- CN207672529U CN207672529U CN201721744616.5U CN201721744616U CN207672529U CN 207672529 U CN207672529 U CN 207672529U CN 201721744616 U CN201721744616 U CN 201721744616U CN 207672529 U CN207672529 U CN 207672529U
- Authority
- CN
- China
- Prior art keywords
- caisson
- concrete dam
- concrete
- bracing means
- dam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Revetment (AREA)
Abstract
The utility model discloses be related to concrete dam technical field, more particularly, to a kind of bracing means of concrete dam, it includes caisson group, draining geonet, the composite geo-membrane that multiple caissons are formed by connecting, it is provided with reinforced concrete structure in the babinet of caisson, caisson group is for being arranged in the upstream side of concrete dam body to be reinforced, draining geonet, composite geo-membrane are laid with the front surface for being fixed on caisson babinet by anchoring piece successively, and the utility model provides a kind of bracing means simple in structure, convenient for the concrete dam of strengthening construction before Dam.
Description
Technical field
The utility model is related to concrete dam technical fields, more particularly, to a kind of bracing means of concrete dam.
Background technology
The dam body of concrete dam is often cracking under various load actions during longtime running, influences big
Dam safety and anti-permeability performance reduce dam durability, need to carry out consolidation process.In reinforcing engineering, for different dams
Actual conditions, generally can be used and the force methods such as reinforce before dam body surface treatment, grouting treatment, dam post-reinforcing and dam.In general,
In the case that dam body surface treatment has been only applicable to dry working face, for the surface crack ratio at the top of dam body downstream face or dam body
It is appropriate.In the place for having grouting condition, using grouting treatment and the effective means of dam body consolidation, but application conditions are limited
System.It is larger for dam body cracking range, when dam body stress and stabilization are a greater impact, in order to ensure the safety of dam, often
It needs to be reinforced comprehensively by the way of widening dam body.The mode for widening dam body generally has two kinds of reinforcing before dam post-reinforcing and dam
Mode, still, dam post-reinforcing are generally unfavorable to improving dam anti-permeability performance, and reinforcing mode can improve dam before using dam
Anti-permeability performance, but reinforced before dam and need to be vented reservoir, construction is relatively difficult, is not easy to construct.
Utility model content
The technical problem to be solved by the utility model is to provide it is a kind of it is simple in structure, convenient for strengthening construction before Dam
The bracing means of concrete dam.
The utility model solves a kind of bracing means of concrete dam used by its technical problem, including multiple caissons
The caisson group that is formed by connecting, draining geonet, composite geo-membrane are provided with reinforced concrete structure, caisson in the babinet of caisson
For being arranged in the upstream side of concrete dam body to be reinforced, draining geonet, composite geo-membrane are laid with group successively by anchoring piece
It is fixed on the front surface of caisson babinet.
Further, the section of each caisson babinet is rectangle, the length of section is between 10-30m, and width is in 2-
Between 20m.
Further, multiple caissons side by side connect to form caisson group by reinforcing bar anchor cable.
Further, being provided with water sealing structure between caisson.
Further, being provided with transmission rod in the rear surface of caisson babinet, transmission rod is used for and concrete dam to be reinforced
Body is connected, and concrete structure is provided between the rear surface of caisson babinet and concrete dam body to be reinforced, and transmission rod is embedded
In concrete structure.
Further, the length of transmission rod is between 0.5-0.9m.
Further, the end set of transmission rod has steel connecting plate.
The utility model has the beneficial effects that:When construction, caisson group is arranged in the upstream side of concrete dam body to be reinforced,
The bottom of caisson group is arranged in horizon d or horizon d hereinafter, to strengthening construction before realizing to Dam, is not required to reservoir
In water emptying can construct, significantly reduce the difficulty of strengthening construction before Dam, it is simple in structure, convenient for construction;Meanwhile
It is laid with fixed draining geonet, composite geo-membrane, draining geonet, composite earth successively in the front surface (water blocking survey) of caisson babinet
Work film plays the effect of waterproof, can be effectively reduced water to the infiltration on dam body surface, wash away, corrode and corrasion, to carry
The barrier properties and durability of high entire dam.
Description of the drawings
Fig. 1 is the schematic front view of the utility model;
Fig. 2 is the schematic top plan view of the utility model;
Parts, position and number in figure:Caisson 1, draining geonet 2, composite geo-membrane 3, concrete dam body to be reinforced
4, transmission rod 5, horizon d 6.
Specific implementation mode
The utility model is described in further detail below in conjunction with the accompanying drawings.
As shown in Figure 1 and Figure 2, a kind of bracing means of concrete dam of the utility model, including multiple caissons 1 connection and
At caisson group, draining geonet 2, composite geo-membrane 3, reinforced concrete structure is provided in the babinet of caisson 1, caisson group is used
In being arranged in the upstream side of concrete dam body 4 to be reinforced, draining geonet 2, composite geo-membrane 3 are laid with solid successively by anchoring piece
It is scheduled on the front surface of 1 babinet of caisson, depending on the front surface of babinet is relative to orientation shown in FIG. 1, that is to say water blocking side.
When construction, caisson group is arranged in the upstream side of concrete dam body 4 to be reinforced, the bottom of caisson group is arranged in basement rock
Layer 6 or horizon d 6 hereinafter, to which realization is to strengthening construction before Dam are not required to that the water emptying in reservoir can be constructed,
The difficulty of strengthening construction before Dam is significantly reduced, it is simple in structure, convenient for construction;Meanwhile in the front surface of 1 babinet of caisson
(water blocking survey) is laid with fixed draining geonet 2, composite geo-membrane 3 successively, and draining geonet, composite geo-membrane have good anti-
Water, anti-seepage effect, can be effectively reduced water to the infiltration on dam body surface, wash away, corrode and corrasion, it is entire big to improve
The barrier properties and durability on dam.
Specifically, the section of 1 babinet of each caisson may be configured as rectangle, between 10-30m, width exists the length of section
Between 2-20m, depending on actual demand.In order to facilitate processing and construct, then as shown in Fig. 2, multiple caissons 1 side by side pass through
Reinforcing bar anchor cable connects to form caisson group.Water penetration in order to prevent is provided with water sealing structure between caisson 1.
Since directly caisson group being arranged on concrete dam body 4 to be reinforced, it is not easy to fix.The utility model is in caisson
It is provided with transmission rod 5 in the rear surface (land side) of 1 babinet, is connected with concrete dam body 4 to be reinforced by transmission rod 5, and
And it is provided with concrete structure between the rear surface and concrete dam body to be reinforced 4 of 1 babinet of caisson, transmission rod 5 is embedded in coagulation
In soil structure, concrete structure is Jackstone-type rockfill concrete.It is connected with concrete dam body 4 to be reinforced by transmission rod 5, is passed
Power bar 5 is steelwork, can be connected with concrete dam body 4 to be reinforced by way of weld bolt.For the ease of connection, power transmission
Bar) end be also provided with steel connecting plate.The length of transmission rod 5 is preferably between 0.5-0.9m, since transmission rod 5 is arranged
There is Jackstone-type rockfill concrete structure, that is to say and concrete dam body 4 to be reinforced is broadened into corresponding width.
Composite geo-membrane 3 is preferably pvc composite geo-membranes, in order to ensure planarization and the company of the composite geo-membrane 3 being laid with
The fastness connect, anchoring piece are made of stainless steel press strip, gasket seal, joint plate and anchor pole, and wherein stainless steel strip is by composite earth
3 marginal surface of work film, gasket seal and joint plate are padded between 1 babinet of composite geo-membrane 3 and caisson, then are fixed by anchor pole.
The surface of composite geo-membrane 3 is also provided with antifouling paint layer, and antifouling paint layer plays waterproof, antifouling effect.
Claims (7)
1. a kind of bracing means of concrete dam, it is characterised in that:The caisson group that is formed by connecting including multiple caissons (1), row
Water geonet (2), composite geo-membrane (3) are provided with reinforced concrete structure in the babinet of caisson (1), and caisson group is for being arranged
Upstream side in concrete dam body to be reinforced (4), draining geonet (2), composite geo-membrane (3) are laid with solid successively by anchoring piece
It is scheduled on the front surface of caisson (1) babinet.
2. a kind of bracing means of concrete dam as described in claim 1, it is characterised in that:Each caisson (1) babinet
Section is rectangle, and the length of section is between 10-30m, and width is between 2-20m.
3. a kind of bracing means of concrete dam as described in claim 1, it is characterised in that:Multiple caissons (1) side by side
It connects to form caisson group by reinforcing bar anchor cable.
4. a kind of bracing means of concrete dam as described in claim 1, it is characterised in that:Caisson is provided between (1)
Water sealing structure.
5. a kind of bracing means of concrete dam as described in Claims 1-4 any one, it is characterised in that:Caisson (1)
Transmission rod (5) is provided in the rear surface of babinet, transmission rod (5) with concrete dam body to be reinforced (4) for being connected, and caisson
(1) concrete structure is provided between the rear surface of babinet and concrete dam body to be reinforced (4), transmission rod (5) is embedded in coagulation
In soil structure.
6. a kind of bracing means of concrete dam as claimed in claim 5, it is characterised in that:The length of transmission rod (5) exists
Between 0.5-0.9m.
7. a kind of bracing means of concrete dam as claimed in claim 5, it is characterised in that:The end of transmission rod (5) is set
It is equipped with steel connecting plate.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721744616.5U CN207672529U (en) | 2017-12-14 | 2017-12-14 | A kind of bracing means of concrete dam |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721744616.5U CN207672529U (en) | 2017-12-14 | 2017-12-14 | A kind of bracing means of concrete dam |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207672529U true CN207672529U (en) | 2018-07-31 |
Family
ID=62968553
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201721744616.5U Active CN207672529U (en) | 2017-12-14 | 2017-12-14 | A kind of bracing means of concrete dam |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207672529U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110004886A (en) * | 2019-05-15 | 2019-07-12 | 中国电建集团中南勘测设计研究院有限公司 | Asphaltic concrete core wall basement construction method and its structure |
-
2017
- 2017-12-14 CN CN201721744616.5U patent/CN207672529U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110004886A (en) * | 2019-05-15 | 2019-07-12 | 中国电建集团中南勘测设计研究院有限公司 | Asphaltic concrete core wall basement construction method and its structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN110094213B (en) | Space combined supporting structure and supporting method for water-rich broken stratum tunnel | |
CN204023501U (en) | A kind of reinforcement Anti-seeping technology structure for earth and rockfill dam | |
CN201746840U (en) | Foundation pit support system equipped with a plurality of inclined rear anchors capable of recycling | |
CN203334322U (en) | Seepage-prevention slurry blocking device of underground continuous wall | |
CN104895121B (en) | Transverse partition method for reducing ground surface settlement and building structure deformation of underground structure construction | |
CN207672529U (en) | A kind of bracing means of concrete dam | |
CN206204967U (en) | A kind of double perfusion pile cofferdam | |
CN207862857U (en) | A kind of bank protection structure of harbour | |
CN207934040U (en) | A kind of foundation pit supporting construction combining Larsen steel sheet pile and H profile steel | |
CN210621716U (en) | Steel sheet pile foundation pit supporting structure | |
CN106498957B (en) | Steel sheet pile cofferdam construction platform and integral construction method | |
CN209323531U (en) | A kind of double-row type foundation pit supporting construction | |
CN204491638U (en) | A kind of strand ultra-deep thick-soft base floating type steel sheet-pile cofferdam | |
CN105239534A (en) | Connecting structure for dam foundation gallery and dam body core wall | |
CN208455647U (en) | Soft Rock Slope ecological safeguard structure | |
CN203229927U (en) | Treatment structure for dam body upstream face superficial layer temperature crack | |
CN205012300U (en) | Connection structure of embankment dam corridor and core -wall | |
CN206607546U (en) | A kind of flood control water bag | |
CN214301579U (en) | Diaphragm wall and toe board water pressure canned type flexible stagnant water structure | |
CN205975597U (en) | Regional transmission tower improved generation bored concrete pile basis is used for corroding | |
CN210033454U (en) | Space combined supporting structure of water-rich broken stratum tunnel | |
CN210315400U (en) | Deep and steep pit wading slope reinforcing structure | |
CN208830256U (en) | A kind of concrete dam grout curtain arragement construction | |
CN104790407A (en) | Method for adjusting soil pressure influence | |
CN206680947U (en) | Steel water stone separates blocking dam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |