- CN2813712Y CN2813712Y CN 200520074915 CN200520074915U CN2813712Y CN 2813712 Y CN2813712 Y CN 2813712Y CN 200520074915 CN200520074915 CN 200520074915 CN 200520074915 U CN200520074915 U CN 200520074915U CN 2813712 Y CN2813712 Y CN 2813712Y
- Authority
- CN
- China
- Prior art keywords
- piece
- extremity
- pieces
- transition
- stone bolt
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Images
Landscapes
- Foundations (AREA)
Abstract
The utility model relates to a basic component for a prefabricated assemblage tower machine for lowland base force bearing concrete, particularly a basic component for a combined split mounting type concrete prefabricated tower machine, wherein transition pieces are provided with two lateral wings; end pieces are also provided with two lateral wings; the basic component also comprises eight ladder-shaped blocks; one corresponding ladder-shaped block is arranged between each two adjacent transition pieces; the two sides of each ladder-shaped block are limited between two groups of adjacent transition pieces; one corresponding ladder-shaped block is arranged between each two adjacent end pieces; the two sides of each ladder-shaped block are limited between two groups of adjacent end pieces; the two ladder-shaped blocks arranged between the adjacent transition pieces and the end pieces are connected with a central piece by steel hinge threads. After the basic component is assembled, the two ladder-shaped blocks are additionally arranged among the transition pieces and among the end pieces and are correspondingly added in four directions, and the basic component, the seventeen ladder-shaped blocks are stretched and fastened from eight directions by the steel hinge threads to form a whole, thereby, the self weight of the foundation and the cubic amount of foundation backfill soil are increased, and the bottom area of the foudation are enlarged.
Description
Technical field
The utility model relates to the prefabricated foundation for tower crane member of a kind of assemble type concrete.
Background technology
The prefabricated foundation for tower crane of existing assemble type concrete mainly is made up of a square central part, the square transition piece of four group leaders and four group leader's square end spares, four groups of transition pieces are arranged in four outsides of central part, four groups of extremity pieces are arranged in the outside of four groups of transition pieces, connect to form crossly between central part, transition piece, the extremity piece by steel hinge line, be respectively equipped with stone bolt box, anchor (bolt) hole, the stone bolt that cooperates with anchor (bolt) hole, stone bolt pad on transition piece, the extremity piece.Because this cross splicing structure makes the basis too little with the contact surface on ground, has greatly influenced basic stability, particularly the stability on power basis is carried in the base, lowland.
The utility model content
The utility model purpose is to design a kind of being convenient to and produces, installs, and the prefabricated assembling foundation for tower crane of power concrete member is carried in the base, lowland of improving base fixed.
The utility model comprises a central part of being made by steel concrete, four groups of transition pieces, four groups of extremity pieces, four groups of transition pieces are arranged in four outsides of central part, four groups of extremity pieces are arranged in the outside of four groups of transition pieces, connect to form cross between central part, transition piece, the extremity piece by steel hinge line, be respectively equipped with stone bolt box, anchor (bolt) hole, the stone bolt that cooperates with anchor (bolt) hole, stone bolt pad on transition piece, the extremity piece, transition piece is provided with two flanks, extremity piece also is provided with two flanks, and basic component also comprises eight ladder type pieces; Be provided with corresponding ladder type piece between the adjacent transition piece, the both sides of every ladder type piece are limited between two groups of adjacent transition pieces; Also be provided with corresponding ladder type piece between the adjacent extremity piece, the both sides of every ladder type piece are limited between two groups of adjacent extremity pieces; Two ladder type pieces between adjacent transition piece and extremity piece are connected with central part by steel hinge line.
After basic part assembling finished, between transition piece and the transition piece, set up two ladder type pieces between extremity piece and the extremity piece, in the corresponding increase of four direction, amounting to 17 stretch-draw basic part, ladder type piece fastening by steel strand by eight directions again was an integral body.Like this, not only increase the weight on basis self, also increased cube amount (being counterweight) of basic backfill, also increased basic floor space simultaneously.By calculating, the utility model basis is compared with former field fabrication basis, and the weight (deadweight+counterweight) on basis has increased by 20%~30%, and the base requirement of carrying power has reduced by 60%~80% over the ground.Strengthened basic stability greatly.By increasing the floor space on basis, with the basis over the ground the base requirement of carrying power be reduced to below the 5T/M2, to be suitable for more riverine, coastal and the relatively low area of power is carried in the base, ground.Another purpose that the utility model has been set up two ladder type piece designs is that the weight of ladder type piece monomer members is reduced, and is convenient to install, removes, transports.
In addition, between the utility model central part and the transition piece, be provided with the concavo-convex stepped end face that is connected that cooperatively interacts between transition piece and the extremity piece.
Above-mentioned technology has changed the plane contact between part and the part, compares with the prefabricated foundation for tower crane of other concrete, has increased contact area, has correspondingly just increased the horizontal anti-shearing force between them; On the contact end face, convex body, groove are arranged, come to reach up and down between reinforcement and the part anti-shearing force of horizontal direction.The anti-shearing structure of the prefabricated foundation for tower crane of its alternative other concrete, and basic part between anti-displacement formation, can reduce production costs.Stairstepping is made at the two ends of transition piece, is more conducive to and being located by connecting of central part, transition piece, and has made things convenient for installation.
In order to guarantee the stability on basis, the anti-shearing force between reinforcement and the part is provided with groove and the convex body that cooperatively interacts between the stepped end face of transition piece of the present utility model and the stepped end face of central part.
In like manner, be provided with groove and the convex body that cooperatively interacts between the stepped end face of the stepped end face of transition piece and extremity piece; Be respectively equipped with groove and the convex body that cooperatively interacts on the ladder type piece of adjacent transition piece and the central part opposing end faces; Two ladder type piece opposing end faces between adjacent transition piece and extremity piece are respectively equipped with groove and the convex body that cooperatively interacts.
Fixedly install hollow section and hard tube connector in the extremity piece of the present utility model, the outer end of hard tube connector splits the outer end at extremity piece, the mutual socket of the inner of hard tube connector and hollow section, steel hinge line is set in hollow section and the hard tube connector, the outer end of steel hinge line is positioned at the outer end of hard tube connector, and is fixed on the outside of extremity piece by ground tackle.
By using prestressing technique, install on the basis, when removing, can select arbitrary extremity piece to carry out stretch-draw, move back anchor according to the situation in place.Solved other the prefabricated foundation for tower crane of concrete, when the steel strand of stretch-draw end because impaired destruction and can not move back anchor, the awkward situation that the basis can't be removed.The prefabricated foundation for tower crane of other concrete is that an end is fixed with the extruding rivet clasp; Tensioned at one end, move back anchor.Install, remove more convenient by comparison.
In order to strengthen the compressive strength of extremity piece, increase the compression area of extremity piece, the utility model also is provided with heavy pressing plate between ground tackle and extremity piece.
In addition, the stone bolt of the utility model transition piece is threaded in the stone bolt pad, offers at least two horizontal pin-and-holes on stone bolt, cooperates latch on the stone bolt of the below of stone bolt pad.
The stone bolt of extremity piece is threaded in the stone bolt pad, offers at least two horizontal pin-and-holes on stone bolt, cooperates latch on the stone bolt of the below of stone bolt pad.
Adjusting for the ease of the stone bolt height, can be according to different tower machines, on the stone bolt of transition piece, extremity piece, select pin-and-hole position correspondingly, regulate the height of stone bolt simultaneously according to the cross deck-molding of tower machine, realize the effect of " base " multitower, removed the trouble that stone bolt will be changed in the prefabricated basis of other concrete from.
Description of drawings
Fig. 1 is the utility model structural representation.
Fig. 2 is an A-A cut-away view among Fig. 1.
Fig. 3 is a B-B cut-away view among Fig. 1.
Fig. 4 is a C-C cut-away view among Fig. 1.
Fig. 5 is a D-D cut-away view among Fig. 1.
Fig. 6 is an E-E cut-away view among Fig. 1.
Fig. 7 is a F-F cut-away view among Fig. 1.
Fig. 8 is an I portion enlarged drawing among Fig. 2.
Fig. 9 is the central part enlarged diagram.
Figure 10 is the transition piece enlarged diagram.
Figure 11 is the extremity piece enlarged diagram.
Figure 12 is ladder type piece () enlarged diagram.
Figure 13 is ladder type piece (a two) enlarged diagram.
Specific embodiment
As shown in the figure, the ladder type piece (two) 6 that equates of ladder type piece (one) 4, four block sizes that equate of the equal-sized transition piece of central part 1, four groups 2, four groups of equal-sized extremity pieces 3, four block sizes is made by steel concrete respectively.
Four link portions that link to each other with transition piece 2 of central part 1 are provided with recessed stepped end face 1-1,1-2,1-3,1-4 respectively, on each recessed stepped end face 1-1,1-2,1-3,1-4, be respectively equipped with groove 1-7, on other face relative, be respectively equipped with groove 1-10,1-11,1-12,1-13, pre-buriedly in the central part 1 be plastic hollow pipe 1-5,1-6,1-8, the 1-9 that meter font is arranged with ladder type piece () 4.
Every group of transition piece 2 is provided with the stepped end face 2-1 of protrusion towards the end of central part 1, also be provided with convex body 2-4 on the stepped end face 2-1 that protrudes on the transition piece 2, be provided with recessed stepped end face 2-2 towards the end of extremity piece 3, stepped end face 2-2 recessed on the transition piece 2 is provided with groove 2-5, the both sides of transition piece 2 are respectively equipped with flank 2-6,2-7, a pre-buried plastic hollow pipe 2-3 in the transition piece 2.
Every group of extremity piece 3 is provided with the stepped end face 3-1 of protrusion towards an end of transition piece 2, is provided with convex body 3-6 on the stepped end face 3-1 that protrudes, and the both sides of extremity piece 3 are respectively equipped with flank 3-4,3-5, pre-buried plastic hollow pipe 3-2 in the extremity piece 3.
The upper base of ladder type piece () 4 is provided with convex body 4-1, goes to the bottom to be provided with groove 4-2 a pre-buried plastic hollow pipe 4-3 in the ladder type piece () 4.
The upper base of ladder type piece (two) 6 is provided with convex body 6-1, a pre-buried plastic hollow pipe 6-2 in the ladder type piece (two) 6.
Four groups of transition pieces 2 relatively are arranged in four recessed stepped end face 1-1,1-2,1-3,1-4 of central part 1 respectively, four groups of extremity pieces 3 are arranged in the outside of four groups of transition pieces 2, stepped end face recessed on stepped end face that protrudes on the above-mentioned transition piece 2 and the central part 1 cooperatively interacts, the stepped end face that protrudes on recessed stepped end face and the extremity piece 3 on the transition piece 2 cooperatively interacts the also corresponding cooperation of each groove opposite and convex body.
Connect to form cross by the some steel hinge lines 14 that are set in each hollow section between central part 1, transition piece 2, the extremity piece 3.
Four ladder type pieces () 4 relatively are arranged in respectively on other four end faces of central part 1, ladder type piece (two) 6 is arranged in the other end of corresponding ladder type piece () 4, make between two adjacent transition pieces 2 and respectively be provided with a ladder type piece () 4, the both sides of ladder type piece () 4 are limited between two groups of adjacent transition pieces 2, be provided with a ladder type piece (two) 6 between two groups of adjacent extremity pieces 3, the both sides of ladder type piece (two) 6 are limited between two groups of adjacent extremity pieces 3.The also corresponding cooperation of each groove opposite and convex body.Central part 1 also and connect to form cross by the some steel hinge lines 14 that are set in the hollow section between the ladder type piece () 4, ladder type piece (two) 6.
The also pre-buried hard tube connector 7 that fixedly installs in extremity piece 3, the outer end of hard tube connector 7 is arranged in the outer end of extremity piece 3, the inner of hard tube connector 7 and the mutual socket of hollow section 3-2, steel hinge line 14 is set in hollow section 3-2 and the hard tube connector 7, the outer end of steel hinge line 14 is positioned at the outer end of hard tube connector 7, and be fixed on the outside of extremity piece 3 by anchor ring 13 and intermediate plate 11, heavy pressing plate 10 is set between anchor ring 13 and extremity piece 3.
Ladder type piece (two) 6 also is provided with and extremity piece 3 structure roughly the same, that be used for fixing steel hinge line 14, and its connected mode is the same.
3 are provided with stone bolt box 8, anchor (bolt) hole 5, the stone bolt 9 that cooperates with anchor (bolt) hole, stone bolt pad 12 on transition piece 2, the extremity piece.
The stone bolt 9 of transition piece 2 is threaded in the stone bolt pad 12, offers four horizontal pin-and-hole 9-1 on stone bolt 9, cooperates latch 15 on the stone bolt 9 of stone bolt pad 12 belows.
The stone bolt of extremity piece 3 is threaded in the stone bolt pad, offers at least two horizontal pin-and-holes on stone bolt, cooperates latch 15 on the stone bolt of the below of stone bolt pad.
Claims (10)
1, the prefabricated assembling foundation for tower crane of power concrete member is carried in the base, lowland, comprise a central part of making by steel concrete, four groups of transition pieces, four groups of extremity pieces, four groups of transition pieces are arranged in four outsides of central part, four groups of extremity pieces are arranged in the outside of four groups of transition pieces, central part, transition piece, connect to form cross between the extremity piece by steel hinge line, transition piece, be respectively equipped with the stone bolt box on the extremity piece, anchor (bolt) hole, the stone bolt that cooperates with anchor (bolt) hole, the stone bolt pad, it is characterized in that transition piece is provided with two flanks, extremity piece also is provided with two flanks, and basic component also comprises eight ladder type pieces; Be provided with corresponding ladder type piece between the adjacent transition piece, the both sides of every ladder type piece are limited between two groups of adjacent transition pieces; Also be provided with corresponding ladder type piece between the adjacent extremity piece, the both sides of every ladder type piece are limited between two groups of adjacent extremity pieces; Two ladder type pieces between adjacent transition piece and extremity piece are connected with central part by steel hinge line.
2, carry the prefabricated assembling foundation for tower crane of power concrete member according to base, the described lowland of claim 1, it is characterized in that between central part and the transition piece, be provided with the concavo-convex stepped end face that is connected that cooperatively interacts between transition piece and the extremity piece.
3, carry the prefabricated assembling foundation for tower crane of power concrete member according to base, the described lowland of claim 1, it is characterized in that being provided with groove and the convex body that cooperatively interacts between the stepped end face of the stepped end face of transition piece and central part.
4, carry the prefabricated assembling foundation for tower crane of power concrete member according to base, the described lowland of claim 1, it is characterized in that being provided with groove and the convex body that cooperatively interacts between the stepped end face of the stepped end face of transition piece and extremity piece.
5, carry the prefabricated assembling foundation for tower crane of power concrete member according to base, the described lowland of claim 1, it is characterized in that being respectively equipped with groove and the convex body that cooperatively interacts on the ladder type piece of adjacent transition piece and the central part opposing end faces.
6, carry the prefabricated assembling foundation for tower crane of power concrete member according to base, the described lowland of claim 1, it is characterized in that two ladder type piece opposing end faces between adjacent transition piece and extremity piece are respectively equipped with groove and the convex body that cooperatively interacts.
7, carry the prefabricated assembling foundation for tower crane of power concrete member according to claim 1 or base, 2 or 3 or 4 or 5 or 6 described lowland, it is characterized in that in extremity piece, fixedly installing hollow section and hard tube connector, the outer end of hard tube connector splits the outer end at extremity piece, the mutual socket of the inner of hard tube connector and hollow section, steel hinge line is set in hollow section and the hard tube connector, the outer end of steel hinge line is positioned at the outer end of hard tube connector, and is fixed on the outside of extremity piece by ground tackle.
8, carry the prefabricated assembling foundation for tower crane of power concrete member according to base, the described lowland of claim 7, it is characterized in that between ground tackle and extremity piece, being provided with heavy pressing plate.
9, carry the prefabricated assembling foundation for tower crane of power concrete member according to base, the described lowland of claim 1, the stone bolt that it is characterized in that transition piece is threaded in the stone bolt pad, on stone bolt, offer at least two horizontal pin-and-holes, on the stone bolt of the below of stone bolt pad, cooperate latch.
10, carry the prefabricated assembling foundation for tower crane of power concrete member according to base, the described lowland of claim 9, the stone bolt that it is characterized in that extremity piece is threaded in the stone bolt pad, on stone bolt, offer at least two horizontal pin-and-holes, on the stone bolt of the below of stone bolt pad, cooperate latch.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520074915 CN2813712Y (en) | 2005-08-23 | 2005-08-23 | Low foundation ground carrying force concrete precast assembling tower machine basic structural component |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN 200520074915 CN2813712Y (en) | 2005-08-23 | 2005-08-23 | Low foundation ground carrying force concrete precast assembling tower machine basic structural component |
Publications (1)
Publication Number | Publication Date |
---|---|
CN2813712Y true CN2813712Y (en) | 2006-09-06 |
Family
ID=36948796
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN 200520074915 Expired - Fee Related CN2813712Y (en) | 2005-08-23 | 2005-08-23 | Low foundation ground carrying force concrete precast assembling tower machine basic structural component |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN2813712Y (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101831918A (en) * | 2010-05-11 | 2010-09-15 | 徐州九鼎建设集团有限公司 | Prestressed assembly box-shaped precast concrete tower crane foundation |
CN104088291A (en) * | 2014-05-05 | 2014-10-08 | 安徽三建工程有限公司 | Annular wedge combined concrete precast block tower crane foundation |
CN105735338A (en) * | 2014-12-09 | 2016-07-06 | 河南省电力勘测设计院 | Prestress assembled-type fan foundation |
CN108867679A (en) * | 2018-05-17 | 2018-11-23 | 四川大学 | A kind of assembled raft foundation structural system suitable for steel construction elevator |
CN109844243A (en) * | 2016-09-26 | 2019-06-04 | 霍尔辛姆科技有限公司 | Ground for windmill |
-
2005
- 2005-08-23 CN CN 200520074915 patent/CN2813712Y/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101831918A (en) * | 2010-05-11 | 2010-09-15 | 徐州九鼎建设集团有限公司 | Prestressed assembly box-shaped precast concrete tower crane foundation |
CN104088291A (en) * | 2014-05-05 | 2014-10-08 | 安徽三建工程有限公司 | Annular wedge combined concrete precast block tower crane foundation |
CN105735338A (en) * | 2014-12-09 | 2016-07-06 | 河南省电力勘测设计院 | Prestress assembled-type fan foundation |
CN105735338B (en) * | 2014-12-09 | 2017-12-29 | 河南省电力勘测设计院 | Prestressing force assembly type blower foundation |
CN109844243A (en) * | 2016-09-26 | 2019-06-04 | 霍尔辛姆科技有限公司 | Ground for windmill |
CN108867679A (en) * | 2018-05-17 | 2018-11-23 | 四川大学 | A kind of assembled raft foundation structural system suitable for steel construction elevator |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN2813712Y (en) | Low foundation ground carrying force concrete precast assembling tower machine basic structural component | |
CN2782763Y (en) | Pretensioned type steel strand prestressed concrete pipe pile | |
CN109629691B (en) | Single-layer inner-ring-free crossed cable supporting structure | |
CN102433931A (en) | Space structure and construction method thereof | |
CN110107037B (en) | Rotary-ascending prestress steel structure ramp structure and construction method thereof | |
CN111877142A (en) | Assembled bridge pier column structure | |
CN101057038A (en) | Hollow prestressed concrete (HPC) girder and spliced hollow prestressed concrete girder (S-HPC) bridge construction method | |
CN202202404U (en) | Space structure | |
CN109296069B (en) | Earthquake-resistant energy-consuming connecting node with repairable prefabricated steel structure | |
CN201103166Y (en) | Building structure of high-rise building arch type commutation layer | |
CN2771299Y (en) | Basic member of concrete prefabricated assembled tower crane | |
CN216197040U (en) | Strain-resistant wine glass crossing tower for power transmission line | |
CN202787301U (en) | Pre-stress baffle type assembling prefabricated reinforced concrete tower crane foundation | |
CN205712820U (en) | A kind of board-like combined staircase | |
CN113309232A (en) | Construction method of flexible connection structure of prefabricated part and building main body | |
CN204609155U (en) | A kind of prefabrication and assembly construction segmented staircase structure | |
CN203307835U (en) | Pre-stress reverse ribbed plate | |
CN220888521U (en) | Ecological frame | |
CN218540746U (en) | Prefabricated reinforced concrete foundation structure that can splice | |
CN1114735C (en) | Design and construction method of prestress steel arch bridge | |
CN216239019U (en) | Wall lintel connecting structure | |
CN2337244Y (en) | Flat shape anchor tie-plate | |
CN221609079U (en) | Assembled sojourn cabin building reinforced structure that encorbelments | |
CN2644127Y (en) | Automatic air block and brake shaper | |
CN221565501U (en) | Major diameter steel reinforcement cage lifting sling |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C14 | Grant of patent or utility model | ||
GR01 | Patent grant | ||
C17 | Cessation of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20060906 |