod basis
CN206408789U (en) A kind of inclined hole grouting shear wall of T-shaped
CN207161264U (en) A kind of bindiny mechanism for combining pylon

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 450007 Zhengzhou Zhongyuan Road, Henan, No. 212

Patentee after: China Electric Power Construction Group Henan electric survey and Design Institute Co., Ltd.

Address before: 450007 Zhengzhou Zhongyuan Road, Henan, No. 212

Patentee before: Hennan Electric Power Survey & Design Institute

CP01 Change in the name or title of a patent holder
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20171229

Termination date: 20191209

CF01 Termination of patent right due to non-payment of annual fee