A kind of assembling type steel structure public lavatory
Technical field
The utility model is related to public sanitation buildings technical fields, more particularly, to a kind of assembling type steel structure public lavatory.
Background technology
Along with the disappearance of China's economy rapid development and demographic dividend, national requirements is actively promoted green building and is built
Material greatly develops steel construction assembled architecture.Public lavatory is as wing, it is also desirable to meet national development requirement, simultaneously
The standard of construction of public lavatory, facility class, quality of keeping a public place clean all represent the civilization degree and " window " image in a city, it reflects
The management level in one city, civilized life mode and citizens'quality.Change public lavatory traditional construction mode, public lavatory is led to build
It makes from the backward handicraft mode of construction of dispersion, crosses the socialization industrial mode of production based on modern technologies, favorably
In raising labour productivity, improve operating environment, reduce labour and rely on, reduces building waste discharge and environmental pollution, promote
Public lavatory Green Development improves contribution of the public lavatory to conservation culture, while being also in response to a kind of embodiment of country's hair strategy.Cause
This, research and development assembling type steel structure public lavatory just seems critically important.
Utility model content
The purpose of this utility model is intended to overcome the shortcomings of the prior art, provide one kind can reduce environmental pollution and
Energy-saving and environment-friendly assembling type steel structure public lavatory.
In order to solve the above-mentioned technical problem, the utility model is achieved through the following technical solutions:
A kind of assembling type steel structure public lavatory, including steel framework, rinse-system, sewage disposal system, wallboard and connection
Component;The steel framework includes main body steel frame head tree, main body steel frame auxiliary strut, main body steel frame crossbeam, energy consumption
Shock-absorbing support, purlin;The main body steel frame head tree is four and is located at edge, the main body steel frame head tree
The cross hang seat welded by its end and the bending abnormal shape connection board of main body steel frame beam-end welding pass through high intensity
It is bolted;The cross hang seat that the main body steel frame auxiliary strut is welded by its end and main body steel frame crossbeam
Upper and lower flange plate is connected by high-strength bolts;The energy-dissipating and shock-absorbing support includes vertical with adjacent main body steel frame master respectively
The butterfly energy consumption connection of column and the connected accentric support steel frame, connection both sides accentric support frame of main body steel frame auxiliary strut
Component;The rinse-system includes the water pipe for carrying switch valve, purification pressurized toilet flushing pump tube, urinal, latrine pit;It is special
Sign is:The butterfly energy consumption connecting elements and the accentric support steel frame of both sides are bolted;The sewage disposal system
System includes the blowdown main pipe line being connect with urinal, latrine pit, closestool, hand washing sink and service sink and connects successively after blowdown main pipe line
The septic tank and ecological circulating water membrane treatment appts connect;The wallboard includes preheating embedding line wallboard, preheating embedding line demarcation strip;It is described
Connecting elements includes the connecting elements for connecting wallboard and main body steel frame crossbeam, and connection preheating embedding line wallboard separates with preheating embedding line
The connecting elements of plate, connection wallboard and main body steel frame head tree, the connecting elements of main body steel frame auxiliary strut.
Preferably, the accentric support steel frame by self drilling tapping screw or is welded in corresponding main body steel framework erection
On column and main body steel frame auxiliary strut.
Preferably, per one side, energy-dissipating and shock-absorbing supports the steel framework at least containing there are one.
Preferably, the main body steel frame head tree of the steel framework, main body steel frame auxiliary strut, main body steel frame
Crossbeam constitutes a cube frame.
Compared with prior art, the utility model has the following advantages that:
For the utility model under the premise of meeting construction shockproof requirements, all component components use batch production prefabricated or city
Purchase, prefabricated construction, avoid environment airborne dust, using water wisely, speed of application is fast, quality controllable, can repeatedly move reuse.
Description of the drawings
In order to illustrate the embodiment of the utility model or the technical proposal in the existing technology more clearly, below will be to embodiment
Or attached drawing needed to be used in the description of the prior art is briefly described, it should be apparent that, the accompanying drawings in the following description is only
It is some embodiments of the utility model, for those of ordinary skill in the art, in the premise not made the creative labor
Under, it can also be obtained according to these attached drawings other attached drawings.
Fig. 1 is the structural schematic diagram of the utility model.
Fig. 2 is the schematic diagram of steel framework in Fig. 1.
Fig. 3 is the connection diagram of main body steel frame head tree and crossbeam in Fig. 2.
Fig. 4 is the connection diagram of main body steel frame auxiliary strut and crossbeam in Fig. 2.
Fig. 5 is main body steel frame head tree 1-1 in Fig. 2, main body steel frame auxiliary strut 1-1a and energy-dissipating and shock-absorbing support 1-3
Connection diagram.
Fig. 6 is the pipeline schematic diagram of rinse-system 2 and sewage disposal system 3 in Fig. 1.
Fig. 7 is the schematic diagram of Fig. 1 deadlights 4-1.
Fig. 8 is the sectional view of Fig. 7.
Fig. 9 is the sectional view of Fig. 7.
Figure 10 is the schematic diagram of Fig. 1 deadlights 4-2.
Figure 11 is the sectional view of Figure 10.
Figure 12 is the sectional view of Figure 10.
Figure 13 is the connection diagram of Fig. 1 deadlights 4 and steel framework 1.
Specific implementation mode
The following will be combined with the drawings in the embodiments of the present invention, carries out the technical scheme in the embodiment of the utility model
Clearly and completely describe, it is clear that the described embodiments are only a part of the embodiments of the utility model, rather than whole
Embodiment.Based on the embodiments of the present invention, those of ordinary skill in the art are not under the premise of making the creative labor
The every other embodiment obtained, shall fall within the protection scope of the present invention.
Assembling type steel structure public lavatory shown in Fig. 1-13, including steel framework 1, rinse-system 2, sewage disposal system 3, wall
Plate 4 and connecting elements 5;The steel framework 1 include main body steel frame head tree 1-1, main body steel frame auxiliary strut 1-1a,
Main body steel frame crossbeam 1-2, energy-dissipating and shock-absorbing support 1-3, purlin 1-4;The main body steel frame head tree 1-1 is four and difference
Positioned at edge, cross hang seat 1-1aa and main body steel frame that the main body steel frame head tree 1-1 is welded by its end
The bending abnormal shape connection board 1-2a of the ends crossbeam 1-2 welding is connected by high-strength bolts;The main body steel frame auxiliary strut
The upper and lower flange plate of the cross hang seat 1-1aa that 1-1a is welded by its end and main body steel frame crossbeam 1-2 passes through high intensity
It is bolted;The energy-dissipating and shock-absorbing support 1-3 includes auxiliary with adjacent main body steel frame head tree 1-1 and main body steel frame respectively
The butterfly energy consumption connecting elements 1- of the accentric support steel frame 1-3a, connection both sides accentric support frame that help column 1-1a connected
3b;The rinse-system 2 include water pipe 2-1 with switch valve, purification pressurized toilet flushing pump tube 2-2, urinal 2-3,
Latrine pit 2-4;The butterfly energy consumption connecting elements 1-3b and the accentric support steel frame 1-3a of both sides are bolted;The dirt
Water treatment system 3 includes the blowdown manifold being connect with urinal 2-3, latrine pit 2-4, closestool 2-4a, hand washing sink 3-1 and service sink 3-2
Sequentially connected septic tank 3-4 and ecological circulating water membrane treatment appts 3-5 after line 3-3 and blowdown main pipe line;The wallboard 4
Including preheating embedding line wallboard 4-1, preheating embedding line demarcation strip 4-2;The connecting elements 5 includes connection wallboard 4 and main body steel frame
The connecting elements 5-1 of crossbeam 1-2 connects the connecting elements 5-2 of preheating embedding line wallboard 4-1 and preheating embedding line demarcation strip 4-2, connection
The connecting elements 5-3 of wallboard 4 and main body steel frame head tree 1-1, main body steel frame auxiliary strut 1-1a.Urinal 2-3, latrine pit 2-
4, the sewage of closestool 2-4a, hand washing sink 3-1 and service sink 3-2 connect successively after blowdown main pipe line 3-3 and blowdown main pipe line
After the septic tank 3-4 and ecological circulating water membrane treatment appts 3-5 connect is handled, used from purification pressurized toilet flushing pump tube 2-2 blowbacks
It flushes the toilet in cycle.
The accentric support steel frame 1-3a is by self drilling tapping screw or is welded in corresponding main body steel frame column 1-1
And on main body steel frame auxiliary strut 1-1a, pass through butterfly energy consumption connecting elements 1-3b connections both sides accentric support steel frame 1-3a
The energy-dissipating and shock-absorbing for forming one meter of word structure supports 1-3;The steel framework is per one side at least containing there are one energy-dissipating and shock-absorbings to support.
Preferably, the main body steel frame head tree of the steel framework, main body steel frame auxiliary strut, main body steel frame
Crossbeam constitutes a cube frame.
The steel framework 1 of the utility model, rinse-system 2, sewage disposal system 3, wallboard 4,5 equal batch production of connecting elements
It makes and constructs with changing.Site welding etc. is avoided, site operation difficulty is greatly reduced, improves working efficiency.Steel framework 1 and wall
It is linked and packed by the realization of connecting elements 5 between plate 4, realizes that steel construction and wallboard, roof boarding etc. form organic entity.Wallboard
4-1, demarcation strip 4-2 thickness are T, are inside embedded with pipeline, and assembled wallboard 4 whiles completes rinse-system 2, sewage disposal system
3 part pipelines of uniting are installed, and realize that mixed mud, electromechanics, plumbing synchronize assembly construction, shortening construction time.The company of steel framework 1
Connecting bolt is hidden in the cross recess of cross hang seat 1-1aa, and wallboard 4 belongs to inside and outside rectangle frame with being linked and packed for steel framework 1
Docking.
Flow is as follows when construction:
(1)Main body steel frame head tree 1-1, main body steel frame auxiliary strut 1-1a, main body steel framework has first been factory produced
The parts of the systems such as frame crossbeam 1-2, energy-dissipating and shock-absorbing support 1-3, purlin 1-4, wallboard 4, connecting elements 5, then carry out ground
Part construction.Foundation construction will be according to the pre-buried company purchased in market of main body steel frame head tree 1-1 position dimensions of steel framework 1
Fastener is connect, then could carry out turning to match again.Meanwhile septic tank 3-4 is embedded into fixed bit by foundation construction according to figure is built
It sets.
(2)When assembly construction, first main body steel frame head tree 1-1 and ground pre-buried securing member purchased in market is assembled,
Then main body steel frame crossbeam 1-2, energy-dissipating and shock-absorbing support 1-3, the assembly of purlin 1-4, adjustment and fastening are carried out, steel frame is constituted
Frame 1.
(3)Then the assembly of wallboard is carried out.When assembly, preheating embedding line wallboard 4-1, pre- is carried out respectively according to Fig. 1 and Figure 13
Buried pipeline demarcation strip 4-2.Preheating embedding line wallboard 4-1, preheating embedding line demarcation strip 4-2 are realized and main body steel by connecting elements 5-1
The connection of cruciform bracing 1-2;Wallboard 4 is assisted vertical by connecting elements 5-3 and main body steel frame head tree 1-1, main body steel frame
Column 1-1a is linked and packed.Pipeline connection is carried out according to piping diagram 6 when assembled wallboard.
(4)According to Fig. 1, Fig. 6 when pipeline assembles, urinal 2-3, latrine pit 2-4, closestool 2-4a, hand washing sink 3-1, service sink
3-2 and the 3-5 installations of ecological circulating water membrane treatment appts are in place, then carry out blowdown main pipe line 3-3 and carry the moisturizing of switch valve
The connection of pipeline 2-1, purification pressurized toilet flushing pump tube 2-2.Finally carry out water inlet pipe, for electrically connecting, you can complete assembled
Steel construction public lavatory is built.
The preferred embodiment of upper described only the utility model, is not intended to limit the utility model, all in this reality
Within novel spirit and principle, any modification, equivalent replacement, improvement and so on should be included in the utility model
Within protection domain.